$82.27Avg low bid / LF
$94.32Avg of all bids
$98.26Avg engineer's estimate
52Jobs · 184,883.1 LF
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 7 | 21,902 | $72.69 | $85.91 |
| 2020 | 13 | 53,726.5 | $74.06 | $82.41 |
| 2019 | 13 | 32,809.7 | $97.68 | $113.37 |
| 2018 | 17 | 73,953.5 | $83.56 | $97.18 |
| 2017 | 2 | 2,491.4 | $102.61 | $98.42 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Jul 15, 2021 | 190363 | LoveDivision 7 | 1,720 LF | $62.17 | C3 Construction, Inc. |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 1,731 LF | $67.35 | C3 Construction, Inc. |
| Mar 18, 2021 | 210097 | KayDivision 4 | 669 LF | $141.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 517 LF | $97.89 | Treas Construction Inc |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 809.4 LF | $110.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 8,363 LF | $65.24 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 795 LF | $69.96 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 485 LF | $79.78 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210097 | KayDivision 4 | 669 LF | $141.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 666.8 LF | $88.00 | HUB Construction, Inc. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 2,738.4 LF | $62.40 | C3 Construction, Inc. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 2,738.4 LF | $62.40 | C3 Construction, Inc. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 1,496.4 LF | $63.85 | EMERY SAPP & SONS, INC. |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 2,665.6 LF | $67.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 2,672.7 LF | $67.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 1,173.3 LF | $70.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 7,823 LF | $79.45 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 1,173.3 LF | $65.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 535.9 LF | $95.08 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 544.1 LF | $89.93 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 639.6 LF | $77.22 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 9,536.2 LF | $62.66 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 691.4 LF | $77.22 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 691.4 LF | $77.22 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 301.3 LF | $77.22 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1,049.5 LF | $71.71 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 301.3 LF | $77.22 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 65 LF | $250.00 | OCCI, INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 88 LF | $134.24 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 954 LF | $69.66 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 1,089.2 LF | $78.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 4,097 LF | $70.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 8,304 LF | $73.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 1,108.3 LF | $75.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 646.8 LF | $82.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 821.5 LF | $80.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 646.8 LF | $81.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 1,071 LF | $75.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Apr 16, 2020 | 200147 | CreekDivision 8 | 48 LF | $500.00 | Rosscon, LLC |
| Apr 16, 2020 | 200165 | OklahomaDivision 4 | 565.2 LF | $85.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Apr 16, 2020 | 200165 | OklahomaDivision 4 | 584.8 LF | $85.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Apr 16, 2020 | 200216 | BlaineDivision 5 | 348 LF | $120.00 | K & R BUILDERS, INC. |
| Feb 20, 2020 | 200047 | AtokaDivision 2 | 627.5 LF | $114.24 | C3 Construction, Inc. |
| Jan 16, 2020 | 190352 | GarvinDivision 3 | 683.2 LF | $94.00 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 190352 | GarvinDivision 3 | 683.2 LF | $94.00 | Silver Star Construction Company, Inc. |
| Nov 14, 2019 | 190392 | PayneDivision 4 | 110 LF | $225.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 1,966 LF | $63.66 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 533.4 LF | $66.11 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 533.6 LF | $66.11 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 659.8 LF | $100.00 | OVERLAND CORPORATION |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 1,153.2 LF | $100.00 | OVERLAND CORPORATION |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 701 LF | $135.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 11,097 LF | $95.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 701 LF | $135.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 663.4 LF | $130.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 324 LF | $130.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 723 LF | $120.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190217 | MurrayDivision 7 | 742.8 LF | $102.71 | C3 Construction, Inc. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 723 LF | $120.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190226 | OkmulgeeDivision 1 | 425.4 LF | $110.00 | C-GAWF CONSTRUCTION, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 1,371.9 LF | $125.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190230 | BryanDivision 2 | 60 LF | $200.00 | HUB Construction, Inc. |
| Jun 20, 2019 | 190016 | McintoshDivision 1 | 622 LF | $143.78 | OBC, INC. |
| Jun 20, 2019 | 180343 | BeckhamDivision 5 | 590.4 LF | $104.14 | Frontier Bridge, Inc. |
| Jun 20, 2019 | 190016 | McintoshDivision 1 | 949.5 LF | $110.00 | OBC, INC. |
| Jun 20, 2019 | 190016 | McintoshDivision 1 | 949.5 LF | $110.00 | OBC, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 768.9 LF | $110.00 | DUIT CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 120.2 LF | $88.93 | DUIT CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 230.8 LF | $85.20 | DUIT CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 120.2 LF | $88.93 | DUIT CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 230.8 LF | $85.20 | DUIT CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 483 LF | $86.80 | DUIT CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 483 LF | $86.80 | DUIT CONSTRUCTION COMPANY, INC. |
| May 16, 2019 | 190186 | Nhppi-4000-(075)pm | 768.9 LF | $110.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Apr 18, 2019 | 190161 | RogersDivision 8 | 487 LF | $90.00 | BECCO CONTRACTORS, INC. |
| Apr 18, 2019 | 190161 | RogersDivision 8 | 487 LF | $90.00 | BECCO CONTRACTORS, INC. |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 2,830 LF | $60.68 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 200 LF | $91.34 | Frontier Bridge, Inc. |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 463.3 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 694 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 559.7 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 4,030.5 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 691.7 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 3,013.1 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 702.1 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 11,420 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 1,098.4 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 679.4 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 503.7 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 603.7 LF | $90.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 493.8 LF | $85.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 464 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 774.1 LF | $85.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 457.5 LF | $85.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 452 LF | $85.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180281 | CreekDivision 8 | 40 LF | $300.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 1,299 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 454.4 LF | $85.00 | BECCO CONTRACTORS, INC. |
| Aug 16, 2018 | 180219 | GarvinDivision 3 | 476.5 LF | $161.00 | A. M. COHRON & SON, INC. |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 447.6 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 1,143.8 LF | $60.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 692.7 LF | $66.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 431.3 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 1,158.9 LF | $60.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 753.1 LF | $58.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 432.2 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 4,397 LF | $56.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 575.4 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 689.6 LF | $58.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 402.7 LF | $59.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 300 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 817.2 LF | $58.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 402.7 LF | $58.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 441.3 LF | $75.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 495 LF | $56.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 711.8 LF | $66.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 393 LF | $125.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 496.7 LF | $99.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 397.3 LF | $97.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 16,051 LF | $87.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 393 LF | $99.50 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 393 LF | $125.00 | SHERWOOD CONSTRUCTION CO., INC. |
| May 17, 2018 | 180132 | GarfieldDivision 4 | 1,405 LF | $78.00 | Bridges, Inc. DBA Scudder Bridge Co. |
| Mar 15, 2018 | 180126 | ClevelandDivision 3 | 662.2 LF | $94.40 | HASKELL LEMON CONSTRUCTION CO. |
| Mar 15, 2018 | 180139 | OklahomaDivision 4 | 1,652 LF | $73.73 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180139 | OklahomaDivision 4 | 1,652 LF | $96.11 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180148 | TulsaDivision 8 | 120 LF | $98.86 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 15, 2018 | 180099 | OklahomaDivision 4 | 416 LF | $135.00 | RUDY CONSTRUCTION CO. |
| Feb 15, 2018 | 180100 | OklahomaDivision 4 | 2,023.4 LF | $65.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Jan 18, 2018 | 180047 | GradyDivision 7 | 881.4 LF | $92.77 | Frontier Bridge, Inc. |
| Jan 18, 2018 | 180048 | KingfisherDivision 4 | 783.6 LF | $72.04 | Frontier Bridge, Inc. |
| Jan 18, 2018 | 180055 | McintoshDivision 1 | 230 LF | $125.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Jan 18, 2018 | 180072 | TulsaDivision 8 | 978.7 LF | $89.56 | Frontier Bridge, Inc. |
| Jan 18, 2018 | 180047 | GradyDivision 7 | 681 LF | $91.63 | Frontier Bridge, Inc. |
| Jan 18, 2018 | 180047 | GradyDivision 7 | 681 LF | $91.63 | Frontier Bridge, Inc. |
| Feb 16, 2017 | 170079 | GarvinDivision 3 | 751.3 LF | $82.00 | OBC, INC. |
| Feb 16, 2017 | 170079 | GarvinDivision 3 | 750.6 LF | $82.00 | OBC, INC. |
| Jan 19, 2017 | 170053 | Acnhppi-4400-(014)ss | 549.5 LF | $145.00 | BECCO CONTRACTORS, INC. |
| Jan 19, 2017 | 170053 | Acnhppi-4400-(014)ss | 440 LF | $120.00 | BECCO CONTRACTORS, INC. |