| 10 | 202(D) 0184 |
UNCLASSIFIED BORROW | 400 | CY |
$12.00 |
$3.50 |
$11.00 |
$1.00 |
$14.68 |
$11.00 |
$11.00 |
$25.00 |
$9.68 |
| 20 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$48,000.00 |
$59,766.24 |
$50,000.00 |
$58,584.70 |
$36,800.00 |
$36,800.00 |
$9,000.00 |
$73,637.50 |
| 30 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$3.25 |
$1.30 |
$2.65 |
$3.00 |
$3.03 |
$1.65 |
$2.00 |
$5.00 |
$3.11 |
| 40 | 221(F) 0100 |
TEMPORARY SILT DIKE | 364 | LF |
$11.00 |
$7.15 |
$9.00 |
$13.50 |
$13.40 |
$6.98 |
$7.50 |
$15.00 |
$13.74 |
| 50 | 230(A) 2806 |
SOLID SLAB SODDING | 9,228 | SY |
$3.15 |
$2.53 |
$2.50 |
$2.65 |
$2.61 |
$2.29 |
$2.29 |
$4.00 |
$2.68 |
| 60 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.91 | AC |
$700.00 |
$500.00 |
$900.00 |
$1,275.00 |
$1,337.35 |
$850.00 |
$850.00 |
$4,200.00 |
$1,370.63 |
| 70 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,070 | TON |
$36.00 |
$38.15 |
$39.35 |
$40.00 |
$70.82 |
$41.00 |
$41.00 |
$47.00 |
$40.78 |
| 80 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$265.00 |
$300.00 |
$250.00 |
$336.24 |
$585.00 |
$350.00 |
$500.00 |
$427.90 |
| 90 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 64 | LF |
$35.00 |
$27.00 |
$36.20 |
$40.00 |
$28.71 |
$29.75 |
$29.75 |
$60.00 |
$39.61 |
| 100 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 230 | LF |
$74.00 |
$44.00 |
$56.10 |
$60.00 |
$54.59 |
$57.00 |
$57.00 |
$75.00 |
$77.34 |
| 110 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,300.00 |
$1,250.00 |
$1,800.00 |
$1,600.00 |
$1,187.94 |
$1,884.75 |
$1,400.00 |
$2,500.00 |
$1,642.41 |
| 120 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,500.00 |
$2,080.00 |
$2,300.00 |
$1,900.00 |
$1,712.48 |
$2,165.25 |
$1,550.00 |
$2,000.00 |
$2,136.57 |
| 130 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,000.00 |
$2,250.00 |
$3,500.00 |
$3,500.00 |
$9,630.69 |
$2,700.00 |
$2,700.00 |
$10,000.00 |
$6,450.00 |
| 140 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 80 | LF |
$38.00 |
$44.00 |
$42.00 |
$40.00 |
$20.45 |
$40.00 |
$40.00 |
$22.00 |
$43.00 |
| 150 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 2 | EA |
$1,200.00 |
$1,650.00 |
$1,600.00 |
$1,500.00 |
$1,258.68 |
$1,500.00 |
$1,500.00 |
$2,000.00 |
$1,612.50 |
| 160 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,850.00 |
$1,650.00 |
$1,600.00 |
$1,500.00 |
$1,599.57 |
$1,500.00 |
$1,500.00 |
$2,000.00 |
$1,612.50 |
| 170 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$12.00 |
$9.00 |
$12.00 |
$15.00 |
$16.80 |
$30.00 |
$26.00 |
$20.00 |
$32.25 |
| 180 | 501(F) 6352 |
GRANULAR BACKFILL | 66 | CY |
$75.00 |
$62.25 |
$72.00 |
$85.00 |
$108.34 |
$84.92 |
$70.00 |
$85.00 |
$109.47 |
| 190 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 238 | LF |
$205.00 |
$184.50 |
$197.70 |
$195.00 |
$168.03 |
$308.62 |
$250.00 |
$225.00 |
$185.13 |
| 200 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$232.00 |
$219.00 |
$219.00 |
$210.00 |
$219.88 |
$224.05 |
$290.00 |
$225.00 |
$240.59 |
| 210 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$290.00 |
$260.00 |
$280.50 |
$244.00 |
$248.33 |
$1.00 |
$320.00 |
$450.00 |
$317.19 |
| 220 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 368.8 | LF |
$81.00 |
$74.00 |
$80.00 |
$80.00 |
$88.92 |
$81.93 |
$90.00 |
$115.00 |
$75.27 |
| 230 | 506(A) 1322 |
STRUCTURAL STEEL | 1,070 | LB |
$3.40 |
$2.75 |
$3.05 |
$2.65 |
$2.78 |
$3.57 |
$4.50 |
$4.00 |
$3.80 |
| 240 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$900.00 |
$810.00 |
$825.00 |
$850.00 |
$895.93 |
$944.85 |
$850.00 |
$1,500.00 |
$1,223.57 |
| 250 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$900.00 |
$810.00 |
$825.00 |
$850.00 |
$895.93 |
$944.85 |
$850.00 |
$1,500.00 |
$1,223.57 |
| 260 | 509(A) 1326 |
CLASS AA CONCRETE | 123.3 | CY |
$700.00 |
$590.00 |
$650.00 |
$650.00 |
$591.89 |
$764.92 |
$650.00 |
$600.00 |
$920.31 |
| 270 | 509(B) 1328 |
CLASS A CONCRETE | 107.4 | CY |
$725.00 |
$620.00 |
$650.00 |
$650.00 |
$675.82 |
$764.92 |
$850.00 |
$600.00 |
$824.83 |
| 280 | 511(A) 1332 |
REINFORCING STEEL | 48,480 | LB |
$1.05 |
$0.9500 |
$1.05 |
$1.00 |
$1.15 |
$1.48 |
$1.00 |
$1.50 |
$1.18 |
| 290 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 206 | LF |
$35.00 |
$24.50 |
$24.20 |
$40.00 |
$29.58 |
$19.54 |
$42.00 |
$45.00 |
$37.70 |
| 300 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 485 | LF |
$39.00 |
$28.00 |
$29.10 |
$50.00 |
$36.50 |
$24.64 |
$51.00 |
$45.00 |
$41.46 |
| 310 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 206 | LF |
$14.00 |
$10.50 |
$12.00 |
$10.00 |
$22.34 |
$15.00 |
$10.50 |
$35.00 |
$26.88 |
| 320 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 485 | LF |
$15.00 |
$12.00 |
$10.00 |
$10.00 |
$18.00 |
$15.00 |
$12.50 |
$35.00 |
$22.58 |
| 330 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 340 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 172 | LF |
$700.00 |
$616.00 |
$645.80 |
$650.00 |
$685.84 |
$807.43 |
$825.00 |
$650.00 |
$908.94 |
| 350 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,061 | TON |
$46.00 |
$52.15 |
$51.35 |
$60.00 |
$54.40 |
$61.51 |
$62.00 |
$65.00 |
$54.74 |
| 360 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 354 | TON |
$38.00 |
$42.65 |
$48.00 |
$50.00 |
$42.25 |
$50.55 |
$46.00 |
$45.00 |
$43.23 |
| 370 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$35.00 |
$28.00 |
$45.00 |
$40.00 |
$45.21 |
$12.11 |
$30.00 |
$20.00 |
$25.76 |
| 380 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$30.00 |
$28.00 |
$45.00 |
$40.00 |
$29.31 |
$12.11 |
$30.00 |
$35.00 |
$27.05 |
| 390 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$12,000.00 |
$6,500.00 |
$15,000.00 |
$23,000.00 |
$26,345.50 |
$7,595.00 |
$20,000.00 |
$15,000.00 |
$16,125.00 |
| 400 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 7.46 | SF |
$38.00 |
$55.00 |
$52.00 |
$50.00 |
$50.35 |
$50.00 |
$50.00 |
$85.00 |
$53.75 |
| 410 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,304 | SD |
$0.6000 |
$0.1100 |
$0.1200 |
$0.1000 |
$1.84 |
$0.1000 |
$0.1000 |
$1.75 |
$0.1100 |
| 420 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,016 | SD |
$1.00 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1600 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1100 |
| 421 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,560 | SD |
$0.0400 |
$0.0600 |
$0.1000 |
$0.0500 |
$0.1300 |
$0.0500 |
$0.0500 |
$0.1200 |
$0.0500 |
| 430 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,200.00 |
$6,250.00 |
$9,100.00 |
$5,500.00 |
$8,896.46 |
$8,000.00 |
$5,000.00 |
$17,500.00 |
$5,912.50 |
| 440 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$1,650.00 |
$3,000.00 |
$500.00 |
$2,294.01 |
$2,500.00 |
$2,000.00 |
$2,500.00 |
$2,687.50 |
| 450 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$39,000.00 |
$42,600.00 |
$66,000.00 |
$61,053.40 |
$65,833.82 |
$59,500.00 |
$88,000.00 |
$74,373.24 |