| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$25,000.00 |
$39,750.00 |
$65,257.50 |
$63,145.00 |
$33,000.00 |
$40,000.00 |
$38,600.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 470 | LF |
$1.75 |
$1.12 |
$1.02 |
$1.63 |
$1.05 |
$1.02 |
$1.50 |
$2.00 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$8.00 |
$10.00 |
$5.00 |
$6.46 |
$9.40 |
$9.12 |
$10.00 |
$10.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 6,700 | SY |
$1.75 |
$1.20 |
$1.50 |
$1.36 |
$1.15 |
$1.10 |
$1.50 |
$1.10 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.39 | AC |
$600.00 |
$55.00 |
$50.00 |
$105.00 |
$51.50 |
$50.00 |
$70.00 |
$50.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 496 | TON |
$35.00 |
$35.00 |
$37.10 |
$38.32 |
$46.00 |
$41.00 |
$40.00 |
$33.50 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$300.00 |
$287.50 |
$436.28 |
$357.50 |
$250.00 |
$450.00 |
$400.00 |
| 8 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 110 | LF |
$55.00 |
$45.00 |
$37.00 |
$54.60 |
$43.00 |
$75.00 |
$70.00 |
$46.50 |
| 9 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 50 | LF |
$40.00 |
$30.00 |
$28.00 |
$43.05 |
$37.90 |
$65.00 |
$70.00 |
$31.00 |
| 10 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 85 | LF |
$60.00 |
$65.00 |
$48.00 |
$60.90 |
$61.00 |
$90.00 |
$120.00 |
$60.00 |
| 11 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$1,200.00 |
$1,250.00 |
$1,289.64 |
$1,389.00 |
$1,500.00 |
$1,000.00 |
$1,250.00 |
| 12 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,750.00 |
$1,500.00 |
$1,800.00 |
$1,621.36 |
$2,070.00 |
$2,300.00 |
$1,500.00 |
$1,350.00 |
| 13 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$1,800.00 |
$1,850.00 |
$1,941.33 |
$2,751.00 |
$2,700.00 |
$1,800.00 |
$1,450.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230.6 | CY |
$18.00 |
$13.00 |
$8.00 |
$21.00 |
$15.70 |
$25.00 |
$20.00 |
$28.00 |
| 15 | 501(G) 6309 |
CLSM BACKFILL | 117.5 | CY |
$180.00 |
$150.00 |
$155.00 |
$168.26 |
$159.00 |
$160.00 |
$180.00 |
$240.00 |
| 16 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 419 | LF |
$230.00 |
$210.00 |
$218.50 |
$235.62 |
$209.50 |
$265.00 |
$240.00 |
$335.00 |
| 17 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$75.00 |
$70.00 |
$76.50 |
$70.01 |
$108.00 |
$85.00 |
$100.00 |
$95.00 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 800 | LB |
$2.75 |
$2.50 |
$3.00 |
$3.37 |
$5.70 |
$2.50 |
$3.00 |
$5.50 |
| 19 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$700.00 |
$600.00 |
$811.00 |
$948.94 |
$1,194.00 |
$850.00 |
$1,000.00 |
$750.00 |
| 20 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$1,000.00 |
$600.00 |
$811.00 |
$948.94 |
$1,171.00 |
$850.00 |
$1,000.00 |
$750.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 93.4 | CY |
$550.00 |
$600.00 |
$640.00 |
$674.94 |
$533.00 |
$650.00 |
$525.00 |
$700.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 83.2 | CY |
$575.00 |
$600.00 |
$667.50 |
$724.13 |
$637.50 |
$650.00 |
$525.00 |
$800.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 36,862 | LB |
$1.00 |
$0.7500 |
$0.8600 |
$0.9400 |
$1.05 |
$0.8500 |
$1.20 |
$1.10 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 420 | LF |
$28.00 |
$25.00 |
$24.50 |
$25.47 |
$28.30 |
$40.00 |
$25.00 |
$39.00 |
| 25 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,470 | LF |
$32.00 |
$30.00 |
$25.90 |
$30.51 |
$31.20 |
$45.00 |
$32.00 |
$48.00 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 420 | LF |
$15.00 |
$15.00 |
$10.50 |
$11.55 |
$13.70 |
$10.00 |
$30.00 |
$12.00 |
| 27 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,470 | LF |
$15.00 |
$15.00 |
$11.10 |
$10.50 |
$20.80 |
$10.00 |
$30.00 |
$12.00 |
| 28 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,962 | TON |
$40.00 |
$48.00 |
$49.60 |
$44.95 |
$48.40 |
$56.00 |
$50.00 |
$49.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 582 | TON |
$32.00 |
$38.00 |
$38.85 |
$34.39 |
$40.60 |
$48.00 |
$38.00 |
$39.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$5,000.00 |
$11,750.00 |
$8,400.00 |
$9,591.00 |
$8,000.00 |
$20,000.00 |
$12,000.00 |
| 32 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 23.56 | LF |
$25.00 |
$28.00 |
$33.00 |
$26.78 |
$26.80 |
$30.00 |
$34.00 |
$30.00 |
| 33 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 1 | EA |
$2,000.00 |
$1,815.00 |
$1,650.00 |
$1,732.50 |
$3,043.00 |
$1,500.00 |
$1,800.00 |
$1,500.00 |
| 34 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,750.00 |
$2,805.00 |
$3,245.00 |
$2,677.50 |
$2,461.00 |
$2,945.00 |
$3,200.00 |
$2,945.00 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$2,150.00 |
$2,500.00 |
$2,047.50 |
$2,057.00 |
$1,950.00 |
$3,000.00 |
$1,950.00 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$7,900.00 |
$5,200.00 |
$5,500.00 |
$4,325.00 |
$4,200.00 |
$12,000.00 |
$4,200.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$2,800.00 |
$2,750.00 |
$2,428.00 |
$1,275.00 |
$3,500.00 |
$4,500.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$30,000.00 |
$47,550.00 |
$40,421.26 |
$69,171.30 |
$62,000.00 |
$62,000.00 |
$40,000.00 |