| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$17,336.64 |
$10,506.21 |
$165,000.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 10,226 | CY |
$8.48 |
$13.11 |
$10.00 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 895 | CY |
$15.70 |
$18.89 |
$16.50 |
$5.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,363.64 |
$30,553.62 |
$6,500.00 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,700 | LF |
$2.55 |
$5.73 |
$4.00 |
$2.00 |
| 6 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 5 | CY |
$115.37 |
$135.54 |
$150.00 |
$400.00 |
| 7 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,180 | LF |
$5.59 |
$9.00 |
$4.00 |
$15.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 10,554 | SY |
$3.38 |
$8.73 |
$5.85 |
$7.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.18 | AC |
$1,840.63 |
$5,710.14 |
$2,597.69 |
$2,750.00 |
| 10 | 241 2832 |
MOWING | 4.36 | AC |
$240.82 |
$823.46 |
$519.54 |
$300.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,401 | CY |
$43.40 |
$38.26 |
$46.50 |
$35.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 33,875 | SY |
$5.70 |
$5.50 |
$6.00 |
$5.00 |
| 13 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 26,485 | SY |
$4.02 |
$4.67 |
$4.60 |
$4.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,120 | TON |
$25.71 |
$19.91 |
$27.00 |
$18.00 |
| 15 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 3,322 | TON |
$70.36 |
$82.94 |
$73.00 |
$67.00 |
| 16 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 403 | TON |
$93.84 |
$108.78 |
$98.50 |
$65.00 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 12,488 | TON |
$75.00 |
$72.13 |
$65.50 |
$60.00 |
| 18 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,041 | TON |
$90.00 |
$110.57 |
$90.00 |
$80.00 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 269 | TON |
$135.85 |
$136.83 |
$110.00 |
$80.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,230 | TON |
$85.00 |
$89.14 |
$98.50 |
$75.00 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 3,413 | SY |
$4.30 |
$3.76 |
$7.75 |
$3.00 |
| 22 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 3,011 | SY |
$33.51 |
$38.67 |
$37.00 |
$35.00 |
| 23 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,966 | LF |
$90.00 |
$63.66 |
$80.00 |
$90.00 |
| 24 | 509 6152 |
SPECIAL CONCRETE FINISH | 719.5 | SY |
$30.00 |
$17.79 |
$15.25 |
$35.00 |
| 25 | 509(B) 0321 |
CLASS A CONCRETE | 1,207.4 | CY |
$450.00 |
$132.28 |
$160.00 |
$130.00 |
| 26 | 509(D) 0325 |
CLASS C CONCRETE | 16.51 | CY |
$326.77 |
$504.90 |
$650.00 |
$500.00 |
| 27 | 510(A) 6333 |
RETAINING WALL | 596.5 | SY |
$700.00 |
$676.19 |
$675.00 |
$945.00 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 63,941 | LB |
$0.9800 |
$0.9900 |
$1.10 |
$1.30 |
| 29 | 609(B) 1500 |
1'-8" COMB. CURB & GUTTER (4" MNTBLE) | 2,332 | LF |
$22.00 |
$18.73 |
$25.00 |
$22.00 |
| 30 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 876 | LF |
$27.36 |
$28.64 |
$32.00 |
$35.00 |
| 31 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 294 | SY |
$59.20 |
$38.91 |
$57.00 |
$70.00 |
| 32 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 407 | SY |
$44.13 |
$55.16 |
$75.00 |
$70.00 |
| 33 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 6 | EA |
$2,437.92 |
$2,865.04 |
$5,000.00 |
$3,000.00 |
| 34 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 2 | EA |
$4,095.60 |
$4,254.60 |
$4,250.00 |
$4,000.00 |
| 35 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 1 | EA |
$7,000.00 |
$7,291.35 |
$5,500.00 |
$5,000.00 |
| 36 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 14.06 | VF |
$171.77 |
$87.18 |
$100.00 |
$250.00 |
| 37 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 0.55 | VF |
$236.53 |
$148.13 |
$165.00 |
$300.00 |
| 38 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 0.32 | VF |
$300.00 |
$254.67 |
$230.00 |
$350.00 |
| 39 | 611(G) 4012 |
SPECIAL INLET DRAIN | 4 | EA |
$8,000.00 |
$11,317.42 |
$3,450.00 |
$4,000.00 |
| 40 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 3 | EA |
$3,506.10 |
$4,476.45 |
$3,450.00 |
$4,000.00 |
| 41 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$4,406.64 |
$6,482.96 |
$4,100.00 |
$4,500.00 |
| 42 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 1 | EA |
$5,328.78 |
$10,218.41 |
$6,275.00 |
$6,000.00 |
| 43 | 611(G) 5123 |
INLET CI DES. 3 (2B) | 3 | EA |
$6,300.00 |
$9,755.76 |
$6,600.00 |
$6,500.00 |
| 44 | 611(G) 5700 |
INLET - LONGITUDINAL BARRIER - TYPE II, DES. 2 | 4 | EA |
$6,000.00 |
$9,359.50 |
$4,015.00 |
$3,500.00 |
| 45 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 3 | EA |
$3,500.00 |
$2,407.49 |
$2,450.00 |
$3,500.00 |
| 46 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 2 | EA |
$3,060.70 |
$5,273.41 |
$10,600.00 |
$3,500.00 |
| 47 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 4.84 | VF |
$402.77 |
$393.50 |
$400.00 |
$500.00 |
| 48 | 611(H) 5698 |
ADD'L DEPTH IN INLET MED. BAR. DES. 2-2 | 13.53 | VF |
$500.00 |
$356.49 |
$175.00 |
$300.00 |
| 49 | 611(L) 0487 |
JUNCTION BOXES | 35 | CF |
$96.00 |
$128.36 |
$79.00 |
$130.00 |
| 50 | 612(C) 0645 |
INLET ADJUST TO GRADE | 1 | EA |
$1,316.94 |
$1,114.17 |
$2,850.00 |
$1,800.00 |
| 51 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 2,012 | LF |
$75.00 |
$66.19 |
$70.00 |
$75.00 |
| 52 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 347 | LF |
$90.00 |
$93.98 |
$80.00 |
$95.00 |
| 53 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 3,584 | LF |
$8.41 |
$9.36 |
$7.15 |
$9.00 |
| 54 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 180 | LF |
$9.64 |
$19.85 |
$5.30 |
$9.00 |
| 55 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$572.74 |
$1,522.26 |
$1,125.00 |
$700.00 |
| 56 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 3 | EA |
$659.90 |
$1,283.81 |
$550.00 |
$700.00 |
| 57 | 613(W) 4498 |
18" JACKED CONDUIT | 71 | LF |
$430.00 |
$1,359.74 |
$300.00 |
$700.00 |
| 58 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$40,000.00 |
$39,419.22 |
$32,000.00 |
$15,000.00 |
| 59 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 5,660 | SY |
$6.60 |
$6.45 |
$9.00 |
$5.00 |
| 60 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 92,326 | SY |
$3.50 |
$3.46 |
$5.75 |
$3.00 |
| 61 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 4,222 | SY |
$7.03 |
$8.69 |
$19.00 |
$8.00 |
| 62 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,065 | LF |
$3.46 |
$3.62 |
$3.50 |
$4.00 |
| 63 | 619(B) 4791 |
REMOVAL OF CURB | 3,308 | LF |
$5.66 |
$5.91 |
$3.25 |
$4.00 |
| 64 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 2,000 | LF |
$14.51 |
$14.79 |
$16.00 |
$25.00 |
| 65 | 619(C) 0924 |
SAWING PAVEMENT | 1,910 | LF |
$4.62 |
$1.46 |
$4.50 |
$4.00 |
| 66 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 67 | LF |
$21.04 |
$24.04 |
$21.00 |
$22.00 |
| 67 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 1 | EA |
$2,289.41 |
$2,103.74 |
$1,850.00 |
$1,925.00 |
| 68 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 714.83 | LF |
$67.71 |
$32.42 |
$37.50 |
$70.00 |
| 69 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 2 | EA |
$22.00 |
$18.03 |
$15.50 |
$100.00 |
| 70 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$1,000.00 |
$4,061.71 |
$4,250.00 |
$10,000.00 |
| 71 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 150 | CY |
$30.00 |
$42.08 |
$36.50 |
$50.00 |
| 72 | 230(A) 2806 |
SOLID SLAB SODDING | 20 | SY |
$4.00 |
$8.36 |
$5.20 |
$7.00 |
| 73 | 616(A) 5830 |
12" DUCTILE IRON PIPE RESTRAINED JOINT | 270 | LF |
$90.00 |
$102.18 |
$88.00 |
$120.00 |
| 74 | 616(D) 1100 |
12" GATE VALVE | 2 | EA |
$2,000.00 |
$4,207.47 |
$3,750.00 |
$2,500.00 |
| 75 | 616(D) 7051 |
STANDARD VALVE BOX | 2 | EA |
$150.00 |
$360.64 |
$315.00 |
$250.00 |
| 76 | 616(D) 7078 |
VALVE BOX EXTENSION | 3 | EA |
$75.00 |
$180.33 |
$155.00 |
$150.00 |
| 77 | 616(I) 5270 |
24" STEEL CASING | 160 | LF |
$300.00 |
$270.48 |
$230.00 |
$150.00 |
| 78 | 616(K) 0225 |
12" SOLID SLEEVE | 4 | EA |
$300.00 |
$1,803.20 |
$1,560.00 |
$1,200.00 |
| 79 | 616(N) 0092 |
SERVICE CONNECTION (LONG) | 2 | EA |
$1,500.00 |
$3,005.34 |
$2,600.00 |
$2,500.00 |
| 80 | 616(O) 0530 |
12" 45 DEGREE FITTING | 4 | EA |
$400.00 |
$1,803.20 |
$1,560.00 |
$800.00 |
| 81 | 616(O) 2000 |
WATER LINE RELOCATION | 1 | LSUM |
$3,000.00 |
$601.07 |
$525.00 |
$6,571.70 |
| 82 | 619(B) 7220 |
REMOVAL OF WATER LINE | 270 | LF |
$30.00 |
$42.08 |
$37.00 |
$25.00 |
| 83 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 2,116.9 | SY |
$13.00 |
$11.30 |
$9.75 |
$10.00 |
| 84 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 225 | CY |
$25.00 |
$16.68 |
$50.00 |
$35.00 |
| 85 | 501(G) 6309 |
CLSM BACKFILL | 340 | CY |
$200.00 |
$150.75 |
$127.00 |
$90.00 |
| 86 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$70,000.00 |
$13,619.89 |
$35,000.00 |
$278,000.00 |
| 87 | 504(A) 1304 |
APPROACH SLAB | 496.2 | SY |
$250.00 |
$185.74 |
$215.00 |
$180.00 |
| 88 | 504(B) 1305 |
SAW-CUT GROOVING | 2,117.2 | SY |
$4.50 |
$4.87 |
$4.10 |
$4.00 |
| 89 | 504(C) 6250 |
SEALED EXPANSION JOINT | 73.96 | LF |
$400.00 |
$352.85 |
$260.00 |
$270.00 |
| 90 | 504(E) 6190 |
42" F-SHAPED PARAPET | 533.4 | LF |
$120.00 |
$66.11 |
$95.00 |
$80.00 |
| 91 | 506(A) 1322 |
STRUCTURAL STEEL | 429,990 | LB |
$2.20 |
$1.62 |
$1.65 |
$2.00 |
| 92 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$2,000.00 |
$2,246.57 |
$2,500.00 |
$3,000.00 |
| 93 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 36 | EA |
$2,000.00 |
$2,246.57 |
$2,500.00 |
$3,000.00 |
| 94 | 509 5000 |
ELASTOMERIC COATING | 1,670 | SF |
$12.00 |
$15.99 |
$10.00 |
$13.00 |
| 95 | 509 6152 |
SPECIAL CONCRETE FINISH | 416 | SY |
$30.00 |
$17.79 |
$15.25 |
$15.00 |
| 96 | 509(A) 1326 |
CLASS AA CONCRETE | 418.8 | CY |
$750.00 |
$823.27 |
$675.00 |
$900.00 |
| 97 | 509(B) 1328 |
CLASS A CONCRETE | 305 | CY |
$900.00 |
$803.70 |
$900.00 |
$800.00 |
| 98 | 511 6306 |
MECHANICAL SPLICES | 699 | EA |
$50.00 |
$65.63 |
$55.00 |
$80.00 |
| 99 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 160,170 | LB |
$1.20 |
$1.23 |
$1.30 |
$1.25 |
| 100 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$300.00 |
$430.68 |
$500.00 |
$350.00 |
| 101 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 384 | LF |
$45.00 |
$40.47 |
$50.00 |
$47.00 |
| 102 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 384 | LF |
$20.00 |
$50.48 |
$20.00 |
$10.00 |
| 103 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 104 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 512 | SY |
$5.00 |
$4.81 |
$4.15 |
$4.00 |
| 105 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 72 | LF |
$1,900.00 |
$3,934.15 |
$3,000.00 |
$2,500.00 |
| 106 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$3,000.00 |
$1,803.20 |
$1,550.00 |
$5,500.00 |
| 107 | 523(A) 6550 |
SEALER CRACK PREPARATION | 517 | LF |
$4.00 |
$4.81 |
$4.15 |
$4.00 |
| 108 | 523(B) 6560 |
SEALER RESIN | 6 | GAL |
$170.00 |
$180.33 |
$155.00 |
$150.00 |
| 109 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 150 | LF |
$40.00 |
$23.14 |
$17.00 |
$10.00 |
| 110 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 93 | LF |
$30.00 |
$12.14 |
$15.00 |
$10.00 |
| 111 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$70,000.00 |
$40,840.94 |
$75,000.00 |
$410,000.00 |
| 112 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 215 | CY |
$25.00 |
$16.68 |
$50.00 |
$35.00 |
| 113 | 501(G) 6309 |
CLSM BACKFILL | 290 | CY |
$200.00 |
$150.75 |
$130.00 |
$90.00 |
| 114 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$70,000.00 |
$13,619.89 |
$60,000.00 |
$278,000.00 |
| 115 | 504(A) 1304 |
APPROACH SLAB | 416.8 | SY |
$250.00 |
$185.74 |
$210.00 |
$180.00 |
| 116 | 504(B) 1305 |
SAW-CUT GROOVING | 1,762.2 | SY |
$4.50 |
$4.87 |
$4.10 |
$4.00 |
| 117 | 504(C) 6250 |
SEALED EXPANSION JOINT | 60.46 | LF |
$400.00 |
$255.60 |
$275.00 |
$270.00 |
| 118 | 504(E) 6190 |
42" F-SHAPED PARAPET | 533.6 | LF |
$120.00 |
$66.11 |
$100.00 |
$80.00 |
| 119 | 506(A) 1322 |
STRUCTURAL STEEL | 379,480 | LB |
$2.20 |
$1.62 |
$1.68 |
$2.00 |
| 120 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$2,246.57 |
$3,000.00 |
$3,000.00 |
| 121 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 32 | EA |
$2,000.00 |
$2,246.57 |
$3,000.00 |
$3,000.00 |
| 122 | 509 5000 |
ELASTOMERIC COATING | 1,468 | SF |
$12.00 |
$15.99 |
$15.00 |
$13.00 |
| 123 | 509 6152 |
SPECIAL CONCRETE FINISH | 374 | SY |
$30.00 |
$17.79 |
$15.25 |
$15.00 |
| 124 | 509(A) 1326 |
CLASS AA CONCRETE | 331.8 | CY |
$750.00 |
$823.27 |
$750.00 |
$900.00 |
| 125 | 509(B) 1328 |
CLASS A CONCRETE | 272.4 | CY |
$950.00 |
$803.70 |
$950.00 |
$800.00 |
| 126 | 510(C) 6138 |
SLOPE WALL (5") | 1,332 | SY |
$150.00 |
$94.72 |
$135.00 |
$80.00 |
| 127 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 127,430 | LB |
$1.20 |
$1.23 |
$1.35 |
$1.25 |
| 128 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 377 | LF |
$45.00 |
$40.47 |
$50.00 |
$47.00 |
| 129 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 377 | LF |
$20.00 |
$50.48 |
$24.00 |
$10.00 |
| 130 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 131 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 498 | SY |
$5.00 |
$4.81 |
$4.15 |
$4.00 |
| 132 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 72 | LF |
$1,900.00 |
$3,934.15 |
$3,500.00 |
$2,500.00 |
| 133 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$1,803.20 |
$1,550.00 |
$5,500.00 |
| 134 | 523(A) 6550 |
SEALER CRACK PREPARATION | 60 | LF |
$4.00 |
$4.81 |
$4.15 |
$4.00 |
| 135 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$170.00 |
$180.33 |
$155.00 |
$150.00 |
| 136 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 414 | LF |
$40.00 |
$23.14 |
$20.00 |
$10.00 |
| 137 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 176 | LF |
$30.00 |
$12.14 |
$20.00 |
$10.00 |
| 138 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$70,000.00 |
$40,840.94 |
$100,000.00 |
$410,000.00 |
| 139 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 56,875 | LF |
$0.1700 |
$0.3000 |
$0.3000 |
$0.3000 |
| 140 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 9,500 | LF |
$0.3400 |
$0.6000 |
$0.5500 |
$0.5000 |
| 141 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,520 | SD |
$7.00 |
$12.02 |
$10.25 |
$11.00 |
| 142 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 20 | SD |
$67.64 |
$180.33 |
$155.00 |
$165.00 |
| 143 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 8,425 | LF |
$25.00 |
$6.61 |
$22.50 |
$15.00 |
| 144 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 23,275 | LF |
$2.94 |
$4.57 |
$2.75 |
$6.00 |
| 145 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 380 | SD |
$4.00 |
$18.03 |
$15.50 |
$20.00 |
| 146 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 19,380 | SD |
$0.3500 |
$0.6000 |
$0.5500 |
$0.5500 |
| 147 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 8,360 | SD |
$0.5000 |
$1.80 |
$1.55 |
$1.50 |
| 148 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 14,820 | SD |
$1.30 |
$2.40 |
$2.10 |
$2.00 |
| 149 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,560 | SD |
$1.00 |
$2.40 |
$2.10 |
$2.00 |
| 150 | 880(C) 8848 |
WING BARRICADES | 3,800 | SD |
$1.75 |
$1.20 |
$1.05 |
$1.00 |
| 151 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 17,860 | SD |
$0.3000 |
$0.1200 |
$0.1500 |
$0.1000 |
| 152 | 880(F) 8878 |
DRUMS | 30,020 | SD |
$0.2000 |
$0.6600 |
$0.6000 |
$0.6000 |
| 153 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 380 | SD |
$430.00 |
$240.43 |
$210.00 |
$200.00 |
| 154 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 50 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 155 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,140 | SD |
$10.55 |
$18.03 |
$15.50 |
$17.00 |
| 156 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 36 | LF |
$1,000.00 |
$1,262.25 |
$1,050.00 |
$1,000.00 |
| 157 | 804(A) 2915 |
STRUCTURAL CONCRETE | 7.32 | CY |
$900.00 |
$240.43 |
$205.00 |
$200.00 |
| 158 | 804(B) 2916 |
REINFORCING STEEL | 2,176 | LB |
$2.00 |
$2.40 |
$2.10 |
$2.00 |
| 159 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$7,000.00 |
$601.07 |
$520.00 |
$600.00 |
| 160 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$1,200.00 |
$601.07 |
$520.00 |
$1,000.00 |
| 161 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 172.33 | SF |
$22.00 |
$21.64 |
$18.50 |
$20.00 |
| 162 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 695.25 | SF |
$25.50 |
$42.08 |
$36.50 |
$37.00 |
| 163 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 139.75 | SF |
$25.50 |
$42.08 |
$36.50 |
$40.00 |
| 164 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 79 | LF |
$35.00 |
$60.11 |
$52.00 |
$55.00 |
| 165 | 851(A) 3212 |
8"@40 GALV.STEEL WIDE FLANGE BEAM POST | 135 | LF |
$50.00 |
$72.12 |
$62.50 |
$65.00 |
| 166 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 72 | LF |
$24.76 |
$42.08 |
$36.50 |
$26.00 |
| 167 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 44 | LF |
$40.00 |
$42.08 |
$36.50 |
$36.00 |
| 168 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 214 | LF |
$10.00 |
$6.01 |
$5.25 |
$5.00 |
| 169 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 1 | EA |
$75,500.00 |
$66,117.43 |
$57,500.00 |
$57,000.00 |
| 170 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 17,800 | LF |
$0.5500 |
$1.20 |
$1.05 |
$1.00 |
| 171 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 2,475 | LF |
$2.00 |
$1.80 |
$1.55 |
$2.00 |
| 172 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,815 | LF |
$2.70 |
$2.40 |
$2.10 |
$2.00 |
| 173 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$140.00 |
$240.43 |
$210.00 |
$200.00 |
| 174 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 2 | EA |
$35,000.00 |
$24,042.70 |
$22,500.00 |
$25,000.00 |
| 175 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 25 | LF |
$1,000.00 |
$1,081.92 |
$935.00 |
$900.00 |
| 176 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 21 | SY |
$60.00 |
$40.88 |
$230.00 |
$70.00 |
| 177 | 802(A) 8306 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 520 | LF |
$25.00 |
$24.04 |
$21.00 |
$20.00 |
| 178 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 500 | LF |
$28.00 |
$42.08 |
$36.50 |
$36.00 |
| 179 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 3,966 | LF |
$8.52 |
$7.21 |
$6.25 |
$6.00 |
| 180 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 2 | EA |
$693.33 |
$601.07 |
$520.00 |
$600.00 |
| 181 | 803(A) 8065 |
PULL BOX(SIZE I) | 10 | EA |
$750.00 |
$1,725.07 |
$1,500.00 |
$1,500.00 |
| 182 | 804(A) 2915 |
STRUCTURAL CONCRETE | 36.08 | CY |
$750.00 |
$1,172.08 |
$1,015.00 |
$975.00 |
| 183 | 804(B) 2916 |
REINFORCING STEEL | 6,248 | LB |
$1.70 |
$2.40 |
$2.10 |
$2.00 |
| 184 | 805(A) 8708 |
REMOVAL OF HIGH MAST TOWER | 1 | EA |
$6,800.00 |
$13,223.49 |
$11,450.00 |
$12,000.00 |
| 185 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 10 | EA |
$474.12 |
$480.85 |
$415.00 |
$500.00 |
| 186 | 806(C) 8926 |
40' MTG & 12' HLMA(G.STL.) | 18 | EA |
$3,700.00 |
$4,718.38 |
$4,080.00 |
$4,000.00 |
| 187 | 806(C) 8929 |
40' MTG.HT.POLE & TWIN H.L.MST.ARM(G.STL.) | 4 | EA |
$3,350.00 |
$5,469.72 |
$4,730.00 |
$4,600.00 |
| 188 | 807 8092 |
BREAKAWAY BASE (DES. B) | 11 | EA |
$800.00 |
$1,442.56 |
$1,250.00 |
$1,200.00 |
| 189 | 809(A) 8090 |
ROADWAY LUMINAIRE | 26 | EA |
$1,937.95 |
$2,843.04 |
$2,450.00 |
$2,400.00 |
| 190 | 809(B) 8098 |
UNDERPASS LUMINIARE | 6 | EA |
$990.00 |
$1,520.70 |
$1,315.00 |
$1,300.00 |
| 191 | 809(E) 8103 |
HIGH MAST LUMINAIRE | 7 | EA |
$1,700.00 |
$4,075.24 |
$3,525.00 |
$3,400.00 |
| 192 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$5,500.00 |
$13,824.56 |
$12,000.00 |
$12,000.00 |
| 193 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 9,201 | LF |
$2.57 |
$2.10 |
$1.80 |
$1.80 |
| 194 | 811 8042 |
1/C NO.8 ELECTRICAL CONDUCTOR | 4,601 | LF |
$1.50 |
$2.04 |
$1.75 |
$1.75 |
| 195 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 1,400 | LF |
$1.30 |
$1.92 |
$1.70 |
$1.65 |
| 196 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 2,860 | LF |
$1.09 |
$1.44 |
$1.25 |
$1.25 |
| 197 | 812 8072 |
150' HIGH MAST POLE(G.STL.) | 1 | EA |
$50,000.00 |
$57,702.49 |
$50,000.00 |
$50,000.00 |
| 198 | 813 8076 |
HIGH MAST LOWERING DEVICE TYPE II | 2 | EA |
$14,000.00 |
$20,676.73 |
$18,000.00 |
$18,000.00 |
| 199 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$85,411.71 |
$76,000.00 |
$85,000.00 |
| 200 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,551.70 |
$3,005.34 |
$1,800.00 |
$17,000.00 |
| 201 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,590.00 |
$490,872.52 |
$494,856.38 |
$540,000.00 |