| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$19,151.08 |
$100,000.00 |
$5,750.00 |
$24,750.00 |
$10,200.00 |
$7,172.56 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 246 | CY |
$20.00 |
$23.07 |
$100.00 |
$23.00 |
$41.00 |
$20.40 |
$28.69 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6,000.00 |
$11,285.88 |
$45,000.00 |
$23,000.00 |
$27,000.00 |
$6,120.00 |
$28,690.25 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,506 | LF |
$5.00 |
$7.37 |
$5.00 |
$8.00 |
$3.50 |
$6.95 |
$6.95 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 98 | LF |
$15.00 |
$51.94 |
$25.00 |
$56.35 |
$20.00 |
$49.00 |
$49.00 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 17,372 | SY |
$5.00 |
$9.49 |
$6.00 |
$10.30 |
$7.85 |
$8.95 |
$8.95 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 3.97 | AC |
$1,100.00 |
$5,247.00 |
$2,500.00 |
$5,693.00 |
$2,000.00 |
$4,950.00 |
$4,950.00 |
| 80 | 310(B)5300 |
SUBGRADE, METHOD B | 886 | SY |
$5.00 |
$8.11 |
$4.00 |
$4.75 |
$8.88 |
$5.10 |
$4.00 |
| 90 | 407(B)7300 |
TACK COAT | 283 | GAL |
$10.00 |
$4.08 |
$15.00 |
$4.43 |
$3.85 |
$3.85 |
$3.85 |
| 100 | 408 8100 |
PRIME COAT | 515 | GAL |
$6.00 |
$5.30 |
$4.00 |
$5.75 |
$5.00 |
$5.00 |
$5.00 |
| 110 | 409(A)9200 |
FABRIC REINFORCEMENT | 312 | SY |
$20.00 |
$7.42 |
$25.00 |
$8.05 |
$8.40 |
$7.00 |
$7.00 |
| 120 | 411 1100 |
(PL)CRACK SEALING ASPHALT PAVEMENT | 80 | LF |
$12.00 |
$17.83 |
$50.00 |
$50.00 |
$19.80 |
$12.00 |
$25.00 |
| 130 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 352 | TON |
$170.00 |
$339.20 |
$210.00 |
$368.00 |
$384.00 |
$320.00 |
$320.00 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 148 | TON |
$140.00 |
$328.60 |
$430.00 |
$356.50 |
$372.00 |
$310.00 |
$310.00 |
| 150 | 412 3100 |
COLD MILLING PAVEMENT | 3,138 | SY |
$10.00 |
$12.66 |
$15.00 |
$11.50 |
$15.00 |
$10.00 |
$10.00 |
| 160 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$500.00 |
$389.73 |
$550.00 |
$800.00 |
$422.65 |
$1,100.00 |
$1,400.00 |
| 170 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 597 | LF |
$5.00 |
$5.79 |
$7.00 |
$7.00 |
$7.70 |
$7.00 |
$15.00 |
| 180 | 619(C)6600 |
SAWING PAVEMENT | 1,232 | LF |
$5.00 |
$5.55 |
$8.50 |
$6.00 |
$6.15 |
$7.00 |
$3.00 |
| 190 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 700 | LF |
$30.00 |
$26.50 |
$38.00 |
$28.75 |
$27.50 |
$25.00 |
$25.00 |
| 200 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$4,500.00 |
$4,240.00 |
$4,500.00 |
$4,600.00 |
$4,400.00 |
$4,000.00 |
$4,000.00 |
| 210 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$4,200.00 |
$4,028.00 |
$4,500.00 |
$4,370.00 |
$4,180.00 |
$3,800.00 |
$3,800.00 |
| 220 | 501(G)1800 |
CLSM BACKFILL | 182.8 | CY |
$240.00 |
$319.49 |
$350.00 |
$373.07 |
$373.00 |
$750.00 |
$365.00 |
| 230 | 504(A)5200 |
APPROACH SLAB | 281.2 | SY |
$300.00 |
$344.83 |
$375.00 |
$340.47 |
$441.00 |
$475.00 |
$350.00 |
| 240 | 504(B)5300 |
SAW-CUT GROOVING | 266.8 | SY |
$5.00 |
$11.45 |
$6.00 |
$14.50 |
$12.96 |
$12.00 |
$10.80 |
| 250 | 504(D)5420 |
CONCRETE RAIL (TR4) | 2,521 | LF |
$125.00 |
$115.35 |
$138.00 |
$159.72 |
$149.75 |
$225.00 |
$195.00 |
| 260 | 505(C)6400 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 5,336 | SY |
$50.00 |
$43.46 |
$64.00 |
$45.00 |
$61.80 |
$60.00 |
$65.00 |
| 270 | 509(A)0210 |
CLASS AA CONCRETE | 696.4 | CY |
$800.00 |
$919.31 |
$900.00 |
$945.91 |
$1,314.00 |
$1,575.00 |
$1,600.00 |
| 280 | 509(D)0510 |
CLASS C CONCRETE | 10 | CY |
$600.00 |
$1,067.41 |
$750.00 |
$900.00 |
$1,044.00 |
$1,100.00 |
$1,400.00 |
| 290 | 509(F)0700 |
ULTRA HIGH PERFORMANCE CONCRETE | 14.2 | CY |
$5,000.00 |
$20,166.52 |
$7,500.00 |
$11,889.01 |
$17,604.22 |
$10,500.00 |
$16,000.00 |
| 300 | 511 2100 |
MECHANICAL SPLICES | 66 | EA |
$75.00 |
$55.25 |
$85.00 |
$35.00 |
$64.00 |
$90.00 |
$60.00 |
| 310 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 207,820 | LB |
$1.75 |
$1.55 |
$1.94 |
$1.97 |
$1.86 |
$1.65 |
$2.00 |
| 320 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 25 | SY |
$500.00 |
$371.00 |
$650.00 |
$500.00 |
$385.00 |
$465.00 |
$500.00 |
| 330 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 25 | SY |
$700.00 |
$731.40 |
$825.00 |
$600.00 |
$759.00 |
$700.00 |
$700.00 |
| 340 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 4,171 | SY |
$4.50 |
$5.99 |
$5.00 |
$6.50 |
$6.22 |
$5.65 |
$5.65 |
| 350 | 517 9110 |
ELASTOMERIC COATING | 2,883 | SF |
$25.00 |
$22.26 |
$27.85 |
$21.00 |
$23.20 |
$19.00 |
$19.00 |
| 360 | 518(B)0300 |
SEALED EXPANSION JOINTS | 172.8 | LF |
$370.00 |
$383.31 |
$415.00 |
$397.46 |
$443.00 |
$450.00 |
$425.00 |
| 370 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 111 | LF |
$45.00 |
$21.20 |
$60.00 |
$48.30 |
$22.00 |
$42.00 |
$42.00 |
| 380 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2.8 | GAL |
$140.00 |
$159.00 |
$176.00 |
$143.75 |
$165.00 |
$125.00 |
$125.00 |
| 390 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 30 | SY |
$1,200.00 |
$826.80 |
$1,425.00 |
$862.50 |
$897.00 |
$750.00 |
$750.00 |
| 400 | 523(A)3200 |
SEALER CRACK PREPARATION | 1,834 | LF |
$5.00 |
$7.95 |
$5.85 |
$3.50 |
$8.25 |
$7.50 |
$7.50 |
| 410 | 523(B)3300 |
SEALER RESIN | 23 | GAL |
$150.00 |
$196.10 |
$165.00 |
$40.00 |
$203.50 |
$185.00 |
$185.00 |
| 420 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 37.6 | SY |
$48.00 |
$31.80 |
$58.00 |
$48.30 |
$33.00 |
$42.00 |
$42.00 |
| 430 | 540 8120 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$5,000.00 |
$13,586.66 |
$5,900.00 |
$7,900.59 |
$8,277.00 |
$7,000.00 |
$12,000.00 |
| 440 | 540 8132 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 1 | LSUM |
$10,000.00 |
$61,747.43 |
$20,000.00 |
$52,626.04 |
$49,500.00 |
$31,000.00 |
$20,000.00 |
| 450 | 540 8152 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 17 | EA |
$2,500.00 |
$1,284.41 |
$3,200.00 |
$1,061.11 |
$1,400.00 |
$850.00 |
$1,250.00 |
| 460 | 540 8168 |
(PL)REPAIR BRIDGE ITEM (TYPE D) | 30 | EA |
$2,500.00 |
$3,252.08 |
$2,950.00 |
$5,695.01 |
$3,700.00 |
$5,500.00 |
$12,000.00 |
| 470 | 545 0101 |
(PL)REPLACE BRIDGE ITEMS | 30 | EA |
$3,000.00 |
$2,154.13 |
$3,200.00 |
$1,668.08 |
$2,900.00 |
$1,700.00 |
$6,500.00 |
| 480 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$350,000.00 |
$516,951.42 |
$325,000.00 |
$358,093.20 |
$540,500.00 |
$550,000.00 |
$950,000.00 |
| 490 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 11 | EA |
$400.00 |
$212.00 |
$2,800.00 |
$230.00 |
$220.00 |
$200.00 |
$200.00 |
| 500 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 330 | SD |
$180.00 |
$159.00 |
$235.00 |
$172.50 |
$165.00 |
$150.00 |
$150.00 |
| 510 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$16.00 |
$26.50 |
$32.00 |
$28.75 |
$27.50 |
$25.00 |
$25.00 |
| 520 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 8,960 | LF |
$2.00 |
$1.06 |
$1.40 |
$1.15 |
$1.10 |
$1.00 |
$1.00 |
| 530 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 4,024 | LF |
$1.00 |
$0.2100 |
$1.20 |
$0.2300 |
$0.2000 |
$0.2000 |
$0.2000 |
| 540 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 3,880 | LF |
$1.50 |
$1.59 |
$1.45 |
$1.73 |
$1.65 |
$1.50 |
$1.50 |
| 550 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 1,940 | LF |
$1.50 |
$0.5300 |
$0.5500 |
$0.5800 |
$0.5500 |
$0.5000 |
$0.5000 |
| 560 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 660 | SD |
$15.00 |
$16.96 |
$16.00 |
$18.40 |
$17.60 |
$16.00 |
$16.00 |
| 570 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,925 | LF |
$28.00 |
$19.23 |
$75.00 |
$42.83 |
$42.00 |
$37.25 |
$37.25 |
| 580 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,925 | LF |
$6.00 |
$4.24 |
$30.00 |
$7.19 |
$6.88 |
$6.25 |
$6.25 |
| 590 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,890 | SD |
$1.00 |
$0.1100 |
$0.6500 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1000 |
| 600 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 700 | SD |
$1.50 |
$2.12 |
$3.45 |
$2.30 |
$5.00 |
$2.00 |
$2.00 |
| 610 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,900 | SD |
$2.00 |
$0.2700 |
$3.55 |
$0.2900 |
$0.2500 |
$0.2500 |
$0.2500 |
| 620 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 80 | SD |
$5.00 |
$3.18 |
$2.95 |
$3.45 |
$8.00 |
$3.00 |
$3.00 |
| 630 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,200 | SD |
$1.00 |
$1.59 |
$0.5500 |
$1.73 |
$3.00 |
$1.50 |
$1.50 |
| 640 | 880(G)6805 |
CHANNELIZER CONES | 1,020 | SD |
$1.50 |
$1.59 |
$1.30 |
$1.73 |
$2.00 |
$1.50 |
$1.50 |
| 650 | 880(I)7000 |
FLAGGER | 40 | SD |
$60.00 |
$106.00 |
$300.00 |
$150.00 |
$310.00 |
$75.00 |
$75.00 |
| 660 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,050 | SD |
$21.00 |
$10.60 |
$24.00 |
$11.50 |
$11.00 |
$10.00 |
$10.00 |
| 670 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$19,080.00 |
$65,000.00 |
$20,700.00 |
$25,000.00 |
$18,000.00 |
$18,000.00 |
| 680 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,650.00 |
$6,500.00 |
$5,000.00 |
$14,000.00 |
$3,000.00 |
$7,500.00 |
| 690 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$95,696.19 |
$200,000.00 |
$393,000.00 |
$217,000.00 |
$450,000.00 |
$585,000.00 |