Bid tab 160069

Let Feb 18, 2016 · Division 6 · Alfalfa Sign up free

‹ Feb 2016 results

BRIDGE AND APPROACHES SH -58: OVER MEDICINE LODGE RIVER OVERFLOW, 1.1 MILES EAST OF THE SH-8 JUNCTION NEAR CHEROKEE. PROJECT LENGTH = 0.225 MILE

Let date
Thursday, February 18, 2016
Contract
160069
J/P numbers
28032(04)
District
Division 6
County
Alfalfa
Highway
Limits
BRIDGE AND APPROACHES SH -58: OVER MEDICINE LODGE RIVER OVERFLOW, 1.1 MILES EAST OF THE SH-8 JUNCTION NEAR CHEROKEE. PROJECT LENGTH = 0.225 MILE
Project number
ACSTP-202C(029)SS

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,780,235
1 Bridges, Inc. DBA Scudder Bridge Co. Low bidder $2,697,204 -3.0%
2 K & R BUILDERS, INC. $2,723,303 -2.0% +1.0%
3 SEWELL BROS., INC. $2,874,441 +3.4% +6.6%
4 L & M Contractors, Inc. $2,989,657 +7.5% +10.8%
5 M.J. HUGHES CONSTRUCTION, INC. $3,236,324 +16.4% +20.0%
6 OBC, INC. $3,273,709 +17.7% +21.4%

Bid tab: unit prices 77 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Bridges, Inc. D…#2 K & R BUILDERS,…#3 SEWELL BROS., I…#4 L & M Contracto…#5 M.J. HUGHES CON…#6 OBC, INC.
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $5,000.00 $15,500.00 $20,000.00 $5,000.00 $1,905.23 $3,088.50
2202(A) 0183 UNCLASSIFIED EXCAVATION5,337CY $7.00 $8.00 $7.25 $10.00 $10.00 $8.25 $10.65
3202(D) 0184 UNCLASSIFIED BORROW3,671CY $10.00 $15.00 $11.25 $10.00 $10.00 $11.18 $25.56
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $20,000.00 $10,000.00 $6,500.00 $10,000.00 $12,000.00 $4,579.50
5221(C) 2801 TEMPORARY SILT FENCE1,622LF $3.50 $2.75 $2.55 $2.00 $2.50 $2.18 $2.66
6221(F) 0100 TEMPORARY SILT DIKE308LF $9.00 $8.25 $8.00 $8.25 $8.00 $9.50 $8.52
7221(K) 0600 TEMPORARY FIBER LOG3,962LF $5.00 $1.50 $1.35 $4.45 $1.25 $8.88 $1.33
8230(A) 2806 SOLID SLAB SODDING10,520SY $2.00 $1.90 $2.09 $1.95 $1.90 $2.05 $2.02
9233(A) 2817 VEGETATIVE MULCHING3AC $600.00 $600.00 $400.00 $240.00 $600.00 $343.09 $639.00
10241 2832 MOWING4.4AC $110.00 $200.00 $200.00 $140.00 $200.00 $60.97 $213.00
11242 0400 (PL)STABILIZED CONSTRUCTION EXIT2EA $5,000.00 $5,000.00 $4,000.00 $3,500.00 $1,500.00 $2,500.00 $3,457.93
12307(K) 4300 STABILIZED SUBGRADE4,939SY $8.00 $9.00 $9.90 $6.50 $9.50 $6.25 $9.59
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E399TON $55.00 $50.00 $46.70 $43.00 $48.00 $90.00 $60.00
14407(B) 0250 TACK COAT2,034GAL $3.00 $4.50 $4.95 $4.95 $4.50 $5.20 $4.79
15408 5774 PRIME COAT3,947GAL $4.00 $8.50 $9.35 $9.35 $8.50 $10.00 $4.00
16411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)2,594TON $85.00 $129.00 $142.00 $148.00 $129.00 $150.00 $137.39
17411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,126TON $95.00 $136.00 $150.00 $164.00 $136.00 $157.00 $144.84
18411(K) 6510 (SP) INTELLIGENT COMPACTION OF ASPHALT1LSUM $75,000.00 $65,000.00 $71,500.00 $71,500.00 $65,000.00 $75,000.00 $69,225.00
19412 5267 COLD MILLING PAVEMENT240SY $10.00 $28.00 $32.00 $35.00 $40.00 $63.00 $30.40
20509(D) 0325 CLASS C CONCRETE10CY $400.00 $350.00 $650.00 $350.00 $310.00 $550.00 $284.63
21613(B) 0696 60" CORR. GALV. STEEL PIPE144LF $150.00 $150.00 $85.00 $85.00 $70.00 $101.95 $108.25
22619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $10,000.00 $6,000.00 $10,000.00 $1,500.00 $2,471.04 $7,987.50
23619(B) 4725 REMOVAL OF FENCE2,118LF $2.00 $2.50 $2.75 $1.00 $2.00 $2.38 $6.92
24619(B) 4728 REMOVAL OF ASPHALT PAVEMENT7,486SY $5.00 $3.00 $5.20 $7.00 $5.00 $3.25 $4.83
25619(B) 4780 REMOVAL OF GUARDRAIL1,162LF $5.00 $3.50 $3.50 $3.00 $7.00 $7.50 $3.20
26619(C) 0924 SAWING PAVEMENT1,154LF $3.50 $4.00 $5.00 $5.00 $9.00 $5.80 $4.26
27623 0100 (PL)GUARDRAIL CURBING4EA $1,000.00 $1,350.00 $1,500.00 $850.00 $2,000.00 $1,350.00 $1,486.96
28623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE125LF $20.00 $14.25 $17.05 $15.65 $18.00 $18.00 $16.51
29623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,000.00 $1,900.00 $2,200.00 $2,585.00 $2,400.00 $2,137.93 $2,126.81
30623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,600.00 $1,475.00 $1,540.00 $2,120.00 $1,800.00 $1,600.00 $1,485.68
31629(E) 5048 REMOVE AND RESET MAILBOX1EA $200.00 $250.00 $250.00 $275.00 $250.00 $229.96 $266.25
32501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON80CY $25.00 $22.00 $10.00 $20.00 $35.00 $13.00 $54.29
33501(G) 6309 CLSM BACKFILL164CY $185.00 $200.00 $190.00 $150.00 $220.00 $152.82 $158.91
34503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)1,295LF $250.00 $260.00 $204.25 $215.00 $220.00 $227.18 $275.00
35504(A) 1304 APPROACH SLAB224.8SY $200.00 $155.00 $195.00 $220.00 $175.00 $197.89 $275.00
36504(B) 1305 SAW-CUT GROOVING1,668.9SY $4.50 $4.00 $3.85 $4.20 $6.00 $4.51 $3.73
37504(D) 6245 CONCRETE RAIL (TR4)747LF $80.00 $90.00 $92.00 $85.00 $80.00 $100.93 $150.00
38506(A) 1322 STRUCTURAL STEEL1,950LB $3.25 $3.75 $3.00 $3.00 $4.00 $1.62 $5.00
39507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY8EA $700.00 $300.00 $300.00 $300.00 $550.00 $350.00 $900.00
40507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY32EA $2,200.00 $1,250.00 $900.00 $1,500.00 $1,200.00 $1,250.00 $2,200.00
41507(C) 6282 ELASTOMERIC BEARING PADS32EA $500.00 $350.00 $500.00 $600.00 $500.00 $399.79 $1,200.00
42509(A) 1326 CLASS AA CONCRETE408.4CY $550.00 $525.00 $617.50 $600.00 $705.00 $950.00 $750.00
43509(B) 1328 CLASS A CONCRETE200.4CY $650.00 $650.00 $635.00 $600.00 $705.00 $625.00 $675.00
44511(B) 6010 EPOXY COATED REINFORCING STEEL123,320LB $1.25 $0.9500 $1.01 $0.9000 $1.00 $1.10 $1.05
45514(A) 6010 PILES, FURNISHED (HP 10X42)608LF $38.00 $44.00 $32.20 $30.00 $53.00 $37.03 $35.00
46514(B) 6292 PILES, DRIVEN (HP 10X42)608LF $17.00 $12.00 $13.80 $15.00 $8.00 $27.00 $38.00
47514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
48515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,456SY $3.75 $3.65 $4.02 $3.50 $5.15 $4.00 $3.20
49516(A) 6096 DRILLED SHAFTS 60" DIAMETER466LF $950.00 $800.00 $790.00 $1,000.00 $700.00 $825.00 $960.21
50516(C) 6200 CROSSHOLE SONIC LOGGING2EA $2,500.00 $3,000.00 $2,850.00 $3,500.00 $4,500.00 $2,936.32 $1,863.75
51523(A) 6550 SEALER CRACK PREPARATION326LF $4.50 $4.00 $4.40 $5.00 $5.50 $4.56 $4.26
52523(B) 6560 SEALER RESIN4GAL $150.00 $100.00 $110.00 $200.00 $210.00 $117.17 $106.50
53525(C) 1000 (SP)NEST PREVENTION1LSUM $7,500.00 $4,500.00 $7,500.00 $15,000.00 $2,000.00 $6,500.00 $8,286.54
54601(B) 1353 TYPE I-A PLAIN RIPRAP1,680TON $60.00 $50.00 $49.25 $48.00 $53.00 $50.00 $52.20
55601(C) 1355 TYPE I-A FILTER BLANKET270TON $45.00 $44.00 $43.42 $42.00 $50.00 $47.00 $45.45
56613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $30.00 $28.00 $35.00 $25.00 $40.00 $20.00 $24.55
57613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.72LF $30.00 $28.00 $35.00 $25.00 $40.00 $20.00 $25.00
58619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $45,000.00 $50,000.00 $35,000.00 $40,000.00 $60,000.00 $240,000.00 $153,000.00
59805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS1EA $250.00 $250.00 $275.00 $275.00 $250.00 $78.15 $266.25
60823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM180SD $225.00 $100.00 $110.00 $105.00 $100.00 $180.00 $106.50
61850(A) 8110 SHEET ALUMINUM SIGNS39SF $40.00 $20.00 $22.00 $22.00 $20.00 $20.73 $21.30
62851(C) 8324 2" SQUARE TUBE POST50LF $13.50 $10.00 $11.00 $11.00 $10.00 $8.18 $10.65
63856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)9,800LF $0.7500 $0.4000 $0.4400 $0.4200 $0.4000 $0.4700 $0.4300
64857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)1,400LF $0.5000 $0.3000 $0.3300 $0.3200 $0.3000 $0.2000 $0.3200
65857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)2,356LF $1.00 $0.7500 $0.8300 $0.7700 $0.7500 $0.8700 $0.8000
66857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)2,370LF $1.25 $0.2000 $0.2200 $0.2500 $0.2000 $0.2900 $0.2100
67880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF4,300SD $1.40 $0.5000 $0.5500 $0.5500 $0.5000 $0.5800 $0.5300
68880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,920SD $1.50 $1.00 $1.10 $1.10 $1.00 $1.15 $1.07
69880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,200SD $1.75 $3.00 $3.30 $3.10 $3.00 $3.50 $3.20
70880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)660SD $1.00 $3.00 $3.30 $3.10 $3.00 $0.2300 $3.20
71880(C) 8848 WING BARRICADES880SD $0.7500 $0.5000 $0.5500 $0.5500 $0.5000 $0.5800 $0.5300
72880(D) 8854 VERTICAL PANELS7,755SD $0.2500 $0.1200 $0.1400 $0.1400 $0.1200 $0.1400 $0.1300
73880(E) 8860 WARNING LIGHTS(TYPE A)1,760SD $0.7500 $3.00 $3.30 $3.10 $3.00 $0.1100 $3.20
74880(F) 8878 DRUMS11,060SD $0.4000 $0.1000 $0.1100 $0.1200 $0.1000 $0.1200 $0.1100
75642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $16,000.00 $20,000.00 $17,100.00 $20,000.00 $20,574.69 $18,318.00
76220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $3,500.00 $8,000.00 $4,000.00 $5,000.00 $1,950.84 $677.69
77641 1399 MOBILIZATION1LSUM $158,670.00 $125,000.00 $135,000.00 $140,000.00 $396,000.00 $185,000.00 $170,000.00