$67.81Avg low bid / LF
$70.33Avg of all bids
$61.49Avg engineer's estimate
128Jobs · 102,523 LF
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 22 | 11,376.25 | $59.70 | $67.26 |
| 2020 | 45 | 50,350.7 | $66.97 | $71.50 |
| 2019 | 35 | 28,884.15 | $73.53 | $73.10 |
| 2018 | 26 | 11,911.9 | $65.21 | $62.33 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 21 LF | $75.00 | C-GAWF CONSTRUCTION, INC. |
| Oct 14, 2021 | 210237 | OklahomaDivision 4 | 275.75 LF | $58.00 | SAC Services, Inc. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 299.5 LF | $61.49 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 550 LF | $59.20 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 605 LF | $50.02 | C3 Construction, Inc. |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 580 LF | $55.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 314 LF | $67.50 | HASKELL LEMON CONSTRUCTION CO. |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 245 LF | $62.00 | Paragon Contractors, LLC |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 452 LF | $72.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 2,256 LF | $67.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 84 LF | $72.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210129 | BryanDivision 2 | 62 LF | $35.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210140 | McclainDivision 3 | 66 LF | $58.69 | Treas Construction Inc |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 470 LF | $63.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 618 LF | $37.70 | Robinson Construction, LLC |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 440 LF | $134.64 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 340 LF | $64.05 | Treas Construction Inc |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 1,076 LF | $45.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 145 LF | $75.83 | HUB Construction, Inc. |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 59 LF | $54.53 | C3 Construction, Inc. |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 887 LF | $60.00 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 210035 | Pontotoc | 782 LF | $46.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 105 LF | $60.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 644 LF | $36.60 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 6,566 LF | $61.25 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 44 LF | $39.14 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 608 LF | $75.45 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 98 LF | $63.80 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 56 LF | $71.62 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200333 | TulsaDivision 8 | 726 LF | $83.00 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 72 LF | $54.05 | THE CUMMINS CONSTRUCTION CO., INC. |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 3,020 LF | $65.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 5,943 LF | $42.10 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 52 LF | $100.00 | Rosscon, LLC |
| Sep 17, 2020 | 200295 | TulsaDivision 8 | 308 LF | $115.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 697 LF | $52.45 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200088 | TulsaDivision 8 | 22 LF | $94.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 1,084 LF | $47.95 | OVERLAND CORPORATION |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 710 LF | $82.44 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 29 LF | $80.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 4,616.7 LF | $91.98 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 36 LF | $85.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 56 LF | $125.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 554 LF | $75.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 534 LF | $43.90 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 1,931 LF | $75.40 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 6 LF | $40.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 70 LF | $50.00 | L & N BRIDGE, LLC |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 890 LF | $63.70 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200228 | Leflore | 48 LF | $58.60 | Robinson Construction, LLC |
| May 14, 2020 | 200126 | TulsaDivision 8 | 1,736 LF | $60.85 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 109 LF | $65.00 | DUIT CONSTRUCTION COMPANY, INC. |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 271 LF | $110.00 | Paragon Contractors, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 8,582 LF | $72.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 3,874 LF | $68.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200198 | KiowaDivision 5 | 120 LF | $111.19 | TOM HUDSON PAVING, INC. |
| Apr 16, 2020 | 200079 | SeminoleDivision 3 | 14 LF | $96.55 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200216 | BlaineDivision 5 | 187 LF | $100.00 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200028 | Cirb-264d(069)rb | 726 LF | $67.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200145 | ClevelandDivision 3 | 205 LF | $56.70 | SAC Services, Inc. |
| Apr 16, 2020 | 200148 | DelawareDivision 8 | 5 LF | $155.00 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 104 LF | $59.95 | Treas Construction Inc |
| Mar 19, 2020 | 200132 | CusterDivision 5 | 68 LF | $90.00 | SEWELL BROS., INC. |
| Mar 19, 2020 | 200085 | TulsaDivision 8 | 597 LF | $87.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Feb 20, 2020 | 200069 | LincolnDivision 3 | 14 LF | $62.00 | Cowboy Contracting, Inc. |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 190 LF | $46.80 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 190350 | Stp-224b(059)ss | 68 LF | $75.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Feb 20, 2020 | 190255 | Pontotoc | 40 LF | $75.75 | BRIDGECO CONTRACTORS, INC. |
| Jan 16, 2020 | 200009 | CusterDivision 5 | 290 LF | $65.00 | SEWELL BROS., INC. |
| Jan 16, 2020 | 200018 | McintoshDivision 1 | 96 LF | $56.60 | L & N BRIDGE, LLC |
| Jan 16, 2020 | 190214 | LoveDivision 7 | 222 LF | $64.00 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 505 LF | $60.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 3,551 LF | $65.00 | APAC-CENTRAL, INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 966 LF | $68.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190341 | CaddoDivision 7 | 240 LF | $58.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 1,189 LF | $68.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190383 | CimarronDivision 6 | 201 LF | $179.81 | IHC Scott, INC. |
| Nov 14, 2019 | 190389 | TulsaDivision 8 | 2,056 LF | $69.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 2,012 LF | $66.19 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190335 | TulsaDivision 8 | 58 LF | $68.60 | Tri Star Construction Arkansas, LLC |
| Oct 17, 2019 | 190312 | CanadianDivision 4 | 298 LF | $82.62 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190322 | CanadianDivision 4 | 228 LF | $80.00 | RUDY CONSTRUCTION CO. |
| Oct 17, 2019 | 190323 | Nhpp-255n(489)eh | 43 LF | $50.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 292 LF | $42.00 | OVERLAND CORPORATION |
| Oct 17, 2019 | 190323 | Nhpp-255n(489)eh | 29 LF | $56.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 19, 2019 | 190216 | McclainDivision 3 | 74 LF | $87.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 22, 2019 | 190271 | TulsaDivision 8 | 490 LF | $86.00 | Paragon Contractors, LLC |
| Aug 22, 2019 | 190262 | TulsaDivision 8 | 1,697 LF | $76.00 | BECCO CONTRACTORS, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 5,217 LF | $72.73 | DUIT CONSTRUCTION COMPANY, INC. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 922 LF | $93.30 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 1,594 LF | $81.60 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 188 LF | $69.55 | Treas Construction Inc |
| Jun 20, 2019 | 190156 | OklahomaDivision 4 | 63 LF | $60.00 | SCHWARZ PAVING CO., INC. |
| Jun 20, 2019 | 190137 | TulsaDivision 8 | 401 LF | $64.00 | Paragon Contractors, LLC |
| Jun 20, 2019 | 190016 | McintoshDivision 1 | 84 LF | $77.74 | OBC, INC. |
| May 16, 2019 | 190027 | WashingtonDivision 8 | 2,829 LF | $85.00 | BECCO CONTRACTORS, INC. |
| May 16, 2019 | 190117 | KiowaDivision 5 | 206 LF | $39.00 | SEWELL BROS., INC. |
| May 16, 2019 | 190013 | McclainDivision 3 | 374 LF | $51.50 | Silver Star Construction Company, Inc. |
| May 16, 2019 | 190174 | ClevelandDivision 3 | 40 LF | $120.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Apr 18, 2019 | 190146 | CaddoDivision 7 | 13 LF | $68.00 | Redlands Contracting, LLC |
| Apr 18, 2019 | 180235 | BryanDivision 2 | 384 LF | $69.59 | L & N BRIDGE, LLC |
| Apr 18, 2019 | 190165 | StephensDivision 7 | 286 LF | $56.05 | OVERLAND CORPORATION |
| Apr 18, 2019 | 190099 | TulsaDivision 8 | 312 LF | $66.00 | Tri Star Construction Arkansas, LLC |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 3,852 LF | $74.20 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 14, 2019 | 190101 | Pontotoc | 54 LF | $39.80 | THE CUMMINS CONSTRUCTION CO., INC. |
| Feb 14, 2019 | 190097 | Nhpp-008n(090)fp | 566 LF | $50.00 | J & R SAND COMPANY, INC. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 397.17 LF | $108.77 | Frontier Bridge, Inc. |
| Jan 17, 2019 | 190020 | Hsipg-256n(041)pm | 200 LF | $72.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 190051 | Ssp-250n(018)pm | 839 LF | $56.00 | Pavers, Inc. |
| Jan 17, 2019 | 190001 | AtokaDivision 2 | 103.98 LF | $61.04 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 180191 | Cotton | 86 LF | $37.00 | SEWELL BROS., INC. |
| Nov 15, 2018 | 180293 | Stp-255c(431)ag | 56 LF | $75.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Nov 15, 2018 | 180293 | Stp-255c(431)ag | 92 LF | $68.50 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180280 | CraigDivision 8 | 1,613 LF | $74.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 16 LF | $140.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180280 | CraigDivision 8 | 5 LF | $88.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 16 LF | $140.00 | BECCO CONTRACTORS, INC. |
| Aug 16, 2018 | 180263 | GarvinDivision 3 | 690 LF | $38.24 | Allen Contracting, Inc. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 2,286 LF | $71.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180127 | ClevelandDivision 3 | 354 LF | $36.75 | Silver Star Construction Company, Inc. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 1,100 LF | $85.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180232 | WashitaDivision 5 | 360 LF | $42.00 | SEWELL BROS., INC. |
| May 17, 2018 | 180132 | GarfieldDivision 4 | 346.4 LF | $47.80 | Bridges, Inc. DBA Scudder Bridge Co. |
| May 17, 2018 | 180190 | ClevelandDivision 3 | 124 LF | $114.00 | Silver Star Construction Company, Inc. |
| May 17, 2018 | 180193 | CreekDivision 8 | 54 LF | $75.00 | Cimarron Construction Company, LLC |
| Mar 15, 2018 | 180148 | TulsaDivision 8 | 62 LF | $109.67 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180131 | DeweyDivision 5 | 68 LF | $31.50 | J & R SAND COMPANY, INC. |
| Mar 15, 2018 | 180151 | WashingtonDivision 8 | 1,334.5 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Mar 15, 2018 | 180139 | OklahomaDivision 4 | 662 LF | $85.67 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180122 | Acstp-277d(044)ur | 1,075 LF | $36.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180141 | OttawaDivision 8 | 92 LF | $41.58 | C3 Construction, Inc. |
| Mar 15, 2018 | 180122 | Acstp-277d(044)ur | 392 LF | $31.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180143 | Tap-263d(051)tp | 15 LF | $125.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Feb 15, 2018 | 180009 | KingfisherDivision 4 | 641 LF | $83.62 | DUIT CONSTRUCTION COMPANY, INC. |
| Feb 15, 2018 | 180010 | Stp-238c(046)ss | 160 LF | $30.00 | RRY SERVICES LLC |
| Feb 15, 2018 | 180078 | CherokeeDivision 1 | 38 LF | $47.85 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Feb 15, 2018 | 180033 | SeminoleDivision 3 | 18 LF | $76.10 | Treas Construction Inc |
| Jan 18, 2018 | 180048 | KingfisherDivision 4 | 72 LF | $68.98 | Frontier Bridge, Inc. |
| Jan 18, 2018 | 180063 | OttawaDivision 8 | 120 LF | $42.81 | Crossland Construction Company, Inc. |
| Jan 18, 2018 | 180030 | RogersDivision 8 | 8 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Jan 18, 2018 | 180032 | SeminoleDivision 3 | 42 LF | $50.00 | T. McDonald Construction, Inc. |