GRADE, DRAIN, SURFACE , AND BRIDGE US-60: FROM 2.3 MILES EAST OF THE US -75 JCT, EXTEND EAST NEAR BARTLESVILLE . PROJECT LENGTH = 4.894 MILES

Let date
Thursday, May 16, 2019
Contract
190027
J/P numbers
24242(04)
District
Division 8
County
Washington
Highway
Limits
GRADE, DRAIN, SURFACE , AND BRIDGE US-60: FROM 2.3 MILES EAST OF THE US -75 JCT, EXTEND EAST NEAR BARTLESVILLE . PROJECT LENGTH = 4.894 MILES
Project number
NHPP-018N(053)

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$15,581,251
1 BECCO CONTRACTORS, INC. Low bidder $15,867,000 +1.8%
2 Paragon Contractors, LLC $16,857,758 +8.2% +6.2%
3 SHERWOOD CONSTRUCTION CO., INC. $18,609,789 +19.4% +17.3%
4 NABHOLZ CONSTRUCTION CORPORATION $20,152,672 +29.3% +27.0%

Bid tab: unit prices 132 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BECCO CONTRACTO…#2 Paragon Contrac…#3 SHERWOOD CONSTR…#4 NABHOLZ CONSTRU…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $110,000.00 $225,000.00 $125,000.00 $500,000.00 $154,341.28
2202(A) 0183 UNCLASSIFIED EXCAVATION172,393CY $4.50 $7.00 $6.35 $5.91 $7.86
3202(D) 0184 UNCLASSIFIED BORROW27,100CY $7.00 $6.00 $5.25 $5.91 $13.19
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $130,000.00 $115,854.40 $105,000.00 $120,391.87 $151,988.87
5221(C) 2801 TEMPORARY SILT FENCE11,025LF $1.60 $2.00 $3.15 $3.75 $3.24
6221(F) 0100 TEMPORARY SILT DIKE2,432LF $7.00 $8.00 $19.00 $14.43 $20.51
7221(G) 0153 TEMPORARY ROCK FILTER DAM TYPE 46CY $115.00 $500.00 $52.00 $301.07 $180.33
8221(K) 0600 TEMPORARY FIBER LOG1,680LF $2.34 $6.00 $19.00 $14.43 $20.51
9230(A) 2806 SOLID SLAB SODDING254,980SY $1.10 $2.50 $2.55 $2.77 $2.70
10232(B) 2814 SEEDING METHOD B53AC $220.00 $1,000.00 $2,900.00 $3,063.43 $2,977.04
11233(A) 2817 VEGETATIVE MULCHING53AC $205.00 $1,000.00 $2,200.00 $2,395.04 $2,327.51
12241 2832 MOWING105AC $50.00 $200.00 $500.00 $551.42 $535.87
13303(A) 2100 AGGREGATE BASE TYPE A32,026CY $38.00 $40.00 $37.00 $46.27 $37.90
14307(K) 4300 STABILIZED SUBGRADE158,867SY $5.25 $5.00 $5.75 $3.95 $5.27
15325 5271 SEPARATOR FABRIC186,701SY $1.10 $0.9000 $1.15 $0.9600 $0.8500
16402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E12,934TON $17.00 $13.00 $17.50 $24.05 $19.89
17407(B) 0250 TACK COAT30,248GAL $2.00 $2.00 $2.10 $7.10 $2.14
18408 5774 PRIME COAT99,096GAL $2.60 $1.00 $2.75 $5.93 $3.21
19411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)14,445TON $72.00 $58.00 $69.00 $81.31 $82.15
20411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)55,180TON $67.00 $59.00 $64.00 $74.14 $75.73
21411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)9,631TON $80.00 $73.00 $77.00 $92.56 $84.40
22411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)6,566TON $71.00 $67.00 $81.00 $100.08 $83.38
23501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED292CY $35.00 $20.00 $37.00 $15.05 $124.51
24509(A) 0319 CLASS AA CONCRETE812CY $400.00 $400.00 $820.00 $719.91 $740.18
25509(D) 0325 CLASS C CONCRETE1,026CY $300.00 $290.00 $412.00 $278.13 $513.77
26511(A) 0332 REINFORCING STEEL116,800LB $0.9000 $1.35 $0.4500 $0.9000 $0.8400
27601(A) 0297 TYPE I PLAIN RIPRAP1,189TON $50.00 $40.00 $42.00 $39.20 $34.96
28609(B) 1501 1'-8" COMB. CURB & GUTTER (6" MNTBLE)24,200LF $20.00 $18.00 $21.00 $14.05 $18.98
29609(B) 1513 1'-8" COMB. CURB & GUTTER (6" BARRIER)272LF $35.00 $18.00 $25.00 $38.12 $43.82
30610(B) 0604 6" CONCRETE DRIVEWAY525SY $60.00 $60.00 $55.00 $55.79 $66.81
31611(G) 5112 INLET CI DES. 2 (STD)4EA $3,600.00 $3,500.00 $4,700.00 $3,332.81 $4,829.74
32611(G) 5387 INLET CDI RCB DES. 11EA $5,000.00 $3,200.00 $3,700.00 $2,116.99 $4,425.26
33611(G) 5389 INLET CDI RCB DES. 31EA $5,000.00 $3,800.00 $4,700.00 $1,856.27 $4,075.83
34611(H) 5325 ADD'L DEPTH IN INLET CI DES. 25.77VF $500.00 $400.00 $317.00 $300.00 $562.78
35613(A) 0491 18" R.C.PIPE CLASS III2,829LF $52.00 $85.00 $52.00 $79.54 $58.45
36613(A) 0492 24" R.C.PIPE CLASS III314LF $60.00 $100.00 $62.00 $86.80 $66.99
37613(A) 0493 30" R.C.PIPE CLASS III252LF $75.00 $115.00 $84.00 $160.28 $88.66
38613(A) 0496 48" R.C.PIPE CLASS III32LF $125.00 $160.00 $153.00 $323.77 $150.73
39613(A) 4508 38" X 60" R.C.PIPE ELLIPTICAL CLASS HE-III32LF $360.00 $280.00 $418.00 $472.98 $270.73
40613(B) 0689 18" CORR. GALV. STEEL PIPE650LF $32.00 $50.00 $53.00 $52.75 $43.67
41613(J) 5915 EDGE DRAIN CONDUIT-PERFORATED24,200LF $10.00 $5.00 $6.35 $9.71 $12.84
42613(K) 5916 EDGE DRAIN OUTLET LATERAL-NONPERFORATED1,480LF $10.00 $5.00 $6.35 $11.18 $18.59
43613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND87EA $450.00 $600.00 $845.00 $499.48 $1,124.42
44613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND24EA $550.00 $700.00 $980.00 $581.74 $1,168.63
45613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND8EA $1,100.00 $850.00 $1,060.00 $734.53 $1,214.30
46613(L) 5738 48" PREFAB. CULVERT END SECTION, ROUND2EA $2,100.00 $2,000.00 $2,600.00 $1,557.20 $2,034.51
47613(L) 5850 38" X 60" PREFAB. CULVERT END SEC., ELLIPTICAL2EA $2,500.00 $4,000.00 $4,700.00 $5,053.54 $2,708.94
48613(Q) 5946 OUTLET LATERAL HEADWALL74EA $300.00 $200.00 $950.00 $297.06 $1,528.90
49613(S) 1186 STANDARD BEDDING MATERIAL, CLASS B439CY $55.00 $40.00 $40.00 $29.32 $28.09
50613(V) 1180 TRENCH EXCAVATION812CY $10.00 $10.00 $4.25 $9.00 $0.7800
51619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $250,000.00 $165,000.00 $160,000.00 $44,298.73 $97,800.76
52619(B) 0291 REMOVAL OF HEADWALL2EA $3,000.00 $300.00 $5,000.00 $1,170.97 $706.43
53619(B) 4728 REMOVAL OF ASPHALT PAVEMENT11,381SY $3.00 $3.00 $3.25 $3.88 $7.91
54619(B) 4763 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY63,685SY $4.25 $4.00 $4.25 $6.67 $15.74
55619(B) 4766 REMOVAL OF CONCRETE DRIVEWAY166SY $12.00 $15.00 $36.00 $12.25 $9.09
56619(B) 4780 REMOVAL OF GUARDRAIL934LF $3.00 $4.00 $4.00 $2.75 $4.04
57619(C) 0924 SAWING PAVEMENT3,380LF $3.00 $4.00 $1.10 $4.46 $5.89
58623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE925LF $18.60 $16.00 $16.00 $24.51 $21.57
59623(G) 8590 GUARDRAIL END TREATMENT (31")8EA $2,285.37 $2,500.00 $2,600.00 $3,007.73 $3,235.44
60623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,850.22 $2,000.00 $2,100.00 $1,949.45 $2,210.89
61624(A) 4281 FENCE-STYLE WWF1,934LF $6.42 $9.00 $6.35 $6.68 $7.46
62624(B) 4466 GATES-STYLE WWF (4.5'HIGH X 16'LONG)6EA $1,100.00 $1,500.00 $530.00 $556.99 $1,331.25
63624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)9,360LF $5.55 $9.00 $6.00 $6.13 $8.52
64629(A) 4958 MAILBOX INSTALLATION-SINGLE22EA $88.96 $90.00 $95.00 $100.26 $97.06
65629(B) 4959 MAILBOX INSTALLATION-MULTIPLE7EA $214.71 $250.00 $264.00 $278.49 $269.62
66629(C) 4960 MAILBOX42EA $21.54 $25.00 $26.00 $27.85 $26.96
67629(D) 4961 REMOVAL OF MAILBOX INSTALLATION42EA $4.75 $25.00 $26.00 $27.85 $26.96
68853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)26EA $11.94 $22.00 $37.00 $16.71 $16.18
69501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON250CY $20.00 $25.00 $21.00 $15.05 $10.81
70501(G) 6309 CLSM BACKFILL288CY $140.00 $135.00 $140.00 $165.64 $216.24
71503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,145LF $240.00 $255.00 $240.00 $216.67 $270.30
72504(A) 1304 APPROACH SLAB381.4SY $190.00 $190.00 $188.00 $183.83 $163.71
73504(B) 1305 SAW-CUT GROOVING1,402.1SY $5.00 $5.00 $11.00 $4.23 $4.05
74504(C) 6250 SEALED EXPANSION JOINT48.9LF $250.00 $280.00 $255.00 $227.95 $10.81
75504(D) 6245 CONCRETE RAIL (TR4)631LF $80.00 $80.00 $78.00 $92.84 $64.87
76506(A) 1322 STRUCTURAL STEEL1,650LB $3.50 $6.00 $2.15 $4.40 $1.08
77507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY10EA $2,117.15 $2,200.00 $1,700.00 $1,339.64 $1,081.22
78507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY20EA $1,730.76 $2,200.00 $1,700.00 $1,339.64 $1,081.22
79509(A) 1326 CLASS AA CONCRETE287CY $650.00 $900.00 $540.00 $581.76 $540.61
80509(B) 1328 CLASS A CONCRETE209.2CY $660.00 $900.00 $545.00 $682.98 $648.73
81509(D) 1331 CLASS C CONCRETE12CY $463.14 $500.00 $545.00 $338.89 $648.73
82511(B) 6010 EPOXY COATED REINFORCING STEEL109,850LB $1.10 $1.50 $0.9500 $1.14 $1.08
83514(A) 6010 PILES, FURNISHED (HP 10X42)88LF $38.72 $38.00 $39.00 $36.02 $43.25
84514(A) 6011 PILES, FURNISHED (HP 12X53)396LF $42.12 $48.00 $44.00 $44.70 $43.25
85514(B) 6292 PILES, DRIVEN (HP 10X42)88LF $20.67 $10.00 $25.00 $43.21 $5.41
86514(B) 6294 PILES, DRIVEN (HP 12X53)396LF $26.48 $15.00 $24.00 $43.39 $5.41
87514(K) 6260 (PL)PILOT HOLES330LF $172.49 $150.00 $275.00 $118.64 $432.49
88514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00
89515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,167SY $3.80 $5.00 $3.20 $4.46 $4.26
90516(A) 6094 DRILLED SHAFTS 48" DIAMETER98LF $900.00 $900.00 $874.00 $783.95 $1,081.22
91516(C) 6200 CROSSHOLE SONIC LOGGING1EA $2,290.26 $7,500.00 $2,645.00 $2,144.40 $3,784.26
92523(A) 6550 SEALER CRACK PREPARATION46.5LF $5.19 $5.00 $20.00 $6.68 $6.39
93523(B) 6560 SEALER RESIN0.6GAL $151.38 $300.00 $200.00 $334.19 $319.50
94601(B) 1353 TYPE I-A PLAIN RIPRAP1,560TON $35.00 $35.00 $42.00 $42.73 $34.03
95601(C) 1355 TYPE I-A FILTER BLANKET310TON $30.00 $30.00 $37.00 $34.11 $33.21
96613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND96LF $35.00 $10.00 $37.00 $18.10 $70.28
97613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $29.19 $10.00 $37.00 $10.36 $70.28
98619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $150,000.00 $85,000.00 $31,000.00 $55,036.86 $64,965.00
99202(A) 1301 UNCLASSIFIED EXCAVATION1,780CY $10.00 $20.00 $6.35 $9.18 $50.72
100501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED173CY $20.00 $35.00 $37.00 $27.84 $47.40
101509(A) 1326 CLASS AA CONCRETE469.17CY $500.00 $600.00 $503.00 $451.06 $638.54
102511(A) 1332 REINFORCING STEEL72,490LB $0.9500 $1.50 $0.6500 $1.03 $1.08
103857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)136,165LF $0.0900 $0.1000 $0.0500 $0.0600 $0.0500
104857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)2,630LF $1.23 $1.00 $1.05 $1.11 $1.08
105857(E) 8881 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS2,000EA $1.50 $1.00 $1.05 $1.11 $1.08
106857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,000LF $0.6900 $1.00 $1.05 $1.11 $1.08
107871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.180SD $13.91 $11.00 $11.00 $11.14 $10.78
108877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,675LF $18.84 $20.00 $45.00 $14.94 $53.27
109877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER500LF $5.08 $10.00 $30.00 $3.65 $6.55
110880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF29,300SD $0.2300 $0.5500 $0.5500 $0.5600 $0.5400
111880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF18,440SD $0.7300 $0.3000 $0.2500 $0.2800 $0.2700
112880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF7,450SD $0.8400 $2.20 $2.15 $2.23 $2.16
113880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)31,560SD $0.3100 $0.2000 $0.1500 $0.1100 $0.1100
114880(C) 8848 WING BARRICADES720SD $1.09 $5.50 $5.25 $5.57 $5.39
115880(E) 8860 WARNING LIGHTS(TYPE A)66,270SD $0.1400 $0.0300 $0.0300 $0.0300 $0.0300
116880(F) 8878 DRUMS108,130SD $0.0900 $0.0500 $0.0500 $0.0600 $0.0500
117880(G) 8884 TUBE CHANNELIZERS1,650SD $0.5000 $1.00 $0.5500 $0.5600 $0.5400
118880(G) 8890 CHANNELIZER CONES1,000SD $0.4800 $1.00 $0.5500 $0.5600 $0.5400
119880(I) 8902 FLAGGER60SD $126.44 $200.00 $33.00 $189.93 $238.16
120882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN720SD $12.44 $15.00 $11.00 $11.14 $10.78
121805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS35EA $34.21 $30.00 $26.00 $27.85 $26.96
122805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS5EA $182.76 $200.00 $155.00 $167.10 $161.77
123850(A) 8110 SHEET ALUMINUM SIGNS223.72SF $18.30 $25.00 $21.00 $22.28 $21.57
124851(C) 8324 2" SQUARE TUBE POST21LF $13.36 $15.00 $12.50 $13.37 $12.94
125851(C) 8327 2 1/4" SQUARE TUBE POST376LF $8.08 $15.00 $12.50 $13.37 $12.94
126856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)100,099LF $0.3100 $0.4000 $0.3600 $0.3900 $0.3800
127856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)220LF $9.40 $11.00 $10.25 $11.14 $10.78
128857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,800LF $0.6900 $1.10 $1.05 $1.11 $1.08
129642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $125,000.00 $95,000.00 $120,000.00 $50,031.34 $194,001.00
130220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,000.00 $22,000.00 $8,325.19 $4,000.00 $31,419.63
131640(A) 1426 FIELD OFFICE1EA $10,000.00 $15,000.00 $15,000.00 $15,000.00 $72,831.39
132641 1552 MOBILIZATION1LSUM $585,000.00 $695,000.00 $725,000.00 $837,428.32 $961,477.34