| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$20,650.00 |
$5,000.00 |
$11,500.00 |
$8,500.00 |
$10,000.00 |
$8,008.97 |
$12,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,737 | CY |
$12.00 |
$6.40 |
$7.00 |
$10.00 |
$11.00 |
$8.03 |
$8.05 |
$8.03 |
$6.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,297 | CY |
$10.00 |
$9.10 |
$9.30 |
$10.00 |
$14.00 |
$11.69 |
$11.70 |
$11.69 |
$14.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,750.00 |
$6,200.00 |
$7,000.00 |
$10,000.00 |
$6,500.00 |
$5,600.00 |
$6,000.00 |
$5,558.74 |
$8,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,350 | LF |
$3.55 |
$1.47 |
$2.10 |
$1.75 |
$1.59 |
$2.00 |
$1.59 |
$1.59 |
$1.59 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 224 | LF |
$19.80 |
$7.45 |
$9.33 |
$9.75 |
$8.89 |
$9.50 |
$8.89 |
$8.89 |
$8.89 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 14,105 | SY |
$4.45 |
$4.93 |
$4.70 |
$5.10 |
$4.48 |
$4.48 |
$4.48 |
$4.48 |
$4.48 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.91 | AC |
$2,200.00 |
$300.00 |
$1,250.00 |
$1,300.00 |
$1,185.00 |
$1,185.00 |
$1,185.00 |
$1,185.00 |
$1,185.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 759 | CY |
$76.00 |
$92.00 |
$89.00 |
$94.00 |
$90.00 |
$98.42 |
$100.00 |
$98.42 |
$75.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 41 | TON |
$61.00 |
$51.00 |
$39.56 |
$47.00 |
$55.00 |
$47.32 |
$50.00 |
$47.32 |
$50.00 |
| 11 | 407(B) 0250 |
TACK COAT | 162 | GAL |
$4.90 |
$7.75 |
$7.98 |
$8.50 |
$7.75 |
$7.75 |
$7.75 |
$7.75 |
$7.75 |
| 12 | 408 5774 |
PRIME COAT | 850 | GAL |
$5.50 |
$7.75 |
$7.98 |
$8.50 |
$7.75 |
$7.75 |
$7.75 |
$7.75 |
$7.75 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 741 | TON |
$115.00 |
$214.50 |
$207.80 |
$218.00 |
$195.00 |
$195.00 |
$195.00 |
$195.00 |
$195.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 352 | TON |
$150.00 |
$236.50 |
$221.45 |
$244.00 |
$215.00 |
$215.00 |
$215.00 |
$215.00 |
$215.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$370.00 |
$200.00 |
$300.00 |
$350.00 |
$340.00 |
$400.00 |
$400.00 |
$525.00 |
$300.00 |
| 16 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 263 | TON |
$75.00 |
$55.00 |
$54.05 |
$61.00 |
$62.00 |
$63.30 |
$65.00 |
$63.30 |
$63.00 |
| 17 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 88 | TON |
$64.00 |
$47.00 |
$44.30 |
$51.00 |
$58.00 |
$47.36 |
$50.00 |
$47.36 |
$47.00 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$4,500.00 |
$7,500.00 |
$7,500.00 |
$6,000.00 |
$10,000.00 |
$10,000.00 |
$9,539.08 |
$15,000.00 |
| 19 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,801 | SY |
$9.50 |
$4.00 |
$7.25 |
$10.00 |
$9.50 |
$3.15 |
$3.20 |
$3.15 |
$5.00 |
| 20 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$10.00 |
$9.00 |
$12.00 |
$10.00 |
$5.00 |
$10.50 |
$11.00 |
$10.27 |
$10.00 |
| 21 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$25.00 |
$13.20 |
$18.03 |
$13.00 |
$12.00 |
$12.00 |
$33.50 |
$32.00 |
$12.00 |
| 22 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$2,170.00 |
$1,650.00 |
$2,200.00 |
$2,000.00 |
$2,000.00 |
$2,150.00 |
$1,950.00 |
$2,000.00 |
| 23 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,950.00 |
$2,170.00 |
$3,100.00 |
$2,200.00 |
$2,000.00 |
$2,000.00 |
$2,750.00 |
$2,700.00 |
$2,000.00 |
| 24 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,301 | LF |
$7.55 |
$8.80 |
$10.94 |
$11.50 |
$8.10 |
$8.30 |
$15.00 |
$8.10 |
$8.10 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$20.00 |
$10.00 |
$14.00 |
$20.00 |
$15.00 |
$34.00 |
$30.00 |
$20.00 |
$45.00 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 154 | CY |
$210.00 |
$180.00 |
$167.71 |
$200.00 |
$175.00 |
$210.00 |
$200.00 |
$295.00 |
$200.00 |
| 27 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 404 | LF |
$290.00 |
$325.00 |
$296.45 |
$290.00 |
$350.00 |
$460.00 |
$435.00 |
$543.00 |
$435.00 |
| 28 | 504(B) 1305 |
SAW-CUT GROOVING | 340 | SY |
$8.00 |
$11.15 |
$10.61 |
$11.30 |
$10.30 |
$12.00 |
$12.50 |
$10.30 |
$10.30 |
| 29 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 364.5 | LF |
$83.30 |
$80.00 |
$82.00 |
$85.00 |
$95.00 |
$95.00 |
$80.00 |
$159.00 |
$200.00 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 840 | LB |
$3.50 |
$2.50 |
$3.05 |
$3.00 |
$2.00 |
$4.50 |
$4.00 |
$3.00 |
$4.00 |
| 31 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$900.00 |
$1,380.00 |
$1,102.90 |
$1,200.00 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$1,896.00 |
$800.00 |
| 32 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$900.00 |
$1,380.00 |
$1,102.90 |
$1,200.00 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$1,896.00 |
$800.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 120.4 | CY |
$690.00 |
$685.00 |
$650.00 |
$650.00 |
$700.00 |
$675.00 |
$775.00 |
$928.00 |
$650.00 |
| 34 | 509(B) 1328 |
CLASS A CONCRETE | 93.6 | CY |
$750.00 |
$700.00 |
$650.00 |
$700.00 |
$700.00 |
$800.00 |
$775.00 |
$808.00 |
$650.00 |
| 35 | 511(A) 1332 |
REINFORCING STEEL | 42,580 | LB |
$1.10 |
$0.9800 |
$1.04 |
$0.9500 |
$1.15 |
$1.10 |
$1.05 |
$0.8000 |
$1.00 |
| 36 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 278 | LF |
$37.00 |
$25.20 |
$28.60 |
$25.00 |
$48.00 |
$41.00 |
$45.00 |
$37.00 |
$25.00 |
| 37 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 889 | LF |
$44.50 |
$29.40 |
$31.60 |
$35.00 |
$55.00 |
$50.00 |
$50.00 |
$49.00 |
$35.00 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 278 | LF |
$16.00 |
$10.80 |
$12.00 |
$15.00 |
$10.00 |
$14.00 |
$8.00 |
$22.00 |
$12.50 |
| 39 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 889 | LF |
$15.00 |
$12.60 |
$12.00 |
$15.00 |
$10.00 |
$16.00 |
$7.00 |
$22.00 |
$17.50 |
| 40 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 41 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,026 | TON |
$64.00 |
$55.16 |
$52.05 |
$61.00 |
$62.00 |
$65.00 |
$65.00 |
$63.30 |
$63.00 |
| 42 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 676 | TON |
$54.00 |
$47.00 |
$44.30 |
$51.00 |
$58.00 |
$49.00 |
$50.00 |
$47.77 |
$47.00 |
| 43 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$36.00 |
$29.00 |
$30.00 |
$35.00 |
$40.00 |
$38.00 |
$40.00 |
$23.00 |
$70.00 |
| 44 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$32.00 |
$37.00 |
$30.00 |
$35.00 |
$40.00 |
$38.00 |
$40.00 |
$22.00 |
$40.00 |
| 45 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$10,500.00 |
$21,500.00 |
$10,000.00 |
$30,000.00 |
$18,000.00 |
$17,000.00 |
$14,426.86 |
$40,000.00 |
| 46 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,530 | LF |
$1.60 |
$2.05 |
$2.06 |
$2.00 |
$1.90 |
$1.90 |
$2.00 |
$2.00 |
$1.90 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,500.00 |
$5,000.00 |
$12,500.00 |
$4,730.00 |
$3,300.00 |
$2,800.00 |
$4,700.00 |
$4,000.00 |
$2,800.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$7,000.00 |
$7,500.00 |
$6,700.00 |
$6,780.00 |
$6,100.00 |
$8,500.00 |
$6,100.00 |
$6,100.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$1,800.00 |
$3,000.00 |
$4,000.00 |
$2,000.00 |
$4,500.00 |
$3,500.00 |
$1,000.00 |
$5,000.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$80,000.00 |
$45,000.00 |
$60,000.00 |
$65,000.00 |
$86,000.00 |
$98,000.00 |
$105,000.00 |
$81,349.00 |
$156,400.00 |