BRIDGE AND APPROACHES I -40: OVER US-69B AND UNION PACIFIC RAILROAD, 0.8 MILES AND 0.9 MILES EAST OF THE US -69 INTERCHANGE IN CHECOTAH . PROJECT LENGTH = 1.058 MILES

Let date
Thursday, June 20, 2019
Contract
190016
J/P numbers
27958(04)
District
Division 1
County
Mcintosh
Highway
Limits
BRIDGE AND APPROACHES I -40: OVER US-69B AND UNION PACIFIC RAILROAD, 0.8 MILES AND 0.9 MILES EAST OF THE US -69 INTERCHANGE IN CHECOTAH . PROJECT LENGTH = 1.058 MILES
Project number
NHPPI-4000-(066)PM

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$15,417,119
1 OBC, INC. Low bidder $15,723,796 +2.0%
2 SHERWOOD CONSTRUCTION CO., INC. $16,001,213 +3.8% +1.8%
3 OVERLAND CORPORATION $17,196,923 +11.5% +9.4%
4 MANHATTAN ROAD & BRIDGE COMPANY, LLC $17,806,169 +15.5% +13.2%

Bid tab: unit prices 142 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 OBC, INC.#2 SHERWOOD CONSTR…#3 OVERLAND CORPOR…#4 MANHATTAN ROAD …
1202(A) 0183 UNCLASSIFIED EXCAVATION18,639CY $6.90 $11.80 $25.00 $19.50 $15.00
2202(D) 0184 UNCLASSIFIED BORROW9,524CY $9.10 $5.00 $1.00 $0.0100 $5.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $37,401.70 $32,529.03 $46,000.00 $50,000.00 $17,500.00
4221(C) 2801 TEMPORARY SILT FENCE5,300LF $1.60 $3.18 $4.20 $3.00 $3.50
5221(E) 2804 TEMPORARY SEDIMENT BASIN5EA $2,000.00 $2,662.50 $1,400.00 $1,100.00 $750.00
6221(F) 0100 TEMPORARY SILT DIKE203LF $8.20 $20.18 $8.90 $19.00 $15.00
7230(A) 2806 SOLID SLAB SODDING50,275SY $1.20 $3.14 $3.50 $3.00 $3.05
8232(B) 2814 SEEDING METHOD B10.4AC $128.40 $2,928.75 $3,300.00 $1,000.00 $2,850.00
9233(A) 2817 VEGETATIVE MULCHING20.8AC $222.80 $2,076.75 $2,300.00 $1,500.00 $2,000.00
10241 2832 MOWING20.8AC $52.70 $527.18 $595.00 $500.00 $515.00
11303(A) 2100 AGGREGATE BASE TYPE A14,700CY $40.30 $29.00 $41.00 $44.00 $35.00
12307(K) 4300 STABILIZED SUBGRADE52,749SY $5.90 $5.00 $4.20 $7.95 $6.50
13317 4270 CEMENT TREATED BASE33,528SY $5.50 $13.00 $18.00 $18.00 $17.50
14325 5271 SEPARATOR FABRIC78,981SY $1.20 $1.20 $1.00 $1.00 $1.25
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E8,725TON $21.80 $20.00 $7.10 $21.50 $24.00
16408 5774 PRIME COAT45,233GAL $3.30 $1.00 $5.00 $4.75 $4.60
17411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,225TON $86.60 $110.33 $125.00 $108.00 $105.00
18413(C) 4868 RUMBLE STRIP-METHOD PCC-CON20,158LF $0.5000 $0.3800 $0.9400 $0.5000 $0.5500
19414(A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT)20,165SY $20.00 $13.00 $18.00 $13.40 $18.00
20414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )34,677SY $24.00 $18.00 $18.00 $19.75 $20.00
21414(G) 5275 P.C. CONCRETE FOR PAVEMENT17,737CY $139.00 $125.00 $140.00 $159.00 $190.00
22504(E) 1381 CONCRETE PARAPET313.8LF $145.30 $165.08 $140.00 $115.00 $115.00
23504(E) 6190 42" F-SHAPED PARAPET622LF $98.10 $143.78 $80.00 $120.00 $85.00
24509(B) 0321 CLASS A CONCRETE29CY $725.00 $585.75 $215.00 $470.00 $750.00
25509(D) 0325 CLASS C CONCRETE10CY $337.20 $639.00 $300.00 $480.00 $800.00
26510(A) 6333 RETAINING WALL507.7SY $900.00 $850.00 $700.00 $670.00 $1,100.00
27510(D) 0350 (SP)GRAFFITI TREATMENT3,950SF $2.30 $1.70 $1.90 $1.60 $1.65
28511(A) 0332 REINFORCING STEEL4,320LB $1.30 $1.17 $0.9500 $1.00 $1.15
29609(A) 0287 CONCRETE CURB (4" MNTBLE-INTEGRAL)201LF $15.00 $12.01 $12.00 $21.75 $15.00
30610(C) 0608 4" CONCRETE DIVIDING STRIP199SY $44.30 $58.58 $40.00 $40.80 $75.00
31613(A) 0491 18" R.C.PIPE CLASS III84LF $51.60 $77.74 $125.00 $70.00 $95.00
32613(B) 5717 15" CORR. GALV. STEEL PIPE250LF $25.00 $34.04 $51.00 $36.00 $30.00
33613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND1,500LF $10.60 $10.00 $32.00 $16.00 $14.50
34613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.500LF $10.80 $10.00 $25.00 $16.00 $10.00
35613(J) 5915 EDGE DRAIN CONDUIT-PERFORATED1,600LF $10.10 $10.00 $7.70 $11.00 $7.00
36613(K) 5916 EDGE DRAIN OUTLET LATERAL-NONPERFORATED400LF $12.10 $10.00 $12.00 $11.00 $4.50
37613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $294.80 $1,166.28 $595.00 $1,000.00 $2,000.00
38613(M) 7196 TYPE A6 CULVERT END TREATMENT1EA $1,375.30 $2,130.00 $3,100.00 $2,600.00 $1,500.00
39613(Q) 5946 OUTLET LATERAL HEADWALL8EA $624.00 $300.00 $325.00 $600.00 $500.00
40619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $11,938.30 $17,380.02 $59,000.00 $100,000.00 $50,000.00
41619(B) 4727 REMOVAL OF CONCRETE PAVEMENT40,646SY $5.80 $9.32 $7.00 $3.36 $9.00
42619(B) 4728 REMOVAL OF ASPHALT PAVEMENT16,515SY $3.00 $4.80 $4.70 $4.15 $4.00
43619(B) 4780 REMOVAL OF GUARDRAIL1,640LF $3.20 $2.40 $3.40 $3.15 $3.00
44619(B) 4791 REMOVAL OF CURB3,625LF $2.00 $1.77 $6.40 $4.74 $3.50
45619(B) 6252 REMOVAL OF EXISTING PARAPET369LF $10.00 $16.00 $8.50 $8.47 $15.00
46619(C) 0924 SAWING PAVEMENT1,028LF $5.30 $3.50 $2.50 $5.53 $4.00
47623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE600LF $17.90 $21.30 $24.00 $18.38 $16.00
48623(G) 8571 GUARDRAIL END TREATMENT (GET)6EA $2,284.10 $2,662.50 $2,100.00 $2,520.00 $3,300.00
49623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")6EA $1,945.60 $1,863.75 $3,000.00 $1,837.50 $2,350.00
50501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON2,275CY $27.00 $25.00 $14.00 $10.00 $7.50
51501(G) 6309 CLSM BACKFILL309CY $162.00 $175.00 $200.00 $180.00 $175.00
52504(A) 1304 APPROACH SLAB383.2SY $205.00 $225.00 $205.00 $165.00 $200.00
53504(B) 1305 SAW-CUT GROOVING2,639.2SY $5.00 $3.83 $4.30 $4.00 $3.75
54504(C) 6250 SEALED EXPANSION JOINT108.9LF $280.00 $275.00 $265.00 $269.00 $300.00
55504(E) 6190 42" F-SHAPED PARAPET949.5LF $110.00 $110.00 $73.00 $93.00 $75.00
56506(A) 1322 STRUCTURAL STEEL815,930LB $1.80 $1.95 $1.60 $1.96 $1.70
57507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY7EA $1,700.00 $2,500.00 $2,100.00 $1,900.00 $2,250.00
58507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY28EA $1,700.00 $2,500.00 $2,100.00 $2,000.00 $2,250.00
59509(A) 1326 CLASS AA CONCRETE563.7CY $600.00 $600.00 $815.00 $740.00 $650.00
60509(B) 1328 CLASS A CONCRETE507.1CY $725.00 $750.00 $785.00 $735.00 $800.00
61509(D) 1331 CLASS C CONCRETE1.5CY $700.00 $3,000.00 $455.00 $1,300.00 $975.00
62510(C) 6138 SLOPE WALL (5")1,805SY $125.00 $111.83 $120.00 $112.00 $130.00
63510(D) 0350 (SP)GRAFFITI TREATMENT24,938SF $2.30 $1.92 $2.20 $1.80 $1.85
64511(B) 6010 EPOXY COATED REINFORCING STEEL240,110LB $1.10 $1.29 $1.20 $1.05 $1.25
65514(A) 6010 PILES, FURNISHED (HP 10X42)1,032LF $28.00 $32.00 $30.00 $40.00 $40.00
66514(B) 6292 PILES, DRIVEN (HP 10X42)1,032LF $16.00 $34.00 $28.00 $9.00 $10.00
67514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00
68515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,216SY $5.00 $4.26 $4.80 $4.00 $4.15
69516(A) 6095 DRILLED SHAFTS 54" DIAMETER163LF $900.00 $1,105.00 $915.00 $1,000.00 $1,250.00
70516(C) 6200 CROSSHOLE SONIC LOGGING6EA $3,200.00 $1,597.50 $1,800.00 $1,500.00 $1,550.00
71523(A) 6550 SEALER CRACK PREPARATION321LF $4.00 $5.33 $6.00 $5.00 $5.25
72523(B) 6560 SEALER RESIN4GAL $150.00 $213.00 $240.00 $200.00 $210.00
73613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND293LF $30.00 $30.00 $32.00 $26.00 $16.00
74613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $30.00 $30.00 $25.00 $30.00 $16.00
75619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $150,000.00 $187,000.00 $140,000.00 $150,000.00 $115,000.00
76624(E) 4294 FENCE-STYLE CLF (8'HIGH, CLASS A)430LF $80.00 $37.15 $160.00 $37.00 $88.50
77501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON2,290CY $27.00 $25.00 $14.00 $10.00 $8.00
78501(E) 6354 SELECT BACKFILL10CY $60.00 $50.00 $87.00 $60.00 $75.00
79501(G) 6309 CLSM BACKFILL313CY $162.00 $175.00 $200.00 $160.00 $175.00
80504(A) 1304 APPROACH SLAB383.2SY $205.00 $225.00 $205.00 $165.00 $210.00
81504(B) 1305 SAW-CUT GROOVING2,639.2SY $5.00 $3.83 $4.30 $4.00 $3.75
82504(C) 6250 SEALED EXPANSION JOINT108.9LF $280.00 $275.00 $265.00 $269.00 $300.00
83504(E) 6190 42" F-SHAPED PARAPET949.5LF $110.00 $110.00 $73.00 $93.00 $75.00
84506(A) 1322 STRUCTURAL STEEL815,930LB $1.80 $1.92 $1.60 $1.96 $1.80
85507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY7EA $1,700.00 $2,500.00 $2,100.00 $2,000.00 $3,000.00
86507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY28EA $1,700.00 $2,500.00 $2,100.00 $2,000.00 $3,000.00
87509(A) 1326 CLASS AA CONCRETE563.7CY $600.00 $600.00 $815.00 $740.00 $650.00
88509(B) 1328 CLASS A CONCRETE511.7CY $725.00 $750.00 $785.00 $735.00 $950.00
89509(D) 1331 CLASS C CONCRETE1.5CY $700.00 $3,000.00 $455.00 $1,300.00 $900.00
90510(C) 6138 SLOPE WALL (5")1,891SY $125.00 $111.83 $120.00 $112.00 $150.00
91510(D) 0350 (SP)GRAFFITI TREATMENT25,142SF $2.30 $1.92 $2.20 $1.80 $1.85
92511(B) 6010 EPOXY COATED REINFORCING STEEL240,360LB $1.10 $1.29 $1.20 $1.05 $1.25
93514(A) 6010 PILES, FURNISHED (HP 10X42)995LF $28.00 $32.00 $30.00 $40.00 $40.00
94514(B) 6292 PILES, DRIVEN (HP 10X42)995LF $16.00 $34.00 $28.00 $9.00 $10.00
95514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00
96515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,218SY $5.00 $4.26 $4.80 $4.00 $4.15
97516(A) 6095 DRILLED SHAFTS 54" DIAMETER157LF $900.00 $1,105.00 $915.00 $1,000.00 $1,600.00
98516(C) 6200 CROSSHOLE SONIC LOGGING6EA $3,200.00 $1,597.50 $1,800.00 $1,500.00 $1,550.00
99523(A) 6550 SEALER CRACK PREPARATION321LF $4.00 $5.33 $6.00 $5.00 $5.25
100523(B) 6560 SEALER RESIN4GAL $150.00 $213.00 $240.00 $200.00 $210.00
101613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND213LF $30.00 $30.00 $32.00 $26.00 $18.00
102613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.65LF $30.00 $30.00 $25.00 $30.00 $18.00
103619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $150,000.00 $187,000.00 $140,000.00 $150,000.00 $350,000.00
104624(E) 4294 FENCE-STYLE CLF (8'HIGH, CLASS A)430LF $80.00 $37.15 $160.00 $37.00 $88.50
105104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)90DAY $650.00 $650.00 $650.00 $650.00 $650.00
106857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)67,012LF $0.1000 $0.1300 $0.0700 $0.0600 $0.1500
107857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-17,839EA $0.4000 $0.6900 $0.4200 $0.5500 $0.7000
108857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)76,598LF $0.1000 $0.1700 $0.0100 $0.0100 $0.2000
109871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.2,925SD $3.60 $6.39 $1.20 $1.00 $6.15
110871(C) 8709 (SP) RELOCATION OF IMPACT ATTENUATOR4EA $1,000.00 $585.75 $120.00 $100.00 $675.00
111877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER7,078LF $23.20 $29.00 $17.00 $25.00 $26.00
112877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER22,409LF $2.10 $3.00 $4.00 $3.20 $2.05
113878(B) 8487 MODULAR GLARE SCREEN (TEMPORARY)172,800SD $0.2000 $0.0200 $0.0100 $0.0100 $0.0200
114880(A) 8800 ARROW DISPLAY(TYPE A)675SD $2.50 $15.98 $22.00 $18.00 $15.50
115880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF15,130SD $0.3000 $0.1600 $0.5400 $0.4500 $0.2000
116880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF12,300SD $0.3000 $0.1600 $0.6000 $0.5000 $0.2000
117880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF15,800SD $0.9000 $4.26 $1.20 $1.00 $4.15
118880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,200SD $1.00 $4.26 $6.00 $5.00 $4.15
119880(C) 8848 WING BARRICADES2,350SD $0.5000 $1.07 $6.00 $5.00 $1.05
120880(E) 8860 WARNING LIGHTS(TYPE A)45,630SD $0.2000 $0.0500 $0.0200 $0.0200 $0.0700
121880(F) 8878 DRUMS115,697SD $0.1000 $0.0500 $0.0700 $0.0600 $0.0700
122882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN1,725SD $7.60 $7.46 $6.00 $5.00 $7.25
123804(A) 2915 STRUCTURAL CONCRETE2.16CY $583.50 $532.50 $360.00 $310.00 $515.00
124804(B) 2916 REINFORCING STEEL332LB $1.90 $3.20 $2.40 $2.00 $3.10
125805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS12EA $126.00 $186.38 $60.00 $51.00 $180.00
126805(D) 8760 (PL)REMOVE & RESET GROUND MOUNTED SIGN4EA $560.00 $745.50 $300.00 $255.00 $725.00
127850(A) 8110 SHEET ALUMINUM SIGNS217.01SF $16.70 $51.12 $15.00 $12.75 $50.00
128851(C) 8324 2" SQUARE TUBE POST378LF $6.90 $8.52 $6.00 $5.10 $8.25
129851(C) 8330 2 1/2" SQUARE TUBE POST90LF $11.30 $12.78 $6.00 $5.10 $12.50
130853 9024 DELINEATORS(TYPE 1, CODE 1)14EA $21.60 $13.85 $30.00 $25.00 $13.50
131856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)37,710LF $0.8000 $0.7200 $0.5400 $0.4500 $0.7000
132856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)5,438LF $0.9000 $0.9100 $0.7200 $0.6000 $0.9000
133856(A) 8548 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)1,340LF $2.00 $3.20 $2.40 $2.00 $3.10
134856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)4EA $210.20 $266.25 $240.00 $200.00 $255.00
135509(A) 0319 CLASS AA CONCRETE308.3CY $468.30 $138.45 $155.00 $1,025.00 $135.00
136619(B) 5190 REMOVAL OF CABLE BARRIER8,358LF $3.40 $3.83 $4.30 $26.00 $3.75
137628(B) 5125 HIGH-TENSION CABLE BARRIER(TL-4)7,497LF $18.00 $16.97 $19.00 $31.00 $16.50
138628(C) 5110 END ANCHORS5EA $4,000.00 $6,283.50 $7,100.00 $11,000.00 $6,000.00
139642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $100,000.00 $74,017.50 $88,000.00 $100,000.00 $115,000.00
140220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $7,500.00 $5,000.00 $15,000.00 $1,775.00
141640(A) 1398 FIELD OFFICE1EA $10,000.00 $35,000.00 $10,000.00 $50,000.00 $60,000.00
142641 1399 MOBILIZATION1LSUM $650,000.00 $682,000.00 $690,000.00 $750,000.00 $775,640.02