$0.9597Avg low bid / LB
$1.08Avg of all bids
$1.05Avg engineer's estimate
178Jobs · 12,010,697.79 LB
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 32 | 1,368,043.4 | $1.24 | $1.17 |
| 2020 | 56 | 3,416,628.83 | $0.9824 | $1.12 |
| 2019 | 48 | 4,940,396.04 | $0.8414 | $1.06 |
| 2018 | 42 | 2,285,629.52 | $1.01 | $1.04 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 21,900 LB | $1.23 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 23,350 LB | $1.25 | K & R BUILDERS, INC. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 11,723.3 LB | $3.39 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 20,223 LB | $1.65 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 2,081.7 LB | $1.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 59,000 LB | $1.14 | C3 Construction, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 118,144 LB | $1.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 63,789 LB | $1.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210143 | MurrayDivision 7 | 33,255 LB | $1.50 | OVERLAND CORPORATION |
| May 20, 2021 | 210133 | EllisDivision 6 | 12,365 LB | $1.35 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210148 | PayneDivision 4 | 4,698 LB | $1.30 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210136 | HughesDivision 3 | 42,515 LB | $1.75 | C-GAWF CONSTRUCTION, INC. |
| May 20, 2021 | 210140 | McclainDivision 3 | 31,154 LB | $1.15 | Treas Construction Inc |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 24,271 LB | $1.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210127 | BlaineDivision 5 | 19,359 LB | $1.33 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 11,338 LB | $1.15 | Silver Star Construction Company, Inc. |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 9,796 LB | $1.25 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 27,327 LB | $1.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 10,780.4 LB | $1.15 | Robinson Construction, LLC |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 118,342 LB | $1.10 | Treas Construction Inc |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 46,566 LB | $1.43 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 134,990 LB | $1.10 | OVERLAND CORPORATION |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 6,723 LB | $1.05 | HUB Construction, Inc. |
| Feb 18, 2021 | 210062 | Pontotoc | 46,726 LB | $1.05 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 200 LB | $6.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 76,796 LB | $1.10 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 880 LB | $1.00 | C3 Construction, Inc. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 11,448 LB | $1.00 | CONCRETE SERVICES CORPORATION |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 51,716 LB | $1.30 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 220,682 LB | $1.40 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 29,176 LB | $1.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210035 | Pontotoc | 43,649 LB | $1.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 8,940 LB | $1.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 14,109 LB | $1.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210014 | GarfieldDivision 4 | 380 LB | $2.09 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 9,651 LB | $1.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 110,991 LB | $1.05 | CORNELL CONSTRUCTION COMPANY, INC. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 126,789 LB | $1.26 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 276,002 LB | $0.5000 | EMERY SAPP & SONS, INC. |
| Oct 15, 2020 | 200333 | TulsaDivision 8 | 10,701 LB | $1.05 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 15, 2020 | 200334 | TulsaDivision 8 | 4,777 LB | $2.30 | TRAFFIC & LIGHTING SYSTEMS, LLC |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 4,181.08 LB | $1.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200313 | JohnstonDivision 3 | 8,720 LB | $1.10 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200315 | MajorDivision 6 | 6,643.33 LB | $1.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 7,092 LB | $1.05 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200199 | LoganDivision 4 | 5,000 LB | $1.85 | C-P INTEGRATED SERVICES, INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 54,172 LB | $1.10 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 2,630 LB | $1.25 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 23,257 LB | $1.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 63,673 LB | $1.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200286 | Mcintosh, Muskogee, Sequoyah | 1,535 LB | $1.50 | Midstate Traffic Control, Inc. |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 357,150 LB | $0.8500 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200088 | TulsaDivision 8 | 1,000 LB | $1.25 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 3,875 LB | $1.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 229,171.83 LB | $1.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200150 | EllisDivision 6 | 7,025.82 LB | $1.30 | J & R SAND COMPANY, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 84,615 LB | $1.06 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 111,505 LB | $1.24 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 7,617 LB | $0.6000 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 32,389 LB | $0.9500 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1,686 LB | $1.18 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 61,167 LB | $1.18 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 33,542 LB | $1.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 203,862 LB | $1.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 196,346.2 LB | $0.9700 | J & R SAND COMPANY, INC. |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 4,700 LB | $1.20 | OCCI, INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 36,413 LB | $1.40 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 1,686 LB | $0.7700 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 24,538 LB | $0.7500 | Paragon Contractors, LLC |
| May 14, 2020 | 200202 | MuskogeeDivision 1 | 19,102 LB | $1.18 | Treas Construction Inc |
| May 14, 2020 | 190377 | WashingtonDivision 8 | 9,264 LB | $1.10 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 89,208 LB | $1.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200022 | OttawaDivision 8 | 34,762 LB | $1.00 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 5,517 LB | $1.20 | Treas Construction Inc |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 76,899 LB | $1.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200193 | EllisDivision 6 | 7,171.78 LB | $1.85 | J & R SAND COMPANY, INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 742 LB | $2.55 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200126 | TulsaDivision 8 | 33,128 LB | $1.53 | SHERWOOD CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200079 | SeminoleDivision 3 | 22,964 LB | $1.60 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200216 | BlaineDivision 5 | 5,120 LB | $1.35 | K & R BUILDERS, INC. |
| Mar 19, 2020 | 200133 | HaskellDivision 1 | 13,003 LB | $1.63 | C3 Construction, Inc. |
| Mar 19, 2020 | 200110 | McintoshDivision 1 | 23,430 LB | $1.05 | Robinson Construction, LLC |
| Mar 19, 2020 | 200125 | Jackson, Tillman | 11,835 LB | $1.14 | BRIDGECO CONTRACTORS, INC. |
| Feb 20, 2020 | 200089 | CimarronDivision 6 | 357 LB | $3.50 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200083 | Stp-270c(037)ci | 10,400.29 LB | $2.06 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200057 | ClevelandDivision 3 | 46,700 LB | $0.6000 | Silver Star Construction Company, Inc. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 297,434 LB | $1.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200083 | Stp-270c(037)ci | 1,104 LB | $3.15 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200086 | TulsaDivision 8 | 506 LB | $2.50 | Ellsworth Construction, LLC |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 94,287 LB | $0.9800 | J & R SAND COMPANY, INC. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 6,577 LB | $0.6600 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200015 | Ssr-242b(074)sr | 3,000 LB | $3.30 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 2,913 LB | $0.6600 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 141,200 LB | $0.6000 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 200020 | NobleDivision 4 | 66,336.5 LB | $1.10 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 52,653 LB | $1.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 190356 | KayDivision 4 | 36,000 LB | $1.40 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 200036 | TulsaDivision 8 | 79 LB | $1.00 | PBX Corporation |
| Jan 16, 2020 | 200009 | CusterDivision 5 | 154,864 LB | $0.9500 | SEWELL BROS., INC. |
| Jan 16, 2020 | 190317 | KayDivision 4 | 11,238 LB | $1.12 | BRIDGECO CONTRACTORS, INC. |
| Jan 16, 2020 | 200043 | HaskellDivision 1 | 34,382 LB | $1.10 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Nov 14, 2019 | 190389 | TulsaDivision 8 | 2,935 LB | $0.8000 | CROSSLAND HEAVY CONTRACTORS INC. |
| Nov 14, 2019 | 190297 | RogersDivision 8 | 11,512 LB | $2.00 | B & B BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190341 | CaddoDivision 7 | 3,376 LB | $1.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Nov 14, 2019 | 190309 | WashingtonDivision 8 | 2,130 LB | $1.40 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 110,136 LB | $1.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 178,249 LB | $1.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190109 | CanadianDivision 4 | 13,932 LB | $0.4500 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190388 | MuskogeeDivision 1 | 2,882 LB | $2.00 | Rosscon, LLC |
| Oct 17, 2019 | 190320 | Carter, Love, Murray | 1,967 LB | $2.65 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 17, 2019 | 190294 | Kay, Noble, Oklahoma | 6,744 LB | $1.25 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 63,941 LB | $0.9900 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 31,495 LB | $1.30 | OVERLAND CORPORATION |
| Oct 17, 2019 | 190315 | GrantDivision 4 | 2,500 LB | $1.50 | Evans & Associates Construction Co., Inc. |
| Sep 19, 2019 | 180071 | TulsaDivision 8 | 843 LB | $2.75 | ACTION SAFETY SUPPLY CO., LLC |
| Sep 19, 2019 | 190224 | OklahomaDivision 4 | 260 LB | $1.10 | Silver Star Construction Company, Inc. |
| Sep 19, 2019 | 190272 | AlfalfaDivision 6 | 2,513 LB | $2.05 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 22, 2019 | 190238 | BlaineDivision 5 | 45,506 LB | $1.35 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 22, 2019 | 190257 | SequoyahDivision 1 | 74,614 LB | $1.25 | JOB CONSTRUCTION CO., INC. |
| Aug 22, 2019 | 190271 | TulsaDivision 8 | 21,213 LB | $0.7000 | Paragon Contractors, LLC |
| Jul 25, 2019 | 190270 | AlfalfaDivision 6 | 83,248 LB | $0.9000 | Venture Corporation dba VCO Paving |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 3,537,729 LB | $0.7400 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190228 | TulsaDivision 8 | 13,434 LB | $1.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 28,700 LB | $1.23 | Treas Construction Inc |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 660 LB | $2.10 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190016 | McintoshDivision 1 | 4,320 LB | $1.17 | OBC, INC. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 884 LB | $1.05 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190156 | OklahomaDivision 4 | 8,535 LB | $1.50 | SCHWARZ PAVING CO., INC. |
| Jun 20, 2019 | 190204 | KayDivision 4 | 858 LB | $1.44 | Evans & Associates Construction Co., Inc. |
| Jun 20, 2019 | 190142 | Jefferson | 24,330 LB | $1.05 | OVERLAND CORPORATION |
| May 16, 2019 | 190013 | McclainDivision 3 | 562 LB | $1.40 | Silver Star Construction Company, Inc. |
| May 16, 2019 | 190134 | RogersDivision 8 | 3,879 LB | $1.00 | Rosscon, LLC |
| May 16, 2019 | 190078 | HaskellDivision 1 | 4,008 LB | $1.00 | Rosscon, LLC |
| May 16, 2019 | 190024 | SeminoleDivision 3 | 23,805 LB | $1.05 | HASKELL LEMON CONSTRUCTION CO. |
| May 16, 2019 | 190081 | JohnstonDivision 3 | 29,276 LB | $1.13 | Treas Construction Inc |
| May 16, 2019 | 190027 | WashingtonDivision 8 | 116,800 LB | $1.35 | BECCO CONTRACTORS, INC. |
| May 16, 2019 | 190132 | Pontotoc | 22,210 LB | $1.15 | OVERLAND CORPORATION |
| Apr 18, 2019 | 190170 | OklahomaDivision 4 | 5,776 LB | $1.10 | Redlands Contracting, LLC |
| Apr 18, 2019 | 190152 | Leflore | 3,877 LB | $1.20 | HUB Construction, Inc. |
| Apr 18, 2019 | 190165 | StephensDivision 7 | 235,538 LB | $1.05 | OVERLAND CORPORATION |
| Apr 18, 2019 | 190169 | GrantDivision 4 | 1,853 LB | $1.50 | Venture Corporation dba VCO Paving |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 128,850 LB | $0.9900 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 14, 2019 | 190063 | WagonerDivision 1 | 95 LB | $1.00 | Tri Star Construction Arkansas, LLC |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 34 LB | $5.46 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 2,310 LB | $1.07 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 2,173 LB | $1.23 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 562 LB | $4.28 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190101 | Pontotoc | 25,530 LB | $1.05 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 190034 | CimarronDivision 6 | 1,038 LB | $1.55 | J & R SAND COMPANY, INC. |
| Jan 17, 2019 | 180209 | PittsburgDivision 2 | 1,519.94 LB | $1.95 | THE CUMMINS CONSTRUCTION CO., INC. |