Bid tab 200279

Let Sep 17, 2020 · Division 7 · Grady Sign up free

‹ Sep 2020 results

BRIDGE AND APPROACHES US-62: OVER WASHITA RIVER , 0.3 MILES EAST OF THE I -44 INTERCHANGE IN CHICKASHA. PROJECT LENGTH = 0.704 MILES

Let date
Thursday, September 17, 2020
Contract
200279
J/P numbers
28182(04)
District
Division 7
County
Grady
Highway
Limits
BRIDGE AND APPROACHES US-62: OVER WASHITA RIVER , 0.3 MILES EAST OF THE I -44 INTERCHANGE IN CHICKASHA. PROJECT LENGTH = 0.704 MILES
Project number
NHPP-126N(187)PM

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$13,725,277
1 MANHATTAN ROAD & BRIDGE COMPANY, LLC Low bidder $12,459,607 -9.2%
2 C3 Construction, Inc. $12,765,169 -7.0% +2.5%
3 OBC, INC. $12,858,626 -6.3% +3.2%
4 Frontier Bridge, Inc. $12,971,077 -5.5% +4.1%
5 K & R BUILDERS, INC. $13,297,179 -3.1% +6.7%
6 OVERLAND CORPORATION $14,373,504 +4.7% +15.4%

Bid tab: unit prices 125 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 MANHATTAN ROAD …#2 C3 Construction…#3 OBC, INC.#4 Frontier Bridge…#5 K & R BUILDERS,…#6 OVERLAND CORPOR…
10201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $70,000.00 $10,145.17 $35,000.35 $63,000.00 $50,000.00 $287,000.00
20202(A) 0183 UNCLASSIFIED EXCAVATION19,356CY $8.00 $12.50 $8.65 $8.00 $6.30 $7.78 $13.75
30202(D) 0184 UNCLASSIFIED BORROW2,751CY $8.00 $14.00 $14.92 $14.00 $12.60 $12.40 $12.00
40205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $16,000.00 $14,274.39 $35,000.35 $8,400.00 $11,000.00 $28,000.00
50221(C) 2801 TEMPORARY SILT FENCE1,350LF $1.60 $3.00 $2.49 $2.18 $2.10 $2.70 $2.30
60221(D) 2803 TEMPORARY SEDIMENT FILTER6EA $150.00 $310.00 $202.90 $211.94 $225.75 $220.00 $205.00
70221(F) 0100 TEMPORARY SILT DIKE390LF $7.00 $12.50 $14.15 $11.59 $10.45 $15.35 $14.00
80230(A) 2806 SOLID SLAB SODDING10,051SY $2.00 $3.30 $3.28 $2.66 $2.08 $3.70 $2.50
90230(F) 2812 WATERING402KGAL $6.00 $9.50 $9.40 $15.98 $5.25 $10.15 $15.00
100307(K) 4300 STABILIZED SUBGRADE5,731SY $6.00 $10.00 $8.35 $11.50 $7.35 $7.70 $12.00
110402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E150TON $40.00 $38.00 $37.88 $90.00 $40.44 $38.50 $50.00
120407(B) 0250 TACK COAT4,755GAL $3.50 $4.00 $4.77 $3.00 $4.20 $4.40 $2.75
130408 5774 PRIME COAT1,784GAL $6.00 $4.00 $7.16 $5.00 $6.30 $6.60 $3.00
140411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)202TON $105.00 $175.00 $138.45 $135.00 $121.80 $133.40 $115.00
150411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,801TON $90.00 $115.00 $107.42 $98.00 $94.50 $103.50 $95.00
160411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)1,644TON $115.00 $123.00 $130.10 $120.00 $114.45 $125.35 $115.00
170411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)941TON $100.00 $117.00 $107.42 $100.00 $94.50 $103.50 $100.00
180412 5267 COLD MILLING PAVEMENT18,569SY $3.00 $3.40 $1.79 $1.85 $3.68 $6.15 $2.75
190413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC5,876LF $1.00 $1.00 $0.5100 $1.93 $1.31 $0.5500 $0.6000
200509(B) 0321 CLASS A CONCRETE1CY $600.00 $1,000.00 $350.94 $2,100.02 $4,889.81 $1,750.00 $1,100.00
210509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES1.5CY $1,100.00 $650.00 $503.88 $1,000.01 $4,364.81 $1,500.00 $1,100.00
220511(B) 4269 EPOXY COATED REINFORCING STEEL130LB $1.10 $1.80 $2.66 $1.50 $2.78 $4.50 $1.30
230609(B) 1501 1'-8" COMB. CURB & GUTTER (6" MNTBLE)974LF $35.00 $31.00 $29.84 $38.00 $26.25 $27.50 $38.00
240611(G) 5112 INLET CI DES. 2 (STD)1EA $4,000.00 $4,482.00 $2,603.99 $6,200.06 $4,008.38 $5,300.00 $4,500.00
250611(H) 5325 ADD'L DEPTH IN INLET CI DES. 21VF $500.00 $300.00 $738.23 $800.01 $1,027.44 $550.00 $350.00
260611(L) 0487 JUNCTION BOXES26CF $100.00 $135.00 $111.63 $350.00 $112.01 $270.00 $1,550.00
270613(B) 0689 18" CORR. GALV. STEEL PIPE5LF $50.00 $160.00 $104.53 $50.00 $55.62 $116.00 $110.00
280613(B) 4529 35" X 24" CORR. GALV. STEEL PIPE ARCH110LF $60.00 $55.00 $63.17 $90.00 $64.27 $35.00 $63.50
290613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.400LF $20.00 $15.00 $10.24 $20.00 $21.85 $25.00 $22.50
300613(M) 7197 TYPE B6 CULVERT END TREATMENT1EA $1,800.00 $1,600.94 $1,281.43 $2,400.02 $2,139.09 $2,300.00 $1,570.00
310619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $3,000.00 $8,502.00 $920.23 $1,900.02 $8,400.00 $7,000.00 $8,000.00
320619(B) 4726 REMOVAL OF CURB AND GUTTER1,056LF $8.00 $8.50 $4.77 $20.00 $6.30 $4.50 $6.00
330619(B) 4728 REMOVAL OF ASPHALT PAVEMENT6,635SY $5.00 $7.50 $3.58 $4.50 $5.25 $6.15 $6.00
340619(B) 4741 REMOVAL OF DRAINAGE INLETS1EA $1,500.00 $850.00 $1,014.52 $2,200.02 $3,675.00 $2,100.00 $2,000.00
350619(B) 4778 REMOVAL OF EXISTING STRUCTURES1EA $1,500.00 $500.00 $1,014.52 $1,900.02 $2,100.00 $3,500.00 $1,000.00
360619(B) 4780 REMOVAL OF GUARDRAIL924LF $3.50 $4.00 $2.98 $2.66 $2.63 $3.00 $2.50
370619(C) 0924 SAWING PAVEMENT1,277LF $5.00 $3.50 $9.55 $4.00 $8.40 $8.80 $3.10
380623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE88LF $20.00 $25.00 $28.65 $25.56 $25.20 $26.40 $26.40
390623(F) 8300 GUARDRAIL TRAIL END TURNDOWN (31")1EA $1,500.00 $519.00 $596.78 $532.50 $525.00 $550.00 $550.00
400623(G) 8590 GUARDRAIL END TREATMENT (31")3EA $2,400.00 $2,180.00 $2,506.46 $2,236.50 $2,205.00 $2,310.00 $2,310.00
410623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $2,905.00 $2,148.39 $1,917.00 $1,890.00 $1,980.00 $1,980.00
420501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON330CY $35.00 $40.00 $12.75 $35.00 $20.80 $11.00 $15.00
430501(G) 6309 CLSM BACKFILL388.4CY $180.00 $190.00 $140.15 $180.00 $159.49 $163.50 $200.00
440503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)6,285LF $275.00 $240.00 $311.69 $234.00 $238.24 $282.00 $305.00
450504(A) 1304 APPROACH SLAB316.6SY $300.00 $215.00 $162.09 $240.00 $242.18 $225.00 $255.00
460504(B) 1305 SAW-CUT GROOVING5,627.1SY $5.00 $3.50 $4.06 $3.62 $3.54 $3.74 $3.50
470504(C) 6250 SEALED EXPANSION JOINT169.82LF $350.00 $255.00 $251.02 $285.00 $250.38 $310.00 $310.00
480504(E) 6190 42" F-SHAPED PARAPET2,665.6LF $120.00 $67.00 $69.76 $75.00 $71.89 $99.00 $85.00
490506(A) 1322 STRUCTURAL STEEL5,050LB $3.50 $2.00 $4.73 $2.50 $2.86 $2.75 $1.50
500507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY40EA $1,800.00 $2,150.00 $1,666.17 $2,500.00 $1,963.10 $1,810.00 $2,000.00
510507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY50EA $1,800.00 $2,150.00 $1,666.17 $2,500.00 $1,963.10 $1,810.00 $2,000.00
520509(A) 1326 CLASS AA CONCRETE1,582.4CY $600.00 $575.00 $490.21 $590.00 $576.14 $607.50 $700.00
530509(B) 1328 CLASS A CONCRETE558.9CY $690.00 $675.00 $735.78 $875.00 $645.33 $657.50 $810.00
540509(D) 0325 CLASS C CONCRETE1CY $500.00 $1,100.00 $396.55 $3,000.00 $3,481.04 $3,500.00 $1,500.00
550511(A) 1332 REINFORCING STEEL1,650LB $1.00 $1.50 $0.7100 $1.00 $1.08 $1.55 $1.20
560511(B) 6010 EPOXY COATED REINFORCING STEEL492,110LB $1.10 $1.20 $0.9900 $1.10 $1.03 $1.15 $1.10
570513(B) 6019 CLASS B BRIDGE DECK REPAIR300SY $450.00 $150.00 $472.20 $461.15 $416.00 $453.48 $400.00
580513(C) 6020 CLASS C BRIDGE DECK REPAIR100SY $700.00 $185.00 $629.16 $692.25 $728.00 $682.00 $650.00
590514(A) 6011 PILES, FURNISHED (HP 12X53)585LF $45.00 $40.00 $33.09 $45.00 $43.56 $35.00 $55.00
600514(B) 6294 PILES, DRIVEN (HP 12X53)585LF $20.00 $15.00 $19.10 $30.00 $18.72 $15.00 $35.00
610514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
620515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)4,085SY $5.00 $3.75 $3.72 $3.89 $3.80 $4.02 $3.70
630516(A) 6096 DRILLED SHAFTS 60" DIAMETER914LF $900.00 $800.00 $785.92 $800.00 $935.99 $773.00 $975.00
640516(C) 6200 CROSSHOLE SONIC LOGGING4EA $4,000.00 $1,450.00 $1,850.00 $1,491.00 $4,056.00 $2,650.00 $2,000.00
650523(A) 6550 SEALER CRACK PREPARATION159LF $5.00 $4.25 $4.08 $4.26 $4.16 $4.00 $4.00
660523(B) 6560 SEALER RESIN1.8GAL $150.00 $155.00 $152.94 $159.75 $156.00 $150.00 $150.00
670601(B) 1353 TYPE I-A PLAIN RIPRAP628TON $55.00 $45.00 $42.69 $45.00 $43.54 $45.50 $53.00
680601(C) 1355 TYPE I-A FILTER BLANKET445TON $45.00 $30.00 $29.08 $35.00 $33.14 $33.00 $40.00
690613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND86LF $35.00 $23.00 $12.56 $30.00 $21.65 $30.00 $41.00
700613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.48LF $35.00 $23.00 $12.56 $30.00 $20.33 $30.00 $43.00
710619(B) 2505 REMOVAL OF BRIDGE ITEMS2EA $10,000.00 $800.00 $8,951.62 $3,000.00 $5,200.00 $15,000.00 $3,000.00
720619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $500,000.00 $74,000.00 $354,427.75 $500,000.00 $520,000.00 $350,000.00 $195,000.00
730501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON365CY $35.00 $50.00 $12.74 $35.00 $21.60 $11.00 $15.00
740501(G) 6309 CLSM BACKFILL388.4CY $170.00 $190.00 $140.15 $180.00 $165.63 $163.50 $200.00
750503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)6,285LF $275.00 $260.00 $306.43 $234.00 $247.40 $282.00 $305.00
760504(A) 1304 APPROACH SLAB332.3SY $300.00 $215.00 $161.98 $240.00 $267.70 $225.00 $255.00
770504(B) 1305 SAW-CUT GROOVING5,642.2SY $5.00 $3.50 $4.06 $3.62 $3.67 $3.74 $3.50
780504(C) 6250 SEALED EXPANSION JOINT171.19LF $350.00 $255.00 $251.02 $285.00 $260.01 $310.00 $310.00
790504(E) 6190 42" F-SHAPED PARAPET2,672.7LF $120.00 $67.00 $52.57 $75.00 $74.65 $99.00 $85.00
800506(A) 1322 STRUCTURAL STEEL5,030LB $3.50 $2.00 $4.73 $2.50 $3.51 $2.75 $1.50
810507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY40EA $1,800.00 $2,250.00 $1,666.17 $2,500.00 $2,009.18 $1,810.00 $2,000.00
820507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY50EA $1,800.00 $2,250.00 $1,666.17 $2,500.00 $2,009.18 $1,810.00 $2,000.00
830509(A) 1326 CLASS AA CONCRETE1,582CY $600.00 $575.00 $480.29 $590.00 $592.84 $607.50 $700.00
840509(B) 1328 CLASS A CONCRETE558CY $690.00 $800.00 $633.40 $875.00 $656.11 $657.50 $810.00
850509(D) 0325 CLASS C CONCRETE1.5CY $500.00 $1,100.00 $405.14 $3,000.00 $3,398.92 $3,500.00 $1,500.00
860511(A) 1332 REINFORCING STEEL1,580LB $1.00 $1.50 $0.7100 $1.00 $1.12 $1.55 $1.20
870511(B) 6010 EPOXY COATED REINFORCING STEEL491,150LB $1.10 $1.25 $0.9900 $1.10 $1.07 $1.15 $1.10
880514(A) 6011 PILES, FURNISHED (HP 12X53)533LF $45.00 $45.00 $33.62 $45.00 $46.60 $35.00 $55.00
890514(B) 6294 PILES, DRIVEN (HP 12X53)533LF $20.00 $18.00 $19.10 $30.00 $16.20 $15.00 $35.00
900514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
910515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)4,118SY $5.00 $3.75 $3.72 $3.89 $3.94 $4.02 $3.70
920516(A) 6096 DRILLED SHAFTS 60" DIAMETER888LF $900.00 $1,100.00 $781.39 $800.00 $1,003.22 $778.00 $975.00
930516(C) 6200 CROSSHOLE SONIC LOGGING4EA $4,000.00 $1,450.00 $1,850.00 $1,491.00 $3,132.00 $2,650.00 $2,000.00
940523(A) 6550 SEALER CRACK PREPARATION161LF $5.00 $4.25 $4.08 $4.26 $4.32 $4.00 $4.00
950523(B) 6560 SEALER RESIN1.8GAL $150.00 $155.00 $152.94 $159.75 $162.00 $150.00 $150.00
960601(B) 1353 TYPE I-A PLAIN RIPRAP837TON $55.00 $50.00 $42.18 $45.00 $47.37 $45.50 $53.00
970601(C) 1355 TYPE I-A FILTER BLANKET489TON $45.00 $30.00 $29.59 $35.00 $33.33 $33.00 $40.00
980613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND86LF $35.00 $23.00 $12.56 $30.00 $24.32 $30.00 $41.00
990613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.52LF $35.00 $23.00 $12.56 $30.00 $26.20 $30.00 $43.00
1,000619(B) 2505 REMOVAL OF BRIDGE ITEMS5EA $10,000.00 $900.00 $7,161.30 $3,000.00 $5,400.00 $14,000.00 $3,000.00
1,010619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $500,000.00 $150,000.00 $270,879.30 $500,000.00 $540,000.00 $350,000.00 $195,000.00
1,020853 9066 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)8EA $15.00 $26.00 $25.49 $26.63 $26.50 $27.50 $26.00
1,030871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.1,032SD $5.00 $4.10 $4.08 $4.26 $4.24 $4.40 $4.10
1,040877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,750LF $25.00 $25.00 $60.67 $25.00 $24.38 $52.00 $17.00
1,050877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,750LF $4.00 $3.00 $3.06 $7.00 $3.18 $5.50 $5.00
1,060880(A) 8812 ARROW DISPLAY(TYPE C)750SD $3.00 $11.00 $10.20 $10.65 $10.60 $11.00 $10.50
1,070880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF8,126SD $0.3000 $0.3200 $0.3100 $0.3200 $0.3200 $0.3300 $0.3100
1,080880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF6,719SD $0.5000 $0.5300 $0.5100 $0.5300 $0.5300 $0.5500 $0.5200
1,090880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF10,407SD $1.30 $2.03 $2.04 $2.13 $2.12 $2.20 $2.05
1,100880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)5,205SD $1.00 $1.80 $1.78 $1.86 $1.86 $1.93 $1.80
1,110880(C) 8848 WING BARRICADES3,000SD $1.50 $0.2700 $0.2500 $0.2700 $0.2600 $0.2800 $0.2700
1,120880(E) 8860 WARNING LIGHTS(TYPE A)18,567SD $0.4000 $0.5200 $0.5100 $0.5300 $0.5300 $0.5500 $0.5200
1,130880(F) 8878 DRUMS76,001SD $0.1500 $0.0600 $0.0600 $0.0600 $0.0600 $0.0700 $0.0700
1,140880(G) 8884 TUBE CHANNELIZERS3,440SD $0.1800 $1.05 $1.02 $1.07 $1.06 $1.10 $1.00
1,150882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN778SD $15.00 $8.25 $8.16 $8.52 $8.48 $8.80 $8.25
1,160850(A) 8110 SHEET ALUMINUM SIGNS36SF $35.00 $40.00 $35.69 $37.28 $37.10 $38.50 $36.00
1,170851(C) 8330 2 1/2" SQUARE TUBE POST60LF $10.00 $8.50 $8.16 $8.52 $8.48 $8.80 $8.25
1,180856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)18,171LF $0.5000 $0.4500 $0.4500 $0.4700 $0.4700 $0.4900 $0.4500
1,190856(B) 8525 TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.)8EA $300.00 $260.00 $254.90 $266.25 $265.00 $275.00 $255.00
1,200857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)30,443LF $0.1500 $0.1400 $0.1300 $0.1400 $0.1400 $0.1500 $0.1300
1,210857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)39,263LF $0.1500 $0.0800 $0.0800 $0.0900 $0.0900 $0.0900 $0.0800
1,220642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $100,000.00 $25,000.00 $29,600.02 $17,040.00 $26,288.00 $46,500.00 $99,000.00
1,230220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $8,000.00 $1,850.00 $3,580.65 $7,500.00 $5,300.00 $12,500.00 $10,000.00
1,240640(A) 1398 FIELD OFFICE1EA $8,000.00 $16,425.00 $1,529.40 $25,000.00 $10,070.00 $15,000.00 $50,000.00
1,250641 1399 MOBILIZATION1LSUM $590,000.00 $560,000.00 $784,400.59 $430,000.00 $582,142.40 $580,000.00 $639,000.00