$85.17Avg low bid / TON
$89.92Avg of all bids
$85.43Avg engineer's estimate
108Jobs · 1,006,596.27 TON
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 16 | 165,542 | $87.60 | $92.14 |
| 2020 | 28 | 278,057.96 | $91.27 | $97.52 |
| 2019 | 28 | 219,333.44 | $97.64 | $100.00 |
| 2018 | 36 | 343,662.87 | $71.11 | $78.11 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 1,689 TON | $134.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210228 | KayDivision 4 | 35,000 TON | $107.50 | HASKELL LEMON CONSTRUCTION CO. |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 1,935 TON | $96.90 | Frontier Bridge, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 3,613 TON | $86.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 17,121 TON | $86.05 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 13,981 TON | $83.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210105 | CreekDivision 8 | 13,982 TON | $67.85 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210087 | RogersDivision 8 | 16,923 TON | $72.00 | BECCO CONTRACTORS, INC. |
| Mar 18, 2021 | 210096 | Ssr-273b(065)sr | 18,528 TON | $77.99 | H & G Paving Contractors Inc. |
| Mar 18, 2021 | 210096 | Ssr-273b(065)sr | 7,508 TON | $77.99 | H & G Paving Contractors Inc. |
| Mar 18, 2021 | 210097 | KayDivision 4 | 1,501 TON | $138.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 1,015 TON | $85.00 | HUB Construction, Inc. |
| Feb 18, 2021 | 210057 | NobleDivision 4 | 24,700 TON | $86.55 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210067 | RogersDivision 8 | 786 TON | $134.77 | C3 Construction, Inc. |
| Feb 18, 2021 | 210068 | TexasDivision 6 | 500 TON | $129.75 | CONCRETE SERVICES CORPORATION |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 651 TON | $176.18 | C3 Construction, Inc. |
| Jan 21, 2021 | 210035 | Pontotoc | 6,094 TON | $76.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 15 TON | $173.00 | Tri Star Construction Arkansas, LLC |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 84 TON | $138.95 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200358 | Custer, Washita | 24,601 TON | $72.19 | Caswell Contracting, Inc. |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 19,390 TON | $89.04 | CORNELL CONSTRUCTION COMPANY, INC. |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 577 TON | $123.75 | L & N BRIDGE, LLC |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 90 TON | $244.46 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 1,644 TON | $123.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 688 TON | $116.55 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 833.33 TON | $101.58 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 190283 | GarvinDivision 3 | 549 TON | $147.20 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 20,549 TON | $91.00 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200259 | WagonerDivision 1 | 4,050 TON | $89.95 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 14,635 TON | $92.90 | DUIT CONSTRUCTION COMPANY, INC. |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 7,461 TON | $74.60 | Paragon Contractors, LLC |
| May 14, 2020 | 200218 | Blaine, Custer, Dewey | 16,450 TON | $106.50 | HASKELL LEMON CONSTRUCTION CO. |
| Apr 16, 2020 | 200216 | BlaineDivision 5 | 313 TON | $166.75 | K & R BUILDERS, INC. |
| Mar 19, 2020 | 200095 | AtokaDivision 2 | 10,600 TON | $84.80 | OVERLAND CORPORATION |
| Mar 19, 2020 | 200106 | KiowaDivision 5 | 3,422 TON | $125.29 | Caswell Contracting, Inc. |
| Mar 19, 2020 | 200132 | CusterDivision 5 | 904 TON | $130.00 | SEWELL BROS., INC. |
| Feb 20, 2020 | 200135 | PottawatomieDivision 3 | 50 TON | $400.00 | CGC, LLC. |
| Feb 20, 2020 | 200086 | TulsaDivision 8 | 1,738.43 TON | $86.00 | Ellsworth Construction, LLC |
| Feb 20, 2020 | 200086 | TulsaDivision 8 | 4,601.2 TON | $86.00 | Ellsworth Construction, LLC |
| Feb 20, 2020 | 200056 | Ssr-022n(221)sr | 9,773 TON | $89.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Feb 20, 2020 | 200056 | Ssr-022n(221)sr | 17,395 TON | $80.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Feb 20, 2020 | 200057 | ClevelandDivision 3 | 13,787 TON | $84.60 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200038 | WagonerDivision 1 | 13,496 TON | $84.35 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 190352 | GarvinDivision 3 | 897 TON | $108.50 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200011 | DeweyDivision 5 | 18,220 TON | $116.55 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200013 | Leflore | 8,400 TON | $82.80 | JOB CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200017 | MccurtainDivision 2 | 2,300 TON | $104.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200029 | Ssr-265c(022)sr | 29,998 TON | $92.87 | CASWELL CONSTRUCTION, INC. |
| Jan 16, 2020 | 200029 | Ssr-265c(022)sr | 30,562 TON | $92.87 | CASWELL CONSTRUCTION, INC. |
| Nov 14, 2019 | 190390 | GradyDivision 7 | 5,221.44 TON | $127.00 | ACTION SAFETY SUPPLY CO., LLC |
| Nov 14, 2019 | 190392 | PayneDivision 4 | 500 TON | $63.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190369 | PittsburgDivision 2 | 850 TON | $159.18 | C3 Construction, Inc. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 9,105 TON | $87.45 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 8,768 TON | $87.45 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190312 | CanadianDivision 4 | 1,214 TON | $132.27 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 2,041 TON | $110.57 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190335 | TulsaDivision 8 | 121 TON | $133.40 | Tri Star Construction Arkansas, LLC |
| Sep 19, 2019 | 190278 | CusterDivision 5 | 22,310 TON | $83.35 | CASWELL CONSTRUCTION, INC. |
| Sep 19, 2019 | 190216 | McclainDivision 3 | 5,664 TON | $102.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 22, 2019 | 190238 | BlaineDivision 5 | 11,595 TON | $91.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 25, 2019 | 190269 | Roger MillsDivision 5 | 382 TON | $125.00 | SEWELL BROS., INC. |
| Jul 25, 2019 | 190205 | Alfalfa, Woods, Woodward | 75 TON | $450.00 | Built Right Construction, LLC |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 744 TON | $107.57 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190265 | BeckhamDivision 5 | 356 TON | $138.46 | CASWELL CONSTRUCTION, INC. |
| Jun 20, 2019 | 190068 | Beckham, Greer | 24,276 TON | $92.66 | CASWELL CONSTRUCTION, INC. |
| Jun 20, 2019 | 190069 | BlaineDivision 5 | 21,981 TON | $104.80 | J & R SAND COMPANY, INC. |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 891 TON | $105.93 | Treas Construction Inc |
| May 16, 2019 | 190183 | OklahomaDivision 4 | 3,469 TON | $97.15 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| May 16, 2019 | 190117 | KiowaDivision 5 | 320 TON | $137.00 | SEWELL BROS., INC. |
| May 16, 2019 | 190062 | TillmanDivision 5 | 38,441 TON | $99.00 | CORNELL CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190013 | McclainDivision 3 | 887 TON | $112.70 | Silver Star Construction Company, Inc. |
| Apr 18, 2019 | 190099 | TulsaDivision 8 | 677 TON | $112.00 | Tri Star Construction Arkansas, LLC |
| Apr 18, 2019 | 190025 | TexasDivision 6 | 9,000 TON | $102.00 | J & R SAND COMPANY, INC. |
| Mar 14, 2019 | 190126 | OkmulgeeDivision 1 | 12,750 TON | $84.00 | APAC-CENTRAL, INC. |
| Feb 14, 2019 | 190097 | Nhpp-008n(090)fp | 21,671 TON | $102.00 | J & R SAND COMPANY, INC. |
| Jan 17, 2019 | 190051 | Ssp-250n(018)pm | 924 TON | $110.00 | Pavers, Inc. |
| Jan 17, 2019 | 190061 | TexasDivision 6 | 11,900 TON | $105.00 | J & R SAND COMPANY, INC. |
| Jan 17, 2019 | 190019 | OklahomaDivision 4 | 3,200 TON | $110.50 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 18, 2018 | 180297 | OttawaDivision 8 | 118 TON | $148.00 | RRY SERVICES LLC |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 1,234 TON | $100.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180314 | BryanDivision 2 | 2,100 TON | $85.90 | OVERLAND CORPORATION |
| Sep 20, 2018 | 180280 | CraigDivision 8 | 1,466 TON | $104.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180288 | Hsipg-240n(068)ad | 5,400 TON | $83.15 | JOB CONSTRUCTION CO., INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 728 TON | $100.00 | BECCO CONTRACTORS, INC. |
| Aug 16, 2018 | 180219 | GarvinDivision 3 | 95 TON | $280.50 | A. M. COHRON & SON, INC. |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 468 TON | $75.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180244 | MccurtainDivision 2 | 972 TON | $123.85 | L & N BRIDGE, LLC |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 230 TON | $75.00 | BECCO CONTRACTORS, INC. |
| May 17, 2018 | 180218 | Grady, Love | 1,850 TON | $93.20 | OVERLAND CORPORATION |
| May 17, 2018 | 180218 | Grady, Love | 865 TON | $121.80 | OVERLAND CORPORATION |
| May 17, 2018 | 180218 | Grady, Love | 1,200 TON | $90.29 | OVERLAND CORPORATION |
| May 17, 2018 | 180152 | WashitaDivision 5 | 31,047 TON | $65.45 | CASWELL CONSTRUCTION, INC. |
| May 17, 2018 | 180218 | Grady, Love | 476 TON | $117.05 | OVERLAND CORPORATION |
| May 17, 2018 | 180178 | PottawatomieDivision 3 | 4,690.27 TON | $91.00 | Midstate Traffic Control, Inc. |
| May 17, 2018 | 180154 | BlaineDivision 5 | 618 TON | $106.97 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180218 | Grady, Love | 392 TON | $116.05 | OVERLAND CORPORATION |
| May 17, 2018 | 180206 | OttawaDivision 8 | 369 TON | $128.63 | Crossland Construction Company, Inc. |
| Apr 19, 2018 | 180217 | Sbr-206c(046)sb | 301.6 TON | $108.90 | K & R BUILDERS, INC. |
| Apr 19, 2018 | 180166 | Leflore | 11,100 TON | $73.80 | JOB CONSTRUCTION CO., INC. |
| Apr 19, 2018 | 180217 | Sbr-206c(046)sb | 500 TON | $108.90 | K & R BUILDERS, INC. |
| Apr 19, 2018 | 180167 | Leflore | 15,800 TON | $67.49 | JOB CONSTRUCTION CO., INC. |
| Apr 19, 2018 | 180217 | Sbr-206c(046)sb | 500 TON | $108.90 | K & R BUILDERS, INC. |
| Apr 19, 2018 | 180177 | PittsburgDivision 2 | 12,900 TON | $69.40 | JOB CONSTRUCTION CO., INC. |
| Apr 19, 2018 | 180158 | CraigDivision 8 | 6,539 TON | $71.75 | APAC-CENTRAL, INC. |
| Mar 15, 2018 | 180130 | CusterDivision 5 | 7,064 TON | $66.74 | CASWELL CONSTRUCTION, INC. |
| Mar 15, 2018 | 180131 | DeweyDivision 5 | 1,844 TON | $97.00 | J & R SAND COMPANY, INC. |
| Feb 15, 2018 | 180121 | WashitaDivision 5 | 16,468 TON | $72.95 | CORNELL CONSTRUCTION COMPANY, INC. |
| Feb 15, 2018 | 180080 | ComancheDivision 7 | 11,051 TON | $74.10 | T & G CONSTRUCTION, INC. |
| Feb 15, 2018 | 180082 | CraigDivision 8 | 3,961 TON | $65.00 | BECCO CONTRACTORS, INC. |
| Feb 15, 2018 | 180089 | Nhpp-020n(044)3p | 21,801 TON | $68.07 | CORNELL CONSTRUCTION COMPANY, INC. |
| Feb 15, 2018 | 180066 | PittsburgDivision 2 | 6,700 TON | $66.25 | GLOVER & ASSOCIATES, INC. |
| Feb 15, 2018 | 180089 | Nhpp-020n(044)3p | 13,068 TON | $68.07 | CORNELL CONSTRUCTION COMPANY, INC. |
| Feb 15, 2018 | 180079 | Stp-211n(030)3p | 11,700 TON | $75.50 | GLOVER & ASSOCIATES, INC. |
| Feb 15, 2018 | 180093 | MayesDivision 8 | 8,075 TON | $74.00 | APAC-CENTRAL, INC. |
| Feb 15, 2018 | 180079 | Stp-211n(030)3p | 6,744 TON | $75.50 | GLOVER & ASSOCIATES, INC. |
| Jan 18, 2018 | 180008 | Ssr-228b(014)sr | 9,054 TON | $68.13 | CASWELL CONSTRUCTION, INC. |
| Jan 18, 2018 | 180032 | SeminoleDivision 3 | 658 TON | $84.00 | T. McDonald Construction, Inc. |
| Jan 18, 2018 | 180008 | Ssr-228b(014)sr | 18,370 TON | $65.18 | CASWELL CONSTRUCTION, INC. |
| Jan 18, 2018 | 180040 | ChoctawDivision 2 | 9,500 TON | $68.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 18, 2018 | 180014 | MccurtainDivision 2 | 17,100 TON | $77.95 | OVERLAND CORPORATION |
| Jan 18, 2018 | 180003 | Beckham, Roger Mills | 19,336 TON | $64.78 | CASWELL CONSTRUCTION, INC. |
| Jan 18, 2018 | 180026 | Ssr-257n(063)sr | 19,993 TON | $65.00 | BECCO CONTRACTORS, INC. |
| Jan 18, 2018 | 180004 | ChoctawDivision 2 | 9,500 TON | $72.45 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 18, 2018 | 180026 | Ssr-257n(063)sr | 6,933 TON | $65.00 | BECCO CONTRACTORS, INC. |
| Jan 18, 2018 | 180007 | GradyDivision 7 | 20,563 TON | $66.00 | T & G CONSTRUCTION, INC. |
| Jan 18, 2018 | 180030 | RogersDivision 8 | 2,221 TON | $70.00 | BECCO CONTRACTORS, INC. |