Bid tab 210055

Let Feb 18, 2021 · Division 7 · Murray Sign up free

‹ Feb 2021 results

BRIDGE AND APPROACHES SH-7 WB: OVER GUY SANDY CREEK , 3.7 MILES WEST OF THE US -177 JUNCTION NEAR SULPHUR. PROJECT LENGTH = 0.634 MILE

Let date
Thursday, February 18, 2021
Contract
210055
J/P numbers
31889(04)
District
Division 7
County
Murray
Highway
Limits
BRIDGE AND APPROACHES SH-7 WB: OVER GUY SANDY CREEK , 3.7 MILES WEST OF THE US -177 JUNCTION NEAR SULPHUR. PROJECT LENGTH = 0.634 MILE
Project number
NHPP-250N(031)PM

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,619,353
1 HUB Construction, Inc. Low bidder $3,978,816 -13.9%
2 Treas Construction Inc $3,998,814 -13.4% +0.5%
3 C3 Construction, Inc. $4,037,284 -12.6% +1.5%
4 L & N BRIDGE, LLC $4,283,478 -7.3% +7.7%
5 HASKELL LEMON CONSTRUCTION CO. $4,492,131 -2.8% +12.9%
6 Silver Star Construction Company, Inc. $4,553,500 -1.4% +14.4%

Bid tab: unit prices 109 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HUB Constructio…#2 Treas Construct…#3 C3 Construction…#4 L & N BRIDGE, L…#5 HASKELL LEMON C…#6 Silver Star Con…
10201(A) 0102 CLEARING AND GRUBBING1LSUM $40,000.00 $42,000.00 $40,950.00 $6,152.89 $14,000.00 $15,140.00 $37,400.00
20202(A) 0183 UNCLASSIFIED EXCAVATION8,953CY $9.00 $6.28 $9.45 $7.38 $9.00 $9.75 $9.50
30202(D) 0184 UNCLASSIFIED BORROW23,677CY $8.00 $8.28 $7.94 $8.61 $7.56 $8.15 $16.00
40205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $60,000.00 $25,000.00 $46,200.00 $18,086.01 $19,000.00 $20,545.00 $65,000.00
50221(C) 2801 TEMPORARY SILT FENCE3,368LF $2.00 $3.50 $2.99 $2.86 $2.85 $4.30 $2.95
60221(D) 2803 TEMPORARY SEDIMENT FILTER4EA $400.00 $800.00 $627.90 $600.86 $598.00 $1,081.00 $619.00
70221(F) 0100 TEMPORARY SILT DIKE406LF $12.00 $10.00 $18.77 $17.97 $17.88 $16.20 $18.50
80230(A) 2806 SOLID SLAB SODDING32,206SY $4.00 $2.98 $3.09 $2.96 $2.95 $3.25 $3.10
90232(A) 2813 SEEDING METHOD A7AC $1,800.00 $700.00 $2,520.00 $2,411.47 $2,400.00 $3,244.00 $2,483.00
100233(A) 2817 VEGETATIVE MULCHING7AC $1,000.00 $700.00 $1,233.75 $1,180.61 $1,175.00 $1,622.00 $1,215.00
110241 2832 MOWING29AC $100.00 $150.00 $194.25 $185.88 $185.00 $216.50 $191.00
120242 0400 (PL)STABILIZED CONSTRUCTION EXIT2EA $3,000.00 $2,800.00 $3,150.00 $1,607.65 $3,800.00 $3,244.00 $2,330.00
130303(A) 2200 (SP)AGGREGATE BASE TYPE A, PLANT MIXED4,012CY $65.00 $42.00 $56.70 $42.71 $54.00 $54.70 $68.00
140307(K) 4300 STABILIZED SUBGRADE19,905SY $6.50 $7.50 $5.51 $9.23 $5.25 $11.40 $6.00
150326(A) 0100 GEOTEXTILE REINFORCEMENT20,996SY $4.00 $6.00 $5.77 $5.98 $5.50 $6.40 $6.00
160402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E3,334TON $35.00 $25.00 $19.95 $19.09 $19.00 $23.60 $26.00
170407(B) 0250 TACK COAT3,440GAL $3.00 $3.40 $2.36 $4.18 $2.25 $4.05 $2.50
180408 5774 PRIME COAT12,300GAL $5.00 $3.50 $3.68 $5.54 $3.50 $7.70 $2.50
190411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)1,775TON $85.00 $75.00 $84.00 $89.23 $80.00 $90.70 $80.10
200411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)7,296TON $90.00 $70.00 $74.55 $80.61 $71.00 $86.70 $66.30
210411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)1,015TON $125.00 $85.00 $97.65 $104.00 $93.00 $108.50 $90.20
220411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)963TON $110.00 $80.00 $86.10 $93.41 $82.00 $117.50 $78.50
230501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED23CY $50.00 $20.00 $20.21 $15.07 $35.00 $20.80 $30.00
240509(A) 0319 CLASS AA CONCRETE60CY $675.00 $480.00 $512.03 $593.89 $790.00 $527.50 $621.00
250509(D) 0325 CLASS C CONCRETE86CY $360.00 $300.00 $304.76 $306.57 $500.00 $314.00 $259.00
260511(A) 0332 REINFORCING STEEL6,723LB $1.50 $1.05 $1.21 $0.9300 $1.10 $1.25 $1.20
270514(J) 6390 TEMPORARY SHEET PILING1LSUM $7,500.00 $10,000.00 $5,250.00 $16,457.50 $10,000.00 $15,000.00 $34,000.00
280601(A) 0297 TYPE I PLAIN RIPRAP133TON $70.00 $45.00 $52.50 $40.63 $45.00 $68.10 $62.00
290611(A) 2665 (SP) PRECAST CONC RND 4' DIA MANHOLE1EA $4,000.00 $2,769.39 $2,959.95 $1,926.91 $2,819.00 $3,048.00 $8,275.00
300611(B) 2690 (SP) ADD'L DEPTH PRECAST RND 4' MANHOLE3.5VF $300.00 $260.32 $318.15 $232.88 $303.00 $327.50 $2,275.00
310611(G) 5476 INLET CDI 30SK RCB DES. 41EA $10,000.00 $2,052.89 $11,550.00 $13,954.92 $15,000.00 $5,623.00 $8,275.00
320611(G) 6000 INLET (SMD-TYPE 1)3EA $4,000.00 $1,640.03 $4,877.25 $4,182.19 $5,500.00 $5,022.00 $3,105.00
330613(A) 0491 18" R.C.PIPE CLASS III145LF $65.00 $75.83 $68.81 $50.23 $65.53 $70.90 $47.60
340613(A) 0492 24" R.C.PIPE CLASS III263LF $75.00 $91.67 $95.33 $70.87 $90.79 $98.20 $72.50
350613(B) 0689 18" CORR. GALV. STEEL PIPE516LF $40.00 $34.62 $36.75 $47.53 $35.00 $37.80 $31.00
360613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND500LF $25.00 $10.00 $26.25 $23.81 $20.00 $48.70 $15.50
370613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $25.00 $10.00 $26.25 $23.81 $20.00 $48.70 $15.50
380613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND4EA $1,000.00 $1,400.00 $698.25 $717.50 $665.00 $719.00 $1,035.00
390613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND8EA $1,500.00 $1,700.00 $1,024.80 $792.21 $976.00 $1,055.00 $1,245.00
400619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $16,616.34 $7,350.00 $17,843.39 $7,000.00 $7,569.00 $45,000.00
410619(B) 4728 REMOVAL OF ASPHALT PAVEMENT16,876SY $5.00 $3.50 $3.67 $6.28 $4.00 $8.55 $6.00
420619(B) 4780 REMOVAL OF GUARDRAIL755LF $8.00 $4.50 $2.10 $2.01 $4.00 $4.30 $4.20
430619(C) 0924 SAWING PAVEMENT3,286LF $6.00 $3.50 $5.25 $3.08 $5.00 $0.4900 $2.90
440623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE450LF $20.00 $24.37 $23.10 $22.11 $19.00 $20.50 $20.00
450623(G) 8590 GUARDRAIL END TREATMENT (31")2EA $3,500.00 $2,769.00 $2,625.00 $2,511.95 $2,850.00 $3,082.00 $2,950.00
460623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")2EA $3,000.00 $2,359.50 $2,236.50 $2,140.18 $2,850.00 $3,082.00 $2,950.00
470629(A) 4958 MAILBOX INSTALLATION-SINGLE2EA $155.00 $138.47 $131.25 $125.60 $250.00 $270.50 $260.00
480629(C) 4960 MAILBOX2EA $50.00 $55.39 $52.50 $50.24 $35.00 $37.80 $37.00
490629(D) 4961 REMOVAL OF MAILBOX INSTALLATION2EA $45.00 $24.70 $26.25 $25.12 $45.00 $48.70 $47.00
500853 9066 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)13EA $25.00 $16.62 $15.75 $15.07 $13.25 $16.20 $13.70
510501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON210CY $25.00 $15.00 $31.50 $12.06 $15.00 $15.30 $30.00
520501(G) 6309 CLSM BACKFILL260.7CY $200.00 $175.00 $255.55 $128.85 $225.00 $165.00 $186.00
530503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)996LF $230.00 $263.15 $236.93 $281.35 $350.00 $237.50 $269.00
540504(A) 1304 APPROACH SLAB364.6SY $300.00 $190.00 $220.46 $198.17 $200.00 $242.50 $207.00
550504(B) 1305 SAW-CUT GROOVING1,240.2SY $5.00 $4.21 $5.04 $4.68 $3.80 $4.10 $4.15
560504(C) 6250 SEALED EXPANSION JOINT94.73LF $350.00 $250.00 $327.15 $277.17 $300.00 $313.00 $414.00
570504(E) 6190 42" F-SHAPED PARAPET666.8LF $150.00 $88.00 $94.23 $80.14 $120.00 $104.00 $93.00
580506(A) 1322 STRUCTURAL STEEL1,500LB $3.50 $2.13 $3.58 $2.92 $3.50 $3.35 $3.00
590507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY8EA $2,000.00 $1,600.00 $1,910.14 $1,746.06 $2,500.00 $2,057.00 $3,105.00
600507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY16EA $2,000.00 $1,613.00 $1,910.14 $1,746.06 $2,500.00 $2,043.00 $3,105.00
610509 5000 ELASTOMERIC COATING1,105SF $15.00 $16.00 $14.70 $14.07 $15.00 $17.60 $17.10
620509(A) 1326 CLASS AA CONCRETE300.6CY $600.00 $650.00 $637.69 $584.73 $900.00 $640.00 $704.00
630509(B) 1328 CLASS A CONCRETE226.9CY $650.00 $725.00 $637.69 $513.58 $1,000.00 $654.50 $704.00
640511(A) 1332 REINFORCING STEEL800LB $1.00 $1.60 $1.20 $3.27 $1.10 $2.70 $1.30
650511(B) 6010 EPOXY COATED REINFORCING STEEL103,640LB $1.10 $1.21 $1.08 $1.16 $1.20 $1.45 $1.50
660514(A) 6010 PILES, FURNISHED (HP 10X42)124LF $40.00 $40.00 $32.88 $42.02 $34.00 $42.90 $41.50
670514(A) 6011 PILES, FURNISHED (HP 12X53)477LF $45.00 $40.00 $37.59 $47.14 $40.00 $50.10 $46.60
680514(B) 6292 PILES, DRIVEN (HP 10X42)124LF $20.00 $18.00 $15.75 $17.74 $14.00 $28.60 $18.60
690514(B) 6294 PILES, DRIVEN (HP 12X53)477LF $20.00 $16.00 $15.75 $18.25 $17.00 $20.20 $18.60
700514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
710515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)924SY $5.00 $4.43 $4.20 $4.02 $4.00 $4.30 $4.20
720516(A) 6096 DRILLED SHAFTS 60" DIAMETER106LF $1,100.00 $1,210.00 $1,148.50 $1,210.49 $1,500.00 $1,237.00 $1,140.00
730516(C) 6200 CROSSHOLE SONIC LOGGING1EA $4,000.00 $1,888.00 $2,835.00 $2,091.98 $1,700.00 $4,911.00 $15,520.00
740523(A) 6550 SEALER CRACK PREPARATION44LF $5.00 $5.54 $5.25 $5.02 $5.00 $5.40 $5.20
750523(B) 6560 SEALER RESIN0.5GAL $150.00 $221.00 $210.00 $200.96 $200.00 $216.50 $207.00
760601(B) 1353 TYPE I-A PLAIN RIPRAP720TON $55.00 $38.79 $43.10 $37.51 $45.00 $45.10 $62.00
770601(C) 1355 TYPE I-A FILTER BLANKET100TON $45.00 $35.00 $30.87 $31.17 $30.00 $37.10 $62.00
780613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND94LF $35.00 $15.00 $31.50 $23.81 $25.00 $41.50 $62.00
790613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $35.00 $16.00 $31.50 $23.81 $25.00 $18.70 $62.00
800619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $70,000.00 $50,000.00 $17,088.75 $65,716.61 $50,000.00 $80,115.00 $75,000.00
810857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)56,166LF $1.00 $0.2800 $0.2600 $0.2500 $0.7400 $0.8000 $0.7500
820857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)32,693LF $0.4000 $0.2800 $0.2600 $0.2500 $0.2700 $0.2900 $0.3000
830871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.665SD $7.00 $2.22 $2.10 $2.01 $8.00 $8.65 $8.30
840877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER7,438LF $25.00 $38.00 $18.90 $12.40 $16.00 $16.20 $12.85
850878(B) 8487 MODULAR GLARE SCREEN (TEMPORARY)25,970SD $0.2000 $0.1700 $0.1600 $0.1500 $0.0200 $0.0200 $0.0200
860880(A) 8812 ARROW DISPLAY(TYPE C)410SD $1.40 $1.11 $1.05 $1.00 $12.00 $13.00 $12.40
870880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF4,490SD $0.5000 $1.66 $1.58 $1.51 $1.80 $1.95 $1.85
880880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF3,935SD $0.7000 $2.22 $2.10 $2.01 $1.80 $1.95 $1.85
890880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF10,625SD $1.00 $0.2800 $0.2600 $0.2500 $1.80 $1.95 $1.85
900880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)13,195SD $0.2000 $0.1100 $0.1000 $0.1000 $0.0200 $0.0200 $0.0200
910880(C) 8848 WING BARRICADES960SD $2.50 $0.2800 $0.2600 $0.2500 $0.0200 $0.0200 $0.0200
920880(E) 8860 WARNING LIGHTS(TYPE A)3,560SD $0.3000 $0.3300 $0.3200 $0.3000 $0.5500 $0.5900 $0.6000
930880(F) 8878 DRUMS57,445SD $0.2000 $0.0800 $0.0700 $0.0700 $0.0200 $0.0200 $0.0200
940882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN508SD $15.00 $20.00 $15.75 $15.07 $6.00 $6.50 $6.20
950413(A) 4870 RUMBLE STRIP-CENTERLINE HMA-CON3,220LF $0.2000 $0.5000 $0.4700 $0.4500 $2.00 $0.9700 $1.00
960413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC3,020LF $0.2000 $0.5000 $0.4700 $0.4500 $2.00 $0.9700 $1.00
970805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $500.00 $1,107.00 $1,050.00 $1,004.78 $2,145.00 $2,319.00 $2,220.00
980850(A) 8110 SHEET ALUMINUM SIGNS246.98SF $20.00 $24.37 $23.10 $22.11 $24.00 $26.00 $25.00
990851(C) 8324 2" SQUARE TUBE POST375LF $8.00 $15.51 $14.70 $14.07 $6.00 $6.50 $6.20
1,000851(C) 8330 2 1/2" SQUARE TUBE POST44LF $12.00 $22.16 $21.00 $20.10 $8.00 $8.65 $8.30
1,010853 9027 DELINEATORS(TYPE 1, CODE 2)6EA $20.00 $22.16 $26.25 $25.12 $28.00 $30.30 $29.00
1,020853 9036 DELINEATORS(TYPE 2, CODE 2)17EA $20.00 $33.23 $31.50 $30.14 $32.00 $34.60 $33.10
1,030856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)39,085LF $0.7500 $0.6300 $0.5900 $0.5700 $0.5100 $0.5500 $0.5500
1,040856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)42LF $7.50 $11.00 $10.50 $10.05 $3.00 $3.25 $3.10
1,050856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)18EA $275.00 $132.00 $126.00 $120.57 $200.00 $216.50 $207.00
1,060642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $11,000.00 $18,690.00 $21,904.29 $12,000.00 $24,330.00 $32,000.00
1,070220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,500.00 $2,835.00 $1,476.69 $3,500.00 $5,136.00 $16,500.00
1,080640(A) 1398 FIELD OFFICE1EA $10,000.00 $5,500.00 $10,500.00 $2,110.03 $10,500.00 $5,406.00 $21,000.00
1,090641 1399 MOBILIZATION1LSUM $238,000.00 $175,000.00 $229,997.97 $234,699.18 $233,000.00 $166,610.00 $244,947.10