| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$13,750.70 |
$4,317.75 |
$4,635.00 |
$4,500.00 |
$60,000.00 |
$10,000.00 |
$7,849.00 |
$35,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,435 | CY |
$10.68 |
$11.51 |
$12.36 |
$12.00 |
$11.00 |
$6.15 |
$13.20 |
$22.00 |
$11.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,406 | CY |
$12.52 |
$15.15 |
$17.51 |
$17.00 |
$19.00 |
$11.25 |
$20.10 |
$29.00 |
$30.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$13,645.24 |
$2,014.95 |
$2,163.00 |
$2,100.00 |
$1,500.00 |
$5,786.39 |
$7,764.00 |
$7,800.00 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,599 | LF |
$1.59 |
$1.87 |
$1.91 |
$2.05 |
$5.00 |
$1.85 |
$1.90 |
$2.00 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 133 | LF |
$8.09 |
$8.59 |
$8.76 |
$7.88 |
$15.00 |
$8.50 |
$8.85 |
$9.35 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 1,970 | SY |
$2.39 |
$3.69 |
$3.76 |
$4.42 |
$3.70 |
$3.65 |
$3.80 |
$4.00 |
$5.25 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$335.49 |
$454.50 |
$463.50 |
$150.00 |
$460.00 |
$450.00 |
$468.00 |
$495.00 |
$1,000.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 885 | CY |
$55.00 |
$51.81 |
$55.62 |
$54.00 |
$75.00 |
$63.00 |
$74.60 |
$130.00 |
$100.00 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 3,697 | SY |
$10.21 |
$1.31 |
$5.51 |
$7.50 |
$6.50 |
$5.35 |
$12.50 |
$7.80 |
$15.00 |
| 11 | 317 4270 |
CEMENT TREATED BASE | 3,209 | SY |
$12.00 |
$19.62 |
$15.31 |
$25.00 |
$20.00 |
$20.00 |
$15.50 |
$56.75 |
$30.00 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 4,068 | SY |
$1.87 |
$4.10 |
$1.62 |
$1.30 |
$1.05 |
$1.35 |
$1.65 |
$6.00 |
$5.00 |
| 13 | 408 5774 |
PRIME COAT | 2,213 | GAL |
$5.36 |
$12.63 |
$5.02 |
$12.50 |
$6.30 |
$12.50 |
$5.05 |
$10.50 |
$7.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 56 | TON |
$165.00 |
$307.04 |
$186.64 |
$304.00 |
$312.00 |
$304.00 |
$214.00 |
$148.00 |
$245.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 28 | TON |
$200.00 |
$391.88 |
$228.66 |
$388.00 |
$400.00 |
$388.00 |
$308.50 |
$240.00 |
$350.00 |
| 16 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 2,935 | SY |
$25.00 |
$35.96 |
$24.21 |
$25.00 |
$27.50 |
$23.00 |
$24.40 |
$50.65 |
$47.00 |
| 17 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 375 | SY |
$129.43 |
$35.35 |
$98.90 |
$65.00 |
$45.00 |
$50.00 |
$99.90 |
$40.00 |
$168.00 |
| 18 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 817 | CY |
$155.00 |
$130.38 |
$144.20 |
$125.00 |
$140.00 |
$160.00 |
$145.50 |
$71.00 |
$200.00 |
| 19 | 416 0100 |
DOWEL BAR RETROFIT | 590 | EA |
$25.00 |
$20.66 |
$37.44 |
$55.00 |
$12.00 |
$20.00 |
$37.80 |
$166.00 |
$35.00 |
| 20 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 723 | LF |
$21.69 |
$22.40 |
$30.90 |
$40.00 |
$35.50 |
$40.00 |
$31.10 |
$31.00 |
$45.00 |
| 21 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 424 | SY |
$71.34 |
$51.42 |
$45.86 |
$40.00 |
$60.00 |
$43.00 |
$46.30 |
$72.00 |
$88.00 |
| 22 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 60 | SF |
$28.71 |
$34.52 |
$23.36 |
$25.00 |
$25.00 |
$30.00 |
$23.60 |
$38.00 |
$45.00 |
| 23 | 611(G) 5118 |
INLET CI DES. 2 (B-D) | 4 | EA |
$7,000.00 |
$3,333.00 |
$3,399.00 |
$3,300.00 |
$6,500.00 |
$6,225.00 |
$3,120.00 |
$9,550.00 |
$7,200.00 |
| 24 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 72 | LF |
$67.00 |
$68.98 |
$58.40 |
$58.00 |
$57.00 |
$61.75 |
$104.00 |
$107.00 |
$55.00 |
| 25 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 36 | LF |
$70.00 |
$53.01 |
$60.52 |
$105.00 |
$65.00 |
$65.25 |
$57.20 |
$70.00 |
$80.00 |
| 26 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 723 | LF |
$13.71 |
$12.49 |
$12.36 |
$18.00 |
$9.00 |
$10.80 |
$10.40 |
$13.00 |
$18.00 |
| 27 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 72 | LF |
$10.00 |
$11.94 |
$9.89 |
$14.00 |
$6.00 |
$12.35 |
$10.40 |
$51.00 |
$19.00 |
| 28 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$439.92 |
$695.41 |
$552.26 |
$700.00 |
$700.00 |
$1,000.00 |
$800.50 |
$858.00 |
$975.00 |
| 29 | 613(P) 0764 |
42" GALV. STEEL CULVERT END SECTION ROUND | 1 | EA |
$1,000.00 |
$1,054.04 |
$813.86 |
$800.00 |
$1,250.00 |
$985.00 |
$260.00 |
$850.00 |
$1,200.00 |
| 30 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$676.67 |
$707.00 |
$824.00 |
$300.00 |
$400.00 |
$625.00 |
$1,005.00 |
$810.00 |
$675.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,695.41 |
$4,125.85 |
$4,429.00 |
$4,300.00 |
$6,500.00 |
$7,000.00 |
$17,295.00 |
$6,300.00 |
$9,500.00 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,253 | SY |
$5.57 |
$3.35 |
$3.61 |
$3.50 |
$6.00 |
$4.00 |
$9.25 |
$5.30 |
$10.00 |
| 33 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 167 | LF |
$3.00 |
$3.35 |
$3.61 |
$3.00 |
$3.25 |
$3.50 |
$20.70 |
$7.75 |
$4.00 |
| 34 | 619(B) 4791 |
REMOVAL OF CURB | 183 | LF |
$7.72 |
$8.64 |
$9.27 |
$9.00 |
$3.75 |
$11.65 |
$7.50 |
$19.00 |
$18.00 |
| 35 | 619(B) 6118 |
REMOVAL OF PAVING BRICK ROADWAY | 245 | SY |
$15.00 |
$10.56 |
$11.33 |
$11.00 |
$25.00 |
$14.55 |
$12.50 |
$11.00 |
$15.00 |
| 36 | 619(B) 6130 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 234 | SY |
$4.50 |
$10.56 |
$11.33 |
$11.00 |
$25.00 |
$12.00 |
$7.50 |
$21.00 |
$16.00 |
| 37 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 113 | LF |
$18.13 |
$17.12 |
$17.46 |
$20.00 |
$17.00 |
$20.00 |
$17.60 |
$18.65 |
$24.00 |
| 38 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,291.25 |
$2,216.95 |
$2,260.85 |
$2,500.00 |
$2,225.00 |
$2,500.00 |
$2,283.00 |
$1,800.00 |
$2,690.00 |
| 39 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,929.76 |
$1,667.50 |
$1,699.50 |
$1,900.00 |
$1,700.00 |
$1,900.00 |
$1,716.00 |
$2,400.00 |
$2,250.00 |
| 40 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 6 | EA |
$12.46 |
$15.15 |
$15.45 |
$20.00 |
$20.50 |
$20.00 |
$15.60 |
$16.00 |
$24.00 |
| 41 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 208 | EA |
$0.4500 |
$3.03 |
$3.09 |
$3.00 |
$3.05 |
$3.00 |
$5.20 |
$3.10 |
$3.50 |
| 42 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 850 | LF |
$0.8200 |
$1.01 |
$1.03 |
$1.00 |
$1.05 |
$1.00 |
$1.05 |
$1.05 |
$1.10 |
| 43 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 730 | SD |
$5.85 |
$5.05 |
$5.15 |
$5.00 |
$5.10 |
$5.00 |
$10.40 |
$5.20 |
$6.00 |
| 44 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,100 | LF |
$26.48 |
$12.00 |
$24.72 |
$30.00 |
$45.00 |
$22.00 |
$29.40 |
$44.00 |
$45.00 |
| 45 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,100 | LF |
$3.35 |
$4.04 |
$4.12 |
$3.00 |
$3.50 |
$3.00 |
$6.05 |
$4.40 |
$4.50 |
| 46 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 730 | SD |
$10.00 |
$1.01 |
$1.03 |
$1.00 |
$1.05 |
$1.00 |
$5.20 |
$1.05 |
$1.15 |
| 47 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,650 | SD |
$0.4600 |
$1.01 |
$1.03 |
$1.00 |
$1.05 |
$1.00 |
$0.3600 |
$1.05 |
$1.15 |
| 48 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,745 | SD |
$0.5400 |
$0.5100 |
$0.5200 |
$0.5000 |
$0.5500 |
$0.5000 |
$1.05 |
$0.5200 |
$0.6000 |
| 49 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,205 | SD |
$1.62 |
$0.2500 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.2500 |
$1.55 |
$0.2700 |
$0.3000 |
| 50 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,190 | SD |
$0.5900 |
$1.01 |
$1.03 |
$1.00 |
$1.05 |
$1.00 |
$1.55 |
$1.05 |
$1.20 |
| 51 | 880(C) 8848 |
WING BARRICADES | 1,095 | SD |
$0.9000 |
$0.5100 |
$0.5200 |
$0.5000 |
$0.5500 |
$0.5000 |
$0.1000 |
$0.5500 |
$0.6000 |
| 52 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,380 | SD |
$0.3000 |
$2.02 |
$2.06 |
$2.00 |
$2.05 |
$2.00 |
$0.3600 |
$2.10 |
$2.40 |
| 53 | 880(F) 8878 |
DRUMS | 63,936 | SD |
$0.1200 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.1600 |
$0.0700 |
$0.1000 |
| 54 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 730 | SD |
$9.77 |
$5.05 |
$5.15 |
$5.00 |
$5.10 |
$5.00 |
$10.40 |
$5.20 |
$6.00 |
| 55 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$431.27 |
$25.25 |
$25.75 |
$25.00 |
$50.00 |
$25.00 |
$520.00 |
$30.00 |
$30.00 |
| 56 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 85 | SF |
$21.17 |
$16.16 |
$16.48 |
$16.00 |
$16.25 |
$16.00 |
$15.60 |
$18.00 |
$19.00 |
| 57 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 123 | LF |
$10.08 |
$8.08 |
$8.24 |
$8.00 |
$8.10 |
$8.00 |
$10.40 |
$8.50 |
$9.50 |
| 58 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 8,481 | LF |
$0.7800 |
$0.6600 |
$0.6700 |
$0.6500 |
$0.7000 |
$0.6500 |
$1.05 |
$0.6700 |
$0.7500 |
| 59 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 564 | LF |
$1.89 |
$2.02 |
$2.06 |
$2.00 |
$2.05 |
$2.00 |
$2.10 |
$2.10 |
$2.40 |
| 60 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 201 | LF |
$13.27 |
$10.10 |
$10.30 |
$10.00 |
$10.20 |
$10.00 |
$4.15 |
$11.00 |
$12.00 |
| 61 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 294.6 | CY |
$35.00 |
$15.75 |
$25.75 |
$6.00 |
$70.00 |
$25.00 |
$22.50 |
$17.00 |
$12.00 |
| 62 | 501(G) 6309 |
CLSM BACKFILL | 517 | CY |
$150.00 |
$102.32 |
$197.19 |
$140.00 |
$120.00 |
$150.00 |
$132.00 |
$150.00 |
$170.00 |
| 63 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 2,632.2 | LF |
$285.00 |
$240.74 |
$246.30 |
$290.00 |
$260.00 |
$300.00 |
$261.50 |
$275.00 |
$298.00 |
| 64 | 504(A) 1304 |
APPROACH SLAB | 513.6 | SY |
$225.00 |
$187.82 |
$180.75 |
$170.00 |
$180.00 |
$150.00 |
$223.50 |
$225.00 |
$260.00 |
| 65 | 504(B) 1305 |
SAW-CUT GROOVING | 2,610.4 | SY |
$5.00 |
$3.99 |
$5.00 |
$3.85 |
$3.90 |
$4.00 |
$3.95 |
$4.45 |
$5.50 |
| 66 | 504(C) 6250 |
SEALED EXPANSION JOINT | 79 | LF |
$290.00 |
$224.31 |
$260.33 |
$225.00 |
$265.00 |
$250.00 |
$201.00 |
$250.00 |
$305.00 |
| 67 | 504(E) 6190 |
42" F-SHAPED PARAPET | 783.6 | LF |
$100.00 |
$72.04 |
$92.19 |
$80.00 |
$52.25 |
$75.00 |
$105.50 |
$85.00 |
$145.00 |
| 68 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 331.7 | LF |
$25.00 |
$21.48 |
$26.78 |
$10.00 |
$25.50 |
$20.00 |
$26.20 |
$30.00 |
$22.00 |
| 69 | 506(A) 1322 |
STRUCTURAL STEEL | 6,656 | LB |
$2.00 |
$1.91 |
$1.87 |
$2.00 |
$1.30 |
$4.00 |
$1.90 |
$2.00 |
$1.75 |
| 70 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,100.00 |
$1,942.07 |
$2,050.19 |
$2,000.00 |
$2,500.00 |
$3,000.00 |
$2,368.00 |
$2,000.00 |
$2,275.00 |
| 71 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 32 | EA |
$2,100.00 |
$1,942.07 |
$2,050.19 |
$2,000.00 |
$2,500.00 |
$3,000.00 |
$2,368.00 |
$2,000.00 |
$2,275.00 |
| 72 | 509 6152 |
SPECIAL CONCRETE FINISH | 244 | SY |
$55.00 |
$103.07 |
$155.53 |
$70.00 |
$75.00 |
$50.00 |
$102.00 |
$162.00 |
$150.00 |
| 73 | 509(A) 1326 |
CLASS AA CONCRETE | 989.6 | CY |
$650.00 |
$449.78 |
$452.09 |
$600.00 |
$450.00 |
$500.00 |
$470.50 |
$650.00 |
$630.00 |
| 74 | 509(B) 1328 |
CLASS A CONCRETE | 421.2 | CY |
$750.00 |
$502.28 |
$452.09 |
$600.00 |
$600.00 |
$600.00 |
$548.00 |
$650.00 |
$660.00 |
| 75 | 511(A) 1332 |
REINFORCING STEEL | 3,096 | LB |
$1.05 |
$0.8900 |
$0.9700 |
$1.25 |
$1.40 |
$2.25 |
$3.05 |
$1.00 |
$0.9000 |
| 76 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 284,212 | LB |
$1.15 |
$0.9300 |
$1.01 |
$0.8500 |
$1.00 |
$1.00 |
$0.9900 |
$1.00 |
$1.00 |
| 77 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 442 | LF |
$30.00 |
$27.56 |
$24.54 |
$30.00 |
$45.00 |
$31.00 |
$36.50 |
$25.00 |
$46.00 |
| 78 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 2,290 | LF |
$40.00 |
$33.12 |
$29.51 |
$36.00 |
$45.00 |
$38.00 |
$38.80 |
$30.00 |
$52.00 |
| 79 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 442 | LF |
$20.00 |
$16.80 |
$11.33 |
$14.00 |
$12.50 |
$10.00 |
$22.50 |
$15.00 |
$23.00 |
| 80 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 2,290 | LF |
$20.00 |
$15.75 |
$11.33 |
$16.00 |
$10.00 |
$10.00 |
$16.50 |
$15.00 |
$24.00 |
| 81 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 82 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,812 | SY |
$4.00 |
$3.15 |
$4.79 |
$3.65 |
$3.70 |
$3.65 |
$3.10 |
$3.25 |
$4.30 |
| 83 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 344 | LF |
$1,200.00 |
$859.47 |
$895.12 |
$850.00 |
$950.00 |
$1,185.00 |
$962.50 |
$850.00 |
$1,265.00 |
| 84 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$3,500.00 |
$2,677.50 |
$2,626.50 |
$1,550.00 |
$1,850.00 |
$3,850.00 |
$3,928.00 |
$2,000.00 |
$2,100.00 |
| 85 | 523(A) 6550 |
SEALER CRACK PREPARATION | 234 | LF |
$4.00 |
$4.20 |
$5.15 |
$4.00 |
$4.10 |
$4.00 |
$4.15 |
$5.00 |
$4.75 |
| 86 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$100.00 |
$210.00 |
$216.30 |
$200.00 |
$205.00 |
$200.00 |
$208.00 |
$150.00 |
$237.00 |
| 87 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,669 | TON |
$45.00 |
$45.15 |
$49.32 |
$45.00 |
$50.00 |
$51.00 |
$54.80 |
$50.00 |
$55.75 |
| 88 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 423 | TON |
$35.00 |
$34.24 |
$39.70 |
$35.00 |
$40.00 |
$39.00 |
$40.40 |
$40.00 |
$43.70 |
| 89 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 156 | LF |
$30.00 |
$22.15 |
$30.90 |
$33.00 |
$25.00 |
$18.00 |
$41.30 |
$25.00 |
$20.00 |
| 90 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$25.00 |
$17.47 |
$30.90 |
$26.00 |
$25.00 |
$18.00 |
$32.70 |
$25.00 |
$20.00 |
| 91 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$296,000.00 |
$94,500.00 |
$123,600.00 |
$66,600.00 |
$125,000.00 |
$150,000.00 |
$165,170.00 |
$350,000.00 |
$230,000.00 |
| 92 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$11,898.17 |
$10,404.00 |
$8,652.00 |
$25,000.00 |
$10,500.00 |
$13,000.00 |
$10,605.00 |
$9,300.00 |
$10,000.00 |
| 93 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$2,525.00 |
$3,090.00 |
$4,000.00 |
$1,800.00 |
$4,500.00 |
$3,617.00 |
$5,000.00 |
$9,000.00 |
| 94 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$245,000.00 |
$183,026.93 |
$177,644.47 |
$215,000.00 |
$217,310.48 |
$200,000.00 |
$561,220.40 |
$200,000.00 |
$150,000.00 |