Let Nov 16, 2017 · Division 4 · Kay Sign up free

‹ Nov 2017 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-18): OVER KILDARE CR AND BOIS D 'ARC CR, 2.2 MILES AND 2.4 MILES WEST OF US -77 NEAR PONCA CITY . PROJECT LENGTH = 0.402 MILE

Let date
Thursday, November 16, 2017
Contract
170349
J/P numbers
28433(04)
District
Division 4
County
Kay
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-18): OVER KILDARE CR AND BOIS D 'ARC CR, 2.2 MILES AND 2.4 MILES WEST OF US -77 NEAR PONCA CITY . PROJECT LENGTH = 0.402 MILE
Project number
STP-236C(039)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,603,491
1 BRIDGECO CONTRACTORS, INC. Low bidder $1,499,902 -6.5%
2 RRY SERVICES LLC $1,507,277 -6.0% +0.5%
3 H & H BRIDGE COMPANY $1,526,585 -4.8% +1.8%
4 K & R BUILDERS, INC. $1,568,188 -2.2% +4.6%
6 Bridges, Inc. DBA Scudder Bridge Co. $1,685,065 +5.1% +12.3%
7 MERIDIAN CONTRACTING, INC. $2,475,284 +54.4% +65.0%

Bid tab: unit prices 78 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIDGECO CONTRA…#2 RRY SERVICES LLC#3 H & H BRIDGE CO…#4 K & R BUILDERS,…#6 Bridges, Inc. D…#7 MERIDIAN CONTRA…
1202(H) 0185 EARTHWORK1LSUM $80,000.00 $116,650.00 $95,000.00 $152,780.00 $122,000.00 $103,000.00 $232,756.00
2221(C) 2801 TEMPORARY SILT FENCE3,200LF $1.50 $1.67 $1.55 $2.99 $1.55 $2.00 $2.00
3221(F) 0100 TEMPORARY SILT DIKE392LF $7.50 $9.75 $8.50 $8.00 $8.50 $9.00 $11.00
4230(A) 2806 SOLID SLAB SODDING15,378SY $1.70 $1.83 $1.75 $2.35 $1.95 $2.25 $3.00
5233(A) 2817 VEGETATIVE MULCHING3.18AC $250.00 $150.00 $100.00 $1,495.00 $100.00 $100.00 $150.00
6307(A) 4200 FLY ASH350TON $76.00 $51.50 $45.00 $45.00 $49.50 $45.00 $65.00
7307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE6,603SY $4.00 $3.35 $3.15 $3.15 $3.70 $3.15 $5.00
8402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E38TON $50.00 $32.45 $30.00 $38.00 $43.00 $29.00 $50.00
9407(B) 0250 TACK COAT347GAL $4.00 $3.90 $3.75 $3.75 $4.20 $3.75 $5.00
10408 5774 PRIME COAT2,401GAL $3.50 $3.90 $3.75 $3.75 $4.20 $3.75 $5.00
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,521TON $85.00 $82.40 $80.00 $80.00 $90.00 $80.00 $90.00
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)770TON $95.00 $91.00 $87.50 $87.50 $98.40 $87.50 $95.00
13509(D) 0325 CLASS C CONCRETE10CY $300.00 $350.00 $250.00 $150.00 $300.00 $400.00 $500.00
14613(B) 0692 36" CORR. GALV. STEEL PIPE140LF $48.00 $35.95 $70.00 $46.00 $41.00 $40.00 $120.00
15613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH100LF $32.00 $24.48 $45.00 $27.00 $29.00 $26.00 $110.00
16613(M) 7186 TYPE A4 CULVERT END TREATMENT4EA $1,080.00 $875.00 $1,400.00 $1,500.00 $1,000.00 $1,200.00 $2,500.00
17613(M) 7189 TYPE D4 CULVERT END TREATMENT4EA $2,200.00 $1,500.00 $2,100.00 $1,500.00 $1,750.00 $1,200.00 $5,000.00
18619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $3,000.00 $3,500.00 $3,800.00 $3,000.00 $4,500.00 $6,000.00 $5,000.50
19619(B) 4728 REMOVAL OF ASPHALT PAVEMENT4,994SY $3.50 $3.00 $4.00 $5.00 $5.60 $2.80 $3.00
20619(B) 6363 (PL)REMOVAL OF EXISTING RIPRAP1LSUM $5,000.00 $1,800.00 $4,000.00 $10,000.00 $4,250.00 $3,500.00 $6,000.00
21619(C) 0924 SAWING PAVEMENT48LF $10.00 $14.00 $5.00 $4.00 $11.55 $9.00 $10.00
22856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)8,500LF $1.65 $0.8200 $0.7800 $0.7900 $0.8600 $0.7800 $1.00
23880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $4,500.00 $4,500.00 $3,900.00 $7,150.00 $4,500.00 $3,900.00 $15,000.00
24501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON200CY $12.00 $12.00 $15.00 $100.00 $8.25 $25.00 $15.00
25501(G) 6309 CLSM BACKFILL92CY $130.00 $153.82 $150.00 $200.00 $146.00 $175.00 $200.00
26503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)357.34LF $190.00 $160.75 $180.00 $200.00 $170.00 $240.00 $255.00
27503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)358.67LF $225.00 $214.31 $220.00 $200.00 $203.75 $290.00 $300.00
28504(B) 1305 SAW-CUT GROOVING564.8SY $6.00 $6.25 $5.60 $5.60 $6.25 $7.00 $7.00
29504(C) 6250 SEALED EXPANSION JOINT70.34LF $240.00 $247.55 $215.00 $10.00 $275.00 $325.00 $240.00
30504(D) 6239 CONCRETE RAIL (TR3)418.8LF $75.00 $73.00 $75.00 $50.00 $74.50 $78.00 $95.00
31506(A) 1322 STRUCTURAL STEEL1,110LB $2.50 $3.15 $2.30 $1.00 $2.60 $3.50 $4.00
32507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY12EA $700.00 $587.00 $630.00 $2,000.00 $685.00 $550.00 $700.00
33507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY12EA $700.00 $587.00 $630.00 $2,000.00 $685.00 $550.00 $700.00
34509(A) 1326 CLASS AA CONCRETE175CY $585.00 $530.00 $550.00 $400.00 $602.00 $525.00 $1,200.00
35509(B) 1328 CLASS A CONCRETE124.2CY $605.00 $550.00 $550.00 $500.00 $615.00 $650.00 $680.00
36511(A) 1332 REINFORCING STEEL56,480LB $0.9000 $1.05 $0.8500 $0.3000 $0.8100 $0.9000 $2.00
37514(A) 6010 PILES, FURNISHED (HP 10X42)130LF $25.00 $27.10 $32.00 $21.00 $29.40 $44.00 $109.00
38514(A) 6011 PILES, FURNISHED (HP 12X53)295LF $29.00 $28.60 $40.00 $26.00 $37.10 $55.00 $114.00
39514(B) 6292 PILES, DRIVEN (HP 10X42)130LF $12.00 $14.00 $10.00 $3.00 $12.60 $12.00 $48.00
40514(B) 6294 PILES, DRIVEN (HP 12X53)295LF $12.00 $12.00 $10.00 $3.00 $15.90 $14.00 $50.00
41514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
42516(A) 6094 DRILLED SHAFTS 48" DIAMETER106LF $700.00 $856.92 $650.00 $850.00 $713.00 $725.00 $1,500.00
43516(C) 6200 CROSSHOLE SONIC LOGGING1EA $2,300.00 $2,750.00 $1,600.00 $2,000.00 $2,291.00 $3,400.00 $6,000.00
44601(B) 1353 TYPE I-A PLAIN RIPRAP1,160TON $48.00 $37.50 $40.00 $35.00 $38.00 $36.00 $45.00
45601(C) 1355 TYPE I-A FILTER BLANKET387TON $40.00 $35.00 $35.00 $26.00 $32.00 $28.00 $35.00
46613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND64LF $35.00 $30.00 $28.00 $75.00 $35.00 $24.00 $25.00
47613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.30LF $30.00 $30.00 $28.00 $65.00 $37.00 $24.00 $25.00
48619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $7,500.00 $12,500.00 $9,000.00 $23,000.00 $8,000.00 $18,500.00 $20,000.00
49623(A) 1418 BEAM GUARDRAIL W-BEAM SINGLE200LF $22.00 $16.28 $15.50 $14.00 $17.05 $18.00 $20.00
50623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,400.00 $1,580.00 $1,100.00 $1,555.00 $1,210.00 $2,225.00 $2,500.00
51623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,400.00 $2,450.00 $2,050.00 $1,693.00 $2,255.00 $1,350.00 $1,500.00
52501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON210CY $12.00 $12.00 $15.00 $100.00 $8.25 $25.00 $15.00
53501(G) 6309 CLSM BACKFILL104CY $130.00 $153.82 $150.00 $200.00 $146.00 $175.00 $200.00
54503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)358.67LF $225.00 $214.31 $230.00 $200.00 $206.00 $290.00 $300.00
55504(B) 1305 SAW-CUT GROOVING286.8SY $6.00 $8.75 $8.20 $8.20 $9.10 $9.00 $7.00
56504(D) 6239 CONCRETE RAIL (TR3)241.2LF $75.00 $74.00 $75.00 $50.00 $74.50 $78.00 $95.00
57506(A) 1322 STRUCTURAL STEEL370LB $2.50 $3.15 $2.30 $1.00 $2.60 $3.50 $4.00
58507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY4EA $700.00 $587.00 $650.00 $2,000.00 $750.00 $600.00 $700.00
59507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY4EA $700.00 $587.00 $650.00 $2,000.00 $750.00 $600.00 $700.00
60509(A) 1326 CLASS AA CONCRETE87.8CY $585.00 $530.00 $550.00 $400.00 $600.00 $525.00 $1,200.00
61509(B) 1328 CLASS A CONCRETE76.2CY $605.00 $550.00 $550.00 $500.00 $617.50 $650.00 $600.00
62511(A) 1332 REINFORCING STEEL29,090LB $0.9000 $1.05 $0.8500 $0.4500 $0.8100 $0.9000 $2.00
63514(A) 6010 PILES, FURNISHED (HP 10X42)174LF $25.00 $27.10 $34.00 $21.00 $29.40 $42.00 $109.00
64514(A) 6011 PILES, FURNISHED (HP 12X53)553LF $29.00 $28.60 $40.00 $26.00 $37.10 $50.00 $114.00
65514(B) 6292 PILES, DRIVEN (HP 10X42)174LF $12.00 $14.00 $10.00 $3.00 $12.60 $12.00 $48.00
66514(B) 6294 PILES, DRIVEN (HP 12X53)553LF $12.00 $12.00 $10.00 $3.00 $15.90 $14.00 $50.00
67514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
68601(B) 1353 TYPE I-A PLAIN RIPRAP591TON $48.00 $37.50 $39.00 $34.00 $38.50 $36.00 $45.00
69601(C) 1355 TYPE I-A FILTER BLANKET197TON $40.00 $35.00 $35.00 $26.00 $32.50 $28.00 $35.00
70613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND64LF $35.00 $30.00 $28.00 $75.00 $35.00 $24.00 $25.00
71613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.30LF $30.00 $30.00 $28.00 $65.00 $37.00 $24.00 $25.00
72619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $5,000.00 $5,500.00 $9,000.00 $13,000.00 $5,625.00 $18,500.00 $20,000.00
73623(A) 1418 BEAM GUARDRAIL W-BEAM SINGLE375LF $22.00 $16.28 $15.50 $14.00 $17.05 $18.00 $20.00
74623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,400.00 $1,580.00 $1,100.00 $1,555.00 $1,210.00 $2,225.00 $1,500.00
75623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,400.00 $2,450.00 $2,050.00 $1,693.00 $2,255.00 $1,350.00 $2,500.00
76642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $8,000.00 $10,500.00 $11,400.00 $7,800.00 $17,500.00 $9,500.00 $10,000.00
77220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $3,000.00 $1,250.00 $1,000.00 $3,000.00 $3,500.00 $10,000.00
78641 1552 MOBILIZATION1LSUM $90,000.00 $58,000.00 $101,000.00 $80,000.00 $76,500.00 $130,000.00 $148,750.00