| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$79,750.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,093 | CY |
$10.00 |
$16.50 |
$25.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,038 | CY |
$11.00 |
$6.60 |
$35.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,150.00 |
$8,250.00 |
$25,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,337 | LF |
$2.00 |
$3.03 |
$5.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$13.00 |
$16.48 |
$30.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 5,923 | SY |
$2.50 |
$3.00 |
$4.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.23 | AC |
$425.00 |
$1,210.00 |
$3,000.00 |
| 9 | 241 2832 |
MOWING | 11.18 | AC |
$100.00 |
$110.00 |
$400.00 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 6,410 | SY |
$7.00 |
$6.55 |
$12.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 124 | TON |
$50.00 |
$67.25 |
$60.00 |
| 12 | 407(B) 0250 |
TACK COAT | 1,028 | GAL |
$3.75 |
$10.40 |
$14.00 |
| 13 | 408 5774 |
PRIME COAT | 2,354 | GAL |
$5.50 |
$16.47 |
$18.00 |
| 14 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 455 | TON |
$125.00 |
$151.22 |
$160.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,987 | TON |
$100.00 |
$126.27 |
$135.00 |
| 16 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 300 | TON |
$140.00 |
$188.93 |
$210.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 375 | TON |
$100.00 |
$161.57 |
$210.00 |
| 18 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 178 | LF |
$30.00 |
$41.50 |
$75.00 |
| 19 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 82 | LF |
$55.00 |
$55.30 |
$200.00 |
| 20 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$2,084.67 |
$1,000.00 |
| 21 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$2,715.26 |
$2,000.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,750.00 |
$5,500.00 |
$20,000.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 6,111 | SY |
$7.00 |
$12.64 |
$14.00 |
| 24 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 507 | LF |
$6.00 |
$5.50 |
$5.00 |
| 25 | 619(C) 0924 |
SAWING PAVEMENT | 1,449 | LF |
$8.00 |
$6.60 |
$8.00 |
| 26 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 263 | LF |
$18.50 |
$23.52 |
$23.00 |
| 27 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,200.00 |
$2,640.00 |
$3,000.00 |
| 28 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,850.00 |
$2,420.00 |
$3,000.00 |
| 29 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 445 | LF |
$10.00 |
$9.35 |
$11.00 |
| 30 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 11 | EA |
$28.00 |
$14.58 |
$20.00 |
| 31 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 270 | CY |
$20.00 |
$33.00 |
$25.00 |
| 32 | 501(G) 6309 |
CLSM BACKFILL | 291.7 | CY |
$170.00 |
$174.68 |
$220.00 |
| 33 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 796 | LF |
$200.00 |
$210.86 |
$250.00 |
| 34 | 504(A) 1304 |
APPROACH SLAB | 410 | SY |
$250.00 |
$259.75 |
$180.00 |
| 35 | 504(B) 1305 |
SAW-CUT GROOVING | 1,247.2 | SY |
$5.00 |
$4.46 |
$8.00 |
| 36 | 504(C) 6250 |
SEALED EXPANSION JOINT | 56.2 | LF |
$350.00 |
$329.14 |
$230.00 |
| 37 | 504(E) 6190 |
42" F-SHAPED PARAPET | 590.4 | LF |
$100.00 |
$104.14 |
$100.00 |
| 38 | 506(A) 1322 |
STRUCTURAL STEEL | 1,780 | LB |
$3.00 |
$4.74 |
$3.00 |
| 39 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,000.00 |
$1,682.88 |
$1,500.00 |
| 40 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$1,792.88 |
$1,500.00 |
| 41 | 509(A) 1326 |
CLASS AA CONCRETE | 242.9 | CY |
$600.00 |
$807.63 |
$620.00 |
| 42 | 509(B) 1328 |
CLASS A CONCRETE | 253.1 | CY |
$600.00 |
$917.63 |
$650.00 |
| 43 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$450.00 |
$641.48 |
$400.00 |
| 44 | 511(A) 1332 |
REINFORCING STEEL | 460 | LB |
$1.00 |
$1.29 |
$1.00 |
| 45 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 105,080 | LB |
$1.10 |
$1.12 |
$1.40 |
| 46 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 590 | LF |
$40.00 |
$34.65 |
$30.00 |
| 47 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,297 | LF |
$50.00 |
$41.31 |
$40.00 |
| 48 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 590 | LF |
$15.00 |
$19.80 |
$30.00 |
| 49 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,297 | LF |
$15.00 |
$19.80 |
$30.00 |
| 50 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 51 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,136 | SY |
$5.00 |
$4.40 |
$5.00 |
| 52 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 296 | LF |
$900.00 |
$1,044.28 |
$1,200.00 |
| 53 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$7,480.00 |
$5,000.00 |
| 54 | 523(A) 6550 |
SEALER CRACK PREPARATION | 57 | LF |
$5.00 |
$5.50 |
$12.00 |
| 55 | 523(B) 6560 |
SEALER RESIN | 0.7 | GAL |
$150.00 |
$220.00 |
$300.00 |
| 56 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,080 | TON |
$55.00 |
$48.19 |
$65.00 |
| 57 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 270 | TON |
$50.00 |
$34.53 |
$50.00 |
| 58 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 120 | LF |
$30.00 |
$29.32 |
$25.00 |
| 59 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$30.00 |
$21.62 |
$25.00 |
| 60 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$247,500.00 |
$230,000.00 |
| 61 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,000 | LF |
$0.5000 |
$0.3900 |
$0.4000 |
| 62 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$1.50 |
$3.30 |
$0.4000 |
| 63 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 160 | SD |
$24.00 |
$8.80 |
$6.00 |
| 64 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,200 | LF |
$30.00 |
$27.50 |
$26.00 |
| 65 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 2,700 | SD |
$0.2000 |
$1.65 |
$3.00 |
| 66 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 240 | SD |
$1.00 |
$11.00 |
$16.00 |
| 67 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,880 | SD |
$0.4000 |
$0.9200 |
$0.1500 |
| 68 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,560 | SD |
$0.6000 |
$0.9300 |
$0.1500 |
| 69 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,400 | SD |
$1.40 |
$0.9300 |
$0.1500 |
| 70 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,744 | SD |
$0.9000 |
$0.2200 |
$2.50 |
| 71 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$0.9000 |
$0.1700 |
$0.1500 |
| 72 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 9,600 | SD |
$0.4000 |
$0.5500 |
$1.50 |
| 73 | 880(F) 8878 |
DRUMS | 16,920 | SD |
$0.4000 |
$0.0200 |
$0.0700 |
| 74 | 880(G) 8890 |
CHANNELIZER CONES | 18,450 | SD |
$0.5000 |
$0.0200 |
$0.0600 |
| 75 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$15.00 |
$22.00 |
$25.00 |
| 76 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 15.8 | SF |
$21.50 |
$66.00 |
$15.00 |
| 77 | 851(C) 8324 |
2" SQUARE TUBE POST | 12 | LF |
$9.80 |
$11.00 |
$40.00 |
| 78 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,000 | LF |
$0.7500 |
$1.49 |
$1.20 |
| 79 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$16,720.00 |
$35,000.00 |
| 80 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,850.00 |
$5,000.00 |
| 81 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$130,000.00 |
$175,340.04 |
$165,000.00 |