| 10 | 407(B)7300 |
TACK COAT | 135 | GAL |
$4.00 |
$6.00 |
$6.50 |
$8.50 |
$6.00 |
$6.39 |
$6.30 |
$8.00 |
$100.00 |
| 20 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 624 | TON |
$125.00 |
$209.00 |
$205.00 |
$212.50 |
$190.00 |
$202.35 |
$199.50 |
$215.00 |
$650.00 |
| 30 | 411(I)2000 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 20 | TON |
$400.00 |
$467.00 |
$450.00 |
$475.00 |
$425.00 |
$452.63 |
$446.25 |
$450.00 |
$650.00 |
| 40 | 412 3100 |
COLD MILLING PAVEMENT | 3,600 | SY |
$10.00 |
$10.20 |
$7.00 |
$7.64 |
$4.20 |
$10.65 |
$6.81 |
$12.00 |
$60.00 |
| 50 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,444 | LF |
$4.00 |
$5.40 |
$4.40 |
$5.00 |
$3.50 |
$5.00 |
$14.51 |
$6.00 |
$20.00 |
| 60 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,075 | LF |
$30.00 |
$30.80 |
$26.50 |
$27.00 |
$30.00 |
$29.82 |
$29.40 |
$30.00 |
$125.00 |
| 70 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,000.00 |
$1,000.00 |
$3,250.00 |
$3,750.00 |
$3,000.00 |
$3,408.00 |
$1,050.00 |
$3,500.00 |
$6,900.00 |
| 80 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$2,000.00 |
$750.00 |
$3,250.00 |
$3,750.00 |
$2,700.00 |
$2,449.50 |
$787.50 |
$3,500.00 |
$6,900.00 |
| 90 | 501(G)1800 |
CLSM BACKFILL | 104 | CY |
$200.00 |
$205.00 |
$160.00 |
$202.12 |
$220.00 |
$220.00 |
$392.65 |
$400.00 |
$500.00 |
| 100 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 1,075 | LF |
$250.00 |
$244.00 |
$260.00 |
$259.74 |
$355.00 |
$325.00 |
$244.08 |
$350.00 |
$365.00 |
| 110 | 504(A)5200 |
APPROACH SLAB | 326.2 | SY |
$250.00 |
$305.00 |
$280.00 |
$290.88 |
$240.00 |
$382.00 |
$275.94 |
$275.00 |
$320.00 |
| 120 | 504(B)5300 |
SAW-CUT GROOVING | 1,260.8 | SY |
$5.00 |
$4.45 |
$4.05 |
$5.00 |
$5.00 |
$4.31 |
$4.25 |
$8.00 |
$50.00 |
| 130 | 504(D)5420 |
CONCRETE RAIL (TR4) | 485.4 | LF |
$115.00 |
$95.50 |
$95.00 |
$93.00 |
$125.00 |
$130.00 |
$128.54 |
$135.00 |
$580.00 |
| 140 | 506(A)7200 |
STRUCTURAL STEEL | 1,750 | LB |
$4.00 |
$3.00 |
$5.00 |
$2.95 |
$7.50 |
$2.82 |
$7.13 |
$5.00 |
$150.00 |
| 150 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,800.00 |
$1,840.00 |
$2,000.00 |
$1,857.00 |
$2,000.00 |
$2,200.00 |
$1,681.71 |
$2,500.00 |
$1,500.00 |
| 160 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 24 | EA |
$1,800.00 |
$1,840.00 |
$2,000.00 |
$1,857.00 |
$2,000.00 |
$2,200.00 |
$1,681.71 |
$2,500.00 |
$1,850.00 |
| 170 | 509 0120 |
ELASTOMERIC COATING | 791 | SF |
$16.00 |
$22.00 |
$20.00 |
$23.25 |
$16.75 |
$17.84 |
$17.59 |
$20.00 |
$50.00 |
| 180 | 509(A)0210 |
CLASS AA CONCRETE | 248.9 | CY |
$650.00 |
$865.00 |
$950.00 |
$895.00 |
$1,200.00 |
$950.00 |
$2,026.55 |
$650.00 |
$910.00 |
| 190 | 509(D)0510 |
CLASS C CONCRETE | 4.2 | CY |
$800.00 |
$757.50 |
$1,300.00 |
$450.00 |
$1,200.00 |
$2,000.00 |
$2,474.70 |
$625.00 |
$1,500.00 |
| 200 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 61,550 | LB |
$1.50 |
$1.50 |
$1.50 |
$1.53 |
$1.90 |
$1.83 |
$1.68 |
$2.00 |
$3.00 |
| 210 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 612 | SY |
$5.00 |
$4.18 |
$3.80 |
$5.80 |
$3.80 |
$4.05 |
$3.99 |
$7.00 |
$50.00 |
| 220 | 518(B)0300 |
SEALED EXPANSION JOINTS | 49.21 | LF |
$400.00 |
$375.00 |
$400.00 |
$358.04 |
$525.00 |
$326.14 |
$357.21 |
$450.00 |
$850.00 |
| 230 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 120 | LF |
$40.00 |
$46.20 |
$15.00 |
$8.00 |
$40.00 |
$42.60 |
$42.00 |
$45.00 |
$150.00 |
| 240 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$90.00 |
$66.00 |
$350.00 |
$275.00 |
$125.00 |
$133.13 |
$131.25 |
$150.00 |
$250.00 |
| 250 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$750.00 |
$1,353.00 |
$2,500.00 |
$1,190.00 |
$825.00 |
$878.63 |
$866.25 |
$900.00 |
$2,500.00 |
| 260 | 523(A)3200 |
SEALER CRACK PREPARATION | 232 | LF |
$5.00 |
$4.40 |
$4.00 |
$5.75 |
$4.00 |
$4.26 |
$4.20 |
$5.00 |
$50.00 |
| 270 | 523(B)3300 |
SEALER RESIN | 4 | GAL |
$250.00 |
$220.00 |
$200.00 |
$180.00 |
$200.00 |
$213.00 |
$210.00 |
$150.00 |
$250.00 |
| 280 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 20 | SY |
$45.00 |
$60.50 |
$900.00 |
$44.00 |
$40.00 |
$42.60 |
$42.00 |
$65.00 |
$1,000.00 |
| 290 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$350,000.00 |
$175,000.00 |
$135,000.00 |
$156,000.00 |
$152,000.00 |
$248,688.00 |
$118,470.75 |
$100,000.00 |
$75,000.00 |
| 300 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 1,200 | LF |
$1.00 |
$2.83 |
$1.75 |
$2.00 |
$6.50 |
$2.74 |
$2.70 |
$2.50 |
$10.00 |
| 310 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 1,350 | LF |
$1.50 |
$3.42 |
$4.50 |
$4.85 |
$5.25 |
$3.31 |
$3.27 |
$6.00 |
$10.00 |
| 320 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$125.00 |
$313.15 |
$93.00 |
$102.30 |
$71.00 |
$106.50 |
$105.00 |
$93.00 |
$150.00 |
| 330 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 6,030 | LF |
$1.00 |
$1.10 |
$1.70 |
$1.84 |
$1.15 |
$1.07 |
$1.05 |
$2.50 |
$1.20 |
| 340 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 2,000 | EA |
$1.00 |
$0.5500 |
$0.5600 |
$0.6000 |
$0.6500 |
$0.5300 |
$0.5300 |
$1.00 |
$0.6000 |
| 350 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 1,350 | LF |
$1.00 |
$0.5500 |
$2.50 |
$2.75 |
$0.2500 |
$0.5300 |
$0.5300 |
$3.00 |
$0.6000 |
| 360 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 360 | SD |
$25.00 |
$5.50 |
$18.00 |
$23.00 |
$6.00 |
$5.33 |
$5.25 |
$18.00 |
$5.50 |
| 370 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,487 | LF |
$30.00 |
$33.00 |
$16.00 |
$17.90 |
$24.50 |
$10.90 |
$18.94 |
$20.00 |
$25.00 |
| 380 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,487 | LF |
$5.00 |
$4.40 |
$2.45 |
$4.00 |
$2.00 |
$4.89 |
$12.75 |
$3.00 |
$25.00 |
| 390 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,240 | SD |
$0.5000 |
$0.2800 |
$0.2000 |
$2.95 |
$0.6000 |
$0.2700 |
$0.2600 |
$0.2000 |
$0.4000 |
| 400 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,160 | SD |
$2.00 |
$1.10 |
$0.3500 |
$0.3700 |
$0.6000 |
$1.07 |
$1.05 |
$0.3500 |
$1.20 |
| 410 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,240 | SD |
$3.00 |
$1.38 |
$2.75 |
$2.95 |
$0.6000 |
$1.33 |
$1.31 |
$2.75 |
$1.50 |
| 420 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$1.00 |
$1.65 |
$2.00 |
$2.15 |
$1.00 |
$1.60 |
$1.58 |
$2.00 |
$1.60 |
| 430 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,320 | SD |
$1.00 |
$0.2800 |
$0.5500 |
$0.5700 |
$0.2500 |
$0.2700 |
$0.2600 |
$0.5500 |
$0.4000 |
| 440 | 880(F)6700 |
DRUMS | 2,880 | SD |
$0.5000 |
$0.5500 |
$1.50 |
$1.60 |
$0.4000 |
$0.5300 |
$0.5300 |
$1.50 |
$0.6000 |
| 450 | 880(G)6805 |
CHANNELIZER CONES | 1,440 | SD |
$0.7500 |
$1.10 |
$1.00 |
$1.10 |
$0.3000 |
$1.07 |
$1.05 |
$1.00 |
$1.20 |
| 460 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$20.00 |
$16.50 |
$18.00 |
$19.50 |
$17.00 |
$15.98 |
$15.75 |
$18.00 |
$20.00 |
| 470 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$7,000.00 |
$6,800.00 |
$10,000.00 |
$6,800.00 |
$7,242.00 |
$7,140.00 |
$15,000.00 |
$50,000.00 |
| 480 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$101,000.00 |
$93,500.00 |
$100,000.00 |
$108,000.00 |
$110,000.00 |
$110,000.00 |
$108,727.66 |
$240,000.00 |
$283,000.00 |