| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$16,000.00 |
$15,750.00 |
$35,000.00 |
$60,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 973 | CY |
$15.00 |
$14.70 |
$15.00 |
$18.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 200 | CY |
$25.00 |
$42.00 |
$5.00 |
$30.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,580 | LF |
$2.50 |
$4.18 |
$2.00 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 400 | LF |
$7.75 |
$13.13 |
$15.00 |
$9.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 534 | SY |
$2.50 |
$0.3700 |
$5.00 |
$7.25 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 35 | TON |
$75.00 |
$65.61 |
$50.00 |
$50.00 |
| 8 | 408 5774 |
PRIME COAT | 403 | GAL |
$7.00 |
$6.30 |
$1.00 |
$7.75 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 302.6 | TON |
$130.00 |
$97.65 |
$70.00 |
$140.00 |
| 10 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 460.2 | TON |
$115.00 |
$114.45 |
$70.00 |
$150.00 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 2,872 | SY |
$7.00 |
$7.35 |
$2.00 |
$10.50 |
| 12 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 58 | SY |
$3.45 |
$26.25 |
$10.00 |
$11.00 |
| 13 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 628 | LF |
$4.50 |
$4.20 |
$4.00 |
$4.00 |
| 14 | 619(C) 0924 |
SAWING PAVEMENT | 475 | LF |
$5.50 |
$10.50 |
$5.00 |
$5.00 |
| 15 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 387.5 | LF |
$22.00 |
$17.85 |
$18.00 |
$20.00 |
| 16 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$900.00 |
$945.00 |
$650.00 |
$1,824.07 |
| 17 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,700.00 |
$2,257.50 |
$2,500.00 |
$2,530.00 |
| 18 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 3 | EA |
$2,100.00 |
$1,863.75 |
$2,000.00 |
$3,300.00 |
| 19 | 504(H) 6389 |
ELASTOMERIC MORTAR | 9 | CF |
$810.00 |
$872.55 |
$900.00 |
$900.00 |
| 20 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,000.00 |
$18,270.00 |
$20,000.00 |
$40,000.00 |
| 21 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$3,000.00 |
$2,772.00 |
$3,000.00 |
$20,000.00 |
| 22 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$2,000.00 |
$609.00 |
$1,000.00 |
$5,000.00 |
| 23 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 2,024 | SY |
$18.00 |
$17.85 |
$18.00 |
$17.50 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 9.8 | CY |
$310.00 |
$297.62 |
$100.00 |
$495.00 |
| 25 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$70,000.00 |
$69,279.00 |
$85,458.10 |
$75,000.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 422.8 | SY |
$230.00 |
$198.46 |
$155.00 |
$180.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 2,312 | SY |
$4.50 |
$3.78 |
$4.00 |
$3.75 |
| 28 | 504(C) 6250 |
SEALED EXPANSION JOINT | 214 | LF |
$260.00 |
$247.67 |
$220.00 |
$320.00 |
| 29 | 504(E) 6190 |
42" F-SHAPED PARAPET | 978.7 | LF |
$90.00 |
$89.56 |
$80.00 |
$60.00 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 1,550 | LB |
$7.00 |
$4.57 |
$4.00 |
$2.00 |
| 31 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 30 | EA |
$3,000.00 |
$821.10 |
$2,850.00 |
$4,500.00 |
| 32 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 30 | EA |
$3,000.00 |
$821.10 |
$2,850.00 |
$4,500.00 |
| 33 | 509 6152 |
SPECIAL CONCRETE FINISH | 125.6 | SY |
$16.25 |
$102.90 |
$100.00 |
$135.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 551.4 | CY |
$850.00 |
$742.36 |
$750.00 |
$975.00 |
| 35 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 149,769 | LB |
$1.15 |
$1.04 |
$1.00 |
$1.35 |
| 36 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,515.1 | SY |
$4.00 |
$3.83 |
$4.00 |
$4.00 |
| 37 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 22 | LF |
$40.00 |
$39.90 |
$40.00 |
$40.00 |
| 38 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1.7 | GAL |
$130.00 |
$63.00 |
$100.00 |
$130.00 |
| 39 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 14.6 | SY |
$850.00 |
$913.50 |
$900.00 |
$900.00 |
| 40 | 523(A) 6550 |
SEALER CRACK PREPARATION | 402.5 | LF |
$3.70 |
$4.20 |
$4.00 |
$4.25 |
| 41 | 523(B) 6560 |
SEALER RESIN | 4.5 | GAL |
$120.00 |
$157.50 |
$160.00 |
$155.00 |
| 42 | 540 4510 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | LSUM |
$8,000.00 |
$9,891.00 |
$20,000.00 |
$45,000.00 |
| 43 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$110,000.00 |
$131,250.00 |
$416,027.00 |
$301,000.00 |
| 44 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 12 | EA |
$15.00 |
$13.31 |
$16.00 |
$13.00 |
| 45 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,481 | LF |
$1.35 |
$1.22 |
$0.6000 |
$1.20 |
| 46 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,844 | LF |
$0.1500 |
$0.3100 |
$0.3000 |
$0.3000 |
| 47 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 3,064 | LF |
$1.00 |
$1.58 |
$0.9000 |
$1.55 |
| 48 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 3,187 | LF |
$0.3500 |
$0.8900 |
$0.3000 |
$0.9000 |
| 49 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 180 | SD |
$8.00 |
$4.20 |
$4.00 |
$4.15 |
| 50 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,300 | LF |
$30.00 |
$18.90 |
$15.00 |
$48.50 |
| 51 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,300 | LF |
$4.80 |
$3.26 |
$5.00 |
$3.25 |
| 52 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 360 | SD |
$2.70 |
$1.05 |
$5.50 |
$1.05 |
| 53 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,520 | SD |
$0.4500 |
$0.4200 |
$0.3000 |
$0.4200 |
| 54 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,700 | SD |
$0.8500 |
$0.4200 |
$0.5500 |
$0.4200 |
| 55 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,240 | SD |
$1.05 |
$0.4200 |
$1.65 |
$0.4200 |
| 56 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$0.5000 |
$2.00 |
$1.65 |
$1.95 |
| 57 | 880(C) 8848 |
WING BARRICADES | 540 | SD |
$1.05 |
$10.50 |
$2.20 |
$10.40 |
| 58 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,340 | SD |
$0.3000 |
$1.05 |
$0.4000 |
$1.05 |
| 59 | 880(F) 8878 |
DRUMS | 12,240 | SD |
$0.1500 |
$0.0500 |
$0.3000 |
$0.0600 |
| 60 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$15.00 |
$5.25 |
$16.00 |
$5.20 |
| 61 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$11,550.00 |
$15,000.00 |
$10,500.00 |
| 62 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$120,000.00 |
$101,490.03 |
$120,000.00 |
$141,000.00 |