| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$56,323.26 |
$10,000.00 |
$26,000.00 |
$6,900.00 |
$10,000.00 |
$37,505.00 |
$15,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$215,000.00 |
$200,000.00 |
$242,591.04 |
$158,500.00 |
$182,275.00 |
$254,860.00 |
$160,000.00 |
$224,710.00 |
$500,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,500 | LF |
$2.00 |
$1.14 |
$1.25 |
$1.04 |
$1.20 |
$1.36 |
$1.04 |
$1.10 |
$2.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$7.00 |
$8.65 |
$8.75 |
$8.00 |
$8.50 |
$7.09 |
$7.89 |
$8.35 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 24,500 | SY |
$2.50 |
$2.50 |
$2.40 |
$2.25 |
$2.50 |
$2.95 |
$2.25 |
$2.40 |
$2.95 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.2 | AC |
$1,000.00 |
$275.00 |
$350.00 |
$250.00 |
$300.00 |
$1,295.00 |
$250.00 |
$265.00 |
$1,295.00 |
| 7 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 100 | TON |
$60.00 |
$50.00 |
$55.00 |
$59.50 |
$65.00 |
$49.31 |
$60.00 |
$68.90 |
$60.00 |
| 8 | 408 5774 |
PRIME COAT | 2,290 | GAL |
$4.00 |
$4.65 |
$4.68 |
$4.25 |
$6.60 |
$4.25 |
$4.25 |
$4.50 |
$4.25 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,580 | TON |
$90.00 |
$120.50 |
$118.65 |
$106.50 |
$109.00 |
$106.50 |
$106.50 |
$113.00 |
$106.50 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,170 | TON |
$100.00 |
$137.00 |
$120.75 |
$115.00 |
$126.00 |
$115.00 |
$115.00 |
$122.00 |
$115.00 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 9,491 | SY |
$2.00 |
$5.00 |
$4.72 |
$4.50 |
$4.50 |
$4.50 |
$4.50 |
$4.75 |
$4.50 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$400.00 |
$450.00 |
$535.00 |
$275.00 |
$600.00 |
$300.00 |
$596.00 |
$145.50 |
| 13 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 148 | LF |
$35.00 |
$35.00 |
$30.00 |
$36.15 |
$40.00 |
$28.13 |
$40.00 |
$35.00 |
$32.00 |
| 14 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$2,000.00 |
$1,100.00 |
$1,550.00 |
$2,250.00 |
$1,100.00 |
$1,200.00 |
$2,200.00 |
$1,831.00 |
$1,525.00 |
| 15 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$15.00 |
$27.00 |
$28.00 |
$25.00 |
$25.00 |
$25.00 |
$25.00 |
$15.90 |
$25.00 |
| 16 | 851(C) 8324 |
2" SQUARE TUBE POST | 30 | LF |
$15.00 |
$12.00 |
$11.00 |
$10.00 |
$20.00 |
$10.00 |
$20.00 |
$10.60 |
$10.00 |
| 17 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,370 | LF |
$0.2500 |
$0.3000 |
$1.10 |
$0.2700 |
$0.3200 |
$0.2700 |
$0.4000 |
$0.3200 |
$0.2700 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 150 | CY |
$17.00 |
$15.00 |
$16.00 |
$22.00 |
$9.80 |
$80.00 |
$30.00 |
$24.20 |
$25.00 |
| 19 | 501(F) 6352 |
GRANULAR BACKFILL | 108 | CY |
$55.00 |
$130.00 |
$74.00 |
$60.00 |
$76.00 |
$150.00 |
$130.00 |
$186.00 |
$55.00 |
| 20 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 4,466.67 | LF |
$230.00 |
$210.00 |
$228.76 |
$275.00 |
$231.00 |
$260.00 |
$255.00 |
$256.00 |
$320.00 |
| 21 | 504(A) 1304 |
APPROACH SLAB | 141.6 | SY |
$200.00 |
$200.00 |
$250.00 |
$160.00 |
$192.00 |
$290.00 |
$170.00 |
$381.50 |
$250.00 |
| 22 | 504(B) 1305 |
SAW-CUT GROOVING | 3,430.5 | SY |
$4.00 |
$3.30 |
$3.50 |
$4.00 |
$3.30 |
$5.00 |
$5.00 |
$3.20 |
$5.00 |
| 23 | 504(C) 6250 |
SEALED EXPANSION JOINT | 175.9 | LF |
$300.00 |
$235.00 |
$275.00 |
$250.00 |
$240.00 |
$190.00 |
$375.00 |
$226.50 |
$250.00 |
| 24 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 2,306.4 | LF |
$75.00 |
$70.00 |
$74.00 |
$75.00 |
$69.50 |
$90.00 |
$85.00 |
$94.70 |
$125.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 5,130 | LB |
$4.00 |
$2.50 |
$3.40 |
$2.00 |
$2.20 |
$5.00 |
$3.50 |
$4.55 |
$4.00 |
| 26 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 40 | EA |
$800.00 |
$700.00 |
$520.00 |
$600.00 |
$736.50 |
$925.00 |
$700.00 |
$1,019.00 |
$2,500.00 |
| 27 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 40 | EA |
$800.00 |
$700.00 |
$520.00 |
$600.00 |
$736.50 |
$925.00 |
$700.00 |
$1,019.00 |
$2,500.00 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 1,063.1 | CY |
$600.00 |
$550.00 |
$515.00 |
$550.00 |
$600.00 |
$625.00 |
$630.00 |
$539.00 |
$950.00 |
| 29 | 509(B) 1328 |
CLASS A CONCRETE | 406.7 | CY |
$600.00 |
$550.00 |
$535.00 |
$600.00 |
$600.00 |
$550.00 |
$630.00 |
$732.00 |
$950.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 268,410 | LB |
$1.00 |
$0.7500 |
$0.9600 |
$0.7500 |
$0.8500 |
$0.9300 |
$0.9000 |
$1.10 |
$1.10 |
| 31 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 440 | LF |
$32.00 |
$25.00 |
$25.50 |
$32.00 |
$24.50 |
$23.00 |
$45.00 |
$39.90 |
$25.00 |
| 32 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,540 | LF |
$40.00 |
$30.00 |
$28.50 |
$35.00 |
$31.50 |
$28.00 |
$51.00 |
$44.40 |
$32.00 |
| 33 | 514(A) 6012 |
PILES, FURNISHED (HP 14X73) | 15,840 | LF |
$55.00 |
$35.00 |
$36.95 |
$45.00 |
$42.00 |
$38.00 |
$55.00 |
$54.10 |
$38.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 440 | LF |
$10.00 |
$15.00 |
$8.00 |
$7.50 |
$10.50 |
$10.00 |
$7.00 |
$37.40 |
$15.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,540 | LF |
$11.00 |
$17.50 |
$10.00 |
$9.00 |
$13.50 |
$12.00 |
$6.00 |
$18.00 |
$15.00 |
| 36 | 514(B) 6296 |
PILES, DRIVEN (HP 14X73) | 15,840 | LF |
$12.00 |
$20.50 |
$10.75 |
$8.50 |
$18.00 |
$14.00 |
$7.00 |
$18.10 |
$17.00 |
| 37 | 514(F) 6354 |
PILE LOAD TEST (DYNAMIC) | 11 | EA |
$500.00 |
$1,500.00 |
$2,750.00 |
$3,500.00 |
$1,500.00 |
$2,500.00 |
$3,000.00 |
$742.00 |
$6,000.00 |
| 38 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 39 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 470 | TON |
$65.00 |
$63.00 |
$60.35 |
$75.00 |
$69.50 |
$60.81 |
$70.00 |
$80.40 |
$75.00 |
| 40 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 90 | TON |
$65.00 |
$53.00 |
$58.50 |
$64.00 |
$56.82 |
$50.97 |
$60.00 |
$72.60 |
$65.00 |
| 41 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$10.00 |
$25.00 |
$35.00 |
$20.00 |
$38.00 |
$40.00 |
$35.00 |
$103.50 |
$20.00 |
| 42 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$10.00 |
$25.00 |
$30.00 |
$20.00 |
$34.00 |
$40.00 |
$35.00 |
$20.70 |
$20.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$125,000.00 |
$145,000.00 |
$85,000.00 |
$162,500.00 |
$64,780.00 |
$120,000.00 |
$228,080.00 |
$350,000.00 |
| 44 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$25.00 |
$19.80 |
$19.50 |
$18.00 |
$20.00 |
$18.00 |
$20.00 |
$17.50 |
$18.00 |
| 45 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,650.00 |
$1,650.00 |
$1,500.00 |
$1,665.00 |
$1,500.00 |
$1,750.00 |
$1,537.00 |
$1,500.00 |
| 46 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$3,500.00 |
$2,668.00 |
$2,650.00 |
$2,425.00 |
$2,670.00 |
$2,425.00 |
$2,600.00 |
$2,438.00 |
$2,425.00 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$4,675.00 |
$5,000.00 |
$4,250.00 |
$6,000.00 |
$4,250.00 |
$5,000.00 |
$8,480.00 |
$20,000.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$15,750.00 |
$32,450.00 |
$14,300.00 |
$17,800.00 |
$14,300.00 |
$16,000.00 |
$27,875.00 |
$60,000.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$4,000.00 |
$4,500.00 |
$2,900.00 |
$10,000.00 |
$8,000.00 |
$4,000.00 |
$5,320.00 |
$10,000.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$250,000.00 |
$250,000.00 |
$245,000.00 |
$240,000.00 |
$260,000.00 |
$409,015.00 |
$310,000.00 |
$814,245.64 |
$330,000.00 |