| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$3,500.00 |
$5,000.00 |
$4,000.00 |
$7,250.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,561 | CY |
$10.00 |
$6.60 |
$6.60 |
$9.00 |
$8.80 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,744 | CY |
$11.00 |
$8.70 |
$8.70 |
$10.00 |
$11.25 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,800.00 |
$3,584.80 |
$4,000.00 |
$3,000.00 |
$3,300.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,246 | LF |
$3.00 |
$2.15 |
$2.15 |
$1.50 |
$4.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 32 | LF |
$10.00 |
$26.00 |
$26.00 |
$12.00 |
$20.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 3,422 | SY |
$2.50 |
$5.00 |
$5.00 |
$6.00 |
$5.35 |
| 8 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,304 | SY |
$2.00 |
$4.55 |
$4.75 |
$3.50 |
$4.60 |
| 9 | 407(B) 0250 |
TACK COAT | 181 | GAL |
$4.00 |
$5.00 |
$10.00 |
$3.00 |
$10.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 271 | TON |
$100.00 |
$170.00 |
$200.00 |
$200.00 |
$225.00 |
| 11 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 110 | TON |
$125.00 |
$170.00 |
$200.00 |
$200.00 |
$225.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 225 | TON |
$115.00 |
$170.00 |
$200.00 |
$200.00 |
$225.00 |
| 13 | 412 5267 |
COLD MILLING PAVEMENT | 978 | SY |
$5.00 |
$8.00 |
$10.00 |
$14.75 |
$11.00 |
| 14 | 613(B) 4536 |
83" X 57" CORR. GALV. STEEL PIPE ARCH | 300 | LF |
$160.00 |
$184.60 |
$190.00 |
$123.00 |
$162.00 |
| 15 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,129 | SY |
$5.00 |
$8.00 |
$11.00 |
$14.50 |
$11.00 |
| 16 | 619(C) 0924 |
SAWING PAVEMENT | 163 | LF |
$5.00 |
$8.00 |
$6.00 |
$9.50 |
$6.00 |
| 17 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$20.00 |
$21.50 |
$18.00 |
$18.50 |
$17.65 |
| 18 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,250.00 |
$2,500.00 |
$2,585.00 |
$2,450.00 |
| 19 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,400.00 |
$2,300.00 |
$2,343.00 |
$2,250.00 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 56 | CY |
$30.00 |
$30.00 |
$28.00 |
$16.50 |
$15.00 |
| 21 | 501(G) 6309 |
CLSM BACKFILL | 45 | CY |
$180.00 |
$195.00 |
$195.00 |
$183.00 |
$180.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 138.6 | SY |
$220.00 |
$165.00 |
$180.00 |
$276.00 |
$195.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 520 | SY |
$7.00 |
$6.00 |
$7.00 |
$5.72 |
$6.00 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 64.34 | LF |
$320.00 |
$250.00 |
$410.00 |
$250.00 |
$202.20 |
| 25 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 322.4 | LF |
$110.00 |
$85.00 |
$80.00 |
$93.00 |
$83.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 63,770 | LB |
$3.30 |
$2.50 |
$1.90 |
$1.90 |
$2.21 |
| 27 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 15 | EA |
$1,800.00 |
$825.00 |
$840.00 |
$1,300.00 |
$792.00 |
| 28 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 15 | EA |
$1,800.00 |
$825.00 |
$840.00 |
$850.00 |
$792.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 92.5 | CY |
$900.00 |
$650.00 |
$945.00 |
$707.50 |
$750.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 35.9 | CY |
$750.00 |
$650.00 |
$945.00 |
$835.00 |
$800.00 |
| 31 | 509(D) 1331 |
CLASS C CONCRETE | 15 | CY |
$600.00 |
$600.00 |
$400.00 |
$705.00 |
$375.00 |
| 32 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 29,190 | LB |
$1.35 |
$1.15 |
$1.10 |
$1.09 |
$1.30 |
| 33 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 333 | SY |
$4.50 |
$4.00 |
$5.50 |
$4.40 |
$4.40 |
| 34 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$50.00 |
$50.00 |
$55.00 |
$6.00 |
| 35 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$120.00 |
$85.00 |
$85.00 |
$93.50 |
$120.00 |
| 36 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$745.00 |
$745.00 |
$819.50 |
$650.00 |
| 37 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$50.00 |
$50.00 |
$50.00 |
$55.00 |
$80.00 |
| 38 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 202 | TON |
$60.00 |
$75.00 |
$52.00 |
$72.00 |
$56.00 |
| 39 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 40 | TON |
$50.00 |
$50.00 |
$50.00 |
$59.50 |
$53.00 |
| 40 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$70,000.00 |
$15,000.00 |
$35,000.00 |
$48,000.00 |
$81,000.00 |
| 41 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 115 | SD |
$150.00 |
$150.00 |
$51.50 |
$56.65 |
$54.10 |
| 42 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 1,846 | LF |
$1.00 |
$3.50 |
$1.95 |
$2.18 |
$2.05 |
| 43 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 120 | LF |
$2.50 |
$2.00 |
$6.00 |
$6.60 |
$6.30 |
| 44 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,000 | LF |
$0.2000 |
$0.2500 |
$0.7500 |
$0.8300 |
$0.8000 |
| 45 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 737.5 | LF |
$30.00 |
$20.00 |
$14.00 |
$15.50 |
$14.00 |
| 46 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,150 | SD |
$0.3500 |
$0.2500 |
$0.1000 |
$0.1100 |
$0.1200 |
| 47 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 230 | SD |
$0.7500 |
$4.00 |
$4.50 |
$6.00 |
$4.75 |
| 48 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 920 | SD |
$1.50 |
$0.5000 |
$5.00 |
$7.00 |
$5.25 |
| 49 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 460 | SD |
$1.00 |
$1.00 |
$0.2000 |
$0.2000 |
$0.2200 |
| 50 | 880(C) 8848 |
WING BARRICADES | 230 | SD |
$1.50 |
$1.00 |
$7.00 |
$9.10 |
$7.50 |
| 51 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,150 | SD |
$0.5000 |
$5.00 |
$0.5000 |
$0.5500 |
$0.5400 |
| 52 | 880(F) 8878 |
DRUMS | 1,380 | SD |
$0.3000 |
$0.2500 |
$0.1000 |
$0.1100 |
$0.1200 |
| 53 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 345 | SD |
$30.00 |
$10.00 |
$8.00 |
$10.00 |
$8.50 |
| 54 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,791.00 |
$7,200.00 |
$10,000.00 |
$9,000.00 |
$9,300.00 |
| 55 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$69,392.00 |
$75,000.00 |
$81,500.00 |
$82,000.00 |
$70,000.00 |