Bid tab 180048

Let Jan 18, 2018 · Division 4 · Kingfisher Sign up free

‹ Jan 2018 results

BRIDGE AND APPROACHES US -81: OVER KINGFISHER CREEK, 0.7 MILES NORTH OF THE SH -3 INTERSECTION IN KINGFISHER. PROJECT LENGTH = 0.146 MILE

Let date
Thursday, January 18, 2018
Contract
180048
J/P numbers
29842(04)
District
Division 4
County
Kingfisher
Highway
Limits
BRIDGE AND APPROACHES US -81: OVER KINGFISHER CREEK, 0.7 MILES NORTH OF THE SH -3 INTERSECTION IN KINGFISHER. PROJECT LENGTH = 0.146 MILE
Project number
NHPP-237N(041)SS

Bidders 9

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,531,636
1 Frontier Bridge, Inc. Low bidder $3,481,003 -23.2%
2 Treas Construction Inc $3,626,860 -20.0% +4.2%
3 L & N BRIDGE, LLC $3,873,100 -14.5% +11.3%
4 MANHATTAN ROAD & BRIDGE COMPANY, LLC $3,894,000 -14.1% +11.9%
5 Bridges, Inc. DBA Scudder Bridge Co. $4,058,340 -10.4% +16.6%
6 HASKELL LEMON CONSTRUCTION CO. $4,357,936 -3.8% +25.2%
7 SEWELL BROS., INC. $4,676,521 +3.2% +34.3%
8 Cimarron Construction Company, LLC $4,871,943 +7.5% +40.0%
9 OBC, INC. $5,746,949 +26.8% +65.1%

Bid tab: unit prices 94 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Frontier Bridge…#2 Treas Construct…#3 L & N BRIDGE, L…#4 MANHATTAN ROAD …#5 Bridges, Inc. D…#6 HASKELL LEMON C…#7 SEWELL BROS., I…#8 Cimarron Constr…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $13,750.70 $4,317.75 $4,635.00 $4,500.00 $60,000.00 $10,000.00 $7,849.00 $35,000.00 $20,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION1,435CY $10.68 $11.51 $12.36 $12.00 $11.00 $6.15 $13.20 $22.00 $11.00
3202(D) 0184 UNCLASSIFIED BORROW2,406CY $12.52 $15.15 $17.51 $17.00 $19.00 $11.25 $20.10 $29.00 $30.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $13,645.24 $2,014.95 $2,163.00 $2,100.00 $1,500.00 $5,786.39 $7,764.00 $7,800.00 $5,000.00
5221(C) 2801 TEMPORARY SILT FENCE1,599LF $1.59 $1.87 $1.91 $2.05 $5.00 $1.85 $1.90 $2.00 $2.00
6221(F) 0100 TEMPORARY SILT DIKE133LF $8.09 $8.59 $8.76 $7.88 $15.00 $8.50 $8.85 $9.35 $10.00
7230(A) 2806 SOLID SLAB SODDING1,970SY $2.39 $3.69 $3.76 $4.42 $3.70 $3.65 $3.80 $4.00 $5.25
8233(A) 2817 VEGETATIVE MULCHING1AC $335.49 $454.50 $463.50 $150.00 $460.00 $450.00 $468.00 $495.00 $1,000.00
9303(A) 2100 AGGREGATE BASE TYPE A885CY $55.00 $51.81 $55.62 $54.00 $75.00 $63.00 $74.60 $130.00 $100.00
10307(K) 4300 STABILIZED SUBGRADE3,697SY $10.21 $1.31 $5.51 $7.50 $6.50 $5.35 $12.50 $7.80 $15.00
11317 4270 CEMENT TREATED BASE3,209SY $12.00 $19.62 $15.31 $25.00 $20.00 $20.00 $15.50 $56.75 $30.00
12325 5271 SEPARATOR FABRIC4,068SY $1.87 $4.10 $1.62 $1.30 $1.05 $1.35 $1.65 $6.00 $5.00
13408 5774 PRIME COAT2,213GAL $5.36 $12.63 $5.02 $12.50 $6.30 $12.50 $5.05 $10.50 $7.00
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)56TON $165.00 $307.04 $186.64 $304.00 $312.00 $304.00 $214.00 $148.00 $245.00
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)28TON $200.00 $391.88 $228.66 $388.00 $400.00 $388.00 $308.50 $240.00 $350.00
16414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )2,935SY $25.00 $35.96 $24.21 $25.00 $27.50 $23.00 $24.40 $50.65 $47.00
17414(E) 0225 FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY)375SY $129.43 $35.35 $98.90 $65.00 $45.00 $50.00 $99.90 $40.00 $168.00
18414(G) 5275 P.C. CONCRETE FOR PAVEMENT817CY $155.00 $130.38 $144.20 $125.00 $140.00 $160.00 $145.50 $71.00 $200.00
19416 0100 DOWEL BAR RETROFIT590EA $25.00 $20.66 $37.44 $55.00 $12.00 $20.00 $37.80 $166.00 $35.00
20609(B) 1525 2'-8" COMB. CURB & GUTTER (6" BARRIER)723LF $21.69 $22.40 $30.90 $40.00 $35.50 $40.00 $31.10 $31.00 $45.00
21610(A) 0602 4" CONCRETE SIDEWALK424SY $71.34 $51.42 $45.86 $40.00 $60.00 $43.00 $46.30 $72.00 $88.00
22610(I) 4610 TACTILE WARNING DEVICE-NEW60SF $28.71 $34.52 $23.36 $25.00 $25.00 $30.00 $23.60 $38.00 $45.00
23611(G) 5118 INLET CI DES. 2 (B-D)4EA $7,000.00 $3,333.00 $3,399.00 $3,300.00 $6,500.00 $6,225.00 $3,120.00 $9,550.00 $7,200.00
24613(A) 0491 18" R.C.PIPE CLASS III72LF $67.00 $68.98 $58.40 $58.00 $57.00 $61.75 $104.00 $107.00 $55.00
25613(B) 0693 42" CORR. GALV. STEEL PIPE36LF $70.00 $53.01 $60.52 $105.00 $65.00 $65.25 $57.20 $70.00 $80.00
26613(J) 5915 EDGE DRAIN CONDUIT-PERFORATED723LF $13.71 $12.49 $12.36 $18.00 $9.00 $10.80 $10.40 $13.00 $18.00
27613(K) 5916 EDGE DRAIN OUTLET LATERAL-NONPERFORATED72LF $10.00 $11.94 $9.89 $14.00 $6.00 $12.35 $10.40 $51.00 $19.00
28613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND4EA $439.92 $695.41 $552.26 $700.00 $700.00 $1,000.00 $800.50 $858.00 $975.00
29613(P) 0764 42" GALV. STEEL CULVERT END SECTION ROUND1EA $1,000.00 $1,054.04 $813.86 $800.00 $1,250.00 $985.00 $260.00 $850.00 $1,200.00
30613(Q) 5946 OUTLET LATERAL HEADWALL4EA $676.67 $707.00 $824.00 $300.00 $400.00 $625.00 $1,005.00 $810.00 $675.00
31619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $6,695.41 $4,125.85 $4,429.00 $4,300.00 $6,500.00 $7,000.00 $17,295.00 $6,300.00 $9,500.00
32619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,253SY $5.57 $3.35 $3.61 $3.50 $6.00 $4.00 $9.25 $5.30 $10.00
33619(B) 4780 REMOVAL OF GUARDRAIL167LF $3.00 $3.35 $3.61 $3.00 $3.25 $3.50 $20.70 $7.75 $4.00
34619(B) 4791 REMOVAL OF CURB183LF $7.72 $8.64 $9.27 $9.00 $3.75 $11.65 $7.50 $19.00 $18.00
35619(B) 6118 REMOVAL OF PAVING BRICK ROADWAY245SY $15.00 $10.56 $11.33 $11.00 $25.00 $14.55 $12.50 $11.00 $15.00
36619(B) 6130 REMOVAL OF 4" CONCRETE DIVIDING STRIP234SY $4.50 $10.56 $11.33 $11.00 $25.00 $12.00 $7.50 $21.00 $16.00
37623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE113LF $18.13 $17.12 $17.46 $20.00 $17.00 $20.00 $17.60 $18.65 $24.00
38623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,291.25 $2,216.95 $2,260.85 $2,500.00 $2,225.00 $2,500.00 $2,283.00 $1,800.00 $2,690.00
39623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,929.76 $1,667.50 $1,699.50 $1,900.00 $1,700.00 $1,900.00 $1,716.00 $2,400.00 $2,250.00
40853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)6EA $12.46 $15.15 $15.45 $20.00 $20.50 $20.00 $15.60 $16.00 $24.00
41857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1208EA $0.4500 $3.03 $3.09 $3.00 $3.05 $3.00 $5.20 $3.10 $3.50
42857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)850LF $0.8200 $1.01 $1.03 $1.00 $1.05 $1.00 $1.05 $1.05 $1.10
43871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.730SD $5.85 $5.05 $5.15 $5.00 $5.10 $5.00 $10.40 $5.20 $6.00
44877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,100LF $26.48 $12.00 $24.72 $30.00 $45.00 $22.00 $29.40 $44.00 $45.00
45877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,100LF $3.35 $4.04 $4.12 $3.00 $3.50 $3.00 $6.05 $4.40 $4.50
46880(A) 8812 ARROW DISPLAY(TYPE C)730SD $10.00 $1.01 $1.03 $1.00 $1.05 $1.00 $5.20 $1.05 $1.15
47880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF3,650SD $0.4600 $1.01 $1.03 $1.00 $1.05 $1.00 $0.3600 $1.05 $1.15
48880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,745SD $0.5400 $0.5100 $0.5200 $0.5000 $0.5500 $0.5000 $1.05 $0.5200 $0.6000
49880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF6,205SD $1.62 $0.2500 $0.2600 $0.2500 $0.3000 $0.2500 $1.55 $0.2700 $0.3000
50880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,190SD $0.5900 $1.01 $1.03 $1.00 $1.05 $1.00 $1.55 $1.05 $1.20
51880(C) 8848 WING BARRICADES1,095SD $0.9000 $0.5100 $0.5200 $0.5000 $0.5500 $0.5000 $0.1000 $0.5500 $0.6000
52880(E) 8860 WARNING LIGHTS(TYPE A)4,380SD $0.3000 $2.02 $2.06 $2.00 $2.05 $2.00 $0.3600 $2.10 $2.40
53880(F) 8878 DRUMS63,936SD $0.1200 $0.0500 $0.0500 $0.0500 $0.0600 $0.0500 $0.1600 $0.0700 $0.1000
54882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN730SD $9.77 $5.05 $5.15 $5.00 $5.10 $5.00 $10.40 $5.20 $6.00
55805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $431.27 $25.25 $25.75 $25.00 $50.00 $25.00 $520.00 $30.00 $30.00
56850(A) 8110 SHEET ALUMINUM SIGNS85SF $21.17 $16.16 $16.48 $16.00 $16.25 $16.00 $15.60 $18.00 $19.00
57851(C) 8330 2 1/2" SQUARE TUBE POST123LF $10.08 $8.08 $8.24 $8.00 $8.10 $8.00 $10.40 $8.50 $9.50
58856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)8,481LF $0.7800 $0.6600 $0.6700 $0.6500 $0.7000 $0.6500 $1.05 $0.6700 $0.7500
59856(A) 8548 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)564LF $1.89 $2.02 $2.06 $2.00 $2.05 $2.00 $2.10 $2.10 $2.40
60856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)201LF $13.27 $10.10 $10.30 $10.00 $10.20 $10.00 $4.15 $11.00 $12.00
61501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON294.6CY $35.00 $15.75 $25.75 $6.00 $70.00 $25.00 $22.50 $17.00 $12.00
62501(G) 6309 CLSM BACKFILL517CY $150.00 $102.32 $197.19 $140.00 $120.00 $150.00 $132.00 $150.00 $170.00
63503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)2,632.2LF $285.00 $240.74 $246.30 $290.00 $260.00 $300.00 $261.50 $275.00 $298.00
64504(A) 1304 APPROACH SLAB513.6SY $225.00 $187.82 $180.75 $170.00 $180.00 $150.00 $223.50 $225.00 $260.00
65504(B) 1305 SAW-CUT GROOVING2,610.4SY $5.00 $3.99 $5.00 $3.85 $3.90 $4.00 $3.95 $4.45 $5.50
66504(C) 6250 SEALED EXPANSION JOINT79LF $290.00 $224.31 $260.33 $225.00 $265.00 $250.00 $201.00 $250.00 $305.00
67504(E) 6190 42" F-SHAPED PARAPET783.6LF $100.00 $72.04 $92.19 $80.00 $52.25 $75.00 $105.50 $85.00 $145.00
68504(G) 6390 RAPID CURE JOINT SEALANT331.7LF $25.00 $21.48 $26.78 $10.00 $25.50 $20.00 $26.20 $30.00 $22.00
69506(A) 1322 STRUCTURAL STEEL6,656LB $2.00 $1.91 $1.87 $2.00 $1.30 $4.00 $1.90 $2.00 $1.75
70507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY16EA $2,100.00 $1,942.07 $2,050.19 $2,000.00 $2,500.00 $3,000.00 $2,368.00 $2,000.00 $2,275.00
71507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY32EA $2,100.00 $1,942.07 $2,050.19 $2,000.00 $2,500.00 $3,000.00 $2,368.00 $2,000.00 $2,275.00
72509 6152 SPECIAL CONCRETE FINISH244SY $55.00 $103.07 $155.53 $70.00 $75.00 $50.00 $102.00 $162.00 $150.00
73509(A) 1326 CLASS AA CONCRETE989.6CY $650.00 $449.78 $452.09 $600.00 $450.00 $500.00 $470.50 $650.00 $630.00
74509(B) 1328 CLASS A CONCRETE421.2CY $750.00 $502.28 $452.09 $600.00 $600.00 $600.00 $548.00 $650.00 $660.00
75511(A) 1332 REINFORCING STEEL3,096LB $1.05 $0.8900 $0.9700 $1.25 $1.40 $2.25 $3.05 $1.00 $0.9000
76511(B) 6010 EPOXY COATED REINFORCING STEEL284,212LB $1.15 $0.9300 $1.01 $0.8500 $1.00 $1.00 $0.9900 $1.00 $1.00
77514(A) 6010 PILES, FURNISHED (HP 10X42)442LF $30.00 $27.56 $24.54 $30.00 $45.00 $31.00 $36.50 $25.00 $46.00
78514(A) 6011 PILES, FURNISHED (HP 12X53)2,290LF $40.00 $33.12 $29.51 $36.00 $45.00 $38.00 $38.80 $30.00 $52.00
79514(B) 6292 PILES, DRIVEN (HP 10X42)442LF $20.00 $16.80 $11.33 $14.00 $12.50 $10.00 $22.50 $15.00 $23.00
80514(B) 6294 PILES, DRIVEN (HP 12X53)2,290LF $20.00 $15.75 $11.33 $16.00 $10.00 $10.00 $16.50 $15.00 $24.00
81514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
82515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)2,812SY $4.00 $3.15 $4.79 $3.65 $3.70 $3.65 $3.10 $3.25 $4.30
83516(A) 6098 DRILLED SHAFTS 72" DIAMETER344LF $1,200.00 $859.47 $895.12 $850.00 $950.00 $1,185.00 $962.50 $850.00 $1,265.00
84516(C) 6200 CROSSHOLE SONIC LOGGING2EA $3,500.00 $2,677.50 $2,626.50 $1,550.00 $1,850.00 $3,850.00 $3,928.00 $2,000.00 $2,100.00
85523(A) 6550 SEALER CRACK PREPARATION234LF $4.00 $4.20 $5.15 $4.00 $4.10 $4.00 $4.15 $5.00 $4.75
86523(B) 6560 SEALER RESIN2GAL $100.00 $210.00 $216.30 $200.00 $205.00 $200.00 $208.00 $150.00 $237.00
87601(B) 1353 TYPE I-A PLAIN RIPRAP2,669TON $45.00 $45.15 $49.32 $45.00 $50.00 $51.00 $54.80 $50.00 $55.75
88601(C) 1355 TYPE I-A FILTER BLANKET423TON $35.00 $34.24 $39.70 $35.00 $40.00 $39.00 $40.40 $40.00 $43.70
89613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND156LF $30.00 $22.15 $30.90 $33.00 $25.00 $18.00 $41.30 $25.00 $20.00
90613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.120LF $25.00 $17.47 $30.90 $26.00 $25.00 $18.00 $32.70 $25.00 $20.00
91619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $296,000.00 $94,500.00 $123,600.00 $66,600.00 $125,000.00 $150,000.00 $165,170.00 $350,000.00 $230,000.00
92642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $11,898.17 $10,404.00 $8,652.00 $25,000.00 $10,500.00 $13,000.00 $10,605.00 $9,300.00 $10,000.00
93220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,000.00 $2,525.00 $3,090.00 $4,000.00 $1,800.00 $4,500.00 $3,617.00 $5,000.00 $9,000.00
94641 1399 MOBILIZATION1LSUM $245,000.00 $183,026.93 $177,644.47 $215,000.00 $217,310.48 $200,000.00 $561,220.40 $200,000.00 $150,000.00

Showing the first 8 bidders. The Excel and CSV downloads include all 9.