| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$33,000.00 |
$19,500.00 |
$35,783.20 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,115 | CY |
$10.00 |
$10.00 |
$14.00 |
$11.50 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,710 | CY |
$14.00 |
$12.00 |
$16.00 |
$11.15 |
$20.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$4,500.00 |
$8,000.00 |
$8,500.00 |
$42,655.31 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 240 | LF |
$3.00 |
$4.25 |
$4.19 |
$2.45 |
$1.45 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 276 | LF |
$8.00 |
$6.75 |
$6.63 |
$8.50 |
$6.25 |
| 7 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 40 | CY |
$120.00 |
$150.00 |
$120.00 |
$52.00 |
$125.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 5,900 | SY |
$3.00 |
$1.54 |
$1.49 |
$2.30 |
$1.80 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.2 | AC |
$550.00 |
$880.00 |
$864.00 |
$500.00 |
$100.00 |
| 10 | 241 2832 |
MOWING | 3 | AC |
$130.00 |
$160.00 |
$156.60 |
$75.00 |
$50.00 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 3,175 | SY |
$10.00 |
$10.00 |
$10.26 |
$11.19 |
$9.50 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 100 | TON |
$40.00 |
$30.00 |
$45.00 |
$32.00 |
$90.00 |
| 13 | 407(B) 0250 |
TACK COAT | 650 | GAL |
$4.00 |
$4.95 |
$4.86 |
$4.86 |
$4.50 |
| 14 | 408 5774 |
PRIME COAT | 1,115 | GAL |
$8.00 |
$6.15 |
$6.05 |
$6.04 |
$5.60 |
| 15 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 485 | TON |
$100.00 |
$112.00 |
$104.76 |
$106.08 |
$97.00 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 980 | TON |
$100.00 |
$102.00 |
$97.20 |
$102.60 |
$90.00 |
| 17 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 320 | TON |
$120.00 |
$137.00 |
$126.36 |
$124.80 |
$117.00 |
| 18 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 2 | EA |
$3,500.00 |
$3,000.00 |
$2,000.00 |
$3,200.00 |
$4,500.00 |
| 19 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 1 | EA |
$4,500.00 |
$4,000.00 |
$3,500.00 |
$4,200.00 |
$6,000.00 |
| 20 | 611(H) 5789 |
ADD'L DEPTH IN INLET CDI RCP DES. 1 | 1 | VF |
$170.00 |
$550.00 |
$200.00 |
$3,000.00 |
$400.00 |
| 21 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 206 | LF |
$50.00 |
$39.00 |
$73.50 |
$56.90 |
$80.00 |
| 22 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 126 | LF |
$80.00 |
$78.00 |
$98.60 |
$71.07 |
$150.00 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$5,000.00 |
$6,500.00 |
$8,000.00 |
| 24 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,625 | SY |
$8.00 |
$15.50 |
$12.00 |
$8.00 |
$20.00 |
| 25 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 495 | LF |
$5.00 |
$5.00 |
$3.00 |
$4.00 |
$10.00 |
| 26 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,760 | LF |
$6.00 |
$6.60 |
$9.34 |
$9.34 |
$9.00 |
| 27 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,840 | CY |
$10.00 |
$10.00 |
$5.00 |
$8.00 |
$15.00 |
| 28 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 640 | CY |
$15.00 |
$20.00 |
$12.00 |
$12.00 |
$5.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 718.8 | CY |
$450.00 |
$475.00 |
$455.50 |
$450.00 |
$435.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 119,150 | LB |
$0.9000 |
$1.00 |
$0.9600 |
$1.05 |
$0.9000 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$8,000.00 |
$40,000.00 |
$38,232.75 |
| 32 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,800 | SD |
$0.3000 |
$1.17 |
$1.24 |
$1.24 |
$1.15 |
| 33 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$0.8000 |
$0.1200 |
$0.1100 |
$0.1800 |
$0.1000 |
| 34 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 960 | SD |
$2.00 |
$0.1200 |
$0.1100 |
$0.1800 |
$0.1000 |
| 35 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 480 | SD |
$3.00 |
$2.05 |
$2.16 |
$2.16 |
$2.00 |
| 36 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,800 | SD |
$0.6000 |
$0.1200 |
$0.1100 |
$0.1800 |
$0.1000 |
| 37 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,560 | SD |
$0.3000 |
$0.1200 |
$0.1100 |
$0.1800 |
$0.1000 |
| 38 | 880(F) 8878 |
DRUMS | 1,320 | SD |
$0.3000 |
$1.05 |
$1.08 |
$1.08 |
$1.00 |
| 39 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 228 | SD |
$15.00 |
$16.00 |
$16.20 |
$16.20 |
$15.00 |
| 40 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,200.00 |
$550.00 |
$540.00 |
$600.00 |
$500.00 |
| 41 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 22.5 | SF |
$25.00 |
$37.00 |
$37.80 |
$37.80 |
$35.00 |
| 42 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 28 | LF |
$12.00 |
$14.00 |
$12.96 |
$12.96 |
$12.00 |
| 43 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 4 | EA |
$25.00 |
$55.00 |
$54.00 |
$54.00 |
$50.00 |
| 44 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,495 | LF |
$1.00 |
$0.7700 |
$0.7600 |
$0.7800 |
$0.7000 |
| 45 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$5,100.00 |
$6,480.00 |
$5,750.00 |
$5,800.00 |
| 46 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$3,500.00 |
$3,500.00 |
$4,000.00 |
| 47 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$41,600.00 |
$74,000.00 |
$75,000.00 |
$156,233.25 |