| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$125,800.00 |
$40,000.00 |
$112,000.00 |
$54,540.00 |
$75,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 104,796 | CY |
$6.50 |
$5.30 |
$5.15 |
$8.15 |
$8.20 |
$7.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,000 | CY |
$18.97 |
$1.00 |
$16.00 |
$8.15 |
$16.90 |
$15.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$265,100.00 |
$108,000.00 |
$250,000.00 |
$136,360.00 |
$150,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 22,398 | LF |
$2.00 |
$1.85 |
$2.00 |
$1.90 |
$1.90 |
$3.45 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 9 | EA |
$375.00 |
$211.00 |
$550.00 |
$542.61 |
$540.00 |
$465.60 |
| 7 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 2 | EA |
$1,000.00 |
$5,390.00 |
$1,500.00 |
$4,035.26 |
$540.00 |
$1,500.00 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,512 | LF |
$10.00 |
$11.60 |
$14.00 |
$13.02 |
$13.00 |
$17.85 |
| 9 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 28 | CY |
$150.00 |
$594.00 |
$175.00 |
$352.92 |
$189.00 |
$45.00 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 137,044 | SY |
$3.00 |
$1.90 |
$1.50 |
$1.47 |
$1.50 |
$3.45 |
| 11 | 230(F) 2812 |
WATERING | 5,481 | KGAL |
$5.00 |
$5.30 |
$10.00 |
$10.85 |
$10.85 |
$10.65 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 58 | AC |
$700.00 |
$211.00 |
$500.00 |
$542.61 |
$540.00 |
$1,530.00 |
| 13 | 234(A) 2824 |
FERTILIZING (10-20-10) | 14 | TON |
$800.00 |
$685.00 |
$1,100.00 |
$1,085.22 |
$1,080.00 |
$1,185.00 |
| 14 | 234(A) 4409 |
FERTILIZING (18-46-0) | 3 | TON |
$1,500.00 |
$1,054.00 |
$1,500.00 |
$1,627.83 |
$1,620.00 |
$1,185.00 |
| 15 | 241 2832 |
MOWING | 116 | AC |
$110.00 |
$53.00 |
$50.00 |
$54.26 |
$54.50 |
$253.20 |
| 16 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 27,103 | CY |
$51.00 |
$40.20 |
$49.00 |
$46.69 |
$57.90 |
$44.55 |
| 17 | 307(A) 4200 |
FLY ASH | 6,987 | TON |
$80.00 |
$75.00 |
$90.00 |
$97.20 |
$111.50 |
$112.00 |
| 18 | 307(D) 4230 |
LIME | 1,119 | TON |
$185.00 |
$155.00 |
$175.00 |
$210.00 |
$150.00 |
$212.75 |
| 19 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 129,299 | SY |
$3.00 |
$3.65 |
$2.80 |
$2.45 |
$2.50 |
$2.58 |
| 20 | 307(G) 4260 |
LIME PRETREATMENT | 94,967 | SY |
$2.00 |
$0.9000 |
$2.70 |
$1.41 |
$1.05 |
$1.75 |
| 21 | 325 5271 |
SEPARATOR FABRIC | 139,215 | SY |
$1.10 |
$0.8500 |
$1.00 |
$1.09 |
$1.68 |
$1.32 |
| 22 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 16,064 | TON |
$24.00 |
$23.40 |
$25.00 |
$30.25 |
$27.20 |
$24.07 |
| 23 | 407(B) 0250 |
TACK COAT | 37,000 | GAL |
$2.60 |
$2.50 |
$2.50 |
$2.75 |
$3.80 |
$4.43 |
| 24 | 408 5774 |
PRIME COAT | 45,321 | GAL |
$2.50 |
$3.00 |
$1.80 |
$3.75 |
$3.80 |
$8.63 |
| 25 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 19,852 | TON |
$90.00 |
$73.65 |
$85.50 |
$85.03 |
$71.00 |
$92.22 |
| 26 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 24,954 | TON |
$65.00 |
$68.15 |
$79.00 |
$74.98 |
$73.30 |
$94.44 |
| 27 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 13,787 | TON |
$85.00 |
$84.60 |
$97.50 |
$94.88 |
$83.70 |
$104.50 |
| 28 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 830 | TON |
$110.00 |
$147.90 |
$115.00 |
$99.52 |
$365.50 |
$360.50 |
| 29 | 411(D) 5965 |
SUPERPAVE, TYPE S5(PG 76-28 OK) | 250 | TON |
$150.00 |
$100.10 |
$125.00 |
$100.06 |
$278.00 |
$172.32 |
| 30 | 412 5267 |
COLD MILLING PAVEMENT | 9,956 | SY |
$3.00 |
$3.30 |
$2.50 |
$4.36 |
$6.20 |
$3.11 |
| 31 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 134 | CY |
$25.00 |
$29.20 |
$50.00 |
$32.85 |
$41.20 |
$25.00 |
| 32 | 509(A) 0319 |
CLASS AA CONCRETE | 234 | CY |
$525.00 |
$553.00 |
$800.00 |
$750.00 |
$740.00 |
$690.00 |
| 33 | 509(B) 0321 |
CLASS A CONCRETE | 119 | CY |
$775.00 |
$648.00 |
$850.00 |
$750.00 |
$801.50 |
$748.00 |
| 34 | 509(D) 0325 |
CLASS C CONCRETE | 2,170 | CY |
$315.00 |
$245.60 |
$325.00 |
$235.40 |
$269.00 |
$373.75 |
| 35 | 511(A) 0332 |
REINFORCING STEEL | 46,700 | LB |
$1.00 |
$0.6000 |
$1.00 |
$1.10 |
$1.40 |
$1.32 |
| 36 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 300 | TON |
$55.00 |
$61.10 |
$70.00 |
$58.86 |
$79.10 |
$65.00 |
| 37 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 162 | SY |
$70.00 |
$78.40 |
$55.00 |
$57.41 |
$270.00 |
$75.00 |
| 38 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 262 | LF |
$85.00 |
$105.40 |
$95.00 |
$75.84 |
$135.50 |
$114.05 |
| 39 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 292 | LF |
$130.00 |
$98.00 |
$110.00 |
$111.96 |
$147.50 |
$133.83 |
| 40 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 204 | LF |
$135.00 |
$116.00 |
$125.00 |
$151.96 |
$202.00 |
$180.78 |
| 41 | 613(A) 4410 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III | 62 | LF |
$100.00 |
$101.20 |
$130.00 |
$93.22 |
$163.50 |
$147.52 |
| 42 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 398 | LF |
$85.00 |
$67.40 |
$100.00 |
$72.78 |
$120.00 |
$109.28 |
| 43 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 288 | LF |
$140.00 |
$112.70 |
$150.00 |
$156.21 |
$251.00 |
$232.63 |
| 44 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 456 | LF |
$45.00 |
$35.80 |
$40.00 |
$38.18 |
$32.70 |
$26.90 |
| 45 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 716 | LF |
$43.00 |
$42.20 |
$45.00 |
$43.73 |
$41.50 |
$36.75 |
| 46 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 1,016 | LF |
$50.00 |
$63.20 |
$60.00 |
$56.77 |
$63.30 |
$53.25 |
| 47 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 268 | LF |
$40.00 |
$39.00 |
$50.00 |
$38.54 |
$30.50 |
$27.75 |
| 48 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 378 | LF |
$40.00 |
$45.30 |
$50.00 |
$44.20 |
$44.20 |
$37.76 |
| 49 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 150 | LF |
$13.00 |
$24.20 |
$20.00 |
$15.85 |
$500.00 |
$24.00 |
| 50 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$19.00 |
$33.70 |
$20.00 |
$14.14 |
$350.00 |
$24.00 |
| 51 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 14 | EA |
$250.00 |
$459.00 |
$350.00 |
$392.36 |
$272.50 |
$235.20 |
| 52 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$270.00 |
$448.00 |
$425.00 |
$428.42 |
$327.50 |
$300.00 |
| 53 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,100.00 |
$1,465.00 |
$1,000.00 |
$1,196.71 |
$2,073.00 |
$1,875.00 |
| 54 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$850.00 |
$1,640.00 |
$1,400.00 |
$1,797.79 |
$3,491.00 |
$2,970.00 |
| 55 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,600.00 |
$1,897.00 |
$1,900.00 |
$1,227.35 |
$1,389.00 |
$1,680.00 |
| 56 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 6 | EA |
$1,350.00 |
$1,530.00 |
$1,800.00 |
$1,728.63 |
$2,444.00 |
$2,160.00 |
| 57 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 14 | EA |
$1,700.00 |
$1,160.00 |
$2,100.00 |
$2,134.83 |
$2,055.00 |
$1,920.00 |
| 58 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 12 | EA |
$1,500.00 |
$1,475.00 |
$2,100.00 |
$3,600.38 |
$2,694.00 |
$2,640.00 |
| 59 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 8 | EA |
$1,800.00 |
$1,580.00 |
$3,700.00 |
$4,369.43 |
$3,377.00 |
$3,840.00 |
| 60 | 613(M) 7203 |
TYPE CC6 CULVERT END TREATMENT | 4 | EA |
$2,000.00 |
$2,425.00 |
$5,200.00 |
$5,225.84 |
$6,776.00 |
$4,320.00 |
| 61 | 613(M) 7204 |
TYPE DD6 CULVERT END TREATMENT | 18 | EA |
$2,200.00 |
$3,320.00 |
$8,200.00 |
$6,155.14 |
$7,459.00 |
$5,040.00 |
| 62 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$135,000.00 |
$30,000.00 |
$101,900.00 |
$49,090.00 |
$45,000.00 |
| 63 | 619(B) 4725 |
REMOVAL OF FENCE | 7,419 | LF |
$1.10 |
$2.60 |
$4.00 |
$1.09 |
$5.40 |
$1.85 |
| 64 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 25,949 | SY |
$5.10 |
$5.40 |
$2.60 |
$6.10 |
$6.45 |
$6.50 |
| 65 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 30,940 | SY |
$12.00 |
$5.70 |
$10.00 |
$13.50 |
$7.20 |
$6.60 |
| 66 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 246 | SY |
$12.00 |
$8.60 |
$17.00 |
$13.69 |
$162.00 |
$14.40 |
| 67 | 619(C) 0924 |
SAWING PAVEMENT | 170 | LF |
$3.20 |
$4.20 |
$3.50 |
$6.43 |
$17.40 |
$3.85 |
| 68 | 623 0100 |
(PL)GUARDRAIL CURBING | 2 | EA |
$1,200.00 |
$9,047.00 |
$1,900.00 |
$2,153.56 |
$2,007.00 |
$1,440.00 |
| 69 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 325 | LF |
$23.00 |
$21.00 |
$20.00 |
$21.70 |
$18.40 |
$24.00 |
| 70 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,900.00 |
$2,635.00 |
$2,500.00 |
$2,713.06 |
$2,554.00 |
$3,000.00 |
| 71 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$2,220.00 |
$2,082.00 |
$2,000.00 |
$2,143.32 |
$2,484.00 |
$2,370.00 |
| 72 | 624(A) 4281 |
FENCE-STYLE WWF | 524 | LF |
$6.85 |
$10.55 |
$8.00 |
$10.85 |
$5.00 |
$8.50 |
| 73 | 624(B) 4460 |
GATES-STYLE WWF (4.5'HIGH X 10'LONG) | 4 | EA |
$100.00 |
$633.00 |
$600.00 |
$651.13 |
$864.00 |
$550.00 |
| 74 | 624(B) 4462 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 4 | EA |
$150.00 |
$685.00 |
$700.00 |
$705.40 |
$972.00 |
$600.00 |
| 75 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,622 | LF |
$4.90 |
$5.10 |
$6.00 |
$5.26 |
$4.30 |
$7.55 |
| 76 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 157 | LF |
$25.25 |
$21.10 |
$30.00 |
$21.70 |
$32.40 |
$46.60 |
| 77 | 624(E) 4292 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 681 | LF |
$20.00 |
$23.20 |
$40.00 |
$23.87 |
$54.00 |
$52.00 |
| 78 | 624(F) 5841 |
GATES-STYLE CLF (4'HIGH X 6'LONG) | 2 | EA |
$100.00 |
$474.00 |
$340.00 |
$488.35 |
$864.00 |
$1,600.00 |
| 79 | 624(F) 5952 |
GATES-STYLE CLF (6'HIGH X 6'LONG) | 2 | EA |
$125.00 |
$580.00 |
$500.00 |
$596.87 |
$891.00 |
$1,800.00 |
| 80 | 624(F) 5954 |
GATES-STYLE CLF (6'HIGH X 8'LONG) | 2 | EA |
$150.00 |
$633.00 |
$650.00 |
$651.14 |
$972.00 |
$2,350.00 |
| 81 | 624(F) 5960 |
GATES-STYLE CLF (6'HIGH X 12'LONG) | 4 | EA |
$175.00 |
$1,054.00 |
$975.00 |
$1,085.22 |
$1,080.00 |
$2,850.00 |
| 82 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 31 | EA |
$100.00 |
$21.00 |
$100.00 |
$108.52 |
$194.50 |
$120.00 |
| 83 | 629(C) 4960 |
MAILBOX | 31 | EA |
$50.00 |
$53.00 |
$50.00 |
$54.26 |
$27.00 |
$60.00 |
| 84 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 38 | EA |
$25.00 |
$53.00 |
$100.00 |
$54.26 |
$32.40 |
$60.00 |
| 85 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 99,429 | LF |
$0.1100 |
$0.1500 |
$0.1500 |
$0.1400 |
$0.1300 |
$0.1500 |
| 86 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,000 | EA |
$0.9500 |
$1.05 |
$1.00 |
$1.09 |
$0.9200 |
$1.15 |
| 87 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 7,891 | LF |
$0.2400 |
$0.5500 |
$0.5000 |
$0.5400 |
$0.4500 |
$0.5800 |
| 88 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 3,600 | SD |
$5.25 |
$5.22 |
$5.00 |
$5.43 |
$6.50 |
$5.75 |
| 89 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 430 | SD |
$5.63 |
$5.22 |
$5.00 |
$5.43 |
$8.65 |
$5.75 |
| 90 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 450 | LF |
$24.30 |
$27.05 |
$17.00 |
$47.00 |
$115.50 |
$29.16 |
| 91 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 45,880 | SD |
$0.1800 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0200 |
$0.0600 |
| 92 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,880 | SD |
$0.4200 |
$5.74 |
$6.00 |
$5.97 |
$5.25 |
$6.33 |
| 93 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,540 | SD |
$0.9300 |
$0.2600 |
$0.2500 |
$0.2700 |
$5.25 |
$0.2900 |
| 94 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 33,820 | SD |
$0.3700 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1600 |
$0.0600 |
| 95 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$1.20 |
$1.04 |
$1.00 |
$1.09 |
$10.80 |
$1.15 |
| 96 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 74,510 | SD |
$0.2000 |
$0.2600 |
$0.2500 |
$0.2700 |
$0.0200 |
$0.2900 |
| 97 | 880(F) 8878 |
DRUMS | 243,820 | SD |
$0.0500 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 98 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 400 | SD |
$10.00 |
$15.65 |
$15.00 |
$16.28 |
$27.00 |
$17.25 |
| 99 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 33,719 | LF |
$0.1700 |
$0.2000 |
$0.1000 |
$0.1000 |
$0.1300 |
$0.1000 |
| 100 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 261 | SF |
$18.40 |
$11.60 |
$12.00 |
$11.94 |
$20.50 |
$12.65 |
| 101 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 402 | LF |
$10.00 |
$19.00 |
$20.00 |
$19.53 |
$8.65 |
$20.75 |
| 102 | 853 9027 |
DELINEATORS(TYPE 1, CODE 2) | 5 | EA |
$10.00 |
$26.35 |
$25.00 |
$27.13 |
$14.00 |
$28.75 |
| 103 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 96,869 | LF |
$0.5000 |
$0.4500 |
$0.5000 |
$0.4700 |
$0.3900 |
$0.4400 |
| 104 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 72 | LF |
$15.60 |
$15.80 |
$15.00 |
$16.28 |
$4.30 |
$17.25 |
| 105 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$82,900.00 |
$135,000.00 |
$96,204.96 |
$172,000.00 |
$80,000.00 |
| 106 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$27,090.00 |
$80,000.00 |
$32,836.99 |
$12,500.00 |
$15,000.00 |
| 107 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$13,000.00 |
$27,300.00 |
$20,000.00 |
$18,600.00 |
$5,400.00 |
$35,000.00 |
| 108 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$585,000.00 |
$525,292.30 |
$530,000.00 |
$598,000.00 |
$599,229.55 |
$268,000.00 |