| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$15,000.00 |
$33,600.00 |
$52,500.00 |
$25,000.00 |
$13,775.51 |
$40,000.00 |
$12,480.00 |
$13,775.51 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13,053 | CY |
$7.50 |
$6.25 |
$7.35 |
$7.24 |
$7.80 |
$6.25 |
$8.00 |
$7.30 |
$6.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,390 | CY |
$9.25 |
$7.50 |
$8.92 |
$8.83 |
$10.00 |
$7.50 |
$10.00 |
$8.85 |
$7.50 |
| 4 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 2,699 | CY |
$7.50 |
$3.50 |
$3.90 |
$6.30 |
$6.88 |
$3.50 |
$10.00 |
$3.85 |
$3.50 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 2,531 | LF |
$5.50 |
$3.80 |
$2.62 |
$6.56 |
$8.00 |
$3.80 |
$15.00 |
$2.60 |
$3.80 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,945 | LF |
$1.40 |
$1.60 |
$1.58 |
$1.26 |
$1.76 |
$1.50 |
$1.20 |
$1.25 |
$1.20 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 420 | LF |
$8.00 |
$12.95 |
$7.35 |
$12.05 |
$11.00 |
$7.00 |
$11.48 |
$11.90 |
$11.48 |
| 8 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 24 | CY |
$120.00 |
$110.00 |
$210.00 |
$157.50 |
$215.00 |
$98.00 |
$150.00 |
$216.00 |
$250.00 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 557 | LF |
$2.50 |
$1.60 |
$1.47 |
$2.20 |
$1.76 |
$1.40 |
$2.10 |
$2.20 |
$2.10 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 19,433 | SY |
$1.50 |
$1.60 |
$1.73 |
$1.84 |
$1.80 |
$1.65 |
$1.76 |
$1.85 |
$1.76 |
| 11 | 232(A) 2813 |
SEEDING METHOD A | 3.18 | AC |
$800.00 |
$1,750.00 |
$2,625.00 |
$1,811.25 |
$1,700.00 |
$2,500.00 |
$1,725.00 |
$1,794.00 |
$1,725.00 |
| 12 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 1,728 | CY |
$80.00 |
$75.00 |
$76.36 |
$77.17 |
$95.00 |
$74.49 |
$62.68 |
$114.00 |
$74.49 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,389 | TON |
$50.00 |
$41.00 |
$37.13 |
$49.08 |
$44.25 |
$40.75 |
$34.83 |
$53.30 |
$40.75 |
| 14 | 408 5774 |
PRIME COAT | 3,554 | GAL |
$3.00 |
$3.75 |
$3.94 |
$3.94 |
$3.80 |
$3.75 |
$3.75 |
$3.90 |
$3.75 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,194 | TON |
$89.00 |
$121.00 |
$127.05 |
$127.05 |
$135.00 |
$121.00 |
$121.00 |
$126.00 |
$121.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,142 | TON |
$99.00 |
$140.00 |
$147.00 |
$148.05 |
$156.00 |
$140.00 |
$140.00 |
$145.50 |
$140.00 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 27 | CY |
$18.00 |
$5.00 |
$26.25 |
$36.75 |
$42.00 |
$29.00 |
$5.00 |
$21.60 |
$50.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 66 | CY |
$600.00 |
$390.00 |
$595.09 |
$577.50 |
$675.00 |
$651.00 |
$388.17 |
$587.50 |
$650.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 83 | CY |
$375.00 |
$400.00 |
$400.31 |
$393.75 |
$347.50 |
$381.00 |
$450.00 |
$565.50 |
$300.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 9,830 | LB |
$0.9000 |
$1.00 |
$1.07 |
$1.23 |
$0.8900 |
$0.8000 |
$1.00 |
$0.9900 |
$1.00 |
| 21 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 728 | TON |
$58.00 |
$52.50 |
$58.85 |
$66.15 |
$59.00 |
$52.50 |
$50.00 |
$70.50 |
$52.50 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 40 | LF |
$80.00 |
$69.00 |
$55.65 |
$65.10 |
$141.00 |
$68.96 |
$90.00 |
$55.10 |
$68.96 |
| 23 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 46 | LF |
$128.00 |
$110.00 |
$110.25 |
$124.95 |
$207.00 |
$109.96 |
$100.00 |
$109.00 |
$109.96 |
| 24 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 278 | LF |
$32.00 |
$25.70 |
$19.95 |
$25.72 |
$24.00 |
$25.70 |
$25.00 |
$19.80 |
$25.70 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 336 | LF |
$40.00 |
$28.40 |
$26.25 |
$33.60 |
$26.00 |
$28.40 |
$35.00 |
$26.00 |
$28.40 |
| 26 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$650.00 |
$1,035.00 |
$165.38 |
$682.50 |
$250.00 |
$1,028.93 |
$300.00 |
$164.00 |
$1,028.93 |
| 27 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$1,150.00 |
$1,000.00 |
$696.73 |
$1,155.00 |
$1,027.00 |
$1,360.00 |
$1,500.00 |
$1,381.00 |
$1,600.00 |
| 28 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,300.00 |
$1,120.00 |
$795.74 |
$1,470.00 |
$1,160.00 |
$1,600.00 |
$1,750.00 |
$1,466.00 |
$2,000.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$3,500.00 |
$4,200.00 |
$13,650.00 |
$8,000.00 |
$3,500.00 |
$15,000.00 |
$4,160.00 |
$3,500.00 |
| 30 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 252.57 | LF |
$5.50 |
$1.60 |
$5.25 |
$3.15 |
$4.50 |
$1.60 |
$20.00 |
$5.20 |
$1.60 |
| 31 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$18.00 |
$20.00 |
$21.00 |
$17.85 |
$20.00 |
$17.00 |
$17.00 |
$17.70 |
$17.00 |
| 32 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,600.00 |
$1,750.00 |
$1,837.50 |
$1,627.50 |
$1,715.00 |
$1,550.00 |
$1,550.00 |
$1,612.00 |
$1,550.00 |
| 33 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,500.00 |
$1,575.00 |
$1,128.75 |
$1,315.00 |
$1,075.00 |
$1,075.00 |
$1,118.00 |
$1,075.00 |
| 34 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 29 | EA |
$15.00 |
$25.00 |
$26.25 |
$26.25 |
$25.00 |
$25.00 |
$15.00 |
$15.60 |
$25.00 |
| 35 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 17,952 | LF |
$0.7500 |
$0.6500 |
$0.6800 |
$0.6800 |
$0.7200 |
$0.6500 |
$0.4000 |
$0.4200 |
$0.6500 |
| 36 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$15.00 |
$15.00 |
$19.26 |
$26.25 |
$12.50 |
$40.00 |
$25.00 |
$28.90 |
$25.00 |
| 37 | 501(G) 6309 |
CLSM BACKFILL | 126 | CY |
$165.00 |
$175.00 |
$136.85 |
$230.32 |
$175.50 |
$228.00 |
$190.00 |
$194.50 |
$160.00 |
| 38 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 2,392 | LF |
$230.00 |
$250.00 |
$209.53 |
$221.09 |
$214.00 |
$233.00 |
$250.00 |
$216.50 |
$225.00 |
| 39 | 504(B) 1305 |
SAW-CUT GROOVING | 1,861.8 | SY |
$15.00 |
$4.00 |
$3.37 |
$4.36 |
$3.65 |
$3.15 |
$5.00 |
$3.30 |
$3.15 |
| 40 | 504(C) 6250 |
SEALED EXPANSION JOINT | 120 | LF |
$272.00 |
$250.00 |
$229.68 |
$256.52 |
$275.00 |
$286.00 |
$250.00 |
$256.00 |
$300.00 |
| 41 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 1,281.4 | LF |
$75.00 |
$75.00 |
$76.06 |
$87.69 |
$76.00 |
$118.00 |
$75.00 |
$91.20 |
$85.00 |
| 42 | 506(A) 1322 |
STRUCTURAL STEEL | 2,580 | LB |
$3.00 |
$2.50 |
$3.24 |
$2.16 |
$3.00 |
$2.00 |
$2.50 |
$4.05 |
$4.00 |
| 43 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$850.00 |
$630.00 |
$862.53 |
$756.08 |
$840.00 |
$904.00 |
$800.00 |
$959.50 |
$500.00 |
| 44 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 32 | EA |
$850.00 |
$630.00 |
$862.53 |
$756.08 |
$840.00 |
$904.00 |
$800.00 |
$959.50 |
$500.00 |
| 45 | 509(A) 1326 |
CLASS AA CONCRETE | 573 | CY |
$660.00 |
$500.00 |
$472.67 |
$573.80 |
$600.00 |
$625.00 |
$675.00 |
$518.50 |
$900.00 |
| 46 | 509(B) 1328 |
CLASS A CONCRETE | 304.4 | CY |
$675.00 |
$500.00 |
$579.67 |
$573.80 |
$625.00 |
$476.00 |
$520.00 |
$582.00 |
$900.00 |
| 47 | 511(A) 1332 |
REINFORCING STEEL | 184,210 | LB |
$0.8500 |
$0.7600 |
$0.8800 |
$0.9200 |
$0.7900 |
$0.8000 |
$0.7000 |
$0.9300 |
$0.6500 |
| 48 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 290 | LF |
$30.00 |
$30.00 |
$28.40 |
$25.59 |
$32.20 |
$33.00 |
$34.00 |
$32.60 |
$20.00 |
| 49 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 959 | LF |
$35.00 |
$38.00 |
$33.50 |
$30.88 |
$32.20 |
$40.00 |
$42.00 |
$39.00 |
$32.00 |
| 50 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 290 | LF |
$14.00 |
$9.00 |
$13.91 |
$11.55 |
$13.80 |
$11.00 |
$5.00 |
$24.60 |
$10.00 |
| 51 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 959 | LF |
$15.00 |
$10.00 |
$12.84 |
$11.55 |
$13.80 |
$11.00 |
$5.00 |
$20.90 |
$12.00 |
| 52 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 53 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 732 | LF |
$980.00 |
$1,110.00 |
$987.68 |
$1,001.06 |
$915.00 |
$1,136.00 |
$1,100.00 |
$895.00 |
$1,170.00 |
| 54 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$3,000.00 |
$3,250.00 |
$4,280.00 |
$2,861.25 |
$4,000.00 |
$6,212.00 |
$1,500.00 |
$1,560.00 |
$10,000.00 |
| 55 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 550 | TON |
$58.00 |
$55.00 |
$63.18 |
$64.55 |
$60.00 |
$52.50 |
$75.00 |
$68.80 |
$52.00 |
| 56 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 175 | TON |
$50.00 |
$45.00 |
$48.54 |
$50.05 |
$45.00 |
$42.10 |
$55.00 |
$64.30 |
$42.00 |
| 57 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$30.00 |
$20.00 |
$20.94 |
$31.50 |
$37.00 |
$29.00 |
$25.00 |
$60.50 |
$40.00 |
| 58 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$30.00 |
$20.00 |
$20.94 |
$31.50 |
$37.00 |
$31.00 |
$25.00 |
$43.20 |
$40.00 |
| 59 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$35,050.00 |
$48,150.00 |
$36,750.00 |
$62,500.00 |
$35,050.00 |
$50,000.00 |
$152,060.00 |
$35,050.00 |
| 60 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$8,650.00 |
$9,082.50 |
$9,082.50 |
$12,000.00 |
$8,650.00 |
$18,000.00 |
$18,720.00 |
$8,650.00 |
| 61 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$19,200.00 |
$30,765.00 |
$20,160.00 |
$24,000.00 |
$29,300.00 |
$19,200.00 |
$33,850.00 |
$19,200.00 |
| 62 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$12,000.00 |
$3,211.00 |
$6,300.00 |
$2,625.00 |
$6,000.00 |
$10,000.00 |
$5,000.00 |
$4,077.00 |
$10,000.00 |
| 63 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$100,000.00 |
$208,200.19 |
$171,665.10 |
$200,000.00 |
$239,130.00 |
$325,000.00 |
$307,271.63 |
$366,850.00 |