| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$15,900.00 |
$45,392.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,634 | CY |
$8.00 |
$17.36 |
$17.77 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,260 | CY |
$12.00 |
$13.19 |
$13.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$15,476.00 |
$76,189.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,658 | LF |
$2.25 |
$2.34 |
$2.40 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 10 | EA |
$175.00 |
$182.32 |
$186.62 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 48 | LF |
$12.00 |
$12.19 |
$12.48 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 31,894 | SY |
$2.25 |
$2.34 |
$2.40 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.11 | AC |
$350.00 |
$620.10 |
$634.72 |
| 10 | 241 2832 |
MOWING | 26.22 | AC |
$150.00 |
$159.00 |
$162.75 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,365 | CY |
$55.00 |
$68.53 |
$70.15 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 15,578 | SY |
$5.50 |
$8.42 |
$10.25 |
| 13 | 317 4270 |
CEMENT TREATED BASE | 13,559 | SY |
$14.00 |
$23.32 |
$18.50 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 17,752 | SY |
$1.05 |
$1.80 |
$1.84 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50 | TON |
$60.00 |
$28.49 |
$29.16 |
| 16 | 408 5774 |
PRIME COAT | 9,161 | GAL |
$6.50 |
$4.24 |
$1.00 |
| 17 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,277 | SY |
$20.00 |
$18.02 |
$28.00 |
| 18 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 12,407 | SY |
$23.00 |
$23.32 |
$35.30 |
| 19 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 3,613 | CY |
$130.00 |
$148.40 |
$182.00 |
| 20 | 504(E) 6190 |
42" F-SHAPED PARAPET | 200 | LF |
$150.00 |
$91.34 |
$215.73 |
| 21 | 509(B) 0321 |
CLASS A CONCRETE | 20 | CY |
$500.00 |
$791.33 |
$351.27 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$520.57 |
$525.16 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 2,310 | LB |
$1.10 |
$1.07 |
$2.13 |
| 24 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 2,859 | LF |
$9.35 |
$12.72 |
$8.27 |
| 25 | 609(B) 1514 |
1'-8" COMB. CURB & GUTTER (8" BARRIER) | 288 | LF |
$23.00 |
$25.44 |
$45.68 |
| 26 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 67 | SY |
$50.00 |
$59.36 |
$77.13 |
| 27 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 359 | SY |
$58.00 |
$76.32 |
$97.28 |
| 28 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 4 | EA |
$3,000.00 |
$3,855.19 |
$3,946.11 |
| 29 | 611(G) 5113 |
INLET CI DES. 2 (B) | 4 | EA |
$3,500.00 |
$5,005.08 |
$5,123.12 |
| 30 | 611(G) 5117 |
INLET CI DES. 2 (2B) | 2 | EA |
$3,800.00 |
$6,129.91 |
$6,274.48 |
| 31 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 38 | VF |
$500.00 |
$275.16 |
$281.64 |
| 32 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 3 | EA |
$350.00 |
$848.00 |
$510.83 |
| 33 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 3 | EA |
$500.00 |
$1,060.00 |
$416.50 |
| 34 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 397.17 | LF |
$52.00 |
$108.77 |
$111.33 |
| 35 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 2,745 | LF |
$10.00 |
$16.74 |
$17.13 |
| 36 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 500 | LF |
$17.00 |
$16.74 |
$17.13 |
| 37 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 9 | EA |
$300.00 |
$807.59 |
$826.64 |
| 38 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,000.00 |
$15,370.00 |
$15,732.50 |
| 39 | 619(B) 4725 |
REMOVAL OF FENCE | 734 | LF |
$2.00 |
$2.61 |
$2.67 |
| 40 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 7,347 | SY |
$5.25 |
$6.33 |
$6.48 |
| 41 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,723 | SY |
$4.25 |
$5.99 |
$12.23 |
| 42 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 6 | EA |
$500.00 |
$260.76 |
$266.91 |
| 43 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 16 | SY |
$20.00 |
$7.82 |
$8.01 |
| 44 | 619(B) 4791 |
REMOVAL OF CURB | 791 | LF |
$6.00 |
$3.91 |
$4.00 |
| 45 | 619(B) 6130 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 976 | SY |
$10.00 |
$6.33 |
$6.48 |
| 46 | 622(A) 4445 |
2" PIPE RAILING | 241 | LF |
$110.00 |
$218.08 |
$180.18 |
| 47 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 194 | LF |
$10.00 |
$9.81 |
$17.36 |
| 48 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 687 | LF |
$11.00 |
$5.57 |
$11.72 |
| 49 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 260 | CY |
$12.00 |
$26.50 |
$60.32 |
| 50 | 501(G) 6309 |
CLSM BACKFILL | 350 | CY |
$140.00 |
$220.31 |
$209.27 |
| 51 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$20,000.00 |
$79,500.00 |
$64,453.01 |
| 52 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 8,770 | LF |
$230.00 |
$217.15 |
$238.63 |
| 53 | 504 6179 |
BRIDGE TRAFFIC RAIL | 2,323.4 | LF |
$150.00 |
$383.65 |
$415.79 |
| 54 | 504(A) 1304 |
APPROACH SLAB | 439.6 | SY |
$240.00 |
$269.37 |
$307.63 |
| 55 | 504(B) 1305 |
SAW-CUT GROOVING | 6,714 | SY |
$4.00 |
$3.82 |
$3.91 |
| 56 | 504(C) 6250 |
SEALED EXPANSION JOINT | 261.6 | LF |
$260.00 |
$368.81 |
$364.98 |
| 57 | 506(A) 1322 |
STRUCTURAL STEEL | 8,220 | LB |
$3.50 |
$2.27 |
$3.46 |
| 58 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 64 | EA |
$2,700.00 |
$1,876.52 |
$3,202.44 |
| 59 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 112 | EA |
$2,700.00 |
$1,876.52 |
$3,202.44 |
| 60 | 509(A) 1326 |
CLASS AA CONCRETE | 2,588 | CY |
$580.00 |
$560.90 |
$937.09 |
| 61 | 509(B) 1328 |
CLASS A CONCRETE | 572 | CY |
$620.00 |
$692.54 |
$1,226.65 |
| 62 | 511 6306 |
MECHANICAL SPLICES | 5,634 | EA |
$40.00 |
$46.10 |
$30.19 |
| 63 | 511(A) 1332 |
REINFORCING STEEL | 2,000 | LB |
$1.00 |
$1.34 |
$1.81 |
| 64 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 815,610 | LB |
$1.10 |
$1.12 |
$1.69 |
| 65 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 206 | LF |
$32.00 |
$40.36 |
$44.37 |
| 66 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,318 | LF |
$35.00 |
$47.87 |
$50.32 |
| 67 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 206 | LF |
$15.00 |
$42.40 |
$49.04 |
| 68 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,318 | LF |
$15.00 |
$19.08 |
$43.92 |
| 69 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 70 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 7,030 | SY |
$3.50 |
$4.24 |
$4.34 |
| 71 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,653 | LF |
$900.00 |
$1,027.68 |
$1,367.56 |
| 72 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 9 | EA |
$1,500.00 |
$3,816.00 |
$1,736.00 |
| 73 | 523(A) 6550 |
SEALER CRACK PREPARATION | 1,566 | LF |
$5.00 |
$4.24 |
$4.34 |
| 74 | 523(B) 6560 |
SEALER RESIN | 19 | GAL |
$120.00 |
$159.00 |
$162.75 |
| 75 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,348 | TON |
$38.00 |
$50.46 |
$63.89 |
| 76 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 307 | TON |
$30.00 |
$37.06 |
$61.82 |
| 77 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 134 | LF |
$22.00 |
$43.69 |
$38.51 |
| 78 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$20.00 |
$35.26 |
$41.50 |
| 79 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$200,000.00 |
$265,000.00 |
$392,188.80 |
| 80 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$200,000.00 |
$265,000.00 |
$392,188.80 |
| 81 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 6,940 | CY |
$8.00 |
$3.18 |
$13.02 |
| 82 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 80 | CY |
$25.00 |
$37.10 |
$34.72 |
| 83 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 375 | CY |
$17.00 |
$37.10 |
$86.80 |
| 84 | 509(A) 1326 |
CLASS AA CONCRETE | 103.5 | CY |
$450.00 |
$778.20 |
$705.25 |
| 85 | 511(A) 1332 |
REINFORCING STEEL | 10,950 | LB |
$1.00 |
$2.13 |
$2.17 |
| 86 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$15,000.00 |
$12,720.00 |
$16,275.00 |
| 87 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,541 | LF |
$0.2000 |
$0.1900 |
$0.2500 |
| 88 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,000 | LF |
$1.00 |
$1.06 |
$1.75 |
| 89 | 857(E) 8881 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 31 | EA |
$8.00 |
$26.50 |
$130.20 |
| 90 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,500 | EA |
$0.7500 |
$0.5300 |
$0.8100 |
| 91 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,000 | LF |
$0.7000 |
$0.5300 |
$1.63 |
| 92 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,250 | SD |
$6.75 |
$4.24 |
$4.34 |
| 93 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,102 | LF |
$23.00 |
$23.32 |
$17.52 |
| 94 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 4,259 | LF |
$4.25 |
$4.24 |
$0.2500 |
| 95 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 515 | SD |
$5.10 |
$5.30 |
$1.09 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,635 | SD |
$0.3000 |
$0.8000 |
$0.2200 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,035 | SD |
$0.7500 |
$2.65 |
$5.09 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,145 | SD |
$1.35 |
$2.12 |
$4.28 |
| 99 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,850 | SD |
$2.00 |
$2.65 |
$1.63 |
| 100 | 880(C) 8848 |
WING BARRICADES | 790 | SD |
$1.00 |
$3.18 |
$4.27 |
| 101 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,260 | SD |
$0.4500 |
$0.5300 |
$0.4900 |
| 102 | 880(F) 8878 |
DRUMS | 31,810 | SD |
$0.2000 |
$0.0200 |
$0.1600 |
| 103 | 880(G) 8884 |
TUBE CHANNELIZERS | 6,720 | SD |
$0.2500 |
$1.06 |
$0.2200 |
| 104 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 790 | SD |
$15.00 |
$10.60 |
$15.19 |
| 105 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 16 | EA |
$65.00 |
$265.00 |
$162.75 |
| 106 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$225.00 |
$1,060.00 |
$162.75 |
| 107 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 98.68 | SF |
$18.00 |
$23.32 |
$21.70 |
| 108 | 851(C) 8324 |
2" SQUARE TUBE POST | 230 | LF |
$12.00 |
$8.48 |
$10.85 |
| 109 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 9,949 | LF |
$0.4500 |
$0.9800 |
$0.8100 |
| 110 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,363 | LF |
$0.8500 |
$3.18 |
$1.63 |
| 111 | 802(A) 8306 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 1,950 | LF |
$30.00 |
$26.50 |
$27.13 |
| 112 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 315 | LF |
$21.00 |
$26.50 |
$27.13 |
| 113 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 3,670 | LF |
$6.50 |
$8.48 |
$8.68 |
| 114 | 802(E) 8376 |
JUNCTION BOX (12"X12"X8") | 10 | EA |
$900.00 |
$1,060.00 |
$1,085.00 |
| 115 | 803(A) 8065 |
PULL BOX(SIZE I) | 24 | EA |
$525.00 |
$477.00 |
$488.25 |
| 116 | 804(A) 2915 |
STRUCTURAL CONCRETE | 29.52 | CY |
$650.00 |
$848.00 |
$868.00 |
| 117 | 804(B) 2916 |
REINFORCING STEEL | 5,112 | LB |
$1.35 |
$1.33 |
$1.36 |
| 118 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 19 | EA |
$500.00 |
$318.00 |
$325.50 |
| 119 | 806(E) 0200 |
DECORATIVE POLE AND MAST ARM | 28 | EA |
$8,500.00 |
$3,990.90 |
$4,085.03 |
| 120 | 807 8092 |
BREAKAWAY BASE (DES. B) | 18 | EA |
$650.00 |
$530.00 |
$542.50 |
| 121 | 809(A) 8090 |
ROADWAY LUMINAIRE | 28 | EA |
$2,100.00 |
$1,994.92 |
$2,041.97 |
| 122 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$2,000.00 |
$15,476.00 |
$15,841.00 |
| 123 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 11,940 | LF |
$2.50 |
$3.18 |
$3.26 |
| 124 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 5,152 | LF |
$1.20 |
$1.06 |
$1.09 |
| 125 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$1,000.00 |
$5,778.00 |
$50,000.00 |
| 126 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 11,125 | CY |
$8.00 |
$22.65 |
$23.08 |
| 127 | 202(D) 0184 |
UNCLASSIFIED BORROW | 17,850 | CY |
$9.00 |
$12.79 |
$13.03 |
| 128 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$33,812.00 |
$190,000.00 |
| 129 | 221(C) 2801 |
TEMPORARY SILT FENCE | 24,000 | LF |
$1.50 |
$1.61 |
$3.22 |
| 130 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 3 | EA |
$145.00 |
$144.45 |
$539.55 |
| 131 | 221(F) 0100 |
TEMPORARY SILT DIKE | 826 | LF |
$7.50 |
$12.57 |
$20.66 |
| 132 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 68 | CY |
$100.00 |
$214.00 |
$220.00 |
| 133 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 20 | CY |
$125.00 |
$267.50 |
$275.00 |
| 134 | 229 4318 |
DITCH LINER PROTECTION | 300 | LF |
$1.50 |
$1.28 |
$2.29 |
| 135 | 230(A) 2806 |
SOLID SLAB SODDING | 42,000 | SY |
$1.75 |
$1.84 |
$2.29 |
| 136 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.68 | AC |
$125.00 |
$625.95 |
$2,125.50 |
| 137 | 241 2832 |
MOWING | 17.36 | AC |
$25.00 |
$144.45 |
$299.75 |
| 138 | 307(K) 4300 |
STABILIZED SUBGRADE | 44,917 | SY |
$5.25 |
$8.50 |
$9.26 |
| 139 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 100 | TON |
$30.00 |
$31.92 |
$32.51 |
| 140 | 407(B) 0250 |
TACK COAT | 4,400 | GAL |
$3.00 |
$3.51 |
$3.58 |
| 141 | 408 5774 |
PRIME COAT | 16,450 | GAL |
$3.00 |
$4.02 |
$1.00 |
| 142 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,000 | TON |
$80.00 |
$85.77 |
$98.00 |
| 143 | 412 5267 |
COLD MILLING PAVEMENT | 1,800 | SY |
$3.25 |
$6.70 |
$14.78 |
| 144 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 10,304 | SY |
$16.00 |
$18.19 |
$35.25 |
| 145 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 19,495 | SY |
$19.00 |
$23.54 |
$47.15 |
| 146 | 414(C) 4425 |
CONT. REINF. P.C.C. PAVEMENT(PLACEMENT) | 12,229 | SY |
$25.00 |
$38.25 |
$63.85 |
| 147 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 12,800 | CY |
$130.00 |
$149.80 |
$154.00 |
| 148 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 3 | CY |
$40.00 |
$37.45 |
$1,635.00 |
| 149 | 504(B) 1305 |
SAW-CUT GROOVING | 12,229 | SY |
$8.00 |
$2.35 |
$2.40 |
| 150 | 509(A) 0319 |
CLASS AA CONCRETE | 14 | CY |
$700.00 |
$738.30 |
$654.00 |
| 151 | 509(D) 0325 |
CLASS C CONCRETE | 45 | CY |
$300.00 |
$342.40 |
$872.00 |
| 152 | 511(A) 0332 |
REINFORCING STEEL | 2,173 | LB |
$1.30 |
$1.23 |
$1.36 |
| 153 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 9,845 | LF |
$6.00 |
$8.56 |
$28.00 |
| 154 | 609(A) 5864 |
CONCRETE CURB (6" BARRIER-DOWELLED) | 4,624 | LF |
$10.00 |
$12.84 |
$35.00 |
| 155 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 1,866 | SY |
$60.00 |
$59.92 |
$59.95 |
| 156 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 2,329 | SY |
$50.00 |
$57.78 |
$70.85 |
| 157 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 160 | SF |
$30.00 |
$26.75 |
$70.85 |
| 158 | 610(J) 4810 |
(PL) STAMPED CONCRETE FINISH | 2,329 | SY |
$75.00 |
$126.26 |
$107.91 |
| 159 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 3 | EA |
$2,200.00 |
$3,611.25 |
$3,678.75 |
| 160 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 661 | LF |
$53.00 |
$98.38 |
$100.21 |
| 161 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 52 | LF |
$80.00 |
$79.19 |
$80.67 |
| 162 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,200.00 |
$1,064.65 |
$1,084.55 |
| 163 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 7 | EA |
$1,050.00 |
$930.90 |
$948.30 |
| 164 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4,000.00 |
$25,653.25 |
$186,311.00 |
| 165 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$250.00 |
$535.00 |
$1,635.00 |
| 166 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 3,725 | LF |
$6.00 |
$3.95 |
$10.00 |
| 167 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 23,884 | SY |
$8.00 |
$6.39 |
$9.00 |
| 168 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 15,300 | SY |
$4.00 |
$13.00 |
$17.00 |
| 169 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 948 | LF |
$5.00 |
$8.56 |
$6.08 |
| 170 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,600 | CY |
$25.00 |
$16.05 |
$31.12 |
| 171 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$35.00 |
$31.10 |
$86.15 |
| 172 | 501(G) 6309 |
CLSM BACKFILL | 259.2 | CY |
$200.00 |
$219.54 |
$241.21 |
| 173 | 504(A) 1304 |
APPROACH SLAB | 471.2 | SY |
$300.00 |
$278.66 |
$297.17 |
| 174 | 504(B) 1305 |
SAW-CUT GROOVING | 2,164.2 | SY |
$5.00 |
$4.33 |
$3.92 |
| 175 | 504(C) 6250 |
SEALED EXPANSION JOINT | 69.67 | LF |
$450.00 |
$388.45 |
$328.70 |
| 176 | 504(E) 1381 |
CONCRETE PARAPET | 1,797.64 | LF |
$200.00 |
$99.62 |
$229.21 |
| 177 | 504(F) 6006 |
HANDRAILING | 709.32 | LF |
$500.00 |
$722.25 |
$300.00 |
| 178 | 506(A) 1322 |
STRUCTURAL STEEL | 593,530 | LB |
$2.60 |
$1.61 |
$2.70 |
| 179 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$3,000.00 |
$2,170.67 |
$3,324.12 |
| 180 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 48 | EA |
$3,000.00 |
$2,170.67 |
$3,324.12 |
| 181 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$150,000.00 |
$132,102.20 |
$139,803.84 |
| 182 | 509(A) 1326 |
CLASS AA CONCRETE | 629 | CY |
$850.00 |
$702.16 |
$982.20 |
| 183 | 509(B) 1328 |
CLASS A CONCRETE | 516.8 | CY |
$850.00 |
$749.82 |
$1,135.30 |
| 184 | 509(D) 1331 |
CLASS C CONCRETE | 25 | CY |
$400.00 |
$536.99 |
$2,891.29 |
| 185 | 510(C) 6138 |
SLOPE WALL (5") | 4,079 | SY |
$155.00 |
$99.00 |
$148.22 |
| 186 | 511 6306 |
MECHANICAL SPLICES | 76 | EA |
$50.00 |
$117.44 |
$97.91 |
| 187 | 511(A) 1332 |
REINFORCING STEEL | 10,850 | LB |
$1.10 |
$1.08 |
$2.79 |
| 188 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 228,660 | LB |
$1.30 |
$1.15 |
$2.23 |
| 189 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$450.00 |
$695.50 |
$654.00 |
| 190 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 20 | SY |
$700.00 |
$1,070.00 |
$926.50 |
| 191 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 124 | LF |
$50.00 |
$44.54 |
$47.37 |
| 192 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 728 | LF |
$60.00 |
$54.04 |
$57.17 |
| 193 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 124 | LF |
$30.00 |
$42.80 |
$52.04 |
| 194 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 728 | LF |
$30.00 |
$26.75 |
$54.85 |
| 195 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 196 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,982 | SY |
$5.00 |
$4.28 |
$4.36 |
| 197 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 296 | LF |
$1,200.00 |
$1,161.85 |
$1,724.65 |
| 198 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 72 | LF |
$2,000.00 |
$1,689.84 |
$2,064.25 |
| 199 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$5,778.00 |
$2,071.00 |
| 200 | 523(A) 6550 |
SEALER CRACK PREPARATION | 261 | LF |
$5.00 |
$4.28 |
$4.36 |
| 201 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$150.00 |
$160.50 |
$163.50 |
| 202 | 535 6780 |
ORNAMENTAL MEDALLION | 6 | EA |
$25,000.00 |
$23,302.23 |
$14,859.93 |
| 203 | 535 6900 |
(SP)AESTHETIC FORM LINERS (NON-BIDDABLE) | 1 | LSUM |
$60,000.00 |
$60,000.00 |
$60,000.00 |
| 204 | 542 4600 |
(PL)INSTALLATION OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$160,500.00 |
$212,915.00 |
| 205 | 542 4610 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$5,000.00 |
$19,165.32 |
$6,021.15 |
| 206 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 749 | LF |
$40.00 |
$42.53 |
$28.23 |
| 207 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 178 | LF |
$40.00 |
$37.86 |
$30.57 |
| 208 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$350,000.00 |
$508,250.00 |
$396,990.27 |
| 209 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 365 | SD |
$134.96 |
$107.00 |
$123.17 |
| 210 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 29,700 | LF |
$0.1800 |
$0.2700 |
$0.2600 |
| 211 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 37,426 | LF |
$1.00 |
$1.07 |
$1.34 |
| 212 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 3,090 | EA |
$0.8400 |
$0.5400 |
$0.6300 |
| 213 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 29,700 | LF |
$0.3900 |
$0.2400 |
$0.2700 |
| 214 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,600 | SD |
$10.90 |
$6.42 |
$6.54 |
| 215 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 13,225 | LF |
$27.32 |
$26.75 |
$15.00 |
| 216 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 119,625 | LF |
$3.40 |
$2.68 |
$0.2500 |
| 217 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 2,790 | SD |
$2.50 |
$1.07 |
$1.09 |
| 218 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 40,866 | SD |
$0.3000 |
$0.0900 |
$0.0200 |
| 219 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 41,600 | SD |
$0.5000 |
$0.1100 |
$0.0200 |
| 220 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 27,650 | SD |
$0.8800 |
$2.89 |
$0.0200 |
| 221 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 120 | SD |
$1.00 |
$5.35 |
$1.29 |
| 222 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 40,900 | SD |
$0.5000 |
$0.7000 |
$0.0500 |
| 223 | 880(C) 8848 |
WING BARRICADES | 2,920 | SD |
$0.6000 |
$5.35 |
$3.23 |
| 224 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 76,200 | SD |
$0.1000 |
$0.5400 |
$0.0500 |
| 225 | 880(F) 8878 |
DRUMS | 160,400 | SD |
$0.2000 |
$0.0500 |
$0.0500 |
| 226 | 880(G) 8884 |
TUBE CHANNELIZERS | 33,489 | SD |
$0.2000 |
$0.2700 |
$0.0500 |
| 227 | 880(G) 8890 |
CHANNELIZER CONES | 18,250 | SD |
$0.2000 |
$3.21 |
$4.27 |
| 228 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 365 | SD |
$250.00 |
$508.25 |
$408.75 |
| 229 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 720 | HOUR |
$69.00 |
$69.00 |
$69.00 |
| 230 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,516 | SD |
$12.00 |
$10.70 |
$6.54 |
| 231 | 509(B) 0321 |
CLASS A CONCRETE | 112 | CY |
$750.00 |
$321.00 |
$1,320.79 |
| 232 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 23,000 | LB |
$2.55 |
$1.61 |
$3.30 |
| 233 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 56.5 | LF |
$1,250.00 |
$1,337.50 |
$2,209.91 |
| 234 | 804(A) 2915 |
STRUCTURAL CONCRETE | 148.86 | CY |
$450.00 |
$909.50 |
$327.00 |
| 235 | 804(B) 2916 |
REINFORCING STEEL | 7,932 | LB |
$2.00 |
$2.14 |
$1.63 |
| 236 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 100 | EA |
$60.00 |
$42.80 |
$43.60 |
| 237 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 551.44 | SF |
$25.00 |
$23.54 |
$23.98 |
| 238 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 510.25 | SF |
$30.00 |
$25.68 |
$26.16 |
| 239 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 803 | SF |
$30.00 |
$28.89 |
$29.43 |
| 240 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 378 | LF |
$20.00 |
$17.12 |
$17.44 |
| 241 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 36 | LF |
$20.00 |
$16.05 |
$16.35 |
| 242 | 851(B) 3220 |
4"@10.79 GALV.STEEL PIPE POST | 84 | LF |
$18.00 |
$19.26 |
$19.62 |
| 243 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 918.5 | LF |
$10.00 |
$5.35 |
$5.45 |
| 244 | 852(D) 0300 |
OVHD.SN.STR., MONOTUBE TYPE B 70' | 2 | EA |
$82,500.00 |
$90,035.15 |
$91,718.05 |
| 245 | 853 9027 |
DELINEATORS(TYPE 1, CODE 2) | 8 | EA |
$20.00 |
$23.54 |
$19.62 |
| 246 | 853 9036 |
DELINEATORS(TYPE 2, CODE 2) | 16 | EA |
$25.00 |
$23.54 |
$23.98 |
| 247 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 8,708 | LF |
$1.20 |
$2.14 |
$1.96 |
| 248 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 133 | LF |
$6.50 |
$5.35 |
$3.27 |
| 249 | 856(A) 8560 |
RECESSED TRAF STRIPE(MULTI-POLY)(4" W) | 13,611 | LF |
$2.40 |
$1.87 |
$1.80 |
| 250 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 38 | EA |
$250.00 |
$267.50 |
$354.25 |
| 251 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 20 | EA |
$52.00 |
$80.25 |
$70.85 |
| 252 | 858(A) 8902 |
PAVEMENT MARKERS CLASS A TYPE 2 | 82 | EA |
$8.00 |
$69.55 |
$11.55 |
| 253 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$20,000.00 |
$29,960.00 |
$23,980.00 |
| 254 | 802(A) 8316 |
3" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 272 | LF |
$58.00 |
$29.96 |
$30.52 |
| 255 | 802(B) 8336 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT BORED | 105 | LF |
$16.00 |
$21.40 |
$21.80 |
| 256 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 87 | LF |
$22.00 |
$26.75 |
$27.25 |
| 257 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 877 | LF |
$37.00 |
$29.76 |
$30.52 |
| 258 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 259 | LF |
$12.00 |
$10.70 |
$10.90 |
| 259 | 802(E) 8376 |
JUNCTION BOX (12"X12"X8") | 1 | EA |
$900.00 |
$1,070.00 |
$1,090.00 |
| 260 | 803(A) 8065 |
PULL BOX(SIZE I) | 18 | EA |
$500.00 |
$481.50 |
$490.50 |
| 261 | 803(A) 8066 |
PULL BOX(SIZE II) | 3 | EA |
$700.00 |
$535.00 |
$545.00 |
| 262 | 803(A) 8067 |
PULL BOX(SIZE III) | 6 | EA |
$400.00 |
$411.95 |
$419.65 |
| 263 | 804(A) 2915 |
STRUCTURAL CONCRETE | 39.8 | CY |
$600.00 |
$856.00 |
$872.00 |
| 264 | 804(B) 2916 |
REINFORCING STEEL | 5,727.4 | LB |
$2.00 |
$1.34 |
$1.36 |
| 265 | 806(A) 8350 |
32'MH POLE,30'TS & 10'LMA(G.STL.) | 2 | EA |
$15,000.00 |
$16,119.55 |
$16,420.85 |
| 266 | 806(A) 8351 |
32'MH POLE 25',TS & 10'LMA(G.STL.) | 2 | EA |
$13,000.00 |
$15,333.10 |
$15,619.70 |
| 267 | 806(A) 8726 |
POLE & 25' TS MST.ARM(G.STL.) | 2 | EA |
$10,000.00 |
$14,195.69 |
$14,461.03 |
| 268 | 806(A) 8728 |
POLE & 30' TS MST.ARM(G.STL.) | 2 | EA |
$11,000.00 |
$14,980.00 |
$15,260.00 |
| 269 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 6 | EA |
$900.00 |
$909.50 |
$926.50 |
| 270 | 806(B) 8898 |
15' MTG.HT.TS PED.POLE(G.STL.) | 2 | EA |
$2,000.00 |
$1,070.00 |
$1,090.00 |
| 271 | 809(A) 8090 |
ROADWAY LUMINAIRE | 5 | EA |
$1,500.00 |
$2,541.25 |
$2,588.75 |
| 272 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$2,600.00 |
$802.50 |
$817.50 |
| 273 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 500 | LF |
$1.75 |
$2.14 |
$2.18 |
| 274 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 8,060 | LF |
$1.20 |
$1.07 |
$1.09 |
| 275 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$45,000.00 |
$29,157.50 |
$29,702.50 |
| 276 | 828(A) 8142 |
VEHICLE LOOP DETECTOR | 12 | EA |
$219.05 |
$267.50 |
$272.50 |
| 277 | 828(B) 8136 |
LOOP DETECTOR WIRE | 4,000 | LF |
$7.00 |
$6.42 |
$6.54 |
| 278 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 12 | EA |
$2,000.00 |
$979.05 |
$997.35 |
| 279 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 6 | EA |
$700.00 |
$856.00 |
$872.00 |
| 280 | 831 8262 |
1WAY 3SEC. ADJ. SIG. HD. S-10 | 4 | EA |
$600.00 |
$695.50 |
$708.50 |
| 281 | 831 8270 |
1WAY 3SEC. ADJ. SIG. HD. S-11 | 8 | EA |
$650.00 |
$856.00 |
$872.00 |
| 282 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 12 | EA |
$500.00 |
$642.00 |
$654.00 |
| 283 | 833 3030 |
BACKPLATE | 40 | EA |
$150.00 |
$133.75 |
$136.25 |
| 284 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 4,884 | LF |
$2.50 |
$3.05 |
$3.11 |
| 285 | 834(A) 8209 |
9/C TRAFFIC SIGNAL ELECTRICAL CABLE | 5,100 | LF |
$3.00 |
$3.75 |
$3.82 |
| 286 | 834(A) 8210 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 2,873 | LF |
$4.00 |
$4.28 |
$4.36 |
| 287 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 4,200 | LF |
$1.85 |
$1.61 |
$1.64 |
| 288 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 120 | SF |
$60.00 |
$53.50 |
$54.50 |
| 289 | 802(A) 8350 |
1 1/2" GALV. STEEL ELECT CONDUIT EXPOSED | 980 | LF |
$24.00 |
$26.75 |
$27.25 |
| 290 | 802(B) 8336 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT BORED | 510 | LF |
$16.00 |
$21.40 |
$21.80 |
| 291 | 802(B) 8338 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 5,003 | LF |
$8.25 |
$8.56 |
$8.72 |
| 292 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 1,090 | LF |
$22.00 |
$26.75 |
$27.25 |
| 293 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 13,863 | LF |
$8.50 |
$8.56 |
$8.72 |
| 294 | 802(E) 8372 |
JUNCTION BOX(8" X 8" X 6") | 4 | EA |
$750.00 |
$909.50 |
$926.50 |
| 295 | 803(A) 8065 |
PULL BOX(SIZE I) | 83 | EA |
$500.00 |
$481.50 |
$490.50 |
| 296 | 804(A) 2915 |
STRUCTURAL CONCRETE | 108.24 | CY |
$600.00 |
$856.00 |
$872.00 |
| 297 | 804(B) 2916 |
REINFORCING STEEL | 38,544 | LB |
$2.00 |
$1.34 |
$1.36 |
| 298 | 805(A) 8708 |
REMOVAL OF HIGH MAST TOWER | 1 | EA |
$10,000.00 |
$10,700.00 |
$10,900.00 |
| 299 | 806(C) 8926 |
40' MTG & 12' HLMA(G.STL.) | 34 | EA |
$3,720.00 |
$3,777.10 |
$3,847.70 |
| 300 | 806(E) 0200 |
DECORATIVE POLE AND MAST ARM | 34 | EA |
$9,181.00 |
$5,050.40 |
$5,144.80 |
| 301 | 807 8092 |
BREAKAWAY BASE (DES. B) | 39 | EA |
$700.00 |
$963.00 |
$981.00 |
| 302 | 808 3107 |
PIER MOUNTED POLE BRACKET | 2 | EA |
$9,000.00 |
$9,095.00 |
$9,265.00 |
| 303 | 809(A) 8090 |
ROADWAY LUMINAIRE | 68 | EA |
$1,500.00 |
$1,664.92 |
$1,696.04 |
| 304 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$2,600.00 |
$8,025.00 |
$8,175.00 |
| 305 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 53,263 | LF |
$2.50 |
$3.21 |
$3.27 |
| 306 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 13,670 | LF |
$1.20 |
$1.07 |
$1.09 |
| 307 | 509(A) 0319 |
CLASS AA CONCRETE | 300 | CY |
$300.00 |
$160.50 |
$150.42 |
| 308 | 509(D) 0325 |
CLASS C CONCRETE | 13.66 | CY |
$620.00 |
$802.50 |
$850.00 |
| 309 | 511(A) 0332 |
REINFORCING STEEL | 562 | LB |
$2.00 |
$4.28 |
$4.36 |
| 310 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 300 | LF |
$4.00 |
$26.75 |
$9.70 |
| 311 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 300 | LF |
$8.00 |
$26.75 |
$9.81 |
| 312 | 628(C) 5110 |
END ANCHORS | 2 | EA |
$7,000.00 |
$8,560.00 |
$12,017.25 |
| 313 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 38 | EA |
$400.00 |
$401.25 |
$316.10 |
| 314 | 870(C) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE REMOVAL | 1 | LSUM |
$4,500.00 |
$5,885.00 |
$1,471.50 |
| 315 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$70,000.00 |
$127,200.00 |
$196,083.53 |
| 316 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$21,250.00 |
$54,813.73 |
| 317 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$985,568.00 |
|
|