Bid tab 170245

Let Jul 20, 2017 · Division 6 · Woods Sign up free

‹ Jul 2017 results

BRIDGE AND APPROACHES COUNTY ROAD (N2380 ROAD): OVER SALT FORK RIVER , 2.6 MILES SOUTH OF THE KANSAS STATE LINE . PROJECT LENGTH = 0.850 MILE

Let date
Thursday, July 20, 2017
Contract
170245
J/P numbers
25493(04)
District
Division 6
County
Woods
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (N2380 ROAD): OVER SALT FORK RIVER , 2.6 MILES SOUTH OF THE KANSAS STATE LINE . PROJECT LENGTH = 0.850 MILE
Project number
CIRB-176C(151)RB

Bidders 9

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,784,058
1 Bridges, Inc. DBA Scudder Bridge Co. Low bidder $3,634,541 -4.0%
2 Frontier Bridge, Inc. $3,702,165 -2.2% +1.9%
3 Treas Construction Inc $3,873,880 +2.4% +6.6%
4 K & R BUILDERS, INC. $3,877,927 +2.5% +6.7%
5 Reece Construction Co, Inc. $3,947,196 +4.3% +8.6%
6 A. M. COHRON & SON, INC. $4,092,887 +8.2% +12.6%
7 HASKELL LEMON CONSTRUCTION CO. $4,093,616 +8.2% +12.6%
8 B & B BRIDGE COMPANY, LLC $4,264,946 +12.7% +17.3%
9 OBC, INC. $4,385,613 +15.9% +20.7%

Bid tab: unit prices 63 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Bridges, Inc. D…#2 Frontier Bridge…#3 Treas Construct…#4 K & R BUILDERS,…#5 Reece Construct…#6 A. M. COHRON & …#7 HASKELL LEMON C…#8 B & B BRIDGE CO…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $50,000.00 $15,000.00 $33,600.00 $52,500.00 $25,000.00 $13,775.51 $40,000.00 $12,480.00 $13,775.51
2202(A) 0183 UNCLASSIFIED EXCAVATION13,053CY $7.50 $6.25 $7.35 $7.24 $7.80 $6.25 $8.00 $7.30 $6.25
3202(D) 0184 UNCLASSIFIED BORROW11,390CY $9.25 $7.50 $8.92 $8.83 $10.00 $7.50 $10.00 $8.85 $7.50
4205(A) 4230 TYPE A-SALVAGED TOPSOIL2,699CY $7.50 $3.50 $3.90 $6.30 $6.88 $3.50 $10.00 $3.85 $3.50
5210 0121 OBLITERATING ABANDONED ROAD2,531LF $5.50 $3.80 $2.62 $6.56 $8.00 $3.80 $15.00 $2.60 $3.80
6221(C) 2801 TEMPORARY SILT FENCE2,945LF $1.40 $1.60 $1.58 $1.26 $1.76 $1.50 $1.20 $1.25 $1.20
7221(F) 0100 TEMPORARY SILT DIKE420LF $8.00 $12.95 $7.35 $12.05 $11.00 $7.00 $11.48 $11.90 $11.48
8221(G) 0151 TEMPORARY ROCK FILTER DAM TYPE 224CY $120.00 $110.00 $210.00 $157.50 $215.00 $98.00 $150.00 $216.00 $250.00
9229 4318 DITCH LINER PROTECTION557LF $2.50 $1.60 $1.47 $2.20 $1.76 $1.40 $2.10 $2.20 $2.10
10230(A) 2806 SOLID SLAB SODDING19,433SY $1.50 $1.60 $1.73 $1.84 $1.80 $1.65 $1.76 $1.85 $1.76
11232(A) 2813 SEEDING METHOD A3.18AC $800.00 $1,750.00 $2,625.00 $1,811.25 $1,700.00 $2,500.00 $1,725.00 $1,794.00 $1,725.00
12303(B) 2110 AGGREGATE BASE TYPE B1,728CY $80.00 $75.00 $76.36 $77.17 $95.00 $74.49 $62.68 $114.00 $74.49
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E4,389TON $50.00 $41.00 $37.13 $49.08 $44.25 $40.75 $34.83 $53.30 $40.75
14408 5774 PRIME COAT3,554GAL $3.00 $3.75 $3.94 $3.94 $3.80 $3.75 $3.75 $3.90 $3.75
15411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)2,194TON $89.00 $121.00 $127.05 $127.05 $135.00 $121.00 $121.00 $126.00 $121.00
16411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,142TON $99.00 $140.00 $147.00 $148.05 $156.00 $140.00 $140.00 $145.50 $140.00
17501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED27CY $18.00 $5.00 $26.25 $36.75 $42.00 $29.00 $5.00 $21.60 $50.00
18509(A) 0319 CLASS AA CONCRETE66CY $600.00 $390.00 $595.09 $577.50 $675.00 $651.00 $388.17 $587.50 $650.00
19509(D) 0325 CLASS C CONCRETE83CY $375.00 $400.00 $400.31 $393.75 $347.50 $381.00 $450.00 $565.50 $300.00
20511(A) 0332 REINFORCING STEEL9,830LB $0.9000 $1.00 $1.07 $1.23 $0.8900 $0.8000 $1.00 $0.9900 $1.00
21601(B) 0536 TYPE I-A PLAIN RIPRAP728TON $58.00 $52.50 $58.85 $66.15 $59.00 $52.50 $50.00 $70.50 $52.50
22613(A) 0492 24" R.C.PIPE CLASS III40LF $80.00 $69.00 $55.65 $65.10 $141.00 $68.96 $90.00 $55.10 $68.96
23613(A) 0494 36" R.C.PIPE CLASS III46LF $128.00 $110.00 $110.25 $124.95 $207.00 $109.96 $100.00 $109.00 $109.96
24613(B) 0689 18" CORR. GALV. STEEL PIPE278LF $32.00 $25.70 $19.95 $25.72 $24.00 $25.70 $25.00 $19.80 $25.70
25613(B) 0690 24" CORR. GALV. STEEL PIPE336LF $40.00 $28.40 $26.25 $33.60 $26.00 $28.40 $35.00 $26.00 $28.40
26613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $650.00 $1,035.00 $165.38 $682.50 $250.00 $1,028.93 $300.00 $164.00 $1,028.93
27613(M) 7186 TYPE A4 CULVERT END TREATMENT8EA $1,150.00 $1,000.00 $696.73 $1,155.00 $1,027.00 $1,360.00 $1,500.00 $1,381.00 $1,600.00
28613(M) 7187 TYPE B4 CULVERT END TREATMENT6EA $1,300.00 $1,120.00 $795.74 $1,470.00 $1,160.00 $1,600.00 $1,750.00 $1,466.00 $2,000.00
29619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $3,500.00 $4,200.00 $13,650.00 $8,000.00 $3,500.00 $15,000.00 $4,160.00 $3,500.00
30619(B) 4780 REMOVAL OF GUARDRAIL252.57LF $5.50 $1.60 $5.25 $3.15 $4.50 $1.60 $20.00 $5.20 $1.60
31623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE50LF $18.00 $20.00 $21.00 $17.85 $20.00 $17.00 $17.00 $17.70 $17.00
32623(F) 4446 GUARDRAIL ANCHOR UNIT (TYPE A)4EA $1,600.00 $1,750.00 $1,837.50 $1,627.50 $1,715.00 $1,550.00 $1,550.00 $1,612.00 $1,550.00
33623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $2,000.00 $1,500.00 $1,575.00 $1,128.75 $1,315.00 $1,075.00 $1,075.00 $1,118.00 $1,075.00
34853 9033 DELINEATORS(TYPE 2, CODE 1)29EA $15.00 $25.00 $26.25 $26.25 $25.00 $25.00 $15.00 $15.60 $25.00
35856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)17,952LF $0.7500 $0.6500 $0.6800 $0.6800 $0.7200 $0.6500 $0.4000 $0.4200 $0.6500
36501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON250CY $15.00 $15.00 $19.26 $26.25 $12.50 $40.00 $25.00 $28.90 $25.00
37501(G) 6309 CLSM BACKFILL126CY $165.00 $175.00 $136.85 $230.32 $175.50 $228.00 $190.00 $194.50 $160.00
38503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)2,392LF $230.00 $250.00 $209.53 $221.09 $214.00 $233.00 $250.00 $216.50 $225.00
39504(B) 1305 SAW-CUT GROOVING1,861.8SY $15.00 $4.00 $3.37 $4.36 $3.65 $3.15 $5.00 $3.30 $3.15
40504(C) 6250 SEALED EXPANSION JOINT120LF $272.00 $250.00 $229.68 $256.52 $275.00 $286.00 $250.00 $256.00 $300.00
41504(D) 6239 CONCRETE RAIL (TR3)1,281.4LF $75.00 $75.00 $76.06 $87.69 $76.00 $118.00 $75.00 $91.20 $85.00
42506(A) 1322 STRUCTURAL STEEL2,580LB $3.00 $2.50 $3.24 $2.16 $3.00 $2.00 $2.50 $4.05 $4.00
43507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY16EA $850.00 $630.00 $862.53 $756.08 $840.00 $904.00 $800.00 $959.50 $500.00
44507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY32EA $850.00 $630.00 $862.53 $756.08 $840.00 $904.00 $800.00 $959.50 $500.00
45509(A) 1326 CLASS AA CONCRETE573CY $660.00 $500.00 $472.67 $573.80 $600.00 $625.00 $675.00 $518.50 $900.00
46509(B) 1328 CLASS A CONCRETE304.4CY $675.00 $500.00 $579.67 $573.80 $625.00 $476.00 $520.00 $582.00 $900.00
47511(A) 1332 REINFORCING STEEL184,210LB $0.8500 $0.7600 $0.8800 $0.9200 $0.7900 $0.8000 $0.7000 $0.9300 $0.6500
48514(A) 6010 PILES, FURNISHED (HP 10X42)290LF $30.00 $30.00 $28.40 $25.59 $32.20 $33.00 $34.00 $32.60 $20.00
49514(A) 6011 PILES, FURNISHED (HP 12X53)959LF $35.00 $38.00 $33.50 $30.88 $32.20 $40.00 $42.00 $39.00 $32.00
50514(B) 6292 PILES, DRIVEN (HP 10X42)290LF $14.00 $9.00 $13.91 $11.55 $13.80 $11.00 $5.00 $24.60 $10.00
51514(B) 6294 PILES, DRIVEN (HP 12X53)959LF $15.00 $10.00 $12.84 $11.55 $13.80 $11.00 $5.00 $20.90 $12.00
52514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
53516(A) 6098 DRILLED SHAFTS 72" DIAMETER732LF $980.00 $1,110.00 $987.68 $1,001.06 $915.00 $1,136.00 $1,100.00 $895.00 $1,170.00
54516(C) 6200 CROSSHOLE SONIC LOGGING2EA $3,000.00 $3,250.00 $4,280.00 $2,861.25 $4,000.00 $6,212.00 $1,500.00 $1,560.00 $10,000.00
55601(B) 1353 TYPE I-A PLAIN RIPRAP550TON $58.00 $55.00 $63.18 $64.55 $60.00 $52.50 $75.00 $68.80 $52.00
56601(C) 1355 TYPE I-A FILTER BLANKET175TON $50.00 $45.00 $48.54 $50.05 $45.00 $42.10 $55.00 $64.30 $42.00
57613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND72LF $30.00 $20.00 $20.94 $31.50 $37.00 $29.00 $25.00 $60.50 $40.00
58613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $30.00 $20.00 $20.94 $31.50 $37.00 $31.00 $25.00 $43.20 $40.00
59619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $8,000.00 $35,050.00 $48,150.00 $36,750.00 $62,500.00 $35,050.00 $50,000.00 $152,060.00 $35,050.00
60880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $10,000.00 $8,650.00 $9,082.50 $9,082.50 $12,000.00 $8,650.00 $18,000.00 $18,720.00 $8,650.00
61642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $19,200.00 $30,765.00 $20,160.00 $24,000.00 $29,300.00 $19,200.00 $33,850.00 $19,200.00
62220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $12,000.00 $3,211.00 $6,300.00 $2,625.00 $6,000.00 $10,000.00 $5,000.00 $4,077.00 $10,000.00
63641 1399 MOBILIZATION1LSUM $150,000.00 $100,000.00 $208,200.19 $171,665.10 $200,000.00 $239,130.00 $325,000.00 $307,271.63 $366,850.00

Showing the first 8 bidders. The Excel and CSV downloads include all 9.