Bid tab 180148

Let Mar 15, 2018 · Division 8 · Tulsa Sign up free

‹ Mar 2018 results

BRIDGE AND APPROACHES CITY STREET (129TH E AVENUE ): OVER I-244, 0.5 MILES NORTH OF I -44 IN TULSA . PROJECT LENGTH = 0.282 MILE

Let date
Thursday, March 15, 2018
Contract
180148
J/P numbers
28859(04)
District
Division 8
County
Tulsa
Highway
Limits
BRIDGE AND APPROACHES CITY STREET (129TH E AVENUE ): OVER I-244, 0.5 MILES NORTH OF I -44 IN TULSA . PROJECT LENGTH = 0.282 MILE
Project number
ACNHPPI-2440-(017)FP

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$6,073,654
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $5,224,453 -14.0%
2 BECCO CONTRACTORS, INC. $5,685,000 -6.4% +8.8%
3 MANHATTAN ROAD & BRIDGE COMPANY, LLC $5,729,000 -5.7% +9.7%
4 Frontier Bridge, Inc. $6,639,451 +9.3% +27.1%

Bid tab: unit prices 136 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 BECCO CONTRACTO…#3 MANHATTAN ROAD …#4 Frontier Bridge…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $50,000.00 $30,000.00 $15,000.00 $22,000.00 $10,450.00
2202(A) 0183 UNCLASSIFIED EXCAVATION4,601CY $8.80 $20.00 $10.00 $12.00 $13.42
3202(D) 0184 UNCLASSIFIED BORROW7,596CY $9.74 $11.50 $10.00 $15.00 $12.28
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $76,350.00 $40,000.00 $5,421.00 $35,180.00 $15,950.00
5221(C) 2801 TEMPORARY SILT FENCE2,767LF $1.80 $4.00 $2.00 $2.10 $2.19
6221(F) 0100 TEMPORARY SILT DIKE48LF $12.03 $7.00 $15.00 $13.00 $16.45
7221(K) 0600 TEMPORARY FIBER LOG280LF $10.00 $3.00 $10.00 $5.25 $7.65
8230(A) 2806 SOLID SLAB SODDING10,180SY $1.98 $2.75 $2.00 $3.10 $3.07
9233(A) 2817 VEGETATIVE MULCHING4.73AC $300.00 $1,300.00 $1,300.00 $1,295.00 $1,424.50
10241 2832 MOWING4AC $87.77 $150.00 $100.00 $240.00 $170.50
11303(A) 2100 AGGREGATE BASE TYPE A2,103CY $45.00 $32.57 $32.00 $50.00 $33.35
12307(K) 4300 STABILIZED SUBGRADE9,460SY $7.03 $5.00 $5.00 $9.50 $5.95
13317 4270 CEMENT TREATED BASE9,460SY $15.08 $14.19 $10.00 $8.00 $33.00
14325 5271 SEPARATOR FABRIC19,716SY $1.28 $3.12 $4.00 $4.75 $1.45
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E120TON $32.19 $27.10 $20.00 $25.00 $17.47
16411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)318TON $180.00 $111.89 $60.00 $150.00 $149.60
17414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )8,813SY $25.00 $21.23 $23.00 $20.00 $33.00
18414(G) 5275 P.C. CONCRETE FOR PAVEMENT2,667CY $140.00 $98.76 $110.00 $150.00 $148.50
19504(E) 1381 CONCRETE PARAPET770.17LF $125.00 $128.92 $80.00 $150.00 $89.59
20504(E) 6190 42" F-SHAPED PARAPET120LF $200.00 $98.86 $90.00 $150.00 $93.57
21509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES1.6CY $1,500.00 $750.00 $1,500.00 $1,000.00 $5,738.74
22509(D) 0325 CLASS C CONCRETE10CY $500.00 $250.00 $800.00 $750.00 $619.05
23510(A) 6333 RETAINING WALL611.37SY $800.00 $562.97 $600.00 $775.00 $701.37
24510(D) 0350 (SP)GRAFFITI TREATMENT9,812SF $2.17 $2.10 $2.00 $2.15 $2.26
25609(A) 0300 CONCRETE CURB (6" BARRIER-INTEGRAL)700LF $11.28 $2.08 $5.00 $10.00 $13.20
26609(A) 0380 CONCRETE CURB (8" BARRIER-INTEGRAL)2,016LF $10.00 $2.26 $6.00 $11.00 $13.20
27610(A) 0602 4" CONCRETE SIDEWALK1,140SY $50.98 $31.42 $53.00 $57.50 $61.60
28610(A) 0652 5" DECORATIVE CONCRETE SIDEWALK140SY $160.00 $89.90 $160.00 $150.00 $96.80
29610(B) 0604 6" CONCRETE DRIVEWAY401SY $64.00 $50.31 $85.00 $40.00 $74.80
30610(I) 4610 TACTILE WARNING DEVICE-NEW32SF $40.00 $22.34 $40.00 $50.00 $61.60
31611(G) 5112 INLET CI DES. 2 (STD)1EA $4,500.00 $2,981.79 $4,500.00 $4,000.00 $4,944.50
32611(G) 5120 INLET CI DES. 3 (STD)1EA $5,500.00 $4,828.41 $5,700.00 $6,000.00 $5,434.00
33611(G) 5123 INLET CI DES. 3 (2B)2EA $4,000.00 $6,314.99 $6,500.00 $7,250.00 $6,094.00
34611(H) 5325 ADD'L DEPTH IN INLET CI DES. 23.02VF $270.00 $275.00 $250.00 $400.00 $187.00
35611(H) 5330 ADD'L DEPTH IN INLET CI DES. 37.84VF $300.00 $425.00 $300.00 $550.00 $319.00
36611(L) 0487 JUNCTION BOXES55CF $65.00 $78.50 $100.00 $150.00 $102.27
37613(A) 0491 18" R.C.PIPE CLASS III62LF $65.00 $109.67 $100.00 $65.00 $87.51
38613(A) 0492 24" R.C.PIPE CLASS III58LF $89.00 $119.54 $115.00 $75.00 $112.41
39613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND1,530LF $13.50 $15.56 $8.00 $20.00 $15.97
40613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.95LF $18.11 $10.50 $8.00 $40.00 $15.97
41613(J) 5915 EDGE DRAIN CONDUIT-PERFORATED2,810LF $9.59 $9.50 $8.00 $7.50 $15.97
42613(K) 5916 EDGE DRAIN OUTLET LATERAL-NONPERFORATED255LF $10.41 $8.50 $8.00 $10.50 $15.97
43613(Q) 5946 OUTLET LATERAL HEADWALL14EA $600.00 $250.00 $600.00 $500.00 $699.21
44619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $25,000.00 $10,000.00 $10,000.00 $17,500.00 $15,169.00
45619(B) 4726 REMOVAL OF CURB AND GUTTER1,143LF $4.39 $6.79 $5.00 $5.00 $4.40
46619(B) 4727 REMOVAL OF CONCRETE PAVEMENT3,984SY $7.20 $5.70 $5.00 $9.00 $6.05
47619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,630SY $5.12 $4.06 $5.00 $6.00 $4.95
48619(B) 4780 REMOVAL OF GUARDRAIL3,450LF $2.63 $4.22 $3.00 $2.50 $3.30
49619(B) 4792 REMOVAL OF SIDEWALK571SY $8.77 $8.34 $5.00 $7.50 $8.25
50619(B) 6068 REMOVAL OF EXISTING RETAINING WALL350LF $150.00 $53.81 $50.00 $70.00 $55.00
51619(C) 0924 SAWING PAVEMENT290LF $6.23 $4.00 $5.00 $8.00 $11.00
52623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE2,350LF $16.40 $19.00 $19.00 $19.00 $20.35
53623(F) 8300 GUARDRAIL TRAIL END TURNDOWN (31")1EA $908.93 $1,000.00 $1,000.00 $650.00 $1,083.50
54623(G) 8590 GUARDRAIL END TREATMENT (31")3EA $2,275.73 $2,200.00 $2,500.00 $2,500.00 $2,420.00
55623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,680.97 $1,600.00 $2,000.00 $2,750.00 $1,705.00
56853 9024 DELINEATORS(TYPE 1, CODE 1)49EA $24.23 $16.00 $20.00 $15.00 $16.50
57414(E) 0225 FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY)30SY $10.00 $145.00 $30.00 $10.00 $220.00
58414(G) 5275 P.C. CONCRETE FOR PAVEMENT10CY $130.00 $135.00 $115.00 $100.00 $281.98
59613(V) 1180 TRENCH EXCAVATION520CY $20.00 $15.50 $20.00 $16.00 $16.50
60616(A) 6020 8" DUCTILE IRON PIPE W/POLYETHYLENE ENCASEMENT32LF $90.00 $156.66 $80.00 $150.00 $150.70
61616(A) 6030 12" DUCTILE IRON PIPE W/POLYETHYLENE ENCASEMENT200LF $105.00 $160.09 $75.00 $150.00 $154.00
62616(A) 6090 12" DUCTILE IRON PIPE REST. JT. W/POLYETHYLENE ENCASEMENT500LF $130.00 $171.52 $75.00 $160.00 $165.00
63616(D) 1080 8" GATE VALVE1EA $1,000.00 $1,486.55 $1,200.00 $1,500.00 $1,430.00
64616(D) 1100 12" GATE VALVE3EA $2,500.00 $2,515.70 $2,000.00 $2,500.00 $2,420.00
65616(D) 7051 STANDARD VALVE BOX4EA $150.00 $114.35 $150.00 $125.00 $110.00
66616(D) 7078 VALVE BOX EXTENSION8EA $100.00 $102.92 $70.00 $100.00 $99.00
67616(K) 0175 8" SOLID SLEEVE1EA $800.00 $514.58 $300.00 $500.00 $495.00
68616(K) 0225 12" SOLID SLEEVE2EA $900.00 $743.27 $500.00 $700.00 $715.00
69616(O) 0350 8" 22 1/2 DEGREE FITTING3EA $350.00 $571.75 $300.00 $525.00 $550.00
70616(O) 0500 12" 11 1/4 DEGREE FITTING3EA $750.00 $743.27 $500.00 $675.00 $715.00
71616(O) 0530 12" 45 DEGREE FITTING3EA $750.00 $743.27 $500.00 $675.00 $715.00
72616(O) 0550 12" 90 DEGREE FITTING2EA $780.00 $857.62 $500.00 $800.00 $825.00
73616(T) 0610 12" X 12" X 8" TEE1EA $900.00 $914.80 $800.00 $850.00 $880.00
74619(B) 4727 REMOVAL OF CONCRETE PAVEMENT30SY $15.00 $9.15 $5.00 $5.00 $8.80
75619(C) 0924 SAWING PAVEMENT104LF $7.00 $5.72 $5.00 $2.50 $5.50
76501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON1,430CY $30.00 $14.98 $26.00 $15.00 $33.60
77501(G) 6309 CLSM BACKFILL404CY $160.00 $137.25 $100.00 $112.50 $158.09
78504(A) 1304 APPROACH SLAB460SY $225.00 $170.04 $160.00 $165.00 $266.82
79504(B) 1305 SAW-CUT GROOVING1,962.7SY $5.00 $4.50 $5.00 $5.00 $4.93
80504(C) 1450 EXPANSION DEVICE12.8LF $400.00 $320.65 $200.00 $400.00 $165.39
81504(C) 6250 SEALED EXPANSION JOINT67.3LF $300.00 $166.08 $235.00 $190.00 $251.77
82504(E) 1381 CONCRETE PARAPET619.8LF $125.00 $128.93 $90.00 $155.00 $80.22
83506(A) 1322 STRUCTURAL STEEL404,210LB $1.65 $1.66 $1.90 $1.70 $2.45
84507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY18EA $1,750.00 $882.06 $1,500.00 $1,100.00 $1,459.13
85507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY54EA $1,750.00 $882.06 $1,500.00 $1,100.00 $1,313.29
86509 6152 SPECIAL CONCRETE FINISH265SY $125.00 $90.00 $80.00 $40.00 $94.51
87509(A) 1326 CLASS AA CONCRETE530.4CY $610.00 $716.38 $750.00 $400.00 $567.11
88509(B) 1328 CLASS A CONCRETE945.5CY $700.00 $595.92 $650.00 $525.00 $788.68
89510(C) 6138 SLOPE WALL (5")1,179SY $120.00 $89.52 $100.00 $85.00 $86.91
90511(B) 6010 EPOXY COATED REINFORCING STEEL235,100LB $1.10 $1.00 $1.00 $1.00 $1.16
91514(A) 6011 PILES, FURNISHED (HP 12X53)805LF $35.00 $34.91 $40.00 $45.00 $47.06
92514(B) 6294 PILES, DRIVEN (HP 12X53)805LF $20.00 $28.56 $15.00 $13.00 $22.40
93514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00
94515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,661SY $4.00 $3.65 $5.00 $4.00 $4.09
95516(A) 6098 DRILLED SHAFTS 72" DIAMETER162LF $2,500.00 $1,796.84 $1,200.00 $2,650.00 $1,885.77
96516(C) 6200 CROSSHOLE SONIC LOGGING9EA $2,750.00 $1,284.21 $1,000.00 $2,500.00 $4,480.00
97523(A) 6550 SEALER CRACK PREPARATION131.6LF $4.00 $4.00 $5.00 $5.00 $4.48
98523(B) 6560 SEALER RESIN2GAL $125.00 $150.00 $165.00 $200.00 $168.00
99613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND362LF $28.00 $15.56 $20.00 $15.00 $35.30
100613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.106LF $28.00 $10.50 $20.00 $15.00 $37.54
101619(B) 2505 REMOVAL OF BRIDGE ITEMS1EA $20,000.00 $5,500.00 $5,000.00 $5,250.00 $11,200.00
102619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $75,000.00 $50,000.00 $485,000.00 $110,000.00 $201,600.00
103857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)2,000LF $0.5000 $0.5700 $0.5500 $0.5500 $0.5500
104857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)7,750LF $0.9200 $0.8600 $0.8000 $0.8000 $0.8300
105857(E) 8881 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS2,000EA $1.20 $1.15 $2.00 $1.05 $1.10
106857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)2,700LF $1.00 $0.2900 $0.2500 $0.2500 $0.2800
107871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.240SD $20.00 $5.72 $5.50 $5.25 $5.50
108877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,475LF $23.87 $16.86 $15.00 $25.00 $38.50
109877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER800LF $10.00 $2.92 $7.00 $5.00 $8.25
110880(A) 8812 ARROW DISPLAY(TYPE C)450SD $4.03 $2.58 $3.00 $2.35 $2.48
111880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF6,340SD $0.2400 $2.29 $2.20 $3.00 $2.20
112880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF7,290SD $0.4200 $0.2900 $0.3000 $0.2500 $0.2800
113880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF7,640SD $0.8600 $0.2900 $0.3000 $0.2500 $0.2800
114880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)4,620SD $0.5300 $2.29 $2.20 $2.50 $2.20
115880(C) 8848 WING BARRICADES2,118SD $0.6000 $0.2900 $0.3000 $0.2500 $0.2800
116880(E) 8860 WARNING LIGHTS(TYPE A)15,630SD $0.2300 $0.1100 $0.1000 $0.1100 $0.1100
117880(F) 8878 DRUMS30,720SD $0.1300 $0.1100 $0.1000 $0.1100 $0.1100
118880(G) 8884 TUBE CHANNELIZERS1,000SD $0.4000 $1.15 $1.10 $1.25 $1.10
119880(G) 8890 CHANNELIZER CONES10,000SD $0.1600 $0.1100 $0.1100 $0.1100 $0.1100
120882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN210SD $14.13 $17.16 $20.00 $17.50 $16.50
121805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS15EA $44.82 $28.59 $100.00 $50.00 $27.50
122805(D) 8744 (PL)REMOVE & RESET LIGHT POLE1EA $3,800.00 $8,976.49 $8,000.00 $10,000.00 $8,250.00
123805(D) 8760 (PL)REMOVE & RESET GROUND MOUNTED SIGN3EA $1,000.00 $171.52 $165.00 $175.00 $165.00
124850(A) 8110 SHEET ALUMINUM SIGNS136.81SF $19.68 $16.01 $15.00 $15.00 $15.40
125851(C) 8327 2 1/4" SQUARE TUBE POST159LF $9.00 $9.15 $10.00 $10.00 $8.80
126856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)3,802LF $1.22 $0.8600 $1.00 $0.8000 $0.8300
127856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)3,407LF $1.38 $1.15 $1.10 $1.10 $1.10
128856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)1,110LF $1.44 $2.29 $2.20 $2.15 $2.20
129856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)67LF $9.48 $11.43 $11.00 $12.50 $11.00
130856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)9EA $176.94 $114.35 $110.00 $110.00 $110.00
131870(C) 8011 SAND FILLED IMPACT ATTENUATION MODULE REMOVAL1LSUM $3,000.00 $1,143.50 $2,000.00 $2,750.00 $1,100.00
132871(A) 8325 (SP)IMPACT ATTENUATOR2EA $30,000.00 $36,020.30 $30,000.00 $34,828.46 $34,650.00
133642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $40,000.00 $40,426.61 $45,000.00 $28,750.00 $25,245.00
134220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $2,000.00 $2,500.00 $10,000.00 $2,500.00 $4,400.00
135640(A) 1398 FIELD OFFICE1EA $3,000.00 $3,430.50 $5,000.00 $20,000.00 $6,600.00
136641 1399 MOBILIZATION1LSUM $280,000.00 $208,913.59 $291,349.15 $286,767.53 $325,617.46