| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$32,000.00 |
$42,550.00 |
$22,000.00 |
$38,000.00 |
$24,720.00 |
$40,000.00 |
$40,253.00 |
$28,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,830 | LF |
$2.00 |
$1.25 |
$1.67 |
$1.25 |
$1.15 |
$1.15 |
$1.50 |
$1.55 |
$1.12 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 336 | LF |
$12.00 |
$5.00 |
$8.64 |
$7.25 |
$6.60 |
$6.78 |
$7.00 |
$8.00 |
$6.59 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 7,720 | SY |
$1.50 |
$1.57 |
$1.70 |
$1.60 |
$1.75 |
$1.46 |
$1.42 |
$1.55 |
$1.42 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.6 | AC |
$140.00 |
$122.00 |
$150.00 |
$495.00 |
$100.00 |
$103.00 |
$100.00 |
$100.00 |
$100.00 |
| 6 | 307(A) 4200 |
FLY ASH | 128 | TON |
$80.00 |
$80.00 |
$76.50 |
$61.00 |
$80.00 |
$76.60 |
$72.00 |
$51.40 |
$78.00 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,363 | SY |
$3.50 |
$4.00 |
$4.25 |
$8.00 |
$4.75 |
$2.83 |
$3.65 |
$8.90 |
$4.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 188 | TON |
$38.00 |
$38.58 |
$38.20 |
$38.00 |
$43.00 |
$41.57 |
$34.50 |
$34.53 |
$45.00 |
| 9 | 408 5774 |
PRIME COAT | 1,178 | GAL |
$8.00 |
$4.00 |
$10.56 |
$10.50 |
$9.60 |
$5.15 |
$9.60 |
$9.60 |
$3.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 748 | TON |
$120.00 |
$84.50 |
$88.10 |
$94.00 |
$95.00 |
$79.24 |
$84.85 |
$84.85 |
$76.93 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 355 | TON |
$130.00 |
$94.60 |
$113.18 |
$119.00 |
$119.00 |
$88.60 |
$108.50 |
$108.50 |
$86.03 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$325.00 |
$250.00 |
$375.00 |
$300.00 |
$200.00 |
$412.00 |
$500.00 |
$600.00 |
$350.00 |
| 13 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 150 | LF |
$200.00 |
$178.00 |
$168.00 |
$240.00 |
$155.00 |
$160.68 |
$117.00 |
$116.86 |
$225.00 |
| 14 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 64 | LF |
$32.00 |
$28.00 |
$30.48 |
$35.00 |
$35.00 |
$46.35 |
$30.00 |
$29.42 |
$45.00 |
| 15 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$990.00 |
$1,500.00 |
$1,100.00 |
$1,000.00 |
$1,287.50 |
$1,300.00 |
$1,750.00 |
$1,500.00 |
| 16 | 613(M) 7195 |
TYPE EE4 CULVERT END TREATMENT | 2 | EA |
$3,100.00 |
$2,800.00 |
$3,150.00 |
$1,300.00 |
$2,600.00 |
$3,193.00 |
$3,200.00 |
$4,200.00 |
$2,200.00 |
| 17 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,030 | SY |
$5.00 |
$3.30 |
$4.50 |
$10.00 |
$12.50 |
$7.21 |
$3.25 |
$11.40 |
$5.00 |
| 18 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$5.00 |
$10.00 |
$12.00 |
$5.00 |
$5.00 |
$10.30 |
$14.00 |
$15.00 |
$5.00 |
| 19 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,600 | LF |
$2.00 |
$1.65 |
$1.75 |
$1.55 |
$1.70 |
$1.54 |
$1.50 |
$1.50 |
$1.50 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$16.00 |
$8.00 |
$12.00 |
$15.00 |
$11.00 |
$30.90 |
$26.00 |
$80.00 |
$15.00 |
| 21 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$130.00 |
$137.00 |
$126.50 |
$150.00 |
$175.00 |
$197.99 |
$160.00 |
$210.00 |
$170.00 |
| 22 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 492 | LF |
$200.00 |
$185.00 |
$192.88 |
$190.00 |
$205.00 |
$189.59 |
$270.00 |
$220.00 |
$220.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 403 | SY |
$8.00 |
$6.00 |
$5.83 |
$5.95 |
$7.50 |
$6.59 |
$7.00 |
$7.00 |
$5.40 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$260.00 |
$235.00 |
$236.42 |
$235.00 |
$265.00 |
$253.87 |
$300.00 |
$190.00 |
$240.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 386 | LF |
$74.00 |
$72.00 |
$75.00 |
$70.00 |
$100.00 |
$76.86 |
$84.00 |
$95.00 |
$75.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 840 | LB |
$2.50 |
$2.40 |
$3.25 |
$2.00 |
$2.75 |
$2.14 |
$4.50 |
$5.50 |
$2.75 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$850.00 |
$615.00 |
$575.00 |
$500.00 |
$765.00 |
$674.62 |
$500.00 |
$800.00 |
$675.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$850.00 |
$615.00 |
$575.00 |
$500.00 |
$765.00 |
$674.62 |
$500.00 |
$800.00 |
$675.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 127.9 | CY |
$600.00 |
$595.00 |
$575.00 |
$550.00 |
$630.00 |
$637.93 |
$600.00 |
$550.00 |
$635.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 105 | CY |
$650.00 |
$618.00 |
$595.00 |
$550.00 |
$610.00 |
$637.93 |
$725.00 |
$505.00 |
$635.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 48,124 | LB |
$0.9000 |
$0.8400 |
$1.00 |
$0.7000 |
$0.8000 |
$0.8900 |
$0.9500 |
$1.00 |
$1.00 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 224 | LF |
$25.00 |
$25.20 |
$24.00 |
$20.00 |
$34.00 |
$24.03 |
$42.00 |
$30.00 |
$40.00 |
| 33 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 530 | LF |
$30.00 |
$29.40 |
$28.50 |
$25.00 |
$41.00 |
$28.95 |
$50.00 |
$35.00 |
$50.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 224 | LF |
$13.00 |
$10.80 |
$12.00 |
$15.00 |
$21.00 |
$12.36 |
$12.00 |
$18.00 |
$10.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 530 | LF |
$14.00 |
$12.60 |
$12.00 |
$15.00 |
$21.00 |
$12.36 |
$12.00 |
$20.00 |
$10.00 |
| 36 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 37 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 201.2 | LF |
$750.00 |
$560.00 |
$675.65 |
$700.00 |
$610.00 |
$702.46 |
$650.00 |
$475.00 |
$875.00 |
| 38 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,700.00 |
$2,250.00 |
$2,200.00 |
$1,980.00 |
$2,000.00 |
$2,884.00 |
$3,000.00 |
$5,000.00 |
$1,800.00 |
| 39 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,567 | TON |
$48.00 |
$47.00 |
$44.45 |
$50.00 |
$52.00 |
$49.27 |
$49.00 |
$46.90 |
$55.00 |
| 40 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 523 | TON |
$38.00 |
$37.74 |
$40.00 |
$40.00 |
$40.00 |
$38.82 |
$41.00 |
$37.89 |
$48.00 |
| 41 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 30 | LF |
$32.00 |
$40.00 |
$35.00 |
$25.00 |
$20.00 |
$30.90 |
$25.00 |
$50.00 |
$35.00 |
| 42 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 52 | LF |
$30.00 |
$25.00 |
$30.00 |
$25.00 |
$20.00 |
$30.90 |
$25.00 |
$50.00 |
$35.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$10,000.00 |
$12,000.00 |
$5,000.00 |
$7,500.00 |
$15,450.00 |
$12,500.00 |
$11,463.00 |
$10,000.00 |
| 44 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$19.00 |
$22.00 |
$22.50 |
$22.00 |
$22.00 |
$20.60 |
$20.00 |
$20.00 |
$20.00 |
| 45 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,375.00 |
$1,350.00 |
$1,375.00 |
$1,400.00 |
$1,287.50 |
$1,250.00 |
$1,250.00 |
$1,250.00 |
| 46 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,475.00 |
$2,350.00 |
$2,475.00 |
$2,500.00 |
$2,317.50 |
$2,250.00 |
$2,250.00 |
$2,250.00 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,800.00 |
$3,800.00 |
$3,250.00 |
$3,300.00 |
$4,000.00 |
$3,090.00 |
$3,000.00 |
$3,000.00 |
$3,000.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,000.00 |
$6,500.00 |
$6,850.00 |
$7,000.00 |
$7,622.00 |
$6,222.00 |
$7,400.00 |
$8,500.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,500.00 |
$3,000.00 |
$4,000.00 |
$3,800.00 |
$2,575.00 |
$2,700.00 |
$14,000.00 |
$1,275.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$50,000.00 |
$48,000.00 |
$50,000.00 |
$17,000.00 |
$85,814.58 |
$45,000.00 |
$82,675.00 |
$78,000.00 |