| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$69,010.00 |
$38,000.00 |
$27,000.00 |
$85,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,503 | CY |
$10.00 |
$8.65 |
$10.75 |
$17.00 |
$14.98 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,232 | CY |
$10.50 |
$9.73 |
$8.40 |
$10.35 |
$9.11 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$7,894.95 |
$11,000.00 |
$12,000.00 |
$10,400.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,047 | LF |
$2.00 |
$1.44 |
$1.29 |
$1.40 |
$1.29 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$10.00 |
$13.49 |
$12.79 |
$13.00 |
$12.79 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 11,366 | SY |
$1.75 |
$1.44 |
$1.33 |
$1.50 |
$1.33 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.35 | AC |
$810.00 |
$638.60 |
$588.00 |
$590.00 |
$588.00 |
| 9 | 241 2832 |
MOWING | 9.4 | AC |
$90.00 |
$123.60 |
$115.00 |
$115.00 |
$115.00 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 8,321 | SY |
$7.50 |
$7.57 |
$6.75 |
$7.70 |
$6.75 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 242 | TON |
$40.00 |
$38.11 |
$40.00 |
$40.00 |
$35.00 |
| 12 | 407(B) 0250 |
TACK COAT | 1,905 | GAL |
$3.50 |
$4.02 |
$3.70 |
$4.00 |
$3.70 |
| 13 | 408 5774 |
PRIME COAT | 3,234 | GAL |
$7.50 |
$4.59 |
$4.25 |
$4.50 |
$4.25 |
| 14 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 661 | TON |
$110.00 |
$91.05 |
$84.20 |
$96.00 |
$84.20 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,318 | TON |
$92.00 |
$87.55 |
$81.00 |
$92.00 |
$81.00 |
| 16 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 618 | TON |
$125.00 |
$106.97 |
$98.90 |
$112.00 |
$98.90 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 519 | TON |
$115.00 |
$91.67 |
$85.00 |
$97.00 |
$85.00 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 2,046 | SY |
$6.50 |
$6.87 |
$6.35 |
$9.00 |
$3.50 |
| 19 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 4,112 | LF |
$1.00 |
$0.5600 |
$0.5100 |
$0.8000 |
$0.5100 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$315.00 |
$309.00 |
$350.00 |
$300.00 |
$650.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$18,000.00 |
$3,605.00 |
$4,700.00 |
$4,000.00 |
$3,500.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,009 | SY |
$6.50 |
$4.16 |
$5.40 |
$6.75 |
$3.50 |
| 23 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 208 | LF |
$4.00 |
$5.15 |
$3.00 |
$4.50 |
$4.00 |
| 24 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$17.50 |
$20.39 |
$18.85 |
$23.00 |
$18.85 |
| 25 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,450.00 |
$2,703.75 |
$2,500.00 |
$2,800.00 |
$2,500.00 |
| 26 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,700.00 |
$2,487.45 |
$2,300.00 |
$2,300.00 |
$2,300.00 |
| 27 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,961 | LF |
$5.00 |
$4.28 |
$3.85 |
$4.50 |
$3.85 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$20.00 |
$10.10 |
$13.75 |
$20.00 |
$32.00 |
| 29 | 501(G) 6309 |
CLSM BACKFILL | 206 | CY |
$150.00 |
$161.72 |
$147.50 |
$193.00 |
$210.00 |
| 30 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,995 | LF |
$225.00 |
$207.94 |
$225.00 |
$238.50 |
$285.00 |
| 31 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$250.00 |
$181.85 |
$210.00 |
$195.00 |
$200.00 |
| 32 | 504(B) 1305 |
SAW-CUT GROOVING | 2,496 | SY |
$5.00 |
$3.82 |
$3.60 |
$4.15 |
$4.40 |
| 33 | 504(C) 6250 |
SEALED EXPANSION JOINT | 86.4 | LF |
$350.00 |
$237.55 |
$300.00 |
$210.00 |
$325.00 |
| 34 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,123.4 | LF |
$95.00 |
$72.72 |
$75.00 |
$95.00 |
$85.00 |
| 35 | 506(A) 1322 |
STRUCTURAL STEEL | 2,250 | LB |
$5.00 |
$1.92 |
$3.40 |
$3.45 |
$5.00 |
| 36 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$967.58 |
$1,700.00 |
$1,500.00 |
$1,450.00 |
| 37 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$967.58 |
$1,830.00 |
$1,515.00 |
$1,450.00 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 580.4 | CY |
$650.00 |
$505.00 |
$550.00 |
$615.00 |
$580.00 |
| 39 | 509(B) 1328 |
CLASS A CONCRETE | 259.6 | CY |
$650.00 |
$510.05 |
$580.00 |
$620.00 |
$750.00 |
| 40 | 509(D) 1331 |
CLASS C CONCRETE | 14 | CY |
$500.00 |
$252.50 |
$354.00 |
$450.00 |
$675.00 |
| 41 | 511(A) 1332 |
REINFORCING STEEL | 440 | LB |
$1.00 |
$1.52 |
$0.8500 |
$0.9000 |
$3.50 |
| 42 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 163,620 | LB |
$1.10 |
$1.03 |
$1.15 |
$1.05 |
$1.20 |
| 43 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 192 | LF |
$45.00 |
$30.45 |
$38.00 |
$39.00 |
$40.00 |
| 44 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 620 | LF |
$50.00 |
$32.25 |
$45.00 |
$48.00 |
$50.00 |
| 45 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 192 | LF |
$15.00 |
$12.12 |
$10.00 |
$16.00 |
$8.00 |
| 46 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 620 | LF |
$15.00 |
$12.12 |
$10.00 |
$20.00 |
$9.50 |
| 47 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 48 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,209 | SY |
$5.00 |
$3.39 |
$3.50 |
$4.00 |
$3.50 |
| 49 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 358 | LF |
$850.00 |
$664.58 |
$746.00 |
$795.00 |
$1,200.00 |
| 50 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$1,616.00 |
$3,000.00 |
$1,500.00 |
$3,500.00 |
| 51 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$5.00 |
$4.24 |
$4.00 |
$4.50 |
$4.00 |
| 52 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$161.60 |
$150.00 |
$170.00 |
$150.00 |
| 53 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,615 | TON |
$55.00 |
$47.47 |
$53.75 |
$68.00 |
$55.00 |
| 54 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 400 | TON |
$45.00 |
$46.46 |
$45.25 |
$57.00 |
$50.00 |
| 55 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$35.00 |
$25.25 |
$30.00 |
$20.00 |
$20.00 |
| 56 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 88 | LF |
$35.00 |
$25.25 |
$30.00 |
$20.00 |
$20.00 |
| 57 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$90,000.00 |
$90,900.00 |
$95,650.00 |
$90,000.00 |
$85,000.00 |
| 58 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,300 | CY |
$10.00 |
$6.06 |
$7.00 |
$9.00 |
$8.00 |
| 59 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 400 | CY |
$20.00 |
$15.15 |
$13.75 |
$16.00 |
$5.00 |
| 60 | 509(A) 1326 |
CLASS AA CONCRETE | 810.9 | CY |
$550.00 |
$429.25 |
$475.00 |
$610.00 |
$301.90 |
| 61 | 511(A) 1332 |
REINFORCING STEEL | 144,623 | LB |
$1.00 |
$0.9900 |
$0.9500 |
$1.00 |
$0.9000 |
| 62 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$45,450.00 |
$40,000.00 |
$28,000.00 |
$49,000.00 |
| 63 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 50 | SF |
$25.00 |
$27.04 |
$25.00 |
$28.00 |
$25.00 |
| 64 | 851(C) 8324 |
2" SQUARE TUBE POST | 140 | LF |
$10.00 |
$7.57 |
$7.00 |
$11.00 |
$7.00 |
| 65 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$22.00 |
$14.63 |
$13.50 |
$17.00 |
$13.50 |
| 66 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 10,472 | LF |
$0.7000 |
$0.4600 |
$0.4300 |
$0.8500 |
$0.4300 |
| 67 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 22,800 | SD |
$0.5000 |
$0.0400 |
$0.0200 |
$0.3000 |
$0.0200 |
| 68 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 900 | SD |
$1.00 |
$4.07 |
$3.75 |
$0.8500 |
$3.75 |
| 69 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,200 | SD |
$1.50 |
$4.07 |
$3.75 |
$1.15 |
$3.75 |
| 70 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,100 | SD |
$0.7500 |
$0.1800 |
$0.1500 |
$1.70 |
$0.1500 |
| 71 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,400 | SD |
$0.3000 |
$0.1800 |
$0.1500 |
$0.3000 |
$0.1500 |
| 72 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$7,931.00 |
$13,000.00 |
$12,000.00 |
$11,000.00 |
| 73 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,914.00 |
$1,275.00 |
$6,500.00 |
$5,000.00 |
| 74 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$215,000.00 |
$193,189.69 |
$189,000.00 |
$46,000.00 |
$400,000.00 |