| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$6,180.00 |
$15,000.00 |
$20,435.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$10.00 |
$15.45 |
$32.50 |
$27.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,500.00 |
$3,605.00 |
$12,000.00 |
$24,205.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,065 | LF |
$2.00 |
$1.65 |
$1.76 |
$1.65 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 120 | LF |
$10.00 |
$8.76 |
$9.35 |
$8.85 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 3,700 | SY |
$3.00 |
$2.32 |
$3.00 |
$2.35 |
| 7 | 230(F) 2812 |
WATERING | 148 | KGAL |
$5.50 |
$5.15 |
$5.50 |
$5.20 |
| 8 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.37 | TON |
$860.00 |
$463.50 |
$100.00 |
$468.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 210 | CY |
$50.00 |
$56.57 |
$87.00 |
$193.00 |
| 10 | 408 5774 |
PRIME COAT | 305 | GAL |
$8.00 |
$5.15 |
$6.00 |
$19.40 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,400 | TON |
$115.00 |
$70.56 |
$82.20 |
$78.60 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 15,910 | SY |
$12.00 |
$2.58 |
$3.50 |
$3.70 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 9 | CY |
$300.00 |
$505.47 |
$700.00 |
$681.50 |
| 14 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,265 | LF |
$5.00 |
$4.12 |
$3.05 |
$2.45 |
| 15 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,636 | LF |
$20.00 |
$16.43 |
$17.60 |
$15.30 |
| 16 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,260.85 |
$2,450.00 |
$2,080.00 |
| 17 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 12 | EA |
$2,000.00 |
$1,699.50 |
$1,815.00 |
$2,080.00 |
| 18 | 501(G) 6309 |
CLSM BACKFILL | 146 | CY |
$200.00 |
$185.77 |
$177.50 |
$204.00 |
| 19 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$11,533.60 |
$15,000.00 |
$14,415.00 |
| 20 | 504(A) 1304 |
APPROACH SLAB | 217 | SY |
$300.00 |
$241.22 |
$267.50 |
$444.50 |
| 21 | 504(B) 1305 |
SAW-CUT GROOVING | 1,768.8 | SY |
$4.00 |
$3.74 |
$3.75 |
$3.75 |
| 22 | 504(C) 6250 |
SEALED EXPANSION JOINT | 143.4 | LF |
$350.00 |
$214.03 |
$255.00 |
$280.50 |
| 23 | 504(E) 6190 |
42" F-SHAPED PARAPET | 681 | LF |
$125.00 |
$91.63 |
$112.50 |
$137.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 381.7 | CY |
$650.00 |
$743.80 |
$844.00 |
$616.00 |
| 25 | 509(D) 1331 |
CLASS C CONCRETE | 3.1 | CY |
$325.00 |
$1,187.37 |
$937.50 |
$1,426.00 |
| 26 | 511 6306 |
MECHANICAL SPLICES | 1,282 | EA |
$30.00 |
$18.52 |
$38.00 |
$13.30 |
| 27 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 131,890 | LB |
$1.10 |
$1.08 |
$1.08 |
$0.9700 |
| 28 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$25,000.00 |
$24,200.80 |
$23,500.00 |
$22,680.00 |
| 29 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 698 | SY |
$4.00 |
$3.12 |
$4.00 |
$3.10 |
| 30 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 28 | LF |
$40.00 |
$31.20 |
$34.00 |
$32.80 |
| 31 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$100.00 |
$41.60 |
$45.00 |
$43.70 |
| 32 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 22.4 | SY |
$700.00 |
$624.00 |
$675.00 |
$655.00 |
| 33 | 523(A) 6550 |
SEALER CRACK PREPARATION | 395 | LF |
$4.50 |
$4.16 |
$4.40 |
$4.15 |
| 34 | 523(B) 6560 |
SEALER RESIN | 5 | GAL |
$115.00 |
$156.00 |
$165.00 |
$156.00 |
| 35 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 375.6 | SF |
$50.00 |
$53.04 |
$64.00 |
$61.20 |
| 36 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 162 | SY |
$30.00 |
$20.80 |
$23.00 |
$21.80 |
| 37 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 4 | EA |
$750.00 |
$1,684.80 |
$1,260.00 |
$1,223.00 |
| 38 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$150,000.00 |
$83,200.00 |
$215,000.00 |
$210,560.00 |
| 39 | 501(G) 6309 |
CLSM BACKFILL | 146 | CY |
$200.00 |
$185.77 |
$177.50 |
$204.00 |
| 40 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$20,000.00 |
$11,533.60 |
$12,900.00 |
$12,110.00 |
| 41 | 504(A) 1304 |
APPROACH SLAB | 217 | SY |
$300.00 |
$241.22 |
$267.50 |
$444.50 |
| 42 | 504(B) 1305 |
SAW-CUT GROOVING | 1,768.8 | SY |
$4.00 |
$3.74 |
$3.75 |
$3.75 |
| 43 | 504(C) 6250 |
SEALED EXPANSION JOINT | 143.4 | LF |
$350.00 |
$214.03 |
$255.00 |
$280.50 |
| 44 | 504(E) 6190 |
42" F-SHAPED PARAPET | 681 | LF |
$125.00 |
$91.63 |
$112.50 |
$137.00 |
| 45 | 509(A) 1326 |
CLASS AA CONCRETE | 381.7 | CY |
$650.00 |
$743.80 |
$844.00 |
$616.00 |
| 46 | 509(D) 1331 |
CLASS C CONCRETE | 5.9 | CY |
$325.00 |
$1,187.37 |
$850.00 |
$887.00 |
| 47 | 511 6306 |
MECHANICAL SPLICES | 1,282 | EA |
$30.00 |
$18.52 |
$38.00 |
$13.30 |
| 48 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 131,890 | LB |
$1.10 |
$1.08 |
$1.08 |
$0.9700 |
| 49 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$25,000.00 |
$24,200.80 |
$23,500.00 |
$22,680.00 |
| 50 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 698 | SY |
$4.00 |
$3.12 |
$4.00 |
$3.10 |
| 51 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 16 | LF |
$40.00 |
$31.20 |
$34.00 |
$32.80 |
| 52 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 3 | GAL |
$100.00 |
$41.60 |
$45.00 |
$43.70 |
| 53 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 21.3 | SY |
$700.00 |
$624.00 |
$675.00 |
$655.00 |
| 54 | 523(A) 6550 |
SEALER CRACK PREPARATION | 395 | LF |
$4.50 |
$4.16 |
$4.40 |
$4.15 |
| 55 | 523(B) 6560 |
SEALER RESIN | 5 | GAL |
$115.00 |
$156.00 |
$165.00 |
$156.00 |
| 56 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 500.8 | SF |
$50.00 |
$53.04 |
$60.00 |
$55.70 |
| 57 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 172.4 | SY |
$30.00 |
$20.80 |
$23.00 |
$21.80 |
| 58 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 5 | EA |
$750.00 |
$1,684.80 |
$1,260.00 |
$1,223.00 |
| 59 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$150,000.00 |
$83,200.00 |
$215,000.00 |
$210,560.00 |
| 60 | 501(G) 6309 |
CLSM BACKFILL | 150 | CY |
$200.00 |
$185.77 |
$177.50 |
$202.50 |
| 61 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$20,000.00 |
$15,069.60 |
$16,500.00 |
$15,820.00 |
| 62 | 504(A) 1304 |
APPROACH SLAB | 221.4 | SY |
$300.00 |
$240.10 |
$267.50 |
$438.00 |
| 63 | 504(B) 1305 |
SAW-CUT GROOVING | 2,289 | SY |
$4.00 |
$3.74 |
$3.75 |
$3.75 |
| 64 | 504(C) 6250 |
SEALED EXPANSION JOINT | 191 | LF |
$350.00 |
$230.10 |
$255.00 |
$280.50 |
| 65 | 504(E) 6190 |
42" F-SHAPED PARAPET | 881.4 | LF |
$125.00 |
$92.77 |
$112.50 |
$145.50 |
| 66 | 509(A) 1326 |
CLASS AA CONCRETE | 510 | CY |
$650.00 |
$769.80 |
$844.00 |
$635.50 |
| 67 | 509(D) 1331 |
CLASS C CONCRETE | 2.4 | CY |
$325.00 |
$1,707.37 |
$937.50 |
$1,757.00 |
| 68 | 511 6306 |
MECHANICAL SPLICES | 1,394 | EA |
$30.00 |
$19.56 |
$38.00 |
$12.40 |
| 69 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 151,700 | LB |
$1.10 |
$1.13 |
$1.08 |
$1.00 |
| 70 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$25,000.00 |
$27,872.00 |
$28,000.00 |
$26,535.00 |
| 71 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,786.8 | SY |
$4.00 |
$3.12 |
$4.00 |
$3.10 |
| 72 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 17.5 | LF |
$40.00 |
$31.20 |
$34.00 |
$32.80 |
| 73 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$100.00 |
$41.60 |
$45.00 |
$43.70 |
| 74 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 62.1 | SY |
$700.00 |
$624.00 |
$675.00 |
$655.00 |
| 75 | 523(A) 6550 |
SEALER CRACK PREPARATION | 401.7 | LF |
$4.50 |
$4.16 |
$4.40 |
$4.15 |
| 76 | 523(B) 6560 |
SEALER RESIN | 5 | GAL |
$115.00 |
$156.00 |
$165.00 |
$156.00 |
| 77 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 334.6 | SF |
$50.00 |
$57.20 |
$64.00 |
$60.10 |
| 78 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 185.5 | SY |
$30.00 |
$20.80 |
$23.00 |
$21.80 |
| 79 | 540 4505 |
(PL)REPAIR BRIDGE ITEMS | 5 | EA |
$800.00 |
$468.00 |
$525.00 |
$491.50 |
| 80 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 3 | EA |
$750.00 |
$1,788.80 |
$1,260.00 |
$1,223.00 |
| 81 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$190,000.00 |
$104,000.00 |
$280,000.00 |
$381,870.00 |
| 82 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 12,792 | LF |
$1.00 |
$0.5200 |
$0.6000 |
$0.6400 |
| 83 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 41,335 | LF |
$0.5000 |
$0.1000 |
$0.1200 |
$0.1400 |
| 84 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 440 | SD |
$11.00 |
$10.30 |
$22.00 |
$16.60 |
| 85 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,500 | LF |
$30.00 |
$26.78 |
$27.50 |
$21.30 |
| 86 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 3,475 | LF |
$5.00 |
$5.15 |
$2.75 |
$2.10 |
| 87 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,990.00 |
$41,200.00 |
$48,000.00 |
$28,415.00 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,464 | SD |
$15.00 |
$10.30 |
$12.00 |
$14.60 |
| 89 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$10,094.00 |
$12,500.00 |
$10,190.00 |
| 90 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$230,000.00 |
$205,955.87 |
$206,000.00 |
$735,149.71 |