| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$85,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 953 | CY |
$15.00 |
$35.00 |
$20.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,545 | CY |
$22.75 |
$40.00 |
$25.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$12,000.00 |
$35,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 10,983 | LF |
$1.80 |
$2.50 |
$1.20 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$605.00 |
$500.00 |
$400.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 135 | LF |
$11.25 |
$6.00 |
$21.00 |
| 8 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 12 | EA |
$300.00 |
$200.00 |
$500.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 9,821 | SY |
$3.10 |
$2.50 |
$4.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 10,749 | SY |
$2.00 |
$1.00 |
$1.75 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 100 | SY |
$2.00 |
$1.00 |
$5.00 |
| 12 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 754 | SY |
$8.00 |
$45.00 |
$65.00 |
| 13 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 189 | CY |
$180.00 |
$150.00 |
$200.00 |
| 14 | 509(A) 0319 |
CLASS AA CONCRETE | 35 | CY |
$600.00 |
$350.00 |
$750.00 |
| 15 | 510(A) 6336 |
BLOCK RETAINING WALL & CAP | 907 | SF |
$30.00 |
$55.00 |
$50.00 |
| 16 | 511(A) 0332 |
REINFORCING STEEL | 2,882 | LB |
$1.35 |
$2.00 |
$2.00 |
| 17 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 6 | TON |
$75.00 |
$50.00 |
$85.00 |
| 18 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 2 | TON |
$85.00 |
$50.00 |
$75.00 |
| 19 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 174 | LF |
$20.00 |
$17.00 |
$40.00 |
| 20 | 609(B) 0383 |
COMBINED CURB & GUTTER (6" BARRIER) | 309 | LF |
$18.50 |
$25.00 |
$40.00 |
| 21 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 2,948 | SY |
$45.00 |
$45.00 |
$78.00 |
| 22 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 712 | SY |
$65.00 |
$54.00 |
$85.00 |
| 23 | 610(F) 0615 |
ASPHALT SIDEWALK | 1,419 | TON |
$125.00 |
$95.00 |
$84.00 |
| 24 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 202 | SF |
$31.50 |
$25.00 |
$35.00 |
| 25 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 2 | EA |
$800.00 |
$1,000.00 |
$1,250.00 |
| 26 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 3 | EA |
$405.00 |
$500.00 |
$500.00 |
| 27 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 3 | EA |
$395.00 |
$500.00 |
$500.00 |
| 28 | 612(G) 0650 |
FIRE HYDRANT RESET | 2 | EA |
$3,500.00 |
$2,500.00 |
$3,500.00 |
| 29 | 612(H) 0651 |
VALVE RESET | 2 | EA |
$1,300.00 |
$2,500.00 |
$2,500.00 |
| 30 | 613(A) 4503 |
14" X 23" R.C.PIPE ELLIPTICAL CLASS HE-III | 11 | LF |
$65.00 |
$100.00 |
$200.00 |
| 31 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 69 | LF |
$50.00 |
$65.00 |
$80.00 |
| 32 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$650.00 |
$500.00 |
$900.00 |
| 33 | 613(L) 5805 |
14" X 23" PREFAB. CULVERT END SEC., ELLI. | 1 | EA |
$1,250.00 |
$1,000.00 |
$1,600.00 |
| 34 | 616(W) 0200 |
(PL) VENT PIPE | 1 | EA |
$5,000.00 |
$500.00 |
$3,500.00 |
| 35 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$55,000.00 |
| 36 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 309 | LF |
$15.00 |
$10.00 |
$10.00 |
| 37 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 575 | SY |
$11.50 |
$25.00 |
$20.00 |
| 38 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 137 | SY |
$8.00 |
$25.00 |
$20.00 |
| 39 | 622(A) 4445 |
2" PIPE RAILING | 464 | LF |
$125.00 |
$25.00 |
$175.00 |
| 40 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 5 | EA |
$600.00 |
$100.00 |
$325.00 |
| 41 | 631(A) 0210 |
(SP)REMOVABLE BOLLARD | 2 | EA |
$400.00 |
$50.00 |
$4,000.00 |
| 42 | 632 0300 |
(PL) SITESCAPING | 1 | LSUM |
$2,000.00 |
$2,500.00 |
$3,000.00 |
| 43 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$265.00 |
$265.00 |
$145.00 |
| 44 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 105 | SF |
$18.00 |
$22.00 |
$35.00 |
| 45 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 220 | LF |
$9.00 |
$11.00 |
$7.00 |
| 46 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,217 | LF |
$1.00 |
$4.50 |
$1.00 |
| 47 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 182 | LF |
$3.00 |
$7.00 |
$1.75 |
| 48 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 681 | LF |
$6.00 |
$13.00 |
$4.50 |
| 49 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 31 | EA |
$225.00 |
$155.00 |
$200.00 |
| 50 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 31 | EA |
$400.00 |
$330.00 |
$200.00 |
| 51 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 164 | LF |
$6.50 |
$6.00 |
$5.50 |
| 52 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$35,000.00 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$15,000.00 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$5,000.00 |
$1,300.00 |
| 55 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$35,000.00 |
$85,000.00 |