| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 860 | CY |
$5.00 |
$4.50 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$8,000.00 |
$12,500.00 |
| 3 | 407(C) 0301 |
(SP) POLYMER MODIFIED CATIONIC RAPID SET - 1S | 38,400 | GAL |
$2.50 |
$2.05 |
| 4 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 12,950 | TON |
$87.00 |
$87.00 |
| 5 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 9,000 | TON |
$100.00 |
$102.00 |
| 6 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 250 | TON |
$125.00 |
$115.00 |
| 7 | 412 5267 |
COLD MILLING PAVEMENT | 76,800 | SY |
$2.50 |
$2.50 |
| 8 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 37,180 | LF |
$0.4000 |
$0.2300 |
| 9 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 42,900 | LF |
$0.7000 |
$0.6200 |
| 10 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$250.00 |
$200.00 |
| 11 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 65 | SD |
$15.00 |
$1.00 |
| 12 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$12,700.00 |
| 13 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$130,000.00 |
$153,000.00 |