| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$26,500.00 |
$2,000.00 |
$2,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,563 | CY |
$10.00 |
$5.34 |
$5.34 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,999 | CY |
$12.00 |
$8.74 |
$8.74 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$22,500.00 |
$3,500.00 |
$3,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,175 | LF |
$2.00 |
$3.00 |
$2.56 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$9.00 |
$12.50 |
$12.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 7,253 | SY |
$2.00 |
$3.50 |
$3.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.2 | AC |
$300.00 |
$4,800.00 |
$4,800.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,194 | TON |
$65.00 |
$55.00 |
$56.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$360.00 |
$550.00 |
$300.00 |
| 11 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 126 | LF |
$30.80 |
$22.00 |
$25.00 |
| 12 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$378.90 |
$240.00 |
$300.00 |
| 13 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 170 | CY |
$18.00 |
$30.00 |
$25.00 |
| 14 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 269 | LF |
$270.00 |
$400.00 |
$305.00 |
| 15 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 248 | LF |
$70.00 |
$110.00 |
$100.00 |
| 16 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$4.00 |
$7.00 |
$5.50 |
| 17 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$600.00 |
$850.00 |
$1,000.00 |
| 18 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$600.00 |
$850.00 |
$1,000.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 71.9 | CY |
$600.00 |
$875.00 |
$1,040.00 |
| 20 | 509(B) 1328 |
CLASS A CONCRETE | 64.2 | CY |
$700.00 |
$900.00 |
$1,040.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 25,370 | LB |
$1.00 |
$1.20 |
$1.20 |
| 22 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 234 | LF |
$42.00 |
$56.00 |
$55.00 |
| 23 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 771 | LF |
$50.00 |
$68.00 |
$60.00 |
| 24 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 234 | LF |
$12.00 |
$12.00 |
$9.00 |
| 25 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 771 | LF |
$14.00 |
$13.00 |
$8.00 |
| 26 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 27 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 780 | TON |
$65.00 |
$81.00 |
$85.00 |
| 28 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 176 | TON |
$60.00 |
$64.00 |
$80.00 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$15,800.00 |
$18,500.00 |
| 30 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,200.00 |
$1,900.00 |
| 31 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,600.00 |
$1,800.00 |
$1,750.00 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$4,400.00 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$5,300.00 |
$6,100.00 |
| 34 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,755.00 |
$3,000.00 |
| 35 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,500.00 |
$43,500.00 |
$117,000.00 |