Bid tab 210007

Let Jan 21, 2021 · Division 5 · Beckham Sign up free

‹ Jan 2021 results

BRIDGE REHABILITATION I-40: OVER NORTH FORK OF RED RIVER , 0.5 MILES SOUTH OF THE SH -152 INTERCHANGE IN SAYRE . PROJECT LENGTH = 0.247 MILE

Let date
Thursday, January 21, 2021
Contract
210007
J/P numbers
31001(04)
District
Division 5
County
Beckham
Highway
Limits
BRIDGE REHABILITATION I-40: OVER NORTH FORK OF RED RIVER , 0.5 MILES SOUTH OF THE SH -152 INTERCHANGE IN SAYRE . PROJECT LENGTH = 0.247 MILE
Project number
NHPPI-4000-(098)PM

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$8,022,197
1 C3 Construction, Inc. Low bidder $7,458,048 -7.0%
2 Treas Construction Inc $7,665,770 -4.4% +2.8%
3 OBC, INC. $7,759,552 -3.3% +4.0%
4 K & R BUILDERS, INC. $8,341,828 +4.0% +11.9%
5 Frontier Bridge, Inc. $8,684,203 +8.3% +16.4%
6 MANHATTAN ROAD & BRIDGE COMPANY, LLC $9,108,476 +13.5% +22.1%

Bid tab: unit prices 104 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 C3 Construction…#2 Treas Construct…#3 OBC, INC.#4 K & R BUILDERS,…#5 Frontier Bridge…#6 MANHATTAN ROAD …
10202(A) 0183 UNCLASSIFIED EXCAVATION11,600CY $8.00 $6.74 $7.81 $10.00 $8.00 $4.96 $7.50
20202(D) 0184 UNCLASSIFIED BORROW6,203CY $14.00 $9.12 $7.81 $12.00 $8.50 $9.23 $14.00
30205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $25,000.00 $8,625.16 $26,250.00 $15,000.00 $27,500.00 $22,428.09 $25,958.00
40221(C) 2801 TEMPORARY SILT FENCE1,512LF $3.00 $1.52 $2.06 $1.54 $1.50 $1.57 $2.00
50221(D) 2803 TEMPORARY SEDIMENT FILTER3EA $275.00 $186.68 $348.60 $189.57 $200.00 $192.24 $345.00
60230(A) 2806 SOLID SLAB SODDING18,173SY $3.50 $1.53 $2.45 $1.55 $1.65 $1.58 $2.40
70233(A) 2817 VEGETATIVE MULCHING1.4AC $1,100.00 $419.51 $837.90 $426.00 $200.00 $432.00 $825.00
80241 2832 MOWING16.22AC $150.00 $94.39 $256.20 $95.85 $100.00 $97.20 $250.00
90307(K) 4300 STABILIZED SUBGRADE2,754SY $10.00 $8.27 $7.35 $8.20 $8.80 $8.64 $7.50
100407(B) 0250 TACK COAT403GAL $3.50 $7.78 $3.58 $3.63 $3.41 $6.86 $3.50
110408 5774 PRIME COAT964GAL $4.00 $8.52 $12.81 $12.99 $12.80 $7.51 $12.20
120411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,063TON $110.00 $155.53 $134.95 $136.87 $141.00 $147.94 $135.00
130411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)651TON $125.00 $176.18 $149.83 $151.96 $157.00 $167.58 $148.00
140411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)255TON $150.00 $172.70 $168.65 $171.06 $178.00 $159.82 $167.00
150412 5267 COLD MILLING PAVEMENT5,067SY $6.00 $2.08 $5.66 $5.74 $6.25 $3.54 $5.50
160619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $1,887.80 $9,765.00 $10,000.00 $10,000.00 $37,800.00 $2,200.00
170619(B) 4728 REMOVAL OF ASPHALT PAVEMENT4,995SY $7.00 $4.90 $5.25 $6.00 $8.50 $3.54 $5.50
180619(B) 4780 REMOVAL OF GUARDRAIL1,775LF $5.00 $3.41 $3.15 $3.46 $2.25 $4.32 $4.00
190623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE825LF $22.00 $22.02 $25.20 $22.37 $26.00 $25.92 $25.00
200623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,500.00 $2,621.95 $2,520.00 $2,662.50 $2,600.00 $2,592.00 $2,600.00
210623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,200.00 $2,307.32 $1,732.50 $2,343.00 $1,750.00 $1,782.00 $3,565.00
220501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON100CY $30.00 $17.16 $26.25 $30.00 $11.00 $22.00 $75.00
230501(G) 6309 CLSM BACKFILL85.6CY $200.00 $146.55 $259.28 $210.00 $160.00 $193.40 $185.00
240502 6116 (PL)FALSEWORK JACKING1LSUM $30,000.00 $18,380.69 $29,141.70 $55,000.00 $40,000.00 $80,712.78 $30,000.00
250504(A) 1304 APPROACH SLAB279.6SY $300.00 $228.16 $228.66 $235.00 $225.00 $314.66 $220.00
260504(B) 1305 SAW-CUT GROOVING5,783SY $5.00 $3.86 $4.35 $3.35 $3.33 $3.46 $3.25
270504(C) 6250 SEALED EXPANSION JOINT190.9LF $350.00 $271.77 $312.91 $350.00 $270.00 $265.49 $290.00
280504(E) 6190 42" F-SHAPED PARAPET2,738.4LF $120.00 $62.40 $93.76 $72.00 $103.50 $86.14 $60.00
290506(A) 1322 STRUCTURAL STEEL2,500LB $3.00 $2.70 $8.66 $7.72 $12.00 $7.98 $2.50
300507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY8EA $1,500.00 $1,881.72 $2,322.54 $5,000.00 $3,250.00 $2,806.10 $4,000.00
310509(A) 1326 CLASS AA CONCRETE1,356.7CY $750.00 $611.41 $705.04 $650.00 $759.00 $875.33 $785.00
320509(D) 1331 CLASS C CONCRETE20CY $600.00 $341.16 $525.00 $1,100.00 $575.00 $591.69 $425.00
330511(B) 6010 EPOXY COATED REINFORCING STEEL479,840LB $1.10 $1.07 $1.27 $1.15 $1.26 $1.13 $1.40
340512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $90,000.00 $361,486.81 $116,760.00 $136,235.87 $121,000.00 $109,120.00 $172,000.00
350512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $9,000.00 $53,303.99 $7,245.00 $17,955.90 $8,000.00 $7,590.00 $1,000.00
360513(B) 6019 CLASS B BRIDGE DECK REPAIR800SY $350.00 $191.99 $105.00 $362.00 $175.00 $416.50 $170.00
370513(C) 6020 CLASS C BRIDGE DECK REPAIR550SY $550.00 $323.06 $105.00 $406.00 $275.00 $526.50 $225.00
380515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)2,764SY $5.00 $4.20 $4.20 $4.26 $4.20 $4.40 $4.20
390520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER200LF $50.00 $41.95 $36.75 $42.60 $38.50 $38.50 $41.50
400520(C) 6060 EPOXY RESIN, ABOVE WATER20GAL $150.00 $131.10 $52.50 $133.13 $52.50 $55.00 $129.00
410521(A) 6210 PNEUMATICALLY PLACED MORTAR500SY $850.00 $919.03 $724.50 $798.75 $400.00 $643.50 $550.00
420523(A) 6550 SEALER CRACK PREPARATION845LF $5.00 $3.15 $3.15 $3.20 $3.00 $3.30 $3.10
430523(B) 6560 SEALER RESIN8.5GAL $150.00 $157.32 $157.50 $159.75 $150.00 $165.00 $155.00
440535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)200SY $50.00 $41.95 $31.50 $42.60 $33.00 $33.00 $41.50
450540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)15EA $1,250.00 $1,918.19 $5,328.75 $3,800.00 $5,450.00 $5,280.00 $3,200.00
460540 4525 (PL)REPAIR BRIDGE ITEM (TYPE B)20EA $1,500.00 $1,558.44 $2,625.00 $2,200.00 $2,750.00 $2,750.00 $2,750.00
470540 4535 (PL)REPAIR BRIDGE ITEM (TYPE C)5EA $2,000.00 $2,861.22 $2,940.00 $5,600.00 $3,000.00 $3,080.00 $4,500.00
480619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $300,000.00 $214,441.33 $316,436.21 $323,000.00 $700,000.00 $487,140.23 $572,525.00
490501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON100CY $30.00 $17.16 $26.25 $30.00 $11.00 $22.00 $75.00
500501(G) 6309 CLSM BACKFILL85.6CY $200.00 $135.63 $259.28 $210.00 $160.00 $182.40 $185.00
510502 6116 (PL)FALSEWORK JACKING1LSUM $30,000.00 $18,380.69 $29,141.70 $55,000.00 $40,000.00 $80,712.78 $165,000.00
520504(A) 1304 APPROACH SLAB279.6SY $300.00 $228.13 $228.66 $235.00 $218.00 $314.66 $240.00
530504(B) 1305 SAW-CUT GROOVING5,783SY $5.00 $3.86 $4.35 $3.35 $3.33 $3.46 $3.25
540504(C) 6250 SEALED EXPANSION JOINT190.9LF $350.00 $271.77 $312.91 $350.00 $270.00 $270.99 $290.00
550504(E) 6190 42" F-SHAPED PARAPET2,738.4LF $120.00 $62.40 $93.76 $72.00 $103.50 $86.14 $105.00
560506(A) 1322 STRUCTURAL STEEL2,500LB $3.00 $2.31 $8.66 $7.72 $12.00 $7.98 $2.50
570507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY6EA $1,500.00 $1,942.99 $2,407.99 $6,000.00 $3,350.00 $2,782.60 $4,200.00
580509(A) 1326 CLASS AA CONCRETE1,356.7CY $750.00 $584.15 $705.04 $650.00 $759.00 $875.33 $895.00
590509(D) 1331 CLASS C CONCRETE20CY $600.00 $330.68 $525.00 $1,100.00 $575.00 $591.69 $425.00
600511(B) 6010 EPOXY COATED REINFORCING STEEL479,840LB $1.10 $1.11 $1.27 $1.15 $1.26 $1.13 $1.60
610512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $90,000.00 $361,486.81 $116,760.00 $136,235.87 $121,000.00 $109,120.00 $200,000.00
620512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $9,000.00 $45,621.89 $7,245.00 $17,955.90 $8,000.00 $7,590.00 $1,000.00
630515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)2,764SY $5.00 $4.20 $4.20 $4.26 $4.20 $4.40 $4.20
640520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER200LF $50.00 $41.95 $36.75 $42.60 $38.50 $38.50 $41.50
650520(C) 6060 EPOXY RESIN, ABOVE WATER20GAL $150.00 $131.10 $52.50 $133.13 $52.50 $55.00 $129.00
660521(A) 6210 PNEUMATICALLY PLACED MORTAR500SY $850.00 $919.03 $724.50 $798.75 $400.00 $643.50 $550.00
670523(A) 6550 SEALER CRACK PREPARATION845LF $5.00 $3.15 $3.15 $3.20 $3.00 $3.30 $3.10
680523(B) 6560 SEALER RESIN8.5GAL $150.00 $157.32 $157.50 $159.75 $150.00 $165.00 $155.00
690535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)200SY $50.00 $41.95 $31.50 $42.60 $33.00 $33.00 $41.50
700540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)15EA $1,250.00 $1,918.19 $5,328.75 $3,800.00 $5,450.00 $5,280.00 $3,200.00
710540 4525 (PL)REPAIR BRIDGE ITEM (TYPE B)20EA $1,500.00 $1,558.44 $2,625.00 $2,200.00 $2,750.00 $2,750.00 $2,750.00
720540 4535 (PL)REPAIR BRIDGE ITEM (TYPE C)5EA $2,000.00 $2,861.22 $2,940.00 $5,600.00 $3,000.00 $3,080.00 $4,500.00
730619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $300,000.00 $214,441.33 $316,436.21 $323,000.00 $700,000.00 $487,140.23 $800,000.00
740413(A) 4861 RUMBLE STRIP-METHOD HMA-CON800LF $1.00 $3.51 $3.15 $3.57 $3.20 $5.40 $3.15
750804(A) 2915 STRUCTURAL CONCRETE1.44CY $600.00 $419.51 $367.50 $426.00 $370.00 $378.00 $367.50
760804(B) 2916 REINFORCING STEEL260LB $2.00 $1.57 $2.10 $1.60 $2.14 $2.16 $2.10
770805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS2EA $150.00 $157.32 $472.50 $159.75 $500.00 $486.00 $472.50
780805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS3EA $350.00 $471.95 $315.00 $479.25 $315.00 $324.00 $315.00
790850(A) 8110 SHEET ALUMINUM SIGNS49SF $25.00 $47.20 $26.25 $47.93 $26.69 $27.00 $26.25
800851(A) 3206 4"@13 GALV.STEEL WIDE FLANGE BEAM POST69LF $30.00 $27.27 $29.40 $27.69 $30.00 $30.24 $29.40
810851(C) 8330 2 1/2" SQUARE TUBE POST36LF $11.00 $12.59 $12.60 $12.78 $13.00 $12.96 $12.50
820853 9066 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)24EA $15.00 $13.90 $12.60 $14.11 $13.00 $12.96 $12.60
830856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)14,995LF $1.00 $0.9600 $0.9500 $0.9800 $1.00 $0.9700 $0.9400
840856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)460LF $1.50 $1.29 $2.10 $1.31 $2.10 $2.16 $2.10
850856(A) 8548 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)283LF $2.50 $1.31 $3.15 $1.33 $3.15 $3.24 $3.15
860857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)14,995LF $0.2500 $0.6200 $0.1400 $0.6300 $0.1500 $0.1400 $0.1400
870857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)27,636LF $0.2000 $0.1800 $0.2100 $0.1800 $0.2200 $0.2200 $0.2200
880857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-15,528EA $0.6000 $0.8900 $0.5300 $0.9100 $0.5300 $0.5400 $0.5300
890871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.690SD $6.00 $6.29 $10.50 $6.39 $11.00 $10.80 $10.50
900877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER3,562.5LF $25.00 $18.67 $21.00 $29.00 $28.00 $17.28 $48.00
910877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER6,087.5LF $4.00 $1.57 $4.20 $4.25 $5.91 $4.32 $2.00
920878(B) 8487 MODULAR GLARE SCREEN (TEMPORARY)43,200SD $0.1000 $0.0200 $0.2100 $0.0200 $0.2100 $0.2200 $0.2200
930880(A) 8812 ARROW DISPLAY(TYPE C)870SD $5.00 $1.05 $2.10 $1.07 $2.10 $2.16 $2.10
940880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF17,040SD $0.5000 $0.0200 $0.2600 $0.0200 $0.2700 $0.2700 $0.2700
950880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF6,780SD $0.7500 $1.05 $1.05 $1.07 $1.07 $1.08 $1.05
960880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF10,080SD $1.50 $1.05 $1.58 $1.07 $1.60 $1.62 $1.58
970880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)8,490SD $1.00 $2.88 $1.05 $2.93 $1.07 $1.08 $1.05
980880(C) 8848 WING BARRICADES1,320SD $2.00 $0.0500 $1.05 $0.0500 $1.07 $1.08 $1.05
990880(E) 8860 WARNING LIGHTS(TYPE A)13,650SD $0.5000 $0.6800 $1.58 $0.6900 $1.60 $1.62 $1.58
1,000880(F) 8878 DRUMS37,020SD $0.2500 $0.2600 $0.0500 $0.2700 $0.0600 $0.0600 $0.0600
1,010882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN688SD $15.00 $18.88 $10.50 $19.17 $11.00 $10.80 $10.50
1,020642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $50,000.00 $33,085.23 $91,350.00 $28,755.00 $50,000.00 $32,400.00 $48,200.00
1,030220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $1,258.53 $108,675.00 $5,600.00 $5,500.00 $5,400.00 $2,439.24
1,040641 1399 MOBILIZATION1LSUM $370,000.00 $484,362.86 $346,651.35 $320,000.00 $300,000.00 $410,874.79 $419,000.00