| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$14,022.70 |
$12,520.00 |
$63,860.00 |
$25,000.00 |
$12,000.00 |
$21,000.00 |
$8,240.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 21,415 | CY |
$7.70 |
$5.41 |
$5.15 |
$5.00 |
$7.25 |
$4.70 |
$5.65 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 21,453 | CY |
$9.80 |
$6.65 |
$7.21 |
$7.00 |
$8.50 |
$9.80 |
$8.75 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,914.00 |
$13,500.00 |
$22,735.19 |
$17,073.00 |
$8,000.00 |
$21,600.00 |
$15,450.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,930 | LF |
$1.80 |
$2.06 |
$2.32 |
$2.25 |
$1.95 |
$2.99 |
$2.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 238 | LF |
$7.80 |
$8.84 |
$10.30 |
$10.00 |
$8.00 |
$11.95 |
$10.30 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 29 | CY |
$107.40 |
$42.30 |
$103.00 |
$100.00 |
$75.00 |
$130.00 |
$103.00 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 2,245 | LF |
$2.10 |
$4.16 |
$2.06 |
$2.00 |
$1.30 |
$4.95 |
$2.05 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 40,977 | SY |
$1.20 |
$2.08 |
$2.06 |
$2.00 |
$2.10 |
$2.00 |
$2.05 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.47 | AC |
$281.20 |
$520.00 |
$772.50 |
$750.00 |
$650.00 |
$1,250.00 |
$772.50 |
| 11 | 241 2832 |
MOWING | 16.94 | AC |
$87.90 |
$165.00 |
$103.00 |
$100.00 |
$50.00 |
$84.00 |
$103.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,002 | CY |
$59.40 |
$64.62 |
$60.36 |
$58.60 |
$64.00 |
$59.40 |
$63.90 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 25,712 | SY |
$7.40 |
$5.91 |
$5.41 |
$5.25 |
$6.50 |
$5.00 |
$5.60 |
| 14 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 25,712 | SY |
$3.00 |
$1.36 |
$2.58 |
$2.50 |
$4.00 |
$1.50 |
$6.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,420 | TON |
$34.70 |
$30.30 |
$31.93 |
$31.00 |
$30.00 |
$30.40 |
$42.20 |
| 16 | 407(B) 0250 |
TACK COAT | 2,930 | GAL |
$3.60 |
$3.71 |
$2.06 |
$3.60 |
$2.15 |
$2.00 |
$3.65 |
| 17 | 408 5774 |
PRIME COAT | 15,524 | GAL |
$3.80 |
$4.63 |
$3.09 |
$4.50 |
$3.15 |
$3.00 |
$6.80 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,438 | TON |
$82.40 |
$67.98 |
$57.90 |
$66.00 |
$60.00 |
$56.21 |
$61.60 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,472 | TON |
$87.50 |
$74.16 |
$68.15 |
$72.00 |
$72.00 |
$66.16 |
$66.20 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 2,934 | SY |
$7.20 |
$3.00 |
$4.12 |
$2.30 |
$6.50 |
$3.00 |
$5.00 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 179 | CY |
$23.60 |
$12.00 |
$25.75 |
$15.00 |
$18.00 |
$15.00 |
$25.80 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 451 | CY |
$475.20 |
$400.00 |
$392.43 |
$400.00 |
$360.00 |
$520.00 |
$392.50 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 36 | CY |
$326.60 |
$325.00 |
$494.40 |
$525.00 |
$260.00 |
$350.00 |
$494.50 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 75,298 | LB |
$1.00 |
$0.9200 |
$1.05 |
$1.07 |
$1.05 |
$0.8500 |
$1.05 |
| 25 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$32,981.20 |
$57,610.00 |
$515.00 |
$20,000.00 |
$40,000.00 |
$65,000.00 |
$8,110.00 |
| 26 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 81 | LF |
$36.00 |
$25.00 |
$25.75 |
$25.00 |
$34.00 |
$24.00 |
$24.70 |
| 27 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 71 | LF |
$37.40 |
$32.50 |
$30.90 |
$30.00 |
$36.00 |
$31.00 |
$33.00 |
| 28 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 74 | LF |
$55.00 |
$42.00 |
$46.35 |
$45.00 |
$42.00 |
$47.00 |
$49.40 |
| 29 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$1,372.10 |
$897.00 |
$1,359.60 |
$1,400.00 |
$1,500.00 |
$1,650.00 |
$1,360.00 |
| 30 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,485.00 |
$1,250.00 |
$1,534.70 |
$1,500.00 |
$1,800.00 |
$1,850.00 |
$1,535.00 |
| 31 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$1,850.00 |
$2,497.75 |
$1,700.00 |
$2,400.00 |
$2,200.00 |
$2,498.00 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,897.40 |
$3,500.00 |
$5,150.00 |
$5,000.00 |
$7,500.00 |
$8,600.00 |
$4,120.00 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 15,619 | SY |
$4.60 |
$3.20 |
$3.61 |
$3.00 |
$5.00 |
$5.00 |
$4.40 |
| 34 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,325 | LF |
$3.10 |
$2.00 |
$3.09 |
$3.00 |
$3.00 |
$7.00 |
$4.15 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 612 | LF |
$4.80 |
$12.00 |
$6.18 |
$8.00 |
$5.00 |
$6.50 |
$2.10 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$17.40 |
$21.60 |
$18.03 |
$20.00 |
$18.00 |
$17.50 |
$17.50 |
| 37 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,158.60 |
$2,750.00 |
$2,214.50 |
$2,600.00 |
$1,700.00 |
$2,150.00 |
$2,266.00 |
| 38 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,743.40 |
$2,750.00 |
$1,411.10 |
$2,000.00 |
$2,300.00 |
$1,370.00 |
$1,699.00 |
| 39 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,697 | LF |
$4.40 |
$5.50 |
$4.22 |
$12.00 |
$7.50 |
$4.10 |
$4.20 |
| 40 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 22 | EA |
$15.00 |
$12.50 |
$15.45 |
$10.00 |
$15.00 |
$10.00 |
$10.30 |
| 41 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$12,000.00 |
$22,165.60 |
$12,500.00 |
$25,000.00 |
$35,000.00 |
$155,640.00 |
| 42 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$22.00 |
$14.00 |
$15.45 |
$25.00 |
$18.00 |
$15.00 |
$20.00 |
| 43 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$144.00 |
$164.12 |
$188.59 |
$165.00 |
$170.00 |
$140.00 |
$134.50 |
| 44 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 897 | LF |
$215.00 |
$182.40 |
$192.46 |
$225.00 |
$195.00 |
$225.00 |
$198.50 |
| 45 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$190.00 |
$186.70 |
$183.84 |
$150.00 |
$200.00 |
$240.00 |
$271.50 |
| 46 | 504(B) 1305 |
SAW-CUT GROOVING | 1,224.5 | SY |
$4.50 |
$3.82 |
$4.33 |
$4.50 |
$4.00 |
$3.60 |
$3.30 |
| 47 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 547 | LF |
$95.00 |
$78.00 |
$84.70 |
$75.00 |
$82.00 |
$75.00 |
$87.50 |
| 48 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 1,050 | LB |
$5.00 |
$2.10 |
$2.20 |
$4.00 |
$2.20 |
$3.00 |
$4.30 |
| 49 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$790.00 |
$315.00 |
$546.11 |
$275.00 |
$320.00 |
$425.00 |
$449.50 |
| 50 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,600.00 |
$800.00 |
$1,183.11 |
$1,200.00 |
$850.00 |
$1,500.00 |
$1,251.00 |
| 51 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$450.00 |
$325.00 |
$103.00 |
$275.00 |
$330.00 |
$400.00 |
$420.50 |
| 52 | 509(A) 1326 |
CLASS AA CONCRETE | 290.8 | CY |
$650.00 |
$515.00 |
$567.39 |
$500.00 |
$545.00 |
$600.00 |
$521.00 |
| 53 | 509(B) 1328 |
CLASS A CONCRETE | 111.2 | CY |
$650.00 |
$515.00 |
$567.39 |
$500.00 |
$545.00 |
$600.00 |
$716.00 |
| 54 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$300.00 |
$515.00 |
$550.00 |
$700.00 |
$375.00 |
$504.50 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 988 | LB |
$0.9800 |
$1.35 |
$1.49 |
$1.50 |
$1.40 |
$1.05 |
$3.70 |
| 56 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 88,382 | LB |
$1.05 |
$1.04 |
$1.07 |
$1.00 |
$1.05 |
$1.10 |
$1.20 |
| 57 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 952 | LF |
$32.00 |
$24.10 |
$25.21 |
$32.00 |
$29.00 |
$39.00 |
$31.20 |
| 58 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 952 | LF |
$14.00 |
$9.50 |
$11.33 |
$10.00 |
$20.00 |
$10.00 |
$18.00 |
| 59 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 60 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 963 | SY |
$4.10 |
$3.87 |
$4.79 |
$3.65 |
$4.00 |
$3.65 |
$3.75 |
| 61 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 299 | LF |
$790.00 |
$769.94 |
$763.81 |
$900.00 |
$900.00 |
$775.00 |
$781.00 |
| 62 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$3,200.00 |
$1,875.00 |
$2,549.25 |
$2,000.00 |
$2,000.00 |
$1,900.00 |
$3,457.00 |
| 63 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$4.50 |
$5.25 |
$5.15 |
$4.00 |
$5.50 |
$4.00 |
$4.10 |
| 64 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$275.00 |
$169.95 |
$150.00 |
$285.00 |
$150.00 |
$154.50 |
| 65 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,620 | TON |
$42.00 |
$41.30 |
$53.34 |
$55.00 |
$45.00 |
$50.00 |
$49.70 |
| 66 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 320 | TON |
$40.00 |
$35.40 |
$42.89 |
$45.00 |
$44.00 |
$43.00 |
$37.80 |
| 67 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$35.00 |
$30.90 |
$20.00 |
$35.00 |
$30.00 |
$47.70 |
| 68 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$30.00 |
$30.00 |
$30.90 |
$20.00 |
$35.00 |
$30.00 |
$89.30 |
| 69 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$20,000.00 |
$31,063.77 |
$25,000.00 |
$25,000.00 |
$50,000.00 |
$178,690.00 |
| 70 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$900.00 |
$750.00 |
$1,030.00 |
$900.00 |
$1,100.00 |
$1,700.00 |
$921.50 |
| 71 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 13,958 | LF |
$0.2000 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1000 |
$0.1000 |
| 72 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,969 | LF |
$0.2000 |
$0.2700 |
$0.2500 |
$0.2500 |
$0.3000 |
$0.2500 |
$0.2600 |
| 73 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 375 | LF |
$34.90 |
$37.00 |
$20.60 |
$25.00 |
$35.00 |
$33.00 |
$49.90 |
| 74 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,680 | SD |
$0.8000 |
$2.05 |
$2.06 |
$2.00 |
$2.10 |
$2.00 |
$2.05 |
| 75 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,760 | SD |
$0.6000 |
$0.1200 |
$1.03 |
$0.1000 |
$0.1500 |
$0.1000 |
$0.1000 |
| 76 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,520 | SD |
$1.00 |
$2.04 |
$2.06 |
$2.00 |
$2.20 |
$2.00 |
$2.05 |
| 77 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,520 | SD |
$0.6000 |
$1.04 |
$1.03 |
$1.00 |
$1.10 |
$1.00 |
$1.05 |
| 78 | 880(C) 8848 |
WING BARRICADES | 420 | SD |
$0.8000 |
$1.04 |
$1.03 |
$1.00 |
$1.10 |
$1.00 |
$1.05 |
| 79 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,720 | SD |
$0.2000 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1000 |
$0.1000 |
| 80 | 880(F) 8878 |
DRUMS | 3,850 | SD |
$0.4000 |
$0.2700 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.2500 |
$0.2600 |
| 81 | 880(G) 8890 |
CHANNELIZER CONES | 23,660 | SD |
$0.3000 |
$0.0800 |
$0.0600 |
$0.0600 |
$0.1000 |
$0.0600 |
$0.0600 |
| 82 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 672 | SD |
$9.00 |
$5.15 |
$5.15 |
$5.00 |
$5.25 |
$5.00 |
$5.15 |
| 83 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 6,450 | LF |
$0.5000 |
$0.3700 |
$0.3100 |
$0.3000 |
$0.9000 |
$0.3000 |
$0.3100 |
| 84 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 19 | SF |
$24.90 |
$22.00 |
$20.60 |
$20.00 |
$25.00 |
$20.00 |
$20.60 |
| 85 | 851(C) 8324 |
2" SQUARE TUBE POST | 56 | LF |
$10.50 |
$9.50 |
$8.24 |
$8.00 |
$8.40 |
$8.00 |
$8.25 |
| 86 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 14,019 | LF |
$0.6000 |
$0.5400 |
$0.5400 |
$0.5200 |
$0.6000 |
$0.5200 |
$0.5400 |
| 87 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$22,000.00 |
$25,595.50 |
$21,850.00 |
$30,000.00 |
$17,000.00 |
$22,505.00 |
| 88 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,000.00 |
$3,090.00 |
$5,000.00 |
$4,000.00 |
$1,275.00 |
$2,964.00 |
| 89 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$5,500.00 |
$2,575.00 |
$5,000.00 |
$4,000.00 |
$8,000.00 |
$3,380.00 |
| 90 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$180,000.00 |
$100,000.00 |
$127,809.11 |
$168,000.00 |
$130,000.00 |
$203,000.00 |
$257,413.45 |