Bid tab 180168

Let Apr 19, 2018 · Division 4 · Logan Sign up free

‹ Apr 2018 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-69): OVER SKELETON CREEK , 5.3 MILES EAST OF THE SH-74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.331 MILE

Let date
Thursday, April 19, 2018
Contract
180168
J/P numbers
28686(04)
District
Division 4
County
Logan
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-69): OVER SKELETON CREEK , 5.3 MILES EAST OF THE SH-74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.331 MILE
Project number
CIRB-242C(067)RB

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,541,573
1 K & R BUILDERS, INC. Low bidder $1,225,821 -20.5%
2 BRIDGECO CONTRACTORS, INC. $1,320,569 -14.3% +7.7%
3 RRY SERVICES LLC $1,347,671 -12.6% +9.9%
4 Cimarron Construction Company, LLC $1,423,232 -7.7% +16.1%
5 Bridges, Inc. DBA Scudder Bridge Co. $1,467,201 -4.8% +19.7%
6 C3 Construction, Inc. $1,520,320 -1.4% +24.0%
7 SEWELL BROS., INC. $1,532,466 -0.6% +25.0%
8 Reece Construction Co, Inc. $1,564,944 +1.5% +27.7%

Bid tab: unit prices 55 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 K & R BUILDERS,…#2 BRIDGECO CONTRA…#3 RRY SERVICES LLC#4 Cimarron Constr…#5 Bridges, Inc. D…#6 C3 Construction…#7 SEWELL BROS., I…#8 Reece Construct…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $35,000.00 $10,000.00 $12,000.00 $7,500.00 $29,750.00 $32,550.00 $28,172.15 $40,000.00 $17,048.37
2202(A) 0183 UNCLASSIFIED EXCAVATION8,849CY $7.65 $6.50 $6.60 $7.00 $8.00 $5.15 $8.32 $8.00 $7.71
3202(D) 0184 UNCLASSIFIED BORROW6,842CY $10.20 $8.88 $8.00 $8.00 $16.00 $9.05 $11.52 $10.00 $9.19
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $27,900.00 $6,700.00 $8,500.00 $4,500.00 $7,500.00 $10,250.00 $16,006.91 $15,000.00 $8,334.41
5221(C) 2801 TEMPORARY SILT FENCE1,835LF $1.80 $1.65 $3.00 $1.49 $1.50 $2.00 $1.95 $1.65 $1.49
6221(F) 0100 TEMPORARY SILT DIKE160LF $7.75 $8.80 $10.00 $8.44 $8.50 $9.50 $10.56 $9.28 $8.44
7230(A) 2806 SOLID SLAB SODDING7,434SY $1.37 $1.50 $2.00 $1.34 $1.35 $1.34 $2.13 $1.65 $1.34
8233(A) 2817 VEGETATIVE MULCHING3.32AC $334.00 $450.00 $800.00 $450.00 $450.00 $450.00 $832.36 $500.00 $450.00
9307(B) 4210 CEMENT KILN DUST290TON $59.50 $77.00 $69.20 $70.00 $66.00 $70.00 $84.39 $70.00 $78.11
10307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE5,235SY $2.95 $3.60 $7.30 $3.25 $7.00 $3.25 $8.90 $7.00 $2.08
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E135TON $36.50 $40.50 $31.00 $50.00 $40.00 $30.00 $34.77 $41.00 $37.60
12407(B) 0250 TACK COAT390.61GAL $2.96 $2.34 $3.73 $2.13 $3.55 $3.55 $4.55 $2.35 $2.13
13408 5774 PRIME COAT1,835GAL $4.70 $3.30 $5.50 $2.98 $5.25 $5.25 $6.72 $3.27 $2.98
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)855TON $79.10 $73.00 $90.30 $66.26 $96.00 $86.00 $97.86 $76.00 $66.26
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)680TON $91.00 $88.50 $98.70 $80.38 $104.00 $94.00 $107.52 $92.00 $80.38
16509(D) 0325 CLASS C CONCRETE20CY $285.00 $250.00 $300.00 $300.00 $255.00 $350.00 $315.02 $350.00 $344.00
17601(A) 0297 TYPE I PLAIN RIPRAP20TON $50.00 $46.00 $50.00 $60.00 $54.00 $50.00 $54.30 $60.00 $57.39
18613(A) 4499 51" X 31" R.C.PIPE ARCH CLASS A-III72LF $230.00 $210.00 $235.00 $180.00 $245.00 $235.50 $366.88 $250.00 $195.65
19613(M) 7188 TYPE C4 CULVERT END TREATMENT2EA $2,100.00 $2,000.00 $1,600.00 $2,000.00 $1,100.00 $1,350.00 $1,728.75 $1,300.00 $3,887.00
20619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $35,200.00 $3,000.00 $3,000.00 $3,000.00 $6,775.00 $1,500.00 $1,600.69 $40,000.00 $8,665.62
21619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,487SY $3.60 $2.00 $3.50 $5.00 $4.00 $3.00 $2.56 $8.00 $6.30
22619(C) 0924 SAWING PAVEMENT40LF $8.58 $7.00 $6.00 $5.00 $2.00 $12.00 $2.56 $10.00 $8.00
23623(F) 4446 GUARDRAIL ANCHOR UNIT (TYPE A)4EA $1,500.00 $1,300.00 $1,350.00 $1,178.00 $2,000.00 $1,178.00 $1,508.49 $1,300.00 $1,178.00
24623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,700.00 $2,000.00 $1,975.00 $1,863.00 $1,450.00 $1,863.00 $2,385.67 $2,050.00 $1,863.00
25880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $12,000.00 $8,000.00 $6,920.00 $3,000.00 $5,400.00 $6,120.00 $7,836.98 $7,950.00 $6,120.00
26501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $22.00 $8.50 $12.00 $15.00 $12.50 $23.00 $16.01 $20.00 $23.00
27501(F) 6352 GRANULAR BACKFILL76CY $70.00 $60.00 $65.00 $85.00 $88.00 $60.00 $36.05 $70.00 $78.00
28503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)448LF $229.05 $202.00 $197.00 $210.00 $222.00 $275.00 $224.33 $220.00 $284.00
29503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)314LF $231.00 $228.00 $228.00 $235.00 $232.00 $315.00 $257.21 $230.00 $318.00
30504(B) 1305 SAW-CUT GROOVING627.1SY $5.56 $5.60 $5.60 $5.10 $6.00 $6.00 $6.53 $5.65 $5.10
31504(C) 6250 SEALED EXPANSION JOINT29.17LF $311.03 $218.00 $198.00 $260.00 $250.00 $225.00 $367.52 $285.00 $226.00
32504(D) 6239 CONCRETE RAIL (TR3)574LF $71.35 $70.00 $77.00 $75.00 $97.00 $85.00 $89.60 $75.00 $114.00
33506(A) 1322 STRUCTURAL STEEL1,180LB $1.80 $2.30 $2.40 $3.45 $2.20 $5.00 $4.01 $3.50 $2.00
34507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY9EA $1,000.00 $800.00 $620.00 $950.00 $975.00 $775.00 $719.67 $800.00 $1,012.00
35507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY9EA $1,450.00 $800.00 $620.00 $950.00 $975.00 $775.00 $719.67 $800.00 $1,012.00
36509(A) 1326 CLASS AA CONCRETE198.3CY $580.00 $540.00 $560.00 $525.00 $537.00 $575.00 $679.97 $600.00 $727.00
37509(B) 1328 CLASS A CONCRETE133CY $610.00 $571.00 $560.00 $525.00 $515.00 $620.00 $513.50 $600.00 $853.00
38511(A) 1332 REINFORCING STEEL68,460LB $1.03 $0.9500 $1.11 $1.00 $0.9000 $1.00 $1.12 $1.00 $0.8000
39514(A) 6010 PILES, FURNISHED (HP 10X42)172LF $40.00 $29.40 $30.50 $35.00 $37.00 $50.00 $29.90 $30.00 $40.00
40514(A) 6011 PILES, FURNISHED (HP 12X53)403LF $42.00 $31.50 $34.50 $45.00 $45.00 $60.00 $36.56 $35.00 $51.00
41514(B) 6292 PILES, DRIVEN (HP 10X42)172LF $16.20 $12.60 $12.00 $10.00 $19.00 $10.00 $15.37 $15.00 $12.00
42514(B) 6294 PILES, DRIVEN (HP 12X53)403LF $16.45 $13.50 $10.00 $10.00 $21.00 $11.00 $15.37 $15.00 $12.00
43514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
44516(A) 6098 DRILLED SHAFTS 72" DIAMETER168LF $1,228.17 $750.00 $795.85 $815.00 $755.00 $900.00 $648.98 $1,200.00 $1,147.00
45601(B) 1353 TYPE I-A PLAIN RIPRAP2,250TON $41.20 $43.50 $40.00 $60.00 $54.00 $58.00 $45.46 $44.00 $51.40
46601(C) 1355 TYPE I-A FILTER BLANKET680TON $35.10 $36.00 $36.00 $53.00 $44.00 $45.00 $34.90 $35.00 $39.78
47613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $28.00 $30.00 $25.00 $30.00 $20.00 $22.00 $9.60 $25.00 $32.00
48613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $25.00 $30.00 $20.00 $30.00 $20.00 $22.00 $9.60 $25.00 $25.00
49619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $40,000.00 $15,750.00 $32,000.00 $40,000.00 $38,200.00 $40,000.00 $38,416.57 $50,000.00 $30,781.23
50850(A) 8110 SHEET ALUMINUM SIGNS7.18SF $20.00 $50.00 $49.50 $47.00 $30.00 $47.00 $60.19 $50.00 $47.00
51851(C) 8327 2 1/4" SQUARE TUBE POST15LF $16.00 $5.00 $6.00 $5.00 $15.00 $5.00 $6.40 $7.00 $5.00
52855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)7,000LF $0.5100 $0.7000 $0.6800 $0.6400 $0.7500 $0.6400 $0.8200 $0.7000 $0.6400
53642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,000.00 $9,000.00 $8,300.00 $5,000.00 $7,900.00 $7,900.00 $11,524.97 $8,700.00 $7,900.00
54220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,306.11 $4,500.00 $3,000.00 $1,275.00 $5,485.00 $3,000.00 $1,920.83 $4,000.00 $4,000.00
55641 1399 MOBILIZATION1LSUM $97,066.21 $45,000.00 $60,000.00 $94,000.00 $19,525.00 $67,000.00 $107,694.46 $60,000.00 $90,860.00