$20.93Avg low bid / CY
$23.18Avg of all bids
$23.02Avg engineer's estimate
111Jobs · 39,360.69 CY
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 18 | 8,268.8 | $24.15 | $26.34 |
| 2020 | 32 | 12,038.24 | $18.56 | $24.21 |
| 2019 | 35 | 10,544.6 | $24.44 | $21.97 |
| 2018 | 26 | 8,509.05 | $16.80 | $20.00 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Oct 14, 2021 | 210273 | EllisDivision 6 | 314 CY | $20.00 | Lopp Construction, LLC |
| Sep 16, 2021 | 210253 | MayesDivision 8 | 246 CY | $15.00 | RRY SERVICES LLC |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 480 CY | $36.75 | Treas Construction Inc |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 258 CY | $10.00 | H & H BRIDGE COMPANY |
| Jun 17, 2021 | 210172 | DeweyDivision 5 | 203 CY | $30.00 | Wyatt Contracting |
| May 20, 2021 | 210133 | EllisDivision 6 | 164 CY | $47.70 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210133 | EllisDivision 6 | 84 CY | $47.70 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 403 CY | $47.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 240 CY | $20.60 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 151 CY | $22.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210143 | MurrayDivision 7 | 56.8 CY | $18.70 | OVERLAND CORPORATION |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 270 CY | $25.00 | OBC, INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 330 CY | $25.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210115 | NobleDivision 4 | 238 CY | $7.00 | SEWELL BROS., INC. |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 1,223 CY | $30.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 371 CY | $30.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 540 CY | $20.00 | Robinson Construction, LLC |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 98 CY | $30.00 | OVERLAND CORPORATION |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 1,215 CY | $5.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 70 CY | $39.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 99 CY | $39.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 364 CY | $36.05 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 110 CY | $10.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 201 CY | $10.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 540 CY | $30.00 | Treas Construction Inc |
| Nov 19, 2020 | 200347 | CreekDivision 8 | 60 CY | $15.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 994.76 CY | $30.00 | Treas Construction Inc |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 402 CY | $30.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200325 | PawneeDivision 8 | 80 CY | $100.00 | CONCRETE SERVICES CORPORATION |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 352 CY | $30.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200325 | PawneeDivision 8 | 46 CY | $30.00 | CONCRETE SERVICES CORPORATION |
| Oct 15, 2020 | 200325 | PawneeDivision 8 | 60 CY | $30.00 | CONCRETE SERVICES CORPORATION |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 328 CY | $15.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200312 | GreerDivision 5 | 99 CY | $10.15 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200316 | Grady, Mcclain | 81 CY | $20.00 | Treas Construction Inc |
| Sep 17, 2020 | 200280 | JacksonDivision 5 | 116 CY | $15.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 345 CY | $14.00 | BRIDGECO CONTRACTORS, INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 256 CY | $15.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 65.65 CY | $15.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200265 | LoganDivision 4 | 441 CY | $20.00 | Wyatt Contracting |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 25.26 CY | $15.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 99 CY | $13.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 83.41 CY | $15.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 74.73 CY | $15.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 79.47 CY | $15.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 17.56 CY | $15.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 216 CY | $25.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200248 | Cotton | 78 CY | $15.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 72 CY | $36.75 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 272 CY | $25.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 3,605 CY | $4.00 | J & R SAND COMPANY, INC. |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 250 CY | $12.60 | Treas Construction Inc |
| May 14, 2020 | 200194 | GarfieldDivision 4 | 293 CY | $21.20 | HASKELL LEMON CONSTRUCTION CO. |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 217 CY | $80.00 | Paragon Contractors, LLC |
| May 14, 2020 | 200203 | MuskogeeDivision 1 | 266 CY | $32.10 | Treas Construction Inc |
| May 14, 2020 | 200203 | MuskogeeDivision 1 | 173 CY | $37.45 | Treas Construction Inc |
| May 14, 2020 | 200213 | TexasDivision 6 | 100 CY | $5.00 | KLAVER CONSTRUCTION COMPANY, INC. |
| Mar 19, 2020 | 200133 | HaskellDivision 1 | 34 CY | $22.78 | C3 Construction, Inc. |
| Mar 19, 2020 | 200133 | HaskellDivision 1 | 34 CY | $22.78 | C3 Construction, Inc. |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 102 CY | $30.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 123 CY | $30.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 96 CY | $30.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 47 CY | $30.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200073 | MarshallDivision 2 | 26 CY | $22.00 | HUB Construction, Inc. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 80 CY | $39.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200018 | McintoshDivision 1 | 684 CY | $12.00 | L & N BRIDGE, LLC |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 300 CY | $24.00 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 190214 | LoveDivision 7 | 113 CY | $38.00 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200036 | TulsaDivision 8 | 75 CY | $35.00 | PBX Corporation |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 315 CY | $24.00 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 190317 | KayDivision 4 | 116 CY | $30.00 | BRIDGECO CONTRACTORS, INC. |
| Jan 16, 2020 | 200043 | HaskellDivision 1 | 245.4 CY | $13.65 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Nov 14, 2019 | 190349 | DeweyDivision 5 | 228 CY | $15.00 | SEWELL BROS., INC. |
| Nov 14, 2019 | 190364 | MayesDivision 8 | 246 CY | $31.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190109 | CanadianDivision 4 | 104 CY | $60.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190389 | TulsaDivision 8 | 215 CY | $32.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190316 | GreerDivision 5 | 83.8 CY | $5.00 | KLAVER CONSTRUCTION COMPANY, INC. |
| Oct 17, 2019 | 190264 | Stp-264c(063)pm | 265 CY | $22.50 | HUB Construction, Inc. |
| Oct 17, 2019 | 190380 | BeckhamDivision 5 | 530 CY | $73.50 | Frontier Bridge, Inc. |
| Oct 17, 2019 | 190264 | Stp-264c(063)pm | 130 CY | $22.00 | HUB Construction, Inc. |
| Oct 17, 2019 | 190335 | TulsaDivision 8 | 366 CY | $27.30 | Tri Star Construction Arkansas, LLC |
| Sep 19, 2019 | 190224 | OklahomaDivision 4 | 182 CY | $21.30 | Silver Star Construction Company, Inc. |
| Aug 22, 2019 | 190250 | OklahomaDivision 4 | 380 CY | $30.00 | Wyatt Contracting |
| Aug 22, 2019 | 190258 | TillmanDivision 5 | 108 CY | $30.00 | Wyatt Contracting |
| Aug 22, 2019 | 190245 | EllisDivision 6 | 171 CY | $30.00 | Wyatt Contracting |
| Jul 25, 2019 | 190269 | Roger MillsDivision 5 | 438 CY | $25.00 | SEWELL BROS., INC. |
| Jul 25, 2019 | 190270 | AlfalfaDivision 6 | 155 CY | $5.00 | Venture Corporation dba VCO Paving |
| Jul 25, 2019 | 190234 | Jefferson | 56.8 CY | $28.00 | OVERLAND CORPORATION |
| Jul 25, 2019 | 190265 | BeckhamDivision 5 | 430 CY | $30.00 | CASWELL CONSTRUCTION, INC. |
| Jun 20, 2019 | 190125 | OkmulgeeDivision 1 | 200 CY | $15.00 | RRY SERVICES LLC |
| Jun 20, 2019 | 190204 | KayDivision 4 | 78 CY | $25.00 | Evans & Associates Construction Co., Inc. |
| Jun 20, 2019 | 190142 | Jefferson | 200 CY | $19.25 | OVERLAND CORPORATION |
| Jun 20, 2019 | 190056 | OttawaDivision 8 | 106 CY | $20.00 | RRY SERVICES LLC |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 270 CY | $10.70 | Treas Construction Inc |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 540 CY | $32.10 | Treas Construction Inc |
| Jun 20, 2019 | 190125 | OkmulgeeDivision 1 | 180 CY | $15.00 | RRY SERVICES LLC |
| May 16, 2019 | 190018 | NowataDivision 8 | 160 CY | $50.00 | H & H BRIDGE COMPANY |
| May 16, 2019 | 190173 | CanadianDivision 4 | 25 CY | $50.00 | SEWELL BROS., INC. |
| May 16, 2019 | 190023 | PottawatomieDivision 3 | 485 CY | $24.36 | CP3 ENTERPRISES, INC. |
| May 16, 2019 | 190027 | WashingtonDivision 8 | 173 CY | $35.00 | BECCO CONTRACTORS, INC. |
| May 16, 2019 | 190004 | ChoctawDivision 2 | 74 CY | $20.00 | HUB Construction, Inc. |
| May 16, 2019 | 190117 | KiowaDivision 5 | 640 CY | $20.00 | SEWELL BROS., INC. |
| May 16, 2019 | 190081 | JohnstonDivision 3 | 250 CY | $25.75 | Treas Construction Inc |
| Apr 18, 2019 | 190087 | NowataDivision 8 | 161 CY | $26.10 | Tri Star Construction Arkansas, LLC |
| Apr 18, 2019 | 190006 | GarvinDivision 3 | 940 CY | $12.00 | BRIDGECO CONTRACTORS, INC. |
| Mar 14, 2019 | 190141 | Jefferson | 81 CY | $12.00 | SEWELL BROS., INC. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 80 CY | $37.10 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190080 | JacksonDivision 5 | 217 CY | $30.00 | Wyatt Contracting |
| Jan 17, 2019 | 180191 | Cotton | 47 CY | $30.00 | SEWELL BROS., INC. |
| Jan 17, 2019 | 190005 | ClevelandDivision 3 | 1,500 CY | $10.00 | Silver Star Construction Company, Inc. |
| Jan 17, 2019 | 180191 | Cotton | 49 CY | $30.00 | SEWELL BROS., INC. |
| Nov 15, 2018 | 180245 | MurrayDivision 7 | 143 CY | $30.00 | Wyatt Contracting |
| Nov 15, 2018 | 180260 | ChoctawDivision 2 | 300 CY | $10.00 | H & H BRIDGE COMPANY |
| Nov 15, 2018 | 180264 | HaskellDivision 1 | 973 CY | $12.60 | B & B BRIDGE COMPANY, LLC |
| Sep 20, 2018 | 180278 | BlaineDivision 5 | 345 CY | $30.00 | Wyatt Contracting |
| Sep 20, 2018 | 180285 | GreerDivision 5 | 66.75 CY | $5.00 | KLAVER CONSTRUCTION COMPANY, INC. |
| Sep 20, 2018 | 180313 | SeminoleDivision 3 | 535 CY | $6.45 | B & B BRIDGE COMPANY, LLC |
| Aug 16, 2018 | 180269 | OklahomaDivision 4 | 189 CY | $5.00 | KLAVER CONSTRUCTION COMPANY, INC. |
| Jul 19, 2018 | 180192 | Cotton | 191 CY | $25.57 | BREWER CONSTRUCTION OKLAHOMA, LLC |
| Jun 14, 2018 | 180225 | Stp-231c(033)ci | 360 CY | $18.00 | T. McDonald Construction, Inc. |
| Jun 14, 2018 | 180231 | WashitaDivision 5 | 442 CY | $31.50 | CASWELL CONSTRUCTION, INC. |
| Jun 14, 2018 | 180189 | CimarronDivision 6 | 102 CY | $5.00 | KLAVER CONSTRUCTION COMPANY, INC. |
| May 17, 2018 | 180154 | BlaineDivision 5 | 400 CY | $15.15 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180211 | StephensDivision 7 | 85 CY | $25.43 | OVERLAND CORPORATION |
| May 17, 2018 | 180190 | ClevelandDivision 3 | 528.3 CY | $29.50 | Silver Star Construction Company, Inc. |
| Apr 19, 2018 | 180217 | Sbr-206c(046)sb | 80 CY | $17.50 | K & R BUILDERS, INC. |
| Apr 19, 2018 | 180217 | Sbr-206c(046)sb | 76 CY | $21.00 | K & R BUILDERS, INC. |
| Mar 15, 2018 | 180147 | TexasDivision 6 | 580 CY | $5.00 | HIGHWAY CONTRACTORS, INC. |
| Mar 15, 2018 | 180151 | WashingtonDivision 8 | 61 CY | $30.00 | BECCO CONTRACTORS, INC. |
| Mar 15, 2018 | 180122 | Acstp-277d(044)ur | 296 CY | $20.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180131 | DeweyDivision 5 | 315 CY | $30.00 | J & R SAND COMPANY, INC. |
| Feb 15, 2018 | 180113 | Roger MillsDivision 5 | 75 CY | $31.20 | CASWELL CONSTRUCTION, INC. |
| Feb 15, 2018 | 180113 | Roger MillsDivision 5 | 188 CY | $31.20 | CASWELL CONSTRUCTION, INC. |
| Feb 15, 2018 | 180120 | WashitaDivision 5 | 125 CY | $12.25 | C-GAWF CONSTRUCTION, INC. |
| Feb 15, 2018 | 180081 | Cotton | 410 CY | $15.00 | SAC Services, Inc. |
| Feb 15, 2018 | 180081 | Cotton | 165 CY | $15.00 | SAC Services, Inc. |
| Feb 15, 2018 | 180010 | Stp-238c(046)ss | 190 CY | $15.00 | RRY SERVICES LLC |
| Jan 18, 2018 | 180011 | LatimerDivision 2 | 215 CY | $15.50 | HUB Construction, Inc. |
| Jan 18, 2018 | 180032 | SeminoleDivision 3 | 932 CY | $6.25 | T. McDonald Construction, Inc. |
| Jan 18, 2018 | 180045 | Ellis, Woodward | 141 CY | $35.80 | THE CUMMINS CONSTRUCTION CO., INC. |