| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$7,570.00 |
$7,570.00 |
$8,000.00 |
$18,000.00 |
$18,390.00 |
$36,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$43,232.10 |
$52,853.50 |
$52,853.00 |
$53,000.00 |
$80,000.00 |
$65,065.00 |
$95,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$5,100.00 |
$4,430.60 |
$4,430.00 |
$4,400.00 |
$6,500.00 |
$4,227.00 |
$12,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 150 | LF |
$1.90 |
$2.15 |
$2.00 |
$2.00 |
$2.50 |
$2.00 |
$2.10 |
$6.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$8.20 |
$5.57 |
$16.00 |
$16.00 |
$16.50 |
$16.00 |
$16.60 |
$9.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 4,325 | SY |
$1.70 |
$2.15 |
$2.12 |
$2.12 |
$2.12 |
$2.12 |
$2.20 |
$3.00 |
| 7 | 230(F) 2812 |
WATERING | 250 | KGAL |
$9.50 |
$6.55 |
$5.00 |
$5.00 |
$5.00 |
$5.00 |
$5.20 |
$9.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.94 | AC |
$600.00 |
$200.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$520.00 |
$750.00 |
| 9 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.3 | TON |
$800.00 |
$700.00 |
$980.00 |
$980.00 |
$980.00 |
$980.00 |
$1,019.00 |
$750.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 345 | TON |
$35.00 |
$34.50 |
$27.70 |
$27.70 |
$28.00 |
$39.00 |
$50.20 |
$43.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$310.00 |
$250.00 |
$300.00 |
$374.00 |
$400.00 |
$350.00 |
$338.00 |
$565.00 |
| 12 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,186 | TON |
$30.00 |
$43.50 |
$41.70 |
$41.70 |
$42.00 |
$58.00 |
$46.50 |
$70.00 |
| 13 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 44 | LF |
$41.50 |
$27.50 |
$28.35 |
$28.35 |
$28.50 |
$50.00 |
$59.40 |
$70.00 |
| 14 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,360.00 |
$1,500.00 |
$1,250.00 |
$1,300.00 |
$1,800.00 |
$1,470.00 |
$1,200.00 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,500.00 |
$3,850.00 |
$4,545.00 |
$4,545.00 |
$4,600.00 |
$4,500.00 |
$3,678.00 |
$33,000.00 |
| 16 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,600.00 |
$1,870.00 |
$1,700.00 |
$1,700.00 |
$1,700.00 |
$1,700.00 |
$1,562.00 |
$2,200.00 |
| 17 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,600.00 |
$1,540.00 |
$1,400.00 |
$1,400.00 |
$1,400.00 |
$1,400.00 |
$1,734.00 |
$1,800.00 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$23.00 |
$9.50 |
$20.00 |
$16.00 |
$26.00 |
$25.00 |
$28.20 |
$45.00 |
| 19 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 82 | CY |
$19.00 |
$11.50 |
$40.00 |
$24.00 |
$45.00 |
$40.00 |
$34.90 |
$13.00 |
| 20 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 336.67 | LF |
$230.00 |
$198.49 |
$289.75 |
$280.00 |
$290.00 |
$260.00 |
$201.50 |
$245.00 |
| 21 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 235 | LF |
$80.00 |
$76.00 |
$85.00 |
$128.00 |
$85.00 |
$90.00 |
$96.60 |
$115.00 |
| 22 | 506(A) 1322 |
STRUCTURAL STEEL | 345 | LB |
$3.80 |
$2.50 |
$5.00 |
$2.00 |
$4.00 |
$3.50 |
$6.70 |
$4.00 |
| 23 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$804.00 |
$765.00 |
$500.00 |
$976.00 |
$675.00 |
$1,000.00 |
$1,229.00 |
$1,500.00 |
| 24 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$902.00 |
$765.00 |
$500.00 |
$976.00 |
$675.00 |
$1,000.00 |
$1,229.00 |
$1,500.00 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 66.2 | CY |
$520.00 |
$625.00 |
$900.00 |
$846.00 |
$700.00 |
$750.00 |
$569.00 |
$1,050.00 |
| 26 | 509(B) 1328 |
CLASS A CONCRETE | 53.8 | CY |
$500.00 |
$645.00 |
$900.00 |
$675.00 |
$800.00 |
$750.00 |
$1,297.00 |
$1,100.00 |
| 27 | 511(A) 1332 |
REINFORCING STEEL | 23,260 | LB |
$1.00 |
$0.8200 |
$0.7000 |
$0.8000 |
$1.05 |
$1.00 |
$1.40 |
$0.7500 |
| 28 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 604 | LF |
$35.00 |
$25.90 |
$30.00 |
$38.00 |
$54.00 |
$45.00 |
$35.80 |
$48.00 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 604 | LF |
$16.00 |
$11.10 |
$20.00 |
$13.00 |
$10.00 |
$10.00 |
$24.00 |
$80.00 |
| 30 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 830 | TON |
$38.00 |
$43.50 |
$41.70 |
$41.70 |
$44.00 |
$58.00 |
$47.40 |
$58.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 220 | TON |
$36.00 |
$36.55 |
$30.77 |
$30.77 |
$34.00 |
$47.00 |
$43.30 |
$75.00 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$6,529.60 |
$6,529.60 |
$8,500.00 |
$10,000.00 |
$13,040.00 |
$31,000.00 |
| 34 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$3,250.00 |
$2,760.00 |
$2,760.00 |
$2,760.00 |
$2,760.00 |
$2,288.00 |
$3,800.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$6,800.00 |
$6,500.00 |
$6,100.00 |
$6,000.00 |
$7,100.00 |
$7,175.00 |
$10,000.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,000.00 |
$3,500.00 |
$3,700.00 |
$1,275.00 |
$3,161.00 |
$3,500.00 |
| 37 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$41,000.00 |
$32,000.00 |
$32,850.00 |
$41,400.00 |
$40,000.00 |
$58,650.00 |
$84,549.68 |
$40,000.00 |