| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$18,200.00 |
$4,990.77 |
$20,000.00 |
$10,000.00 |
$19,000.00 |
$19,250.00 |
$6,861.75 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,450 | CY |
$8.00 |
$6.85 |
$7.49 |
$6.75 |
$6.45 |
$8.00 |
$7.07 |
$6.45 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,637 | CY |
$10.00 |
$7.90 |
$11.23 |
$8.50 |
$8.64 |
$9.50 |
$9.10 |
$8.64 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$12,600.00 |
$3,244.00 |
$10,000.00 |
$5,000.00 |
$14,000.00 |
$13,900.00 |
$4,819.34 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,719 | LF |
$1.22 |
$2.00 |
$3.11 |
$1.30 |
$2.49 |
$2.49 |
$2.20 |
$2.49 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 497 | LF |
$9.00 |
$12.00 |
$8.73 |
$7.50 |
$18.00 |
$18.00 |
$11.00 |
$18.00 |
| 7 | 227 0300 |
(SP)TURF REINFORCEMENT MAT | 308 | SY |
$30.00 |
$41.00 |
$48.66 |
$55.00 |
$39.00 |
$39.00 |
$27.50 |
$39.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 2,325 | SY |
$2.20 |
$4.15 |
$4.93 |
$4.15 |
$3.95 |
$3.95 |
$4.00 |
$3.95 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 11.32 | AC |
$211.50 |
$3,100.00 |
$436.69 |
$3,000.00 |
$2,950.00 |
$2,950.00 |
$1,320.00 |
$2,950.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.32 | AC |
$350.00 |
$1,160.00 |
$1,372.46 |
$1,150.00 |
$1,100.00 |
$1,100.00 |
$880.00 |
$1,100.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,725 | CY |
$65.00 |
$45.00 |
$33.38 |
$37.00 |
$47.80 |
$60.00 |
$61.00 |
$47.80 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 3,259 | SY |
$2.69 |
$3.00 |
$3.46 |
$3.00 |
$3.73 |
$2.00 |
$3.80 |
$3.73 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 737 | TON |
$25.00 |
$28.00 |
$28.70 |
$23.00 |
$24.85 |
$31.00 |
$31.50 |
$24.85 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,900 | TON |
$72.00 |
$74.55 |
$71.75 |
$73.00 |
$62.95 |
$68.00 |
$74.25 |
$71.75 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,138 | TON |
$80.00 |
$81.12 |
$100.42 |
$81.00 |
$68.10 |
$86.00 |
$79.70 |
$84.70 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 22 | CY |
$310.00 |
$300.00 |
$257.02 |
$420.00 |
$375.00 |
$360.00 |
$500.00 |
$414.00 |
| 17 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 808 | TON |
$35.00 |
$32.40 |
$36.68 |
$32.75 |
$40.00 |
$46.00 |
$44.00 |
$39.67 |
| 18 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 425 | TON |
$30.00 |
$25.25 |
$30.26 |
$28.00 |
$30.50 |
$37.00 |
$34.00 |
$30.37 |
| 19 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 103 | LF |
$25.00 |
$22.55 |
$32.44 |
$21.00 |
$24.92 |
$45.00 |
$23.00 |
$24.92 |
| 20 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,100.00 |
$1,200.00 |
$709.94 |
$1,100.00 |
$1,152.00 |
$1,550.00 |
$900.00 |
$8,617.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$2,339.42 |
$3,000.00 |
$7,500.00 |
$4,500.00 |
$6,250.00 |
$5,813.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 6,988 | SY |
$5.63 |
$3.00 |
$3.74 |
$3.00 |
$3.00 |
$5.50 |
$4.75 |
$3.00 |
| 23 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,255 | CY |
$9.36 |
$6.00 |
$7.49 |
$15.00 |
$10.50 |
$9.00 |
$8.00 |
$10.49 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 45 | CY |
$20.15 |
$20.00 |
$9.98 |
$15.00 |
$25.00 |
$15.00 |
$19.50 |
$228.00 |
| 25 | 501(G) 6309 |
CLSM BACKFILL | 228 | CY |
$123.06 |
$135.00 |
$249.54 |
$160.00 |
$185.00 |
$135.00 |
$150.00 |
$231.00 |
| 26 | 508 6359 |
PRECAST ARCH CULVERT | 51 | LF |
$3,500.00 |
$2,900.00 |
$2,295.76 |
$2,882.36 |
$4,750.00 |
$5,100.00 |
$4,800.00 |
$6,236.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 22 | CY |
$1,000.00 |
$600.00 |
$927.04 |
$620.00 |
$600.00 |
$700.00 |
$675.00 |
$818.00 |
| 28 | 509(B) 1328 |
CLASS A CONCRETE | 150 | CY |
$450.00 |
$500.00 |
$411.74 |
$570.00 |
$500.00 |
$600.00 |
$650.00 |
$828.00 |
| 29 | 511(A) 1332 |
REINFORCING STEEL | 14,252 | LB |
$0.9400 |
$1.10 |
$0.8000 |
$1.10 |
$1.15 |
$1.00 |
$0.9200 |
$0.8000 |
| 30 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 2,532 | LB |
$1.66 |
$1.20 |
$1.11 |
$1.20 |
$1.60 |
$1.65 |
$1.26 |
$1.00 |
| 31 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 216 | SY |
$4.50 |
$4.00 |
$3.74 |
$8.00 |
$3.00 |
$3.00 |
$3.30 |
$3.00 |
| 32 | 516(A) 6089 |
DRILLED SHAFTS 18" DIAMETER | 372 | LF |
$200.00 |
$232.50 |
$188.33 |
$205.00 |
$225.00 |
$225.00 |
$252.00 |
$257.00 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,312 | TON |
$50.00 |
$32.40 |
$36.68 |
$32.75 |
$41.40 |
$46.00 |
$43.00 |
$39.67 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 163 | TON |
$35.00 |
$31.00 |
$30.26 |
$28.00 |
$32.00 |
$36.00 |
$33.50 |
$30.37 |
| 35 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 120 | LF |
$20.00 |
$35.00 |
$14.35 |
$8.00 |
$25.00 |
$25.00 |
$71.00 |
$29.00 |
| 36 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$25.00 |
$14.35 |
$8.00 |
$25.00 |
$25.00 |
$30.00 |
$30.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$12,476.93 |
$10,000.00 |
$8,500.00 |
$8,000.00 |
$8,000.00 |
$6,975.60 |
| 38 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,439 | CY |
$9.36 |
$6.00 |
$7.49 |
$15.00 |
$9.50 |
$9.00 |
$8.00 |
$9.38 |
| 39 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 131 | CY |
$15.00 |
$15.00 |
$9.98 |
$10.00 |
$25.00 |
$15.00 |
$19.50 |
$228.00 |
| 40 | 501(G) 6309 |
CLSM BACKFILL | 215 | CY |
$123.06 |
$135.00 |
$249.54 |
$160.00 |
$185.00 |
$135.00 |
$150.00 |
$231.00 |
| 41 | 508 6359 |
PRECAST ARCH CULVERT | 51 | LF |
$3,500.00 |
$3,720.00 |
$3,749.32 |
$5,392.16 |
$6,000.00 |
$5,100.00 |
$5,550.00 |
$4,929.00 |
| 42 | 509(A) 1326 |
CLASS AA CONCRETE | 45 | CY |
$850.00 |
$600.00 |
$1,020.61 |
$620.00 |
$600.00 |
$700.00 |
$675.00 |
$645.00 |
| 43 | 509(B) 1328 |
CLASS A CONCRETE | 266 | CY |
$450.00 |
$550.00 |
$411.74 |
$570.00 |
$500.00 |
$600.00 |
$650.00 |
$641.00 |
| 44 | 511(A) 1332 |
REINFORCING STEEL | 38,408 | LB |
$0.9400 |
$1.05 |
$0.8000 |
$1.10 |
$1.07 |
$1.00 |
$0.9200 |
$0.8000 |
| 45 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 4,798 | LB |
$1.66 |
$1.20 |
$1.11 |
$1.20 |
$1.60 |
$1.65 |
$1.26 |
$1.00 |
| 46 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 270 | SY |
$4.52 |
$4.00 |
$3.74 |
$8.00 |
$3.00 |
$3.00 |
$3.30 |
$3.00 |
| 47 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,503 | TON |
$40.00 |
$32.40 |
$36.68 |
$32.75 |
$41.40 |
$46.00 |
$43.00 |
$39.67 |
| 48 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 339 | TON |
$30.00 |
$31.00 |
$30.26 |
$28.00 |
$32.00 |
$36.00 |
$33.50 |
$30.37 |
| 49 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 120 | LF |
$20.00 |
$35.00 |
$14.35 |
$8.00 |
$25.00 |
$25.00 |
$71.00 |
$29.00 |
| 50 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$25.00 |
$14.35 |
$8.00 |
$25.00 |
$25.00 |
$30.00 |
$30.00 |
| 51 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$14,348.47 |
$10,000.00 |
$8,500.00 |
$8,000.00 |
$9,000.00 |
$6,265.47 |
| 52 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 450 | LF |
$16.00 |
$18.30 |
$21.71 |
$17.00 |
$17.40 |
$15.95 |
$17.90 |
$16.40 |
| 53 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,000.00 |
$2,150.00 |
$2,545.29 |
$2,200.00 |
$2,040.00 |
$2,045.00 |
$2,250.00 |
$2,250.00 |
| 54 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 12,100 | LF |
$0.8500 |
$0.5500 |
$0.6500 |
$0.5800 |
$0.5200 |
$0.5100 |
$0.6200 |
$0.5100 |
| 55 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$4,300.00 |
$2,837.25 |
$4,100.00 |
$2,274.00 |
$2,400.00 |
$3,400.00 |
$2,400.00 |
| 56 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$10,300.00 |
$15,596.16 |
$14,000.00 |
$9,800.00 |
$9,800.00 |
$12,000.00 |
$11,400.00 |
| 57 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$3,000.00 |
$1,871.54 |
$3,500.00 |
$2,500.00 |
$1,275.00 |
$4,500.00 |
$7,000.00 |
| 58 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$92,000.00 |
$90,000.00 |
$116,035.45 |
$70,000.00 |
$175,000.00 |
$126,000.00 |
$130,000.00 |
$113,390.00 |