| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$20,000.00 |
$30,000.00 |
$3,124.49 |
$8,520.00 |
$27,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 832 | CY |
$18.00 |
$55.00 |
$25.00 |
$8.12 |
$19.17 |
$21.60 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 115 | CY |
$20.00 |
$55.00 |
$60.00 |
$12.50 |
$21.30 |
$81.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$1,500.00 |
$20,000.00 |
$6,600.00 |
$7,723.73 |
$2,982.00 |
$10,800.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,555 | LF |
$1.25 |
$2.10 |
$2.75 |
$3.50 |
$4.26 |
$4.32 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 84 | LF |
$4.00 |
$21.00 |
$10.00 |
$27.35 |
$21.30 |
$21.60 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 24 | CY |
$150.00 |
$235.00 |
$120.00 |
$169.97 |
$266.25 |
$216.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 936 | SY |
$5.00 |
$12.50 |
$12.50 |
$19.11 |
$12.78 |
$12.96 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 0.2 | AC |
$350.00 |
$2,620.00 |
$6,100.00 |
$13,685.20 |
$6,390.00 |
$6,480.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.2 | AC |
$350.00 |
$5,220.00 |
$5,025.00 |
$14,935.00 |
$5,325.00 |
$5,400.00 |
| 11 | 241 2832 |
MOWING | 0.2 | AC |
$200.00 |
$1,045.00 |
$1,025.00 |
$1,343.50 |
$1,065.00 |
$1,080.00 |
| 12 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,500.00 |
$2,200.00 |
$5,000.00 |
$3,749.38 |
$5,325.00 |
$5,505.30 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 4,701 | SY |
$4.00 |
$10.00 |
$7.60 |
$8.44 |
$8.52 |
$7.29 |
| 14 | 408 5774 |
PRIME COAT | 1,956 | GAL |
$4.00 |
$3.00 |
$3.00 |
$3.75 |
$2.25 |
$9.34 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,018 | TON |
$85.00 |
$84.50 |
$86.00 |
$107.48 |
$105.70 |
$106.92 |
| 16 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 897 | TON |
$120.00 |
$108.50 |
$115.00 |
$137.48 |
$134.19 |
$149.58 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,015 | TON |
$105.00 |
$106.00 |
$106.00 |
$132.48 |
$114.75 |
$136.08 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 9,722 | SY |
$4.00 |
$10.00 |
$8.25 |
$10.00 |
$7.46 |
$8.21 |
| 19 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,201 | SY |
$20.00 |
$45.00 |
$25.00 |
$24.18 |
$15.98 |
$30.24 |
| 20 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 2,600 | SY |
$35.00 |
$35.00 |
$30.00 |
$26.68 |
$29.82 |
$37.80 |
| 21 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,109 | CY |
$125.00 |
$143.00 |
$155.00 |
$208.49 |
$146.97 |
$317.20 |
| 22 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 1,013 | LF |
$45.00 |
$45.00 |
$28.50 |
$40.78 |
$42.60 |
$51.71 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$45,000.00 |
$3,975.00 |
$1,974.68 |
$3,195.00 |
$5,940.00 |
| 24 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,013 | LF |
$8.00 |
$10.00 |
$4.62 |
$7.92 |
$10.65 |
$10.80 |
| 25 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 3,800 | SY |
$10.00 |
$15.00 |
$5.18 |
$5.19 |
$8.52 |
$12.96 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,677 | SY |
$5.00 |
$18.00 |
$5.00 |
$5.19 |
$6.39 |
$9.72 |
| 27 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 3,800 | SY |
$10.00 |
$11.00 |
$5.21 |
$8.12 |
$15.98 |
$14.04 |
| 28 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,479 | LF |
$3.00 |
$5.00 |
$4.00 |
$5.72 |
$4.88 |
$5.40 |
| 29 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$500.00 |
$9,500.00 |
$1,750.00 |
$518.20 |
$745.50 |
$2,390.45 |
| 30 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,325 | LF |
$25.00 |
$19.20 |
$18.50 |
$22.95 |
$19.55 |
$20.52 |
| 31 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$2,500.00 |
$3,135.00 |
$3,100.00 |
$3,749.38 |
$3,195.00 |
$3,240.00 |
| 32 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,750.00 |
$3,080.00 |
$4,250.00 |
$3,686.89 |
$3,141.75 |
$1,998.00 |
| 33 | 501(G) 6309 |
CLSM BACKFILL | 75 | CY |
$150.00 |
$180.00 |
$230.00 |
$165.30 |
$175.00 |
$224.69 |
| 34 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$8,000.00 |
$10,725.00 |
$10,000.00 |
$12,840.38 |
$35,000.00 |
$11,301.40 |
| 35 | 504(A) 1304 |
APPROACH SLAB | 408.4 | SY |
$205.00 |
$160.00 |
$188.00 |
$220.51 |
$270.00 |
$298.20 |
| 36 | 504(B) 1305 |
SAW-CUT GROOVING | 1,440.3 | SY |
$5.00 |
$4.25 |
$4.25 |
$5.25 |
$4.47 |
$4.62 |
| 37 | 504(C) 6250 |
SEALED EXPANSION JOINT | 96 | LF |
$300.00 |
$285.00 |
$315.00 |
$359.99 |
$350.00 |
$316.84 |
| 38 | 504(E) 6190 |
42" F-SHAPED PARAPET | 683.2 | LF |
$100.00 |
$94.00 |
$65.00 |
$128.39 |
$125.00 |
$106.20 |
| 39 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 120 | LF |
$30.00 |
$6.00 |
$48.00 |
$36.18 |
$65.00 |
$68.15 |
| 40 | 506(A) 1322 |
STRUCTURAL STEEL | 5,000 | LB |
$3.50 |
$5.25 |
$6.50 |
$10.43 |
$5.33 |
$7.70 |
| 41 | 509 5000 |
ELASTOMERIC COATING | 918 | SF |
$12.00 |
$12.75 |
$10.50 |
$15.25 |
$12.99 |
$13.42 |
| 42 | 509(A) 1326 |
CLASS AA CONCRETE | 269.9 | CY |
$650.00 |
$725.00 |
$900.00 |
$874.59 |
$850.00 |
$822.98 |
| 43 | 509(B) 1328 |
CLASS A CONCRETE | 17 | CY |
$800.00 |
$415.00 |
$585.00 |
$325.39 |
$1,100.00 |
$932.98 |
| 44 | 509(D) 1331 |
CLASS C CONCRETE | 7.4 | CY |
$325.00 |
$1,800.00 |
$600.00 |
$620.85 |
$2,310.00 |
$588.49 |
| 45 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 108,220 | LB |
$1.10 |
$0.7800 |
$1.30 |
$1.08 |
$1.45 |
$1.19 |
| 46 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$113,000.00 |
$70,210.00 |
$16,000.00 |
$84,038.59 |
$71,612.73 |
$73,966.20 |
| 47 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$23,000.00 |
$5,520.00 |
$3,000.00 |
$6,598.91 |
$5,623.20 |
$5,808.00 |
| 48 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 150 | LF |
$35.00 |
$37.00 |
$45.00 |
$48.28 |
$45.00 |
$52.73 |
| 49 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 150 | LF |
$20.00 |
$160.00 |
$27.00 |
$15.00 |
$50.00 |
$33.00 |
| 50 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 51 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 962 | SY |
$4.00 |
$4.10 |
$4.05 |
$5.00 |
$4.26 |
$4.40 |
| 52 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 132 | LF |
$35.00 |
$31.00 |
$46.00 |
$37.49 |
$31.95 |
$33.00 |
| 53 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4.4 | GAL |
$80.00 |
$52.00 |
$105.00 |
$62.49 |
$53.25 |
$55.00 |
| 54 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$650.00 |
$580.00 |
$730.00 |
$714.88 |
$609.18 |
$629.20 |
| 55 | 523(A) 6550 |
SEALER CRACK PREPARATION | 82 | LF |
$5.00 |
$5.20 |
$5.50 |
$6.25 |
$5.33 |
$5.50 |
| 56 | 523(B) 6560 |
SEALER RESIN | 0.7 | GAL |
$150.00 |
$187.00 |
$185.00 |
$224.96 |
$191.70 |
$198.00 |
| 57 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 8 | EA |
$500.00 |
$325.00 |
$1,000.00 |
$393.69 |
$335.48 |
$346.50 |
| 58 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 1 | EA |
$1,000.00 |
$355.00 |
$1,500.00 |
$452.36 |
$362.10 |
$374.00 |
| 59 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 1 | EA |
$1,000.00 |
$315.00 |
$2,000.00 |
$414.11 |
$324.83 |
$335.50 |
| 60 | 540 4545 |
(PL)REPAIR BRIDGE ITEM (TYPE D) | 1 | EA |
$4,000.00 |
$14,940.00 |
$10,000.00 |
$21,727.65 |
$15,242.28 |
$15,743.20 |
| 61 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$91,000.00 |
$74,000.00 |
$70,000.00 |
$112,481.38 |
$205,000.00 |
$170,507.42 |
| 62 | 501(G) 6309 |
CLSM BACKFILL | 70 | CY |
$150.00 |
$180.00 |
$250.00 |
$165.30 |
$175.00 |
$197.19 |
| 63 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$8,000.00 |
$10,100.00 |
$25,000.00 |
$12,432.95 |
$35,000.00 |
$10,942.80 |
| 64 | 504(A) 1304 |
APPROACH SLAB | 408.4 | SY |
$205.00 |
$160.00 |
$200.00 |
$220.51 |
$270.00 |
$298.20 |
| 65 | 504(B) 1305 |
SAW-CUT GROOVING | 1,440.3 | SY |
$5.00 |
$4.00 |
$4.25 |
$5.25 |
$4.47 |
$4.62 |
| 66 | 504(C) 6250 |
SEALED EXPANSION JOINT | 96 | LF |
$325.00 |
$288.00 |
$315.00 |
$359.99 |
$350.00 |
$316.84 |
| 67 | 504(E) 6190 |
42" F-SHAPED PARAPET | 683.2 | LF |
$100.00 |
$94.00 |
$70.00 |
$128.39 |
$125.00 |
$106.20 |
| 68 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 120 | LF |
$30.00 |
$6.25 |
$50.00 |
$36.18 |
$65.00 |
$44.00 |
| 69 | 506(A) 1322 |
STRUCTURAL STEEL | 5,000 | LB |
$3.50 |
$5.10 |
$6.50 |
$10.43 |
$5.33 |
$9.90 |
| 70 | 509 5000 |
ELASTOMERIC COATING | 918 | SF |
$12.00 |
$12.50 |
$10.50 |
$15.25 |
$12.99 |
$13.42 |
| 71 | 509(A) 1326 |
CLASS AA CONCRETE | 269.9 | CY |
$650.00 |
$725.00 |
$975.00 |
$874.59 |
$850.00 |
$822.98 |
| 72 | 509(B) 1328 |
CLASS A CONCRETE | 17 | CY |
$800.00 |
$415.00 |
$650.00 |
$325.39 |
$1,100.00 |
$932.98 |
| 73 | 509(D) 1331 |
CLASS C CONCRETE | 7.8 | CY |
$350.00 |
$1,800.00 |
$600.00 |
$620.85 |
$2,310.00 |
$588.49 |
| 74 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 108,220 | LB |
$1.10 |
$0.7800 |
$1.65 |
$0.2500 |
$1.45 |
$1.27 |
| 75 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$113,000.00 |
$69,150.00 |
$26,000.00 |
$82,812.54 |
$70,567.97 |
$72,887.10 |
| 76 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$23,000.00 |
$5,550.00 |
$3,000.00 |
$6,598.91 |
$5,623.20 |
$5,808.00 |
| 77 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 150 | LF |
$35.00 |
$37.00 |
$50.00 |
$43.99 |
$45.00 |
$52.73 |
| 78 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 150 | LF |
$20.00 |
$160.00 |
$37.00 |
$15.00 |
$50.00 |
$33.00 |
| 79 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 80 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 962 | SY |
$4.00 |
$4.10 |
$4.20 |
$5.00 |
$4.26 |
$4.40 |
| 81 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 144 | LF |
$35.00 |
$32.00 |
$47.00 |
$37.49 |
$31.95 |
$33.00 |
| 82 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4.8 | GAL |
$80.00 |
$52.00 |
$105.00 |
$62.49 |
$53.25 |
$55.00 |
| 83 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$650.00 |
$600.00 |
$750.00 |
$714.88 |
$609.18 |
$629.20 |
| 84 | 523(A) 6550 |
SEALER CRACK PREPARATION | 82 | LF |
$5.00 |
$5.20 |
$5.50 |
$6.25 |
$5.33 |
$5.50 |
| 85 | 523(B) 6560 |
SEALER RESIN | 0.7 | GAL |
$150.00 |
$188.00 |
$185.00 |
$224.96 |
$191.70 |
$198.00 |
| 86 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 8 | EA |
$500.00 |
$330.00 |
$1,500.00 |
$393.69 |
$335.48 |
$346.50 |
| 87 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 3 | EA |
$1,000.00 |
$355.00 |
$2,000.00 |
$452.36 |
$362.10 |
$374.00 |
| 88 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 3 | EA |
$1,000.00 |
$315.00 |
$2,500.00 |
$414.11 |
$324.83 |
$335.50 |
| 89 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$91,000.00 |
$76,000.00 |
$225,000.00 |
$112,481.38 |
$205,000.00 |
$187,007.42 |
| 90 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$50.00 |
$68.00 |
$70.00 |
$81.24 |
$69.23 |
$81.00 |
| 91 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$150.00 |
$210.00 |
$210.00 |
$249.97 |
$213.00 |
$108.00 |
| 92 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 90.5 | LF |
$15.00 |
$23.00 |
$22.50 |
$27.50 |
$23.43 |
$12.96 |
| 93 | 853 9045 |
DELINEATORS(TYPE 1, CODE 2, FLEXIBLE) | 83 | EA |
$5.00 |
$60.50 |
$59.00 |
$72.49 |
$61.77 |
$32.40 |
| 94 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 33 | EA |
$12.00 |
$14.00 |
$14.00 |
$16.56 |
$14.11 |
$10.80 |
| 95 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 3,816 | LF |
$0.8500 |
$0.4700 |
$0.4600 |
$0.5600 |
$0.4800 |
$0.7600 |
| 96 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 25,129 | LF |
$1.25 |
$0.6700 |
$0.6600 |
$0.8000 |
$0.6800 |
$0.8100 |
| 97 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,904 | LF |
$2.25 |
$1.57 |
$1.55 |
$1.87 |
$1.60 |
$1.76 |
| 98 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 990 | LF |
$4.50 |
$2.09 |
$2.05 |
$2.50 |
$2.13 |
$3.24 |
| 99 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 6,849 | LF |
$0.5000 |
$0.3100 |
$0.3200 |
$0.3700 |
$0.3200 |
$0.2700 |
| 100 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 53,248 | LF |
$1.50 |
$0.9200 |
$0.9000 |
$1.10 |
$0.9400 |
$1.06 |
| 101 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 857 | EA |
$1.00 |
$1.04 |
$1.05 |
$1.25 |
$1.07 |
$2.16 |
| 102 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 57,440 | LF |
$0.3000 |
$0.2100 |
$0.2200 |
$0.2500 |
$0.2100 |
$0.1600 |
| 103 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,200 | SD |
$15.00 |
$6.26 |
$6.25 |
$7.50 |
$6.39 |
$2.70 |
| 104 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 9,375 | LF |
$35.00 |
$24.40 |
$35.00 |
$29.25 |
$13.46 |
$32.40 |
| 105 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 9,825 | LF |
$5.00 |
$1.25 |
$3.00 |
$1.50 |
$1.51 |
$3.24 |
| 106 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 13,600 | SD |
$0.1000 |
$0.0800 |
$0.0900 |
$0.1000 |
$0.0900 |
$0.2700 |
| 107 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 880 | SD |
$15.00 |
$3.13 |
$3.18 |
$3.75 |
$3.20 |
$5.40 |
| 108 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 14,640 | SD |
$0.5000 |
$1.83 |
$1.80 |
$2.19 |
$1.86 |
$2.48 |
| 109 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 12,800 | SD |
$1.00 |
$0.5200 |
$0.5100 |
$0.6200 |
$0.5300 |
$0.2700 |
| 110 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 14,480 | SD |
$1.50 |
$0.5200 |
$0.5100 |
$0.6200 |
$0.5300 |
$2.16 |
| 111 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,960 | SD |
$1.25 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.2700 |
| 112 | 880(C) 8848 |
WING BARRICADES | 3,400 | SD |
$2.00 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.2700 |
| 113 | 880(D) 8854 |
VERTICAL PANELS | 4,800 | SD |
$1.00 |
$0.4700 |
$0.4600 |
$0.5600 |
$0.4800 |
$0.5400 |
| 114 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 15,920 | SD |
$0.5000 |
$0.7800 |
$0.7700 |
$0.9400 |
$0.8000 |
$0.2700 |
| 115 | 880(F) 8878 |
DRUMS | 44,160 | SD |
$0.5000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0500 |
| 116 | 882 8382 |
(SP) LITE SMART WORKZONE SYSTEM-PCMS | 3,080 | SD |
$20.00 |
$18.80 |
$18.50 |
$22.50 |
$19.17 |
$10.80 |
| 117 | 882 8384 |
(SP) LITE SMART WORKZONE SYSTEM-PTS | 1,760 | SD |
$25.00 |
$12.00 |
$11.50 |
$13.75 |
$11.72 |
$10.80 |
| 118 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 894 | SD |
$15.00 |
$15.00 |
$12.50 |
$15.00 |
$12.78 |
$10.80 |
| 119 | 509(A) 0319 |
CLASS AA CONCRETE | 23 | CY |
$750.00 |
$150.00 |
$150.00 |
$178.72 |
$152.30 |
$1,080.00 |
| 120 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 500 | LF |
$3.00 |
$10.85 |
$12.00 |
$12.99 |
$11.07 |
$37.80 |
| 121 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 500 | LF |
$20.00 |
$13.67 |
$13.50 |
$16.36 |
$13.94 |
$37.80 |
| 122 | 628(C) 5110 |
END ANCHORS | 1 | EA |
$4,000.00 |
$9,925.00 |
$9,600.00 |
$11,873.04 |
$10,117.50 |
$10,800.00 |
| 123 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$22,000.00 |
$12,258.85 |
$2,343.37 |
$29,400.00 |
$13,500.00 |
| 124 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$45,000.00 |
$9,750.00 |
$10,373.29 |
$8,307.00 |
$10,800.00 |
| 125 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$170,000.00 |
$179,131.31 |
$210,500.00 |
$349,414.65 |
$220,000.00 |
$244,707.60 |