53BidsJan 21, 2016 to Sep 17, 2026
11Wins (low bidder)
20.8%Win rate
$39,595,733Total won
Competitor scorecard
Last 5 years in Oklahoma12.5%Win rate1 of 8 bids
+28.0%Average bid vs estimate
—Winning bids vs estimate
+17.6%Over the low bid when they loseAverage field: 4.9 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| K & R BUILDERS, INC. | 7 | 2 | 5 | 29% |
| Frontier Bridge, Inc. | 5 | 2 | 3 | 40% |
| SEWELL BROS., INC. | 3 | 1 | 2 | 33% |
| BRIDGECO CONTRACTORS, INC. | 3 | 1 | 2 | 33% |
| OBC, INC. | 3 | 2 | 1 | 67% |
| RRY SERVICES LLC | 2 | 0 | 2 | 0% |
| Built Right Construction, LLC | 2 | 2 | 0 | 100% |
| MANHATTAN ROAD & BRIDGE COMPANY, LLC | 1 | 1 | 0 | 100% |
| WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES | 1 | 1 | 0 | 100% |
| Wyatt Contracting, Inc./Central Bridge Company JV | 1 | 0 | 1 | 0% |
| Let date | Contract | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Sep 17, 2026 | 260231 | Bridge RehabilitationCimarron · Division 6 | 2 of 2 | $4,927,160 | $4,272,306K & R BUILDERS, INC. | +15.3% |
| Aug 13, 2026 | 260183 | Beaver · Division 6 | 5 of 6 | $4,969,113 | $3,765,301Frontier Bridge, Inc. | +32.0% |
| Aug 13, 2026 | 260191 | Texas · Division 6 | 1 of 2 | $2,140,580 | $2,140,580 | Won |
| Jun 12, 2025 | 250092 | Bridge RehabilitationTexas · Division 6 | 3 of 5 | $4,374,591 | $3,795,521Frontier Bridge, Inc. | +15.3% |
| Nov 14, 2024 | 240268 | Bridge RehabilitationBeaver · Division 6 | 2 of 6 | $1,658,246 | $1,478,340SEWELL BROS., INC. | +12.2% |
| Oct 10, 2024 | 240234 | Bridge And ApproachesKay · Division 4 | 6 of 7 | $12,338,932 | $10,601,828Frontier Bridge, Inc. | +16.4% |
| Mar 17, 2022 | 220080 | BRIDGE AND APPROACHES COUNTY ROAD (NS-145): OVER NORTH FORK OF KIOWA CREEK, 1.1 MILES NORTH OF THE TEXAS STATE LINE . PROJECT LENGTH = 0.264 MILEBeaver · Division 6 | 3 of 3 | $932,296 | $765,097K & R BUILDERS, INC. | +21.9% |
| Feb 17, 2022 | 220068 | BRIDGE REHABILITATION US-60: OVER CHARLIE CREEK, 8.2 MILES EAST OF THE KAY COUNTY LINE . PROJECT LENGTH = 0.159 MILEOsage · Division 8 | 4 of 8 | $1,708,713 | $1,549,498K & R BUILDERS, INC. | +10.3% |
| Oct 15, 2020 | 200314 | BRIDGE AND APPROACHES COUNTY ROAD (EW-67): OVER TURKEY CREEK , 2.5 MILES WEST OF THE US -81 JUNCTION NEAR HENNESSEY. PROJECT LENGTH = 0.284 MILEKingfisher · Division 4 | 6 of 8 | $939,992 | $768,168K & R BUILDERS, INC. | +22.4% |
| Sep 17, 2020 | 200284 | BRIDGE AND APPROACHES COUNTY ROAD (NS-228): OVER WEST CREEK , 4.1 MILES NORTH OF THE US -412 JUNCTION NEAR WAYNOKA . PROJECT LENGTH = 0.189 MILESMajor · Division 6 | 5 of 7 | $848,835 | $729,412BRIDGECO CONTRACTORS, INC. | +16.4% |
| Aug 20, 2020 | 200239 | BRIDGE AND APPROACHES COUNTY ROAD (NS-237): OVER GREEN LEAF CREEK, 8.7 MILES NORTH OF THE US -64 JUNCTION NEAR THE KANSAS STATE LINE . PROJECT LENGTH = 0.239 MILEWoods · Division 6 | 5 of 8 | $1,394,465 | $1,199,890K & R BUILDERS, INC. | +16.2% |
| Jul 23, 2020 | 200252 | BRIDGE REHABILITATION SH -11: OVER BOIS D'ARC CREEK, 2.0 MILES WEST OF THE US -77 JUNCTION NEAR PONCA CITY . PROJECT LENGTH = 0.144 MILEKay · Division 4 | 7 of 7 | $739,312 | $449,673CONCRETE SERVICES CORPORATI… | +64.4% |
| May 16, 2019 | 190130 | PAWNEE BRIDGE AND APPROACHES US -64: OVER CEDAR CREEK AND PEDESTRIAN TRAIL , 0.1 MILES SOUTH OF THE SH -99 JUNCTION IN THE CITY OF CLEVELAND . PROJECT LENGTH = 0.364 MILEStp-259b(034)ss · | 1 of 2 | $9,996,429 | $9,996,429 | Won |
| Mar 14, 2019 | 190003 | BRIDGE AND APPROACHES COUNTY ROAD (EW-19): OVER CAMP CREEK , 7.6 MILES EAST OF THE SH-23 JUNCTION NEAR BEAVER CITY . PROJECT LENGTH = 0.330 MILEBeaver · Division 6 | 1 of 2 | $706,909 | $706,909 | Won |
| Jan 17, 2019 | 180358 | LOGAN BRIDGE AND APPROACHES SH -51: OVER MIDDLE BEAVER CREEK AND WEST BEAVER CREEK , 2.2 MILES AND 3.3 MILES WEST OF US -77 NEAR MULHALL. PROJECT LENGTH = 0.507 MILEStp-242c(058)ss · | 5 of 5 | $5,216,331 | $4,406,958RRY SERVICES LLC | +18.4% |
| Sep 20, 2018 | 180208 | BRIDGE AND APPROACHES COUNTY ROAD (EW-63): OVER SALT CREEK , 2.6 MILES EAST OF THE SH-18 JUNCTION NEAR YALE . PROJECT LENGTH = 0.203 MILEPayne · Division 4 | 3 of 5 | $897,376 | $769,370K & R BUILDERS, INC. | +16.6% |
| Jul 19, 2018 | 180159 | BRIDGE AND APPROACHES SH -99: OVER LAGOON CREEK, 0.5 MILES NORTH OF THE SH -51 JUNCTION NEAR OILTON . PROJECT LENGTH = 0.253 MILECreek · Division 8 | 2 of 3 | $2,144,518 | $1,788,000BECCO CONTRACTORS, INC. | +19.9% |
| Jul 19, 2018 | 180214 | BRIDGE AND APPROACHES COUNTY ROAD (NS-250): OVER LAKE CREEK, 4.9 MILES NORTH OF THE SH-45 JUNCTION NEAR DACOMA. PROJECT LENGTH = 0.190 MILEWoods · Division 6 | 4 of 8 | $659,800 | $623,431B & B BRIDGE COMPANY, LLC | +5.8% |
| Jul 19, 2018 | 180240 | BRIDGE AND APPROACHES COUNTY ROAD (EW-60): OVER TURKEY CREEK , 2.6 MILES WEST OF THE US-81 JUNCTION NEAR HENNESSEY. PROJECT LENGTH = 0.331 MILEKingfisher · Division 4 | 5 of 7 | $829,357 | $740,615RRY SERVICES LLC | +12.0% |
| Jul 19, 2018 | 180256 | BRIDGE AND APPROACHES US -64: OVER ANDERSON CREEK , 2.1 MILES EAST OF THE SH -50 JUNCTION NEAR FREEDOM. PROJECT LENGTH = 0.198 MILEWoods · Division 6 | 1 of 6 | $2,393,762 | $2,393,762 | Won |
| Jun 14, 2018 | 180189 | BRIDGE AND APPROACHES COUNTY ROAD (NS-40): OVER DRY LAKE CREEK , 0.5 MILES SOUTH OF US-56 NEAR BOISE CITY. PROJECT LENGTH = 0.265 MILECimarron · Division 6 | 4 of 4 | $927,041 | $839,249KLAVER CONSTRUCTION COMPANY… | +10.5% |
| May 17, 2018 | 180132 | BRIDGE AND APPROACHES US -60: OVER BNSF RAILROAD, 1.8 MILES NORTH OF THE US -412 INTERSECTION IN THE CITY OF ENID . PROJECT LENGTH = 0.323 MILEGarfield · Division 4 | 1 of 3 | $10,889,658 | $10,889,658 | Won |
| May 17, 2018 | 180154 | BRIDGE AND APPROACHES SH -51: OVER NORTH CANADIAN RIVER AND OVERFLOW , 0.4 MILES AND 0.6 MILES EAST OF THE SH -58 JUNCTION IN CANTON . PROJECT LENGTH = 0.378 MILEBlaine · Division 5 | 4 of 4 | $4,018,478 | $3,381,458FRONTIER BRIDGE, INC. / BRI… | +18.8% |
| May 17, 2018 | 170125 | BRIDGE AND APPROACHES US -77: OVER THE CIMARRON RIVER , 2.7 MILES NORTH OF SH -33 NEAR GUTHRIE. PROJECT LENGTH = 0.610 MILELogan · Division 4 | 3 of 8 | $5,648,595 | $5,452,152FRONTIER BRIDGE, INC. / BRI… | +3.6% |
| Apr 19, 2018 | 180168 | BRIDGE AND APPROACHES COUNTY ROAD (EW-69): OVER SKELETON CREEK , 5.3 MILES EAST OF THE SH-74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.331 MILELogan · Division 4 | 5 of 8 | $1,467,201 | $1,225,821K & R BUILDERS, INC. | +19.7% |
| Apr 19, 2018 | 180217 | 28077(04) SBR-206C(045)SB BLAINE BRIDGE AND APPROACHES AND BRIDGE REHABILITATION SH -8: OVER SPRING CREEK AND UNNAMED CREEKS, 1.0 MI, 10.9 MI, AND 12.4 MI S OF THE SH -51 JCT NEAR OKEENE AND HITCHCOCK. PROJECT LENGTH = 0.592 MILESbr-206c(046)sb · | 2 of 3 | $3,644,736 | $3,598,709K & R BUILDERS, INC. | +1.3% |
| Feb 15, 2018 | 170348 | BRIDGE REHABILITATION US -270: OVER UNNAMED CREEK, 2.3 MILES WEST OF THE US -283 INTERSECTION NEAR LAVERNE . PROJECT LENGTH = 0.096 MILEHarper · Division 6 | 5 of 9 | $463,093 | $405,948B & B BRIDGE COMPANY, LLC | +14.1% |
| Feb 15, 2018 | 170363 | BRIDGE REHABILITATION SH -11: OVER UNNAMED CREEK, 3.3 MILES EAST OF THE US -281 JUNCTION NEAR CAPRON. PROJECT LENGTH = 0.098 MILEWoods · Division 6 | 1 of 4 | $827,321 | $827,321 | Won |
| Feb 15, 2018 | 180091 | BRIDGE AND APPROACHES SH -18: OVER DRY CREEK OVERFLOW AND DRY CREEK , 5.6 MILES AND 5.7 MILES NORTH OF I -44 NEAR CHANDLER. PROJECT LENGTH = 0.661 MILELincoln · Division 3 | 3 of 6 | $3,348,125 | $3,216,964BRIDGECO CONTRACTORS, INC. | +4.1% |
| Feb 15, 2018 | 170364 | BRIDGE REHABILITATION SH -50: OVER BULL CREEK , 2.8 MILES SOUTH OF THE US -412 JUNCTION NEAR MOORELAND. PROJECT LENGTH = 0.127 MILEWoodward · Division 6 | 1 of 5 | $945,011 | $945,011 | Won |
| Feb 15, 2018 | 180108 | BRIDGE AND APPROACHES COUNTY ROAD (EW-28/GEORGE BRADEN ROAD): OVER UNNAMED CREEK, 8.9 MILES EAST OF US -177 NEAR PONCA CITY . PROJECT LENGTH = 0.247 MILEOsage · Division 8 | 5 of 7 | $975,954 | $874,941BRIDGECO CONTRACTORS, INC. | +11.5% |
| Jan 18, 2018 | 180006 | BRIDGE AND APPROACHES COUNTY ROAD (NS-366/S. 449TH W. AVENUE ): OVER TRIBUTARIES TO BUCKEYE CREEK, 3.5 MI AND 3.8 MI S OF SH-51 NEAR OILTON . PROJECT LENGTH = 0.572 MILECreek · Division 8 | 5 of 7 | $2,143,920 | $1,831,559BRIDGECO CONTRACTORS, INC. | +17.1% |
| Jan 18, 2018 | 180023 | BRIDGE AND APPROACHES COUNTY ROAD (EW-33): OVER DOG THRESHER CREEK , 3.2 MILES WEST OF SH -11 NEAR BARNSDALL. PROJECT LENGTH = 0.302 MILEOsage · Division 8 | 6 of 7 | $1,044,381 | — | |
| Jan 18, 2018 | 180048 | BRIDGE AND APPROACHES US -81: OVER KINGFISHER CREEK, 0.7 MILES NORTH OF THE SH -3 INTERSECTION IN KINGFISHER. PROJECT LENGTH = 0.146 MILEKingfisher · Division 4 | 5 of 9 | $4,058,340 | $3,481,003Frontier Bridge, Inc. | +16.6% |
| Jan 18, 2018 | 180061 | BRIDGE REHABILITATION SH -20: OVER BOAR CREEK, WILD HORSE CREEK, AND HOMINY CREEK , 6.0 MI, 8.1 MI AND 13.0 MI EAST OF SH -99 NEAR HOMINY. PROJECT LENGTH = 0.252 MILEOsage · Division 8 | 3 of 3 | $2,888,671 | $1,419,768Built Right Construction, L… | +103.5% |
| Nov 16, 2017 | 170349 | BRIDGE AND APPROACHES COUNTY ROAD (EW-18): OVER KILDARE CR AND BOIS D 'ARC CR, 2.2 MILES AND 2.4 MILES WEST OF US -77 NEAR PONCA CITY . PROJECT LENGTH = 0.402 MILEKay · Division 4 | 6 of 6 | $1,685,065 | $1,499,902BRIDGECO CONTRACTORS, INC. | +12.3% |
| Nov 16, 2017 | 170354 | BRIDGE AND APPROACHES COUNTY ROAD (EW-52): OVER SAND CREEK, 1.0 MILES EAST OF THE SH-58 INTERSECTION IN FAIRVIEW . PROJECT LENGTH = 0.216 MILEMajor · Division 6 | 5 of 5 | $949,358 | $752,930SEWELL BROS., INC. | +26.1% |
| Nov 16, 2017 | 170362 | BRIDGE AND APPROACHES COUNTY ROAD (NS-63): OVER SAND CREEK, 9.9 MILES SOUTH OF THE US-64 INTERSECTION NEAR TEXHOMA . PROJECT LENGTH = 0.227 MILETexas · Division 6 | 1 of 3 | $1,288,441 | $1,288,441 | Won |
| Aug 17, 2017 | 170255 | BRIDGE AND APPROACHES COUNTY ROAD (EW-92): OVER QUARTERMASTER CREEK , 3.0 MILES EAST OF THE SH -34 JUNCTION NEAR HAMMON. PROJECT LENGTH = 0.180 MILECuster · Division 5 | 7 of 7 | $778,592 | $606,470SEWELL BROS., INC. | +28.4% |
| Aug 17, 2017 | 170267 | BRIDGE AND APPROACHES US -60: OVER CIMARRON RIVER, 1.5 MILES SOUTHWEST OF THE SH -8 JUNCTION NEAR CLEO SPRINGS. PROJECT LENGTH = 1.316 MILEMajor · Division 6 | 3 of 7 | $8,438,348 | $7,816,101Frontier Bridge, Inc. | +8.0% |
| Jul 20, 2017 | 170214 | BRIDGE AND APPROACHES COUNTY ROAD (NS-274): OVER WAGON CREEK , 0.2 MILES SOUTH OF US-64 NEAR JET. PROJECT LENGTH = 0.227 MILEAlfalfa · Division 6 | 4 of 10 | $678,295 | $659,351King Construction CO., INC. | +2.9% |
| Jul 20, 2017 | 170245 | BRIDGE AND APPROACHES COUNTY ROAD (N2380 ROAD): OVER SALT FORK RIVER , 2.6 MILES SOUTH OF THE KANSAS STATE LINE . PROJECT LENGTH = 0.850 MILEWoods · Division 6 | 1 of 9 | $3,634,541 | $3,634,541 | Won |
| Jun 15, 2017 | 170206 | BRIDGE AND APPROACHES COUNTY ROAD (E0445): OVER UNNAMED CREEK, 3.7 MILES WEST OF THE OSAGE COUNTY LINE NEAR BLACKBURN . PROJECT LENGTH = 0.160 MILEPawnee · Division 8 | 4 of 7 | $558,316 | $469,576K & R BUILDERS, INC. | +18.9% |
| Jun 15, 2017 | 170207 | BRIDGE AND APPROACHES SH -18: OVER CAMP CREEK , 1.5 MILES SOUTH OF THE US -64 JUNCTION NEAR PAWNEE . PROJECT LENGTH = 0.113 MILEPawnee · Division 8 | 3 of 8 | $1,789,240 | $1,726,386BRIDGECO CONTRACTORS, INC. | +3.6% |
| Apr 20, 2017 | 170150 | BRIDGE AND APPROACHES COUNTY ROAD (NS-165): OVER BEAVER RIVER , 4.4 MILES SOUTH OF US-64 NEAR BUFFALO . PROJECT LENGTH = 0.906 MILEBeaver · Division 6 | 3 of 8 | $4,797,669 | $4,673,802SEWELL BROS., INC. | +2.7% |
| Apr 20, 2017 | 170162 | BRIDGE AND APPROACHES COUNTY ROAD (NS-357): OVER LAGOON CREEK, 0.5 MILES NORTH OF THE PAYNE COUNTY LINE NEAR JENNINGS . PROJECT LENGTH = 0.133 MILEPawnee · Division 8 | 7 of 8 | $832,070 | $694,556H & H BRIDGE COMPANY | +19.8% |
| Apr 20, 2017 | 170169 | BRIDGE AND APPROACHES COUNTY ROAD (EW-51): OVER SKELETON CREEK , 6.9 MILES EAST OF US-81 NEAR WAUKOMIS . PROJECT LENGTH = 0.274 MILEGarfield · Division 4 | 5 of 9 | $839,574 | $776,041K & R BUILDERS, INC. | +8.2% |
| Apr 20, 2017 | 170170 | BRIDGE AND APPROACHES COUNTY ROAD (EW-84): OVER WINTER CAMP CREEK /DEAD INDIAN CREEK, 5.3 MILES WEST OF US -81/SH-3 NEAR OKARCHE. PROJECT LENGTH = 0.246 MILEKingfisher · Division 4 | 6 of 9 | $1,023,948 | $906,756K & R BUILDERS, INC. | +12.9% |
| Mar 16, 2017 | 170112 | BRIDGE AND APPROACHES SH -8: OVER DRIFTWOOD CREEK, 0.9 MILES NORTH OF THE SH -11 JUNCTION NEAR BURLINGTON . PROJECT LENGTH = 0.251 MILEAlfalfa · Division 6 | 3 of 9 | $2,448,321 | $2,388,859L & M Contractors, Inc. | +2.5% |
| Mar 16, 2017 | 170118 | BRIDGE AND APPROACHES US -385: OVER BEAVER RIVER , 2.8 MILES SOUTH OF THE US -412 JUNCTION NEAR BOISE CITY. PROJECT LENGTH = 0.274 MILECimarron · Division 6 | 1 of 3 | $4,075,877 | $4,075,877 | Won |
| Mar 16, 2017 | 170128 | BRIDGE AND APPROACHES US -60: OVER THE NORTH CANADIAN RIVER , 2.2 MILES NORTH OFUS-270 NEAR SEILING. PROJECT LENGTH = 0.851 MILEMajor · Division 6 | 7 of 10 | $6,440,279 | $5,360,056Frontier Bridge, Inc. | +20.2% |
| Feb 18, 2016 | 160069 | BRIDGE AND APPROACHES SH -58: OVER MEDICINE LODGE RIVER OVERFLOW, 1.1 MILES EAST OF THE SH-8 JUNCTION NEAR CHEROKEE. PROJECT LENGTH = 0.225 MILEAlfalfa · Division 6 | 1 of 6 | $2,697,204 | $2,697,204 | Won |
| Jan 21, 2016 | 160002 | BRIDGE REHABILITATION SH -8: OVER STINK CREEK, 3.0 MILES WEST OF SH -58 NEAR BURLINGTON . PROJECT LENGTH = 0.112 MILEAlfalfa · Division 6 | 2 of 4 | $847,497 | $789,897L & M Contractors, Inc. | +7.3% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.