| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$110,000.00 |
$225,000.00 |
$125,000.00 |
$500,000.00 |
$154,341.28 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 172,393 | CY |
$4.50 |
$7.00 |
$6.35 |
$5.91 |
$7.86 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 27,100 | CY |
$7.00 |
$6.00 |
$5.25 |
$5.91 |
$13.19 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$130,000.00 |
$115,854.40 |
$105,000.00 |
$120,391.87 |
$151,988.87 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,025 | LF |
$1.60 |
$2.00 |
$3.15 |
$3.75 |
$3.24 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,432 | LF |
$7.00 |
$8.00 |
$19.00 |
$14.43 |
$20.51 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 6 | CY |
$115.00 |
$500.00 |
$52.00 |
$301.07 |
$180.33 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,680 | LF |
$2.34 |
$6.00 |
$19.00 |
$14.43 |
$20.51 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 254,980 | SY |
$1.10 |
$2.50 |
$2.55 |
$2.77 |
$2.70 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 53 | AC |
$220.00 |
$1,000.00 |
$2,900.00 |
$3,063.43 |
$2,977.04 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 53 | AC |
$205.00 |
$1,000.00 |
$2,200.00 |
$2,395.04 |
$2,327.51 |
| 12 | 241 2832 |
MOWING | 105 | AC |
$50.00 |
$200.00 |
$500.00 |
$551.42 |
$535.87 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 32,026 | CY |
$38.00 |
$40.00 |
$37.00 |
$46.27 |
$37.90 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 158,867 | SY |
$5.25 |
$5.00 |
$5.75 |
$3.95 |
$5.27 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 186,701 | SY |
$1.10 |
$0.9000 |
$1.15 |
$0.9600 |
$0.8500 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,934 | TON |
$17.00 |
$13.00 |
$17.50 |
$24.05 |
$19.89 |
| 17 | 407(B) 0250 |
TACK COAT | 30,248 | GAL |
$2.00 |
$2.00 |
$2.10 |
$7.10 |
$2.14 |
| 18 | 408 5774 |
PRIME COAT | 99,096 | GAL |
$2.60 |
$1.00 |
$2.75 |
$5.93 |
$3.21 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 14,445 | TON |
$72.00 |
$58.00 |
$69.00 |
$81.31 |
$82.15 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 55,180 | TON |
$67.00 |
$59.00 |
$64.00 |
$74.14 |
$75.73 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 9,631 | TON |
$80.00 |
$73.00 |
$77.00 |
$92.56 |
$84.40 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,566 | TON |
$71.00 |
$67.00 |
$81.00 |
$100.08 |
$83.38 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 292 | CY |
$35.00 |
$20.00 |
$37.00 |
$15.05 |
$124.51 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 812 | CY |
$400.00 |
$400.00 |
$820.00 |
$719.91 |
$740.18 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 1,026 | CY |
$300.00 |
$290.00 |
$412.00 |
$278.13 |
$513.77 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 116,800 | LB |
$0.9000 |
$1.35 |
$0.4500 |
$0.9000 |
$0.8400 |
| 27 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,189 | TON |
$50.00 |
$40.00 |
$42.00 |
$39.20 |
$34.96 |
| 28 | 609(B) 1501 |
1'-8" COMB. CURB & GUTTER (6" MNTBLE) | 24,200 | LF |
$20.00 |
$18.00 |
$21.00 |
$14.05 |
$18.98 |
| 29 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 272 | LF |
$35.00 |
$18.00 |
$25.00 |
$38.12 |
$43.82 |
| 30 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 525 | SY |
$60.00 |
$60.00 |
$55.00 |
$55.79 |
$66.81 |
| 31 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 4 | EA |
$3,600.00 |
$3,500.00 |
$4,700.00 |
$3,332.81 |
$4,829.74 |
| 32 | 611(G) 5387 |
INLET CDI RCB DES. 1 | 1 | EA |
$5,000.00 |
$3,200.00 |
$3,700.00 |
$2,116.99 |
$4,425.26 |
| 33 | 611(G) 5389 |
INLET CDI RCB DES. 3 | 1 | EA |
$5,000.00 |
$3,800.00 |
$4,700.00 |
$1,856.27 |
$4,075.83 |
| 34 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 5.77 | VF |
$500.00 |
$400.00 |
$317.00 |
$300.00 |
$562.78 |
| 35 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 2,829 | LF |
$52.00 |
$85.00 |
$52.00 |
$79.54 |
$58.45 |
| 36 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 314 | LF |
$60.00 |
$100.00 |
$62.00 |
$86.80 |
$66.99 |
| 37 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 252 | LF |
$75.00 |
$115.00 |
$84.00 |
$160.28 |
$88.66 |
| 38 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 32 | LF |
$125.00 |
$160.00 |
$153.00 |
$323.77 |
$150.73 |
| 39 | 613(A) 4508 |
38" X 60" R.C.PIPE ELLIPTICAL CLASS HE-III | 32 | LF |
$360.00 |
$280.00 |
$418.00 |
$472.98 |
$270.73 |
| 40 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 650 | LF |
$32.00 |
$50.00 |
$53.00 |
$52.75 |
$43.67 |
| 41 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 24,200 | LF |
$10.00 |
$5.00 |
$6.35 |
$9.71 |
$12.84 |
| 42 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 1,480 | LF |
$10.00 |
$5.00 |
$6.35 |
$11.18 |
$18.59 |
| 43 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 87 | EA |
$450.00 |
$600.00 |
$845.00 |
$499.48 |
$1,124.42 |
| 44 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 24 | EA |
$550.00 |
$700.00 |
$980.00 |
$581.74 |
$1,168.63 |
| 45 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$1,100.00 |
$850.00 |
$1,060.00 |
$734.53 |
$1,214.30 |
| 46 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,100.00 |
$2,000.00 |
$2,600.00 |
$1,557.20 |
$2,034.51 |
| 47 | 613(L) 5850 |
38" X 60" PREFAB. CULVERT END SEC., ELLIPTICAL | 2 | EA |
$2,500.00 |
$4,000.00 |
$4,700.00 |
$5,053.54 |
$2,708.94 |
| 48 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 74 | EA |
$300.00 |
$200.00 |
$950.00 |
$297.06 |
$1,528.90 |
| 49 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 439 | CY |
$55.00 |
$40.00 |
$40.00 |
$29.32 |
$28.09 |
| 50 | 613(V) 1180 |
TRENCH EXCAVATION | 812 | CY |
$10.00 |
$10.00 |
$4.25 |
$9.00 |
$0.7800 |
| 51 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$250,000.00 |
$165,000.00 |
$160,000.00 |
$44,298.73 |
$97,800.76 |
| 52 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$3,000.00 |
$300.00 |
$5,000.00 |
$1,170.97 |
$706.43 |
| 53 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 11,381 | SY |
$3.00 |
$3.00 |
$3.25 |
$3.88 |
$7.91 |
| 54 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 63,685 | SY |
$4.25 |
$4.00 |
$4.25 |
$6.67 |
$15.74 |
| 55 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 166 | SY |
$12.00 |
$15.00 |
$36.00 |
$12.25 |
$9.09 |
| 56 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 934 | LF |
$3.00 |
$4.00 |
$4.00 |
$2.75 |
$4.04 |
| 57 | 619(C) 0924 |
SAWING PAVEMENT | 3,380 | LF |
$3.00 |
$4.00 |
$1.10 |
$4.46 |
$5.89 |
| 58 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 925 | LF |
$18.60 |
$16.00 |
$16.00 |
$24.51 |
$21.57 |
| 59 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,285.37 |
$2,500.00 |
$2,600.00 |
$3,007.73 |
$3,235.44 |
| 60 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,850.22 |
$2,000.00 |
$2,100.00 |
$1,949.45 |
$2,210.89 |
| 61 | 624(A) 4281 |
FENCE-STYLE WWF | 1,934 | LF |
$6.42 |
$9.00 |
$6.35 |
$6.68 |
$7.46 |
| 62 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 6 | EA |
$1,100.00 |
$1,500.00 |
$530.00 |
$556.99 |
$1,331.25 |
| 63 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 9,360 | LF |
$5.55 |
$9.00 |
$6.00 |
$6.13 |
$8.52 |
| 64 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 22 | EA |
$88.96 |
$90.00 |
$95.00 |
$100.26 |
$97.06 |
| 65 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 7 | EA |
$214.71 |
$250.00 |
$264.00 |
$278.49 |
$269.62 |
| 66 | 629(C) 4960 |
MAILBOX | 42 | EA |
$21.54 |
$25.00 |
$26.00 |
$27.85 |
$26.96 |
| 67 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 42 | EA |
$4.75 |
$25.00 |
$26.00 |
$27.85 |
$26.96 |
| 68 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 26 | EA |
$11.94 |
$22.00 |
$37.00 |
$16.71 |
$16.18 |
| 69 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$20.00 |
$25.00 |
$21.00 |
$15.05 |
$10.81 |
| 70 | 501(G) 6309 |
CLSM BACKFILL | 288 | CY |
$140.00 |
$135.00 |
$140.00 |
$165.64 |
$216.24 |
| 71 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,145 | LF |
$240.00 |
$255.00 |
$240.00 |
$216.67 |
$270.30 |
| 72 | 504(A) 1304 |
APPROACH SLAB | 381.4 | SY |
$190.00 |
$190.00 |
$188.00 |
$183.83 |
$163.71 |
| 73 | 504(B) 1305 |
SAW-CUT GROOVING | 1,402.1 | SY |
$5.00 |
$5.00 |
$11.00 |
$4.23 |
$4.05 |
| 74 | 504(C) 6250 |
SEALED EXPANSION JOINT | 48.9 | LF |
$250.00 |
$280.00 |
$255.00 |
$227.95 |
$10.81 |
| 75 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 631 | LF |
$80.00 |
$80.00 |
$78.00 |
$92.84 |
$64.87 |
| 76 | 506(A) 1322 |
STRUCTURAL STEEL | 1,650 | LB |
$3.50 |
$6.00 |
$2.15 |
$4.40 |
$1.08 |
| 77 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,117.15 |
$2,200.00 |
$1,700.00 |
$1,339.64 |
$1,081.22 |
| 78 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,730.76 |
$2,200.00 |
$1,700.00 |
$1,339.64 |
$1,081.22 |
| 79 | 509(A) 1326 |
CLASS AA CONCRETE | 287 | CY |
$650.00 |
$900.00 |
$540.00 |
$581.76 |
$540.61 |
| 80 | 509(B) 1328 |
CLASS A CONCRETE | 209.2 | CY |
$660.00 |
$900.00 |
$545.00 |
$682.98 |
$648.73 |
| 81 | 509(D) 1331 |
CLASS C CONCRETE | 12 | CY |
$463.14 |
$500.00 |
$545.00 |
$338.89 |
$648.73 |
| 82 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 109,850 | LB |
$1.10 |
$1.50 |
$0.9500 |
$1.14 |
$1.08 |
| 83 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 88 | LF |
$38.72 |
$38.00 |
$39.00 |
$36.02 |
$43.25 |
| 84 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 396 | LF |
$42.12 |
$48.00 |
$44.00 |
$44.70 |
$43.25 |
| 85 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 88 | LF |
$20.67 |
$10.00 |
$25.00 |
$43.21 |
$5.41 |
| 86 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 396 | LF |
$26.48 |
$15.00 |
$24.00 |
$43.39 |
$5.41 |
| 87 | 514(K) 6260 |
(PL)PILOT HOLES | 330 | LF |
$172.49 |
$150.00 |
$275.00 |
$118.64 |
$432.49 |
| 88 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 89 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,167 | SY |
$3.80 |
$5.00 |
$3.20 |
$4.46 |
$4.26 |
| 90 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 98 | LF |
$900.00 |
$900.00 |
$874.00 |
$783.95 |
$1,081.22 |
| 91 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,290.26 |
$7,500.00 |
$2,645.00 |
$2,144.40 |
$3,784.26 |
| 92 | 523(A) 6550 |
SEALER CRACK PREPARATION | 46.5 | LF |
$5.19 |
$5.00 |
$20.00 |
$6.68 |
$6.39 |
| 93 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$151.38 |
$300.00 |
$200.00 |
$334.19 |
$319.50 |
| 94 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,560 | TON |
$35.00 |
$35.00 |
$42.00 |
$42.73 |
$34.03 |
| 95 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 310 | TON |
$30.00 |
$30.00 |
$37.00 |
$34.11 |
$33.21 |
| 96 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 96 | LF |
$35.00 |
$10.00 |
$37.00 |
$18.10 |
$70.28 |
| 97 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$29.19 |
$10.00 |
$37.00 |
$10.36 |
$70.28 |
| 98 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$85,000.00 |
$31,000.00 |
$55,036.86 |
$64,965.00 |
| 99 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,780 | CY |
$10.00 |
$20.00 |
$6.35 |
$9.18 |
$50.72 |
| 100 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 173 | CY |
$20.00 |
$35.00 |
$37.00 |
$27.84 |
$47.40 |
| 101 | 509(A) 1326 |
CLASS AA CONCRETE | 469.17 | CY |
$500.00 |
$600.00 |
$503.00 |
$451.06 |
$638.54 |
| 102 | 511(A) 1332 |
REINFORCING STEEL | 72,490 | LB |
$0.9500 |
$1.50 |
$0.6500 |
$1.03 |
$1.08 |
| 103 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 136,165 | LF |
$0.0900 |
$0.1000 |
$0.0500 |
$0.0600 |
$0.0500 |
| 104 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,630 | LF |
$1.23 |
$1.00 |
$1.05 |
$1.11 |
$1.08 |
| 105 | 857(E) 8881 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 2,000 | EA |
$1.50 |
$1.00 |
$1.05 |
$1.11 |
$1.08 |
| 106 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.6900 |
$1.00 |
$1.05 |
$1.11 |
$1.08 |
| 107 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 180 | SD |
$13.91 |
$11.00 |
$11.00 |
$11.14 |
$10.78 |
| 108 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,675 | LF |
$18.84 |
$20.00 |
$45.00 |
$14.94 |
$53.27 |
| 109 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 500 | LF |
$5.08 |
$10.00 |
$30.00 |
$3.65 |
$6.55 |
| 110 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 29,300 | SD |
$0.2300 |
$0.5500 |
$0.5500 |
$0.5600 |
$0.5400 |
| 111 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 18,440 | SD |
$0.7300 |
$0.3000 |
$0.2500 |
$0.2800 |
$0.2700 |
| 112 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,450 | SD |
$0.8400 |
$2.20 |
$2.15 |
$2.23 |
$2.16 |
| 113 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 31,560 | SD |
$0.3100 |
$0.2000 |
$0.1500 |
$0.1100 |
$0.1100 |
| 114 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.09 |
$5.50 |
$5.25 |
$5.57 |
$5.39 |
| 115 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 66,270 | SD |
$0.1400 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0300 |
| 116 | 880(F) 8878 |
DRUMS | 108,130 | SD |
$0.0900 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
| 117 | 880(G) 8884 |
TUBE CHANNELIZERS | 1,650 | SD |
$0.5000 |
$1.00 |
$0.5500 |
$0.5600 |
$0.5400 |
| 118 | 880(G) 8890 |
CHANNELIZER CONES | 1,000 | SD |
$0.4800 |
$1.00 |
$0.5500 |
$0.5600 |
$0.5400 |
| 119 | 880(I) 8902 |
FLAGGER | 60 | SD |
$126.44 |
$200.00 |
$33.00 |
$189.93 |
$238.16 |
| 120 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$12.44 |
$15.00 |
$11.00 |
$11.14 |
$10.78 |
| 121 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 35 | EA |
$34.21 |
$30.00 |
$26.00 |
$27.85 |
$26.96 |
| 122 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$182.76 |
$200.00 |
$155.00 |
$167.10 |
$161.77 |
| 123 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 223.72 | SF |
$18.30 |
$25.00 |
$21.00 |
$22.28 |
$21.57 |
| 124 | 851(C) 8324 |
2" SQUARE TUBE POST | 21 | LF |
$13.36 |
$15.00 |
$12.50 |
$13.37 |
$12.94 |
| 125 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 376 | LF |
$8.08 |
$15.00 |
$12.50 |
$13.37 |
$12.94 |
| 126 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 100,099 | LF |
$0.3100 |
$0.4000 |
$0.3600 |
$0.3900 |
$0.3800 |
| 127 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 220 | LF |
$9.40 |
$11.00 |
$10.25 |
$11.14 |
$10.78 |
| 128 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,800 | LF |
$0.6900 |
$1.10 |
$1.05 |
$1.11 |
$1.08 |
| 129 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$125,000.00 |
$95,000.00 |
$120,000.00 |
$50,031.34 |
$194,001.00 |
| 130 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$22,000.00 |
$8,325.19 |
$4,000.00 |
$31,419.63 |
| 131 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$15,000.00 |
$15,000.00 |
$15,000.00 |
$72,831.39 |
| 132 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$585,000.00 |
$695,000.00 |
$725,000.00 |
$837,428.32 |
$961,477.34 |