| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$6,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,236 | CY |
$14.00 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,844 | CY |
$20.00 |
$18.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$9,650.00 |
$5,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 425 | LF |
$8.00 |
$7.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,478 | LF |
$3.00 |
$2.50 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 108 | LF |
$16.00 |
$15.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 14,256 | SY |
$4.00 |
$2.50 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 964 | CY |
$45.00 |
$45.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 4,591 | SY |
$3.00 |
$4.00 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 4,003 | SY |
$2.00 |
$2.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 185 | TON |
$35.00 |
$28.00 |
| 13 | 407(B) 0250 |
TACK COAT | 300 | GAL |
$3.00 |
$3.00 |
| 14 | 408 5774 |
PRIME COAT | 1,021 | GAL |
$3.50 |
$5.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 686 | TON |
$86.00 |
$90.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 448 | TON |
$101.00 |
$105.00 |
| 17 | 509(B) 0321 |
CLASS A CONCRETE | 82 | CY |
$449.00 |
$350.00 |
| 18 | 511(A) 0332 |
REINFORCING STEEL | 9,264 | LB |
$1.20 |
$1.10 |
| 19 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 240 | TON |
$42.00 |
$45.00 |
| 20 | 613(E) 4786 |
18" CORRUGATED POLYETHYLENE PIPE TYPE "S" | 258 | LF |
$39.00 |
$40.00 |
| 21 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 192 | LF |
$19.00 |
$20.00 |
| 22 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$1,228.00 |
$2,000.00 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$2,500.00 |
| 24 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$22.00 |
$25.00 |
| 25 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,523.00 |
$1,175.00 |
| 26 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,488.00 |
$2,650.00 |
| 27 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$200.00 |
$50.00 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$28.00 |
$18.00 |
| 29 | 501(F) 6352 |
GRANULAR BACKFILL | 138 | CY |
$74.00 |
$65.00 |
| 30 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 404 | LF |
$330.00 |
$240.00 |
| 31 | 504(B) 1305 |
SAW-CUT GROOVING | 340 | SY |
$7.00 |
$7.00 |
| 32 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 364.5 | LF |
$91.00 |
$85.00 |
| 33 | 506(A) 1322 |
STRUCTURAL STEEL | 1,100 | LB |
$3.60 |
$3.00 |
| 34 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$948.00 |
$750.00 |
| 35 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,133.00 |
$750.00 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 120.4 | CY |
$750.00 |
$750.00 |
| 37 | 509(B) 1328 |
CLASS A CONCRETE | 93.6 | CY |
$849.00 |
$700.00 |
| 38 | 511(A) 1332 |
REINFORCING STEEL | 14,240 | LB |
$1.10 |
$1.20 |
| 39 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 28,340 | LB |
$1.30 |
$1.20 |
| 40 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 74 | LF |
$40.00 |
$60.00 |
| 41 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 210 | LF |
$46.00 |
$70.00 |
| 42 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 74 | LF |
$22.00 |
$10.00 |
| 43 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 210 | LF |
$27.00 |
$10.00 |
| 44 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 584 | TON |
$44.00 |
$45.00 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 195 | TON |
$36.00 |
$35.00 |
| 47 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 779 | SY |
$3.50 |
$2.75 |
| 48 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$19.00 |
$20.00 |
| 49 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$16.00 |
$20.00 |
| 50 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$10,000.00 |
| 51 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$26.00 |
$28.00 |
| 52 | 851(C) 8324 |
2" SQUARE TUBE POST | 25 | LF |
$12.00 |
$10.00 |
| 53 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,344 | LF |
$1.10 |
$1.25 |
| 54 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$8,600.00 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$4,000.00 |
| 57 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$74,000.00 |
$30,000.00 |