| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$50,000.00 |
$125,000.00 |
$250,000.00 |
$40,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 21,835 | CY |
$10.00 |
$10.58 |
$15.00 |
$12.50 |
$18.00 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 31,847 | CY |
$15.00 |
$10.58 |
$10.00 |
$11.00 |
$25.00 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$27,743.49 |
$30,000.00 |
$30,000.00 |
$23,024.64 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,071 | LF |
$3.00 |
$4.01 |
$2.00 |
$1.85 |
$1.98 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 336 | LF |
$20.00 |
$8.74 |
$13.00 |
$12.50 |
$13.55 |
| 70 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 6 | CY |
$200.00 |
$177.60 |
$400.00 |
$200.00 |
$361.23 |
| 80 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,320 | LF |
$12.00 |
$8.69 |
$8.00 |
$7.20 |
$7.70 |
| 90 | 230(A) 2806 |
SOLID SLAB SODDING | 16,637 | SY |
$5.00 |
$2.22 |
$2.00 |
$1.80 |
$1.93 |
| 100 | 232(B) 2814 |
SEEDING METHOD B | 3.46 | AC |
$2,600.00 |
$954.43 |
$800.00 |
$755.00 |
$829.37 |
| 110 | 233(A) 2817 |
VEGETATIVE MULCHING | 34.6 | AC |
$1,500.00 |
$1,013.05 |
$800.00 |
$825.00 |
$880.30 |
| 120 | 241 2832 |
MOWING | 6.92 | AC |
$400.00 |
$248.49 |
$200.00 |
$200.00 |
$215.92 |
| 130 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$2,500.00 |
$5,593.41 |
$6,000.00 |
$5,000.00 |
$4,560.72 |
| 140 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6 | CY |
$75.00 |
$69.52 |
$70.00 |
$105.00 |
$59.28 |
| 150 | 307(K) 4300 |
STABILIZED SUBGRADE | 19,050 | SY |
$7.00 |
$4.46 |
$6.00 |
$9.00 |
$10.84 |
| 160 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,685 | SY |
$3.50 |
$3.32 |
$2.00 |
$3.00 |
$4.65 |
| 170 | 319(A) 5190 |
OPEN-GRADED BITUMINOUS BASE | 19,715 | SY |
$25.00 |
$10.92 |
$8.00 |
$17.00 |
$8.86 |
| 180 | 325 5271 |
SEPARATOR FABRIC | 22,903 | SY |
$2.50 |
$1.13 |
$1.00 |
$1.25 |
$1.82 |
| 190 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 169.95 | TON |
$40.00 |
$28.04 |
$20.00 |
$25.00 |
$35.94 |
| 200 | 407(B) 0250 |
TACK COAT | 1,153 | GAL |
$3.00 |
$2.48 |
$3.00 |
$2.60 |
$3.32 |
| 210 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,527.12 | TON |
$80.00 |
$64.39 |
$60.00 |
$94.00 |
$60.90 |
| 220 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 327.5 | TON |
$95.00 |
$74.29 |
$75.00 |
$132.00 |
$77.51 |
| 230 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 18,179 | SY |
$22.00 |
$25.83 |
$21.00 |
$30.00 |
$23.50 |
| 240 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 4,546 | CY |
$120.00 |
$104.29 |
$135.00 |
$200.00 |
$144.00 |
| 250 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 113 | CY |
$40.00 |
$28.59 |
$25.00 |
$20.00 |
$53.77 |
| 260 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,049.5 | LF |
$125.00 |
$71.71 |
$82.00 |
$100.00 |
$86.33 |
| 270 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 29 | LF |
$100.00 |
$63.71 |
$40.00 |
$67.43 |
$14.12 |
| 280 | 509(A) 0319 |
CLASS AA CONCRETE | 582 | CY |
$600.00 |
$583.56 |
$500.00 |
$880.00 |
$407.31 |
| 290 | 509(B) 0321 |
CLASS A CONCRETE | 413.4 | CY |
$575.00 |
$281.21 |
$400.00 |
$440.00 |
$436.53 |
| 300 | 509(D) 0325 |
CLASS C CONCRETE | 3.13 | CY |
$350.00 |
$585.39 |
$550.00 |
$525.00 |
$505.63 |
| 310 | 510(A) 6333 |
RETAINING WALL | 282 | SY |
$875.00 |
$926.00 |
$1,200.00 |
$1,250.00 |
$1,112.33 |
| 320 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 8,623 | SF |
$2.00 |
$2.36 |
$2.00 |
$1.90 |
$2.05 |
| 330 | 510(D) 6341 |
MSE RETAINING WALL | 1,542 | SY |
$600.00 |
$582.56 |
$625.00 |
$800.00 |
$975.00 |
| 340 | 511(A) 0332 |
REINFORCING STEEL | 84,615 | LB |
$1.15 |
$1.06 |
$1.00 |
$1.30 |
$1.10 |
| 350 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 67,910 | LB |
$1.50 |
$1.27 |
$1.10 |
$1.30 |
$1.84 |
| 360 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,567 | SY |
$5.00 |
$5.10 |
$5.00 |
$4.15 |
$4.43 |
| 370 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 133.3 | TON |
$55.00 |
$41.93 |
$70.00 |
$45.00 |
$79.93 |
| 380 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 31.3 | TON |
$45.00 |
$30.48 |
$35.00 |
$32.00 |
$57.84 |
| 390 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 108.8 | SY |
$4.00 |
$4.71 |
$2.00 |
$7.50 |
$4.46 |
| 400 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 6,175 | LF |
$7.00 |
$1.72 |
$6.00 |
$8.00 |
$6.00 |
| 410 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 362 | LF |
$35.00 |
$44.25 |
$35.00 |
$40.00 |
$38.00 |
| 420 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 2,207 | SY |
$75.00 |
$58.71 |
$62.00 |
$45.00 |
$61.00 |
| 430 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 2,440 | SY |
$65.00 |
$44.71 |
$75.00 |
$55.00 |
$61.00 |
| 440 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 96 | SF |
$40.00 |
$17.98 |
$35.00 |
$28.00 |
$38.00 |
| 450 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 5 | EA |
$2,800.00 |
$3,832.50 |
$4,000.00 |
$3,100.00 |
$2,416.16 |
| 460 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 10 | EA |
$4,500.00 |
$5,911.70 |
$6,000.00 |
$5,150.00 |
$4,552.67 |
| 470 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 4 | VF |
$200.00 |
$331.46 |
$300.00 |
$205.00 |
$288.40 |
| 480 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 7.15 | VF |
$335.00 |
$476.06 |
$500.00 |
$520.00 |
$560.92 |
| 490 | 611(G) 4012 |
SPECIAL INLET DRAIN | 19 | EA |
$4,250.00 |
$5,627.84 |
$6,500.00 |
$6,250.00 |
$7,817.98 |
| 500 | 611(G) 7180 |
INLET GPI, TYPE 2 (DES.11A) | 1 | EA |
$3,000.00 |
$5,852.01 |
$4,000.00 |
$4,700.00 |
$3,465.04 |
| 510 | 613(A) 0407 |
21" R.C.PIPE CLASS III | 285 | LF |
$50.00 |
$86.01 |
$80.00 |
$78.00 |
$54.43 |
| 520 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 710 | LF |
$65.00 |
$82.44 |
$75.00 |
$68.00 |
$53.66 |
| 530 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 231 | LF |
$85.00 |
$84.53 |
$80.00 |
$94.00 |
$61.83 |
| 540 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 105 | LF |
$110.00 |
$99.87 |
$90.00 |
$99.00 |
$83.70 |
| 550 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 522 | LF |
$135.00 |
$125.58 |
$95.00 |
$130.00 |
$95.37 |
| 560 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 600 | LF |
$175.00 |
$158.35 |
$125.00 |
$156.00 |
$114.59 |
| 570 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 137 | LF |
$175.00 |
$204.00 |
$155.00 |
$171.00 |
$172.73 |
| 580 | 613(B) 0695 |
54" CORR. GALV. STEEL PIPE | 197 | LF |
$100.00 |
$141.63 |
$125.00 |
$182.00 |
$114.04 |
| 590 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 6,208 | LF |
$10.00 |
$9.89 |
$8.00 |
$10.00 |
$12.20 |
| 600 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 85 | LF |
$10.00 |
$22.66 |
$8.00 |
$14.00 |
$9.05 |
| 610 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 7 | EA |
$650.00 |
$1,418.74 |
$800.00 |
$780.00 |
$1,602.99 |
| 620 | 613(L) 5728 |
21" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,250.00 |
$1,474.01 |
$1,200.00 |
$985.00 |
$4,112.67 |
| 630 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,000.00 |
$3,200.54 |
$1,800.00 |
$2,750.00 |
$3,999.46 |
| 640 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$500.00 |
$711.45 |
$1,000.00 |
$1,070.00 |
$953.53 |
| 650 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$36,320.59 |
$25,000.00 |
$75,000.00 |
$78,577.00 |
| 660 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 7,997 | SY |
$9.00 |
$7.20 |
$5.00 |
$9.25 |
$10.51 |
| 670 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 13,235 | SY |
$5.00 |
$6.52 |
$5.00 |
$6.50 |
$5.54 |
| 680 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 2,649 | SY |
$15.00 |
$12.30 |
$5.00 |
$8.15 |
$10.89 |
| 690 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 388 | SY |
$12.00 |
$14.72 |
$5.00 |
$8.15 |
$10.89 |
| 700 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,070 | LF |
$5.00 |
$2.55 |
$4.00 |
$2.55 |
$7.54 |
| 710 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 154 | SY |
$10.00 |
$11.16 |
$8.00 |
$12.00 |
$16.12 |
| 720 | 620(C) 5910 |
CONTRACTOR HEALTH SAFETY PLAN | 1 | LSUM |
$10,000.00 |
$8,919.91 |
$45,000.00 |
$2,500.00 |
$12,000.00 |
| 730 | 620(C) 5920 |
CONTAMINATED MATERIALS MANAGEMENT PLAN | 1 | LSUM |
$5,000.00 |
$12,742.72 |
$75,000.00 |
$2,500.00 |
$12,000.00 |
| 740 | 624(A) 4281 |
FENCE-STYLE WWF | 571 | LF |
$10.00 |
$13.76 |
$16.00 |
$11.00 |
$13.58 |
| 750 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 7 | EA |
$175.00 |
$153.82 |
$100.00 |
$52.00 |
$193.78 |
| 760 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 1 | EA |
$3,000.00 |
$33,285.14 |
$30,000.00 |
$29,000.00 |
$27,682.55 |
| 770 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 3,405 | CY |
$25.00 |
$19.18 |
$25.00 |
$25.00 |
$16.61 |
| 780 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 3,042 | CY |
$70.00 |
$29.66 |
$35.00 |
$13.00 |
$33.22 |
| 790 | 501(F) 6352 |
GRANULAR BACKFILL | 236 | CY |
$55.00 |
$38.52 |
$45.00 |
$66.00 |
$68.65 |
| 800 | 501(G) 6309 |
CLSM BACKFILL | 3,440 | CY |
$160.00 |
$141.58 |
$90.00 |
$117.00 |
$116.27 |
| 810 | 504(A) 1304 |
APPROACH SLAB | 517.9 | SY |
$225.00 |
$265.13 |
$200.00 |
$240.00 |
$254.68 |
| 820 | 504(B) 1305 |
SAW-CUT GROOVING | 2,064.9 | SY |
$4.50 |
$5.35 |
$5.00 |
$4.25 |
$4.65 |
| 830 | 504(C) 6250 |
SEALED EXPANSION JOINT | 154.8 | LF |
$275.00 |
$302.86 |
$350.00 |
$360.00 |
$304.51 |
| 840 | 504(E) 6190 |
42" F-SHAPED PARAPET | 639.6 | LF |
$100.00 |
$77.22 |
$80.00 |
$90.00 |
$88.58 |
| 850 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 451,895 | LB |
$3.00 |
$1.64 |
$2.00 |
$2.55 |
$2.21 |
| 860 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 24 | EA |
$2,200.00 |
$2,486.83 |
$3,000.00 |
$3,500.00 |
$2,214.60 |
| 870 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 32 | EA |
$2,200.00 |
$2,486.83 |
$3,000.00 |
$3,500.00 |
$2,214.60 |
| 880 | 509 5000 |
ELASTOMERIC COATING | 2,168 | SF |
$15.00 |
$18.48 |
$17.00 |
$15.50 |
$21.04 |
| 890 | 509(A) 1326 |
CLASS AA CONCRETE | 632.8 | CY |
$685.00 |
$785.42 |
$800.00 |
$650.00 |
$581.33 |
| 900 | 509(B) 1328 |
CLASS A CONCRETE | 2,205.5 | CY |
$600.00 |
$663.22 |
$600.00 |
$550.00 |
$442.92 |
| 910 | 510(A) 6334 |
RETAINING WALL | 427.1 | SY |
$2,250.00 |
$1,295.44 |
$1,700.00 |
$1,750.00 |
$1,522.49 |
| 920 | 510(C) 6138 |
SLOPE WALL (5") | 313.3 | SY |
$120.00 |
$116.97 |
$100.00 |
$150.00 |
$143.95 |
| 930 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 22,544 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 940 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 502,903 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.25 |
$1.33 |
| 950 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 887 | SY |
$5.00 |
$5.73 |
$5.00 |
$4.60 |
$4.98 |
| 960 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 108 | LF |
$1,000.00 |
$1,069.16 |
$1,000.00 |
$2,000.00 |
$2,214.60 |
| 970 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 980 | 523(A) 6550 |
SEALER CRACK PREPARATION | 305.5 | LF |
$5.00 |
$5.10 |
$4.00 |
$4.15 |
$4.43 |
| 990 | 523(B) 6560 |
SEALER RESIN | 2.5 | GAL |
$160.00 |
$254.86 |
$200.00 |
$205.00 |
$221.46 |
| 1,000 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 251 | LF |
$25.00 |
$23.38 |
$15.00 |
$20.00 |
$22.15 |
| 1,010 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$25.00 |
$24.31 |
$15.00 |
$22.00 |
$22.15 |
| 1,020 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$127,605.71 |
$459,195.60 |
|
$954,336.00 |
| 1,030 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 28 | EA |
$40.00 |
$63.71 |
$55.00 |
$52.00 |
$110.73 |
| 1,040 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$300.00 |
$254.86 |
$220.00 |
$205.00 |
$2,768.25 |
| 1,050 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 297.5 | SF |
$25.00 |
$25.48 |
$22.00 |
$21.00 |
$22.15 |
| 1,060 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 543.8 | LF |
$15.00 |
$12.74 |
$11.00 |
$10.50 |
$15.50 |
| 1,070 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 16,621 | LF |
$1.00 |
$1.27 |
$1.10 |
$1.05 |
$1.11 |
| 1,080 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,242 | LF |
$2.00 |
$5.10 |
$4.40 |
$4.15 |
$3.32 |
| 1,090 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 1,506 | LF |
$6.00 |
$22.94 |
$20.00 |
$18.70 |
$14.95 |
| 1,100 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 14 | EA |
$215.05 |
$254.86 |
$220.00 |
$205.00 |
$166.10 |
| 1,110 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 17 | EA |
$777.00 |
$637.14 |
$550.00 |
$520.00 |
$442.92 |
| 1,120 | 802(A) 8350 |
1 1/2" GALV. STEEL ELECT CONDUIT EXPOSED | 28 | LF |
$27.00 |
$19.11 |
$17.00 |
$15.50 |
$16.61 |
| 1,130 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 74 | LF |
$8.25 |
$15.29 |
$13.00 |
$12.50 |
$13.29 |
| 1,140 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 317 | LF |
$25.00 |
$17.20 |
$15.00 |
$14.00 |
$14.95 |
| 1,150 | 802(C) 8553 |
3" HIGH DENSITY PE PIPE - BORED | 1,744 | LF |
$50.00 |
$50.97 |
$44.00 |
$41.50 |
$44.29 |
| 1,160 | 803(A) 8065 |
PULL BOX(SIZE I) | 8 | EA |
$1,000.00 |
$1,146.84 |
$990.00 |
$935.00 |
$996.57 |
| 1,170 | 803(A) 8066 |
PULL BOX(SIZE II) | 2 | EA |
$1,075.00 |
$1,592.85 |
$1,400.00 |
$1,275.00 |
$1,384.13 |
| 1,180 | 804(A) 2915 |
STRUCTURAL CONCRETE | 62 | CY |
$750.00 |
$1,019.42 |
$880.00 |
$830.00 |
$885.84 |
| 1,190 | 804(B) 2916 |
REINFORCING STEEL | 8,954 | LB |
$1.50 |
$2.10 |
$2.00 |
$1.70 |
$1.83 |
| 1,200 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$8,000.00 |
$12,742.72 |
$15,000.00 |
$10,500.00 |
$11,073.02 |
| 1,210 | 806(A) 8314 |
32'MH POLE 50'TS & 10'LMA(G.STL.) | 4 | EA |
$26,000.00 |
$20,515.79 |
$18,000.00 |
$16,500.00 |
$17,827.56 |
| 1,220 | 806(A) 8348 |
32'MH POLE,60'TS & 10'LMA(G.STL.) | 1 | EA |
$30,000.00 |
$24,338.61 |
$22,000.00 |
$19,750.00 |
$21,149.47 |
| 1,230 | 806(A) 8349 |
32' MH POLE, 65' TS & 10' LMA (G.STL.) | 2 | EA |
$34,000.00 |
$27,524.29 |
$24,000.00 |
$22,500.00 |
$23,917.72 |
| 1,240 | 806(A) 8353 |
32'MH POLE,55'TS & 10'LMA(G.STL.) | 1 | EA |
$28,000.00 |
$22,936.91 |
$20,000.00 |
$18,750.00 |
$19,931.43 |
| 1,250 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 8 | EA |
$1,000.00 |
$1,083.13 |
$1,000.00 |
$885.00 |
$941.21 |
| 1,260 | 809(A) 8090 |
ROADWAY LUMINAIRE | 8 | EA |
$1,500.00 |
$892.00 |
$800.00 |
$725.00 |
$775.11 |
| 1,270 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$2,000.00 |
$2,293.70 |
$2,000.00 |
$1,870.00 |
$1,993.15 |
| 1,280 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 1,351 | LF |
$2.25 |
$2.55 |
$2.20 |
$2.05 |
$2.21 |
| 1,290 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 2,233 | LF |
$1.51 |
$0.9600 |
$1.00 |
$0.8000 |
$0.8300 |
| 1,300 | 811 8052 |
2/C NO.12 ELECTRICAL CONDUCTOR | 1,595 | LF |
$2.50 |
$1.27 |
$1.10 |
$1.05 |
$1.11 |
| 1,310 | 823 8600 |
WIRELESS SIGNAL COMMUNICATION SYSTEM | 2 | EA |
$8,000.00 |
$10,194.18 |
$9,000.00 |
$8,305.00 |
$8,858.42 |
| 1,320 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 2 | EA |
$40,000.00 |
$48,422.37 |
$42,000.00 |
$39,500.00 |
$42,077.48 |
| 1,330 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$50,000.00 |
$86,650.54 |
$75,000.00 |
$70,500.00 |
$75,296.53 |
| 1,340 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 16 | EA |
$1,600.00 |
$1,592.85 |
$1,400.00 |
$1,300.00 |
$1,384.13 |
| 1,350 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 16 | EA |
$625.00 |
$1,287.02 |
$1,200.00 |
$1,050.00 |
$1,118.38 |
| 1,360 | 831 8280 |
1WAY 4SEC. ADJ. SIG. HD.S-13 | 4 | EA |
$900.00 |
$1,560.98 |
$1,400.00 |
$1,275.00 |
$1,356.45 |
| 1,370 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 16 | EA |
$625.00 |
$860.13 |
$800.00 |
$700.00 |
$747.43 |
| 1,380 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 746 | LF |
$2.75 |
$2.55 |
$2.20 |
$2.10 |
$2.21 |
| 1,390 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 3,124 | LF |
$3.50 |
$2.87 |
$2.50 |
$2.35 |
$2.49 |
| 1,400 | 834(A) 8213 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,275 | LF |
$6.00 |
$7.65 |
$7.00 |
$6.25 |
$6.64 |
| 1,410 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 406 | LF |
$1.25 |
$1.59 |
$2.00 |
$1.30 |
$1.38 |
| 1,420 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 8 | EA |
$1,500.00 |
$1,165.96 |
$1,100.00 |
$950.00 |
$1,013.18 |
| 1,430 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 1,844 | LF |
$2.50 |
$2.55 |
$2.20 |
$2.10 |
$2.21 |
| 1,440 | 840(D) 8597 |
E.P.S. 4 CHANNEL PHASE SELECTOR | 4 | EA |
$4,000.00 |
$6,307.65 |
$5,500.00 |
$5,150.00 |
$5,481.15 |
| 1,450 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 122 | SF |
$60.00 |
$86.65 |
$75.00 |
$71.00 |
$75.30 |
| 1,460 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 510 | LF |
$45.00 |
$35.68 |
$31.00 |
$29.00 |
$31.00 |
| 1,470 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 3,800 | LF |
$10.00 |
$9.56 |
$8.00 |
$7.80 |
$8.30 |
| 1,480 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 3 | EA |
$1,500.00 |
$713.59 |
$700.00 |
$581.00 |
$620.09 |
| 1,490 | 803(A) 8060 |
PULL BOX | 5 | EA |
$750.00 |
$1,242.42 |
$1,100.00 |
$1,015.00 |
$1,079.62 |
| 1,500 | 804(A) 2915 |
STRUCTURAL CONCRETE | 36.08 | CY |
$900.00 |
$1,153.21 |
$1,000.00 |
$935.00 |
$1,002.11 |
| 1,510 | 804(B) 2916 |
REINFORCING STEEL | 6,248 | LB |
$2.00 |
$2.55 |
$2.20 |
$2.10 |
$2.21 |
| 1,520 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 5 | EA |
$1,000.00 |
$382.28 |
$500.00 |
$310.00 |
$332.19 |
| 1,530 | 806(C) 8270 |
30' MTG & HLMA (SPECIAL) | 22 | EA |
$4,500.00 |
$2,994.55 |
$2,500.00 |
$2,440.00 |
$2,602.16 |
| 1,540 | 807 8091 |
BREAKAWAY BASE (DES. A) | 21 | EA |
$900.00 |
$700.85 |
$605.00 |
$570.00 |
$609.02 |
| 1,550 | 809(A) 8090 |
ROADWAY LUMINAIRE | 22 | EA |
$1,500.00 |
$1,624.70 |
$1,400.00 |
$1,320.00 |
$1,411.81 |
| 1,560 | 809(B) 8098 |
UNDERPASS LUMINIARE | 6 | EA |
$1,250.00 |
$1,401.70 |
$1,200.00 |
$1,140.00 |
$1,218.03 |
| 1,570 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 11,100 | LF |
$2.25 |
$1.59 |
$1.50 |
$1.30 |
$1.38 |
| 1,580 | 811 8042 |
1/C NO.8 ELECTRICAL CONDUCTOR | 700 | LF |
$2.00 |
$1.85 |
$1.60 |
$1.50 |
$1.61 |
| 1,590 | 806(C) 8269 |
POWDER COAT LIGHTING POLE | 22 | EA |
$600.00 |
$955.71 |
$825.00 |
$775.00 |
$830.48 |
| 1,600 | 806(A) 8282 |
POWDER COAT SIGNAL POLE | 16 | EA |
$1,200.00 |
$1,911.40 |
$1,650.00 |
$1,555.00 |
$1,660.95 |
| 1,610 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$150,000.00 |
$150,000.00 |
$975,000.00 |
$300,000.00 |
$225,000.00 |
| 1,620 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 161,570 | CY |
$8.00 |
$10.58 |
$15.00 |
$11.00 |
$19.00 |
| 1,630 | 202(D) 0184 |
UNCLASSIFIED BORROW | 69,447 | CY |
$8.00 |
$10.58 |
$10.00 |
$15.00 |
$26.00 |
| 1,640 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$110,973.94 |
$80,000.00 |
$37,500.00 |
$300,000.00 |
| 1,650 | 221(C) 2801 |
TEMPORARY SILT FENCE | 13,523 | LF |
$3.00 |
$4.01 |
$2.00 |
$1.85 |
$1.98 |
| 1,660 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 103 | EA |
$200.00 |
$156.66 |
$450.00 |
$400.00 |
$437.38 |
| 1,670 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,184 | LF |
$12.50 |
$8.74 |
$13.00 |
$12.50 |
$13.55 |
| 1,680 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 6 | CY |
$200.00 |
$177.60 |
$400.00 |
$195.00 |
$367.83 |
| 1,690 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 13 | CY |
$200.00 |
$177.60 |
$400.00 |
$160.00 |
$372.90 |
| 1,700 | 229 4318 |
DITCH LINER PROTECTION | 3,789 | LF |
$1.50 |
$3.76 |
$4.00 |
$3.00 |
$3.27 |
| 1,710 | 230(A) 2806 |
SOLID SLAB SODDING | 86,583 | SY |
$4.00 |
$2.22 |
$2.00 |
$1.80 |
$1.93 |
| 1,720 | 232(B) 2814 |
SEEDING METHOD B | 35.8 | AC |
$1,500.00 |
$954.43 |
$800.00 |
$765.00 |
$829.37 |
| 1,730 | 233(A) 2817 |
VEGETATIVE MULCHING | 17.93 | AC |
$1,500.00 |
$1,013.05 |
$800.00 |
$825.00 |
$880.31 |
| 1,740 | 241 2832 |
MOWING | 35.8 | AC |
$150.00 |
$248.49 |
$200.00 |
$200.00 |
$215.92 |
| 1,750 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 16 | EA |
$1,750.00 |
$5,593.41 |
$6,000.00 |
$2,000.00 |
$4,560.76 |
| 1,760 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 48,297 | CY |
$38.00 |
$38.43 |
$35.00 |
$40.00 |
$57.00 |
| 1,770 | 307(K) 4300 |
STABILIZED SUBGRADE | 223,575 | SY |
$5.00 |
$4.46 |
$6.00 |
$7.00 |
$10.68 |
| 1,780 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 187,276 | SY |
$4.00 |
$4.71 |
$4.00 |
$4.45 |
$5.96 |
| 1,790 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,596.68 | TON |
$25.00 |
$19.48 |
$20.00 |
$22.00 |
$35.93 |
| 1,800 | 407(B) 0250 |
TACK COAT | 8,117 | GAL |
$2.50 |
$2.36 |
$3.00 |
$2.60 |
$3.32 |
| 1,810 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 1,263.98 | TON |
$80.00 |
$83.77 |
$70.00 |
$93.00 |
$77.51 |
| 1,820 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 44,936.07 | TON |
$70.00 |
$62.18 |
$60.00 |
$88.00 |
$60.90 |
| 1,830 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 833.33 | TON |
$110.00 |
$101.58 |
$80.00 |
$120.00 |
$88.58 |
| 1,840 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,340.08 | TON |
$90.00 |
$73.07 |
$75.00 |
$100.00 |
$77.51 |
| 1,850 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 500 | TON |
$175.00 |
$110.39 |
$80.00 |
$305.00 |
$88.58 |
| 1,860 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 13,923 | SY |
$17.00 |
$18.40 |
$14.00 |
$18.00 |
$22.00 |
| 1,870 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 111,490 | SY |
$22.00 |
$20.22 |
$16.00 |
$19.00 |
$25.00 |
| 1,880 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 41,390 | CY |
$120.00 |
$104.29 |
$135.00 |
$145.00 |
$144.00 |
| 1,890 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 165 | CY |
$40.00 |
$17.87 |
$25.00 |
$27.00 |
$29.12 |
| 1,900 | 504(E) 1381 |
CONCRETE PARAPET | 3,043.2 | LF |
$100.00 |
$78.61 |
$85.00 |
$100.00 |
$87.38 |
| 1,910 | 504(E) 6190 |
42" F-SHAPED PARAPET | 9,536.2 | LF |
$90.00 |
$62.66 |
$82.00 |
$80.00 |
$86.33 |
| 1,920 | 509(A) 0319 |
CLASS AA CONCRETE | 352.2 | CY |
$800.00 |
$750.00 |
$500.00 |
$1,750.00 |
$1,264.40 |
| 1,930 | 509(B) 0321 |
CLASS A CONCRETE | 4,322.2 | CY |
$400.00 |
$193.30 |
$400.00 |
$250.00 |
$433.39 |
| 1,940 | 509(B) 0325 |
CLASS A CONCRETE(LONG. BAR. DES. 1-A) | 704.1 | CY |
$750.00 |
$274.67 |
$500.00 |
$400.00 |
$515.43 |
| 1,950 | 509(D) 0325 |
CLASS C CONCRETE | 595.8 | CY |
$350.00 |
$294.07 |
$450.00 |
$300.00 |
$554.36 |
| 1,960 | 510(C) 6135 |
SLOPE WALL (5") | 1,270 | SY |
$105.00 |
$41.80 |
$95.00 |
$106.00 |
$93.97 |
| 1,970 | 511(A) 0332 |
REINFORCING STEEL | 111,505 | LB |
$1.10 |
$1.24 |
$1.00 |
$1.20 |
$1.24 |
| 1,980 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 806,120 | LB |
$1.75 |
$1.27 |
$1.10 |
$1.20 |
$1.92 |
| 1,990 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 332.2 | TON |
$45.00 |
$41.93 |
$70.00 |
$44.00 |
$79.94 |
| 2,000 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 68.2 | TON |
$40.00 |
$30.48 |
$35.00 |
$33.00 |
$57.80 |
| 2,010 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 252.1 | SY |
$4.00 |
$4.71 |
$2.00 |
$14.00 |
$4.46 |
| 2,020 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 16,199 | LF |
$4.00 |
$1.29 |
$6.00 |
$5.25 |
$4.00 |
| 2,030 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 883 | LF |
$35.00 |
$42.38 |
$27.00 |
$39.00 |
$38.00 |
| 2,040 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 4,919 | SY |
$45.00 |
$36.45 |
$50.00 |
$48.00 |
$55.00 |
| 2,050 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 822 | SY |
$55.00 |
$51.50 |
$60.00 |
$58.00 |
$65.00 |
| 2,060 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 23 | EA |
$2,000.00 |
$3,676.07 |
$4,000.00 |
$3,100.00 |
$2,416.20 |
| 2,070 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 9 | EA |
$3,500.00 |
$5,486.07 |
$5,000.00 |
$4,150.00 |
$3,721.40 |
| 2,080 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 48.8 | VF |
$150.00 |
$331.46 |
$300.00 |
$205.00 |
$288.63 |
| 2,090 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 27.9 | VF |
$250.00 |
$393.69 |
$400.00 |
$310.00 |
$374.73 |
| 2,100 | 611(G) 5113 |
INLET CI DES. 2 (B) | 9 | EA |
$4,500.00 |
$5,462.83 |
$6,000.00 |
$4,670.00 |
$6,505.47 |
| 2,110 | 611(G) 5397 |
INLET CDI RCB DES. 11 | 1 | EA |
$4,000.00 |
$5,129.85 |
$7,500.00 |
$4,150.00 |
$7,888.16 |
| 2,120 | 611(G) 5484 |
INLET CDI 30SK RCB DES. 12 | 1 | EA |
$9,500.00 |
$4,683.26 |
$9,000.00 |
$4,150.00 |
$8,439.79 |
| 2,130 | 611(G) 5699 |
INLET - LONGITUDINAL BARRIER - TYPE I, DES. 2 | 35 | EA |
$3,250.00 |
$3,828.77 |
$4,500.00 |
$3,850.00 |
$5,001.84 |
| 2,140 | 611(G) 5700 |
INLET - LONGITUDINAL BARRIER - TYPE II, DES. 2 | 12 | EA |
$4,500.00 |
$6,672.81 |
$7,000.00 |
$6,000.00 |
$8,866.30 |
| 2,150 | 611(G) 5970 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 4 | EA |
$6,500.00 |
$6,015.96 |
$7,500.00 |
$5,925.00 |
$7,672.32 |
| 2,160 | 611(G) 5972 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 6 | EA |
$6,500.00 |
$6,804.46 |
$9,000.00 |
$6,750.00 |
$9,566.95 |
| 2,170 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 4 | EA |
$2,500.00 |
$4,233.37 |
$4,000.00 |
$3,115.00 |
$2,705.05 |
| 2,180 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 25.5 | VF |
$250.00 |
$414.74 |
$300.00 |
$260.00 |
$439.33 |
| 2,190 | 611(H) 5546 |
ADD'L DEPTH IN INLET CDI RCB DES. 11 | 14.5 | VF |
$750.00 |
$522.04 |
$600.00 |
$415.00 |
$821.14 |
| 2,200 | 611(H) 5633 |
ADD'L DEPTH IN INLET CDI RCB 30SK DES. 12 | 0.3 | VF |
$1,000.00 |
$547.19 |
$800.00 |
$520.00 |
$844.47 |
| 2,210 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 4,616.7 | LF |
$65.00 |
$91.98 |
$85.00 |
$67.00 |
$69.08 |
| 2,220 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,116.5 | LF |
$85.00 |
$106.61 |
$95.00 |
$94.00 |
$92.39 |
| 2,230 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 521.3 | LF |
$105.00 |
$130.98 |
$105.00 |
$120.00 |
$112.18 |
| 2,240 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 466.1 | LF |
$135.00 |
$214.73 |
$115.00 |
$130.00 |
$167.79 |
| 2,250 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 8 | LF |
$175.00 |
$315.70 |
$215.00 |
$260.00 |
$175.04 |
| 2,260 | 613(H) 0550 |
12" PERFORATED PIPE UNDERDRAIN ROUND | 300 | LF |
$20.00 |
$31.76 |
$30.00 |
$52.00 |
$33.65 |
| 2,270 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 27,146 | LF |
$10.00 |
$9.48 |
$8.00 |
$9.00 |
$12.21 |
| 2,280 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 1,447 | LF |
$10.00 |
$19.03 |
$8.00 |
$8.00 |
$9.04 |
| 2,290 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 12 | EA |
$400.00 |
$1,313.37 |
$800.00 |
$780.00 |
$1,059.27 |
| 2,300 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$750.00 |
$1,755.94 |
$1,200.00 |
$985.00 |
$1,188.70 |
| 2,310 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$1,000.00 |
$2,321.55 |
$1,300.00 |
$1,140.00 |
$1,374.06 |
| 2,320 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$1,500.00 |
$3,069.83 |
$1,500.00 |
$1,660.00 |
$2,151.61 |
| 2,330 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,500.00 |
$4,909.55 |
$2,100.00 |
$2,285.00 |
$3,158.39 |
| 2,340 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 27 | EA |
$400.00 |
$711.45 |
$1,000.00 |
$455.00 |
$953.57 |
| 2,350 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 7,319 | CY |
$30.00 |
$48.48 |
$33.00 |
$36.00 |
$49.70 |
| 2,360 | 613(W) 4508 |
48" JACKED CONDUIT | 250.2 | LF |
$1,500.00 |
$1,375.20 |
$1,100.00 |
$1,550.00 |
$3,280.60 |
| 2,370 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$65,000.00 |
$188,298.08 |
$570,000.00 |
$105,000.00 |
$165,100.00 |
| 2,380 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 9,083 | LF |
$5.00 |
$5.70 |
$5.00 |
$4.00 |
$9.91 |
| 2,390 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 42,969 | SY |
$6.50 |
$11.94 |
$5.00 |
$11.50 |
$16.95 |
| 2,400 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 94,997 | SY |
$4.50 |
$7.74 |
$5.00 |
$6.20 |
$5.54 |
| 2,410 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 19,802 | SY |
$9.00 |
$16.98 |
$6.00 |
$17.00 |
$20.27 |
| 2,420 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 11,019 | LF |
$3.00 |
$2.40 |
$4.00 |
$2.05 |
$7.54 |
| 2,430 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 9,032 | LF |
$10.00 |
$10.87 |
$10.00 |
$9.00 |
$9.62 |
| 2,440 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 858 | LF |
$7.50 |
$20.38 |
$50.00 |
$9.50 |
$16.26 |
| 2,450 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 1,894 | LF |
$5.00 |
$10.18 |
$6.00 |
$15.00 |
$6.91 |
| 2,460 | 619(B) 6132 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 1,234 | SY |
$10.00 |
$11.24 |
$9.00 |
$15.00 |
$11.49 |
| 2,470 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 3,512.5 | LF |
$20.00 |
$22.94 |
$20.00 |
$18.50 |
$22.15 |
| 2,480 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 6 | EA |
$850.00 |
$637.14 |
$600.00 |
$520.00 |
$1,107.30 |
| 2,490 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,500.00 |
$3,313.10 |
$2,700.00 |
$2,700.00 |
$2,934.35 |
| 2,500 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$2,000.00 |
$2,102.55 |
$1,700.00 |
$1,700.00 |
$2,214.60 |
| 2,510 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 6,132 | LF |
$50.00 |
$46.59 |
$90.00 |
$95.00 |
$88.42 |
| 2,520 | 627(B) 4410 |
CONCRETE LONGITUDINAL BARRIER END SECTIONS | 50 | EA |
$500.00 |
$536.62 |
$6,000.00 |
$1,300.00 |
$1,716.89 |
| 2,530 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 16 | EA |
$23,000.00 |
$31,219.68 |
$30,000.00 |
$29,000.00 |
$27,682.55 |
| 2,540 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$63,713.63 |
$85,000.00 |
$85,000.00 |
$83,047.64 |
| 2,550 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,414 | CY |
$25.00 |
$44.60 |
$50.00 |
$36.00 |
$38.76 |
| 2,560 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$3.00 |
$4.01 |
$2.00 |
$2.25 |
$1.98 |
| 2,570 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$13.00 |
$8.74 |
$13.00 |
$12.00 |
$13.55 |
| 2,580 | 230(A) 2806 |
SOLID SLAB SODDING | 3,768 | SY |
$6.00 |
$2.22 |
$2.00 |
$1.80 |
$1.93 |
| 2,590 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 81 | CY |
$40.00 |
$69.37 |
$75.00 |
$59.00 |
$59.28 |
| 2,600 | 307(K) 4300 |
STABILIZED SUBGRADE | 484 | SY |
$125.00 |
$20.51 |
$10.00 |
$11.50 |
$65.73 |
| 2,610 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 147 | TON |
$85.00 |
$124.41 |
$70.00 |
$130.00 |
$60.90 |
| 2,620 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 57 | SY |
$25.00 |
$67.07 |
$80.00 |
$140.00 |
$71.64 |
| 2,630 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 10 | CY |
$130.00 |
$163.87 |
$135.00 |
$165.00 |
$238.13 |
| 2,640 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 120 | LF |
$40.00 |
$32.97 |
$35.00 |
$45.00 |
$43.79 |
| 2,650 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 2 | EA |
$5,500.00 |
$3,185.68 |
$4,000.00 |
$2,600.00 |
$2,768.26 |
| 2,660 | 613(U) 0600 |
BORE & JACK 42" CASING | 432 | LF |
$1,000.00 |
$1,465.41 |
$600.00 |
$1,175.00 |
$1,273.40 |
| 2,670 | 616(A) 5121 |
6" DUCTILE IRON PIPE | 177 | LF |
$80.00 |
$82.83 |
$80.00 |
$67.00 |
$71.97 |
| 2,680 | 616(A) 5124 |
12" DUCTILE IRON PIPE | 131 | LF |
$125.00 |
$121.05 |
$125.00 |
$99.00 |
$105.19 |
| 2,690 | 616(A) 5126 |
24" DUCTILE IRON PIPE | 229 | LF |
$250.00 |
$210.26 |
$250.00 |
$171.00 |
$182.70 |
| 2,700 | 616(A) 5810 |
6" DUCTILE IRON PIPE RESTRAINED JOINT | 500 | LF |
$125.00 |
$95.57 |
$80.00 |
$78.00 |
$83.05 |
| 2,710 | 616(A) 5830 |
12" DUCTILE IRON PIPE RESTRAINED JOINT | 1,931 | LF |
$130.00 |
$146.54 |
$135.00 |
$120.00 |
$127.34 |
| 2,720 | 616(D) 1070 |
6" GATE VALVE | 6 | EA |
$2,500.00 |
$1,401.70 |
$1,200.00 |
$1,140.00 |
$1,218.03 |
| 2,730 | 616(D) 1100 |
12" GATE VALVE | 7 | EA |
$5,000.00 |
$4,077.68 |
$2,800.00 |
$3,320.00 |
$3,543.37 |
| 2,740 | 616(D) 1140 |
24" GATE VALVE | 4 | EA |
$18,000.00 |
$35,042.50 |
$32,000.00 |
$28,500.00 |
$30,450.80 |
| 2,750 | 616(D) 7051 |
STANDARD VALVE BOX | 17 | EA |
$400.00 |
$318.57 |
$400.00 |
$260.00 |
$276.83 |
| 2,760 | 616(D) 7078 |
VALVE BOX EXTENSION | 17 | EA |
$125.00 |
$191.15 |
$200.00 |
$155.00 |
$166.10 |
| 2,770 | 616(F) 5211 |
METER INSTALLATION 2" | 1 | EA |
$800.00 |
$7,645.64 |
$4,000.00 |
$6,230.00 |
$6,643.81 |
| 2,780 | 616(F) 5948 |
METER INSTALLATION 3/4" | 12 | EA |
$500.00 |
$955.71 |
$600.00 |
$780.00 |
$830.48 |
| 2,790 | 616(G) 1192 |
FIRE HYDRANTS | 3 | EA |
$5,500.00 |
$4,459.96 |
$4,500.00 |
$3,650.00 |
$3,875.56 |
| 2,800 | 616(G) 1193 |
FIRE HYDRANT EXTENSION | 3 | EA |
$500.00 |
$637.14 |
$600.00 |
$520.00 |
$553.65 |
| 2,810 | 616(I) 5264 |
18" STEEL CASING | 20 | LF |
$160.00 |
$191.15 |
$285.00 |
$155.00 |
$166.10 |
| 2,820 | 616(I) 5270 |
24" STEEL CASING | 65 | LF |
$220.00 |
$318.57 |
$300.00 |
$260.00 |
$276.83 |
| 2,830 | 616(I) 5285 |
42" STEEL CASING | 30 | LF |
$480.00 |
$445.99 |
$350.00 |
$360.00 |
$387.56 |
| 2,840 | 616(J) 0176 |
BORE AND JACK 18" CASING | 159 | LF |
$450.00 |
$892.00 |
$500.00 |
$725.00 |
$775.11 |
| 2,850 | 616(J) 0180 |
BORE AND JACK 20" CASING | 817 | LF |
$500.00 |
$892.00 |
$550.00 |
$1.00 |
$775.11 |
| 2,860 | 616(J) 0185 |
BORE AND JACK 24" CASING | 475 | LF |
$600.00 |
$1,274.28 |
$600.00 |
$935.00 |
$996.57 |
| 2,870 | 616(K) 0150 |
6" SOLID SLEEVE | 2 | EA |
$1,200.00 |
$382.28 |
$600.00 |
$310.00 |
$332.19 |
| 2,880 | 616(K) 0225 |
12" SOLID SLEEVE | 7 | EA |
$1,800.00 |
$892.00 |
$1,200.00 |
$725.00 |
$775.11 |
| 2,890 | 616(K) 0247 |
24" SOLID SLEEVE | 4 | EA |
$5,000.00 |
$5,097.09 |
$2,600.00 |
$4,150.00 |
$4,429.21 |
| 2,900 | 616(N) 0090 |
SERVICE CONNECTION (SHORT) | 4 | EA |
$500.00 |
$2,229.97 |
$1,200.00 |
$1,815.00 |
$1,937.78 |
| 2,910 | 616(N) 0092 |
SERVICE CONNECTION (LONG) | 9 | EA |
$2,500.00 |
$4,459.96 |
$2,500.00 |
$3,650.00 |
$3,875.56 |
| 2,920 | 616(O) 0200 |
6" 45 DEGREE FITTING | 17 | EA |
$550.00 |
$382.28 |
$600.00 |
$310.00 |
$332.19 |
| 2,930 | 616(O) 0500 |
12" 11 1/4 DEGREE FITTING | 7 | EA |
$750.00 |
$1,019.42 |
$1,200.00 |
$830.00 |
$885.84 |
| 2,940 | 616(O) 0520 |
12" 22 1/2 DEGREE FITTING | 5 | EA |
$750.00 |
$1,019.42 |
$1,200.00 |
$830.00 |
$885.84 |
| 2,950 | 616(O) 0530 |
12" 45 DEGREE FITTING | 22 | EA |
$950.00 |
$1,019.42 |
$1,200.00 |
$830.00 |
$885.84 |
| 2,960 | 616(O) 2000 |
WATER LINE RELOCATION | 1 | LSUM |
$380,940.00 |
$547,937.26 |
$728,000.00 |
$575,000.00 |
$609,016.06 |
| 2,970 | 616(S) 0210 |
6" PLUG | 1 | EA |
$600.00 |
$127.42 |
$300.00 |
$103.00 |
$110.73 |
| 2,980 | 616(T) 0600 |
12" X 12" X 6" TEE | 2 | EA |
$1,750.00 |
$1,529.12 |
$1,200.00 |
$1,245.00 |
$1,328.76 |
| 2,990 | 616(T) 2500 |
6" X 6" X 6" TEE | 3 | EA |
$850.00 |
$892.00 |
$600.00 |
$725.00 |
$775.11 |
| 3,000 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 120 | LF |
$5.00 |
$12.74 |
$10.00 |
$10.50 |
$11.07 |
| 3,010 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 57 | SY |
$50.00 |
$12.74 |
$25.00 |
$10.50 |
$11.07 |
| 3,020 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 427 | SY |
$40.00 |
$10.19 |
$5.00 |
$8.30 |
$8.86 |
| 3,030 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$44,599.55 |
$65,000.00 |
$60,000.00 |
$60,901.61 |
| 3,040 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 887 | CY |
$25.00 |
$108.31 |
$125.00 |
$130.00 |
$138.41 |
| 3,050 | 230(A) 2806 |
SOLID SLAB SODDING | 350 | SY |
$6.00 |
$2.22 |
$2.00 |
$1.80 |
$1.93 |
| 3,060 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 316 | CY |
$40.00 |
$48.89 |
$50.00 |
$64.00 |
$59.28 |
| 3,070 | 307(K) 4300 |
STABILIZED SUBGRADE | 2,847 | SY |
$125.00 |
$4.46 |
$7.00 |
$7.75 |
$65.79 |
| 3,080 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 2,847 | SY |
$25.00 |
$26.03 |
$80.00 |
$16.00 |
$49.67 |
| 3,090 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 712 | CY |
$120.00 |
$107.73 |
$135.00 |
$170.00 |
$238.13 |
| 3,100 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 15 | EA |
$5,500.00 |
$4,459.96 |
$5,500.00 |
$4,150.00 |
$4,429.21 |
| 3,110 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 6 | EA |
$6,500.00 |
$10,831.32 |
$7,000.00 |
$9,350.00 |
$9,965.72 |
| 3,120 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 42.98 | VF |
$185.00 |
$382.28 |
$400.00 |
$310.00 |
$332.19 |
| 3,130 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 73.11 | VF |
$250.00 |
$764.56 |
$500.00 |
$625.00 |
$664.38 |
| 3,140 | 613(U) 0500 |
BORE & JACK 20" STEEL CASING | 817 | LF |
$500.00 |
$1,274.28 |
$550.00 |
$1,040.00 |
$1,107.30 |
| 3,150 | 613(U) 0600 |
BORE & JACK 42" CASING | 60 | LF |
$1,000.00 |
$3,185.68 |
$800.00 |
$2,600.00 |
$2,768.25 |
| 3,160 | 615(A) 6120 |
8" POLYVINYL CHLORIDE (PVC) PIPE | 1,482 | LF |
$85.00 |
$95.57 |
$75.00 |
$90.00 |
$94.12 |
| 3,170 | 615(A) 6134 |
24" POLYVINYL CHLORIDE (PVC) PIPE | 1,326 | LF |
$260.00 |
$254.86 |
$135.00 |
$230.00 |
$243.61 |
| 3,180 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,847 | SY |
$50.00 |
$15.13 |
$5.00 |
$4.30 |
$14.89 |
| 3,190 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 805 | LF |
$20.00 |
$2.40 |
$3.00 |
$5.50 |
$7.54 |
| 3,200 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 1,103 | CY |
$25.00 |
$19.18 |
$25.00 |
$10.75 |
$19.93 |
| 3,210 | 501(F) 6352 |
GRANULAR BACKFILL | 162 | CY |
$60.00 |
$38.52 |
$45.00 |
$60.00 |
$68.65 |
| 3,220 | 501(G) 6309 |
CLSM BACKFILL | 1,554 | CY |
$160.00 |
$141.58 |
$90.00 |
$110.00 |
$121.80 |
| 3,230 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 2,457 | LF |
$250.00 |
$238.73 |
$300.00 |
$242.00 |
$282.36 |
| 3,240 | 504(A) 1304 |
APPROACH SLAB | 579.2 | SY |
$225.00 |
$203.28 |
$225.00 |
$200.00 |
$221.46 |
| 3,250 | 504(B) 1305 |
SAW-CUT GROOVING | 2,747.1 | SY |
$5.00 |
$5.35 |
$5.00 |
$4.25 |
$4.65 |
| 3,260 | 504(C) 6250 |
SEALED EXPANSION JOINT | 75 | LF |
$275.00 |
$302.86 |
$350.00 |
$280.00 |
$304.51 |
| 3,270 | 504(E) 6190 |
42" F-SHAPED PARAPET | 691.4 | LF |
$100.00 |
$77.22 |
$80.00 |
$71.00 |
$88.58 |
| 3,280 | 506(A) 1322 |
STRUCTURAL STEEL | 2,620 | LB |
$6.00 |
$8.14 |
$6.00 |
$2.05 |
$2.77 |
| 3,290 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$2,200.00 |
$2,214.60 |
| 3,300 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 36 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$2,200.00 |
$2,214.60 |
| 3,310 | 509 5000 |
ELASTOMERIC COATING | 1,708 | SF |
$15.00 |
$18.48 |
$17.00 |
$15.50 |
$21.04 |
| 3,320 | 509(A) 1326 |
CLASS AA CONCRETE | 588 | CY |
$685.00 |
$785.42 |
$800.00 |
$550.00 |
$581.33 |
| 3,330 | 509(B) 1328 |
CLASS A CONCRETE | 858.2 | CY |
$600.00 |
$663.22 |
$600.00 |
$575.00 |
$442.92 |
| 3,340 | 509(D) 1331 |
CLASS C CONCRETE | 14.3 | CY |
$800.00 |
$1,453.83 |
$600.00 |
$625.00 |
$669.92 |
| 3,350 | 510(A) 6334 |
RETAINING WALL | 76.6 | SY |
$1,900.00 |
$1,295.44 |
$1,700.00 |
$1,275.00 |
$1,472.14 |
| 3,360 | 510(C) 6138 |
SLOPE WALL (5") | 539 | SY |
$120.00 |
$116.97 |
$100.00 |
$115.00 |
$143.95 |
| 3,370 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 47,612 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 3,380 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 298,670 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.15 |
$1.27 |
| 3,390 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 634 | LF |
$40.00 |
$28.28 |
$35.00 |
$35.00 |
$37.65 |
| 3,400 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 347 | LF |
$50.00 |
$35.15 |
$45.00 |
$42.00 |
$46.51 |
| 3,410 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 634 | LF |
$20.00 |
$26.37 |
$10.00 |
$10.00 |
$13.29 |
| 3,420 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 347 | LF |
$20.00 |
$26.37 |
$10.00 |
$15.00 |
$17.72 |
| 3,430 | 514(K) 6260 |
(PL)PILOT HOLES | 297 | LF |
$150.00 |
$122.83 |
$100.00 |
$86.00 |
$110.73 |
| 3,440 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 3,450 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 340 | SY |
$5.00 |
$5.73 |
$5.00 |
$4.55 |
$4.98 |
| 3,460 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 434 | LF |
$750.00 |
$622.54 |
$700.00 |
$575.00 |
$586.87 |
| 3,470 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 228 | LF |
$1,000.00 |
$1,069.16 |
$1,000.00 |
$1,100.00 |
$1,107.30 |
| 3,480 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 3,490 | 523(A) 6550 |
SEALER CRACK PREPARATION | 74.5 | LF |
$5.00 |
$5.10 |
$4.00 |
$4.10 |
$4.43 |
| 3,500 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$160.00 |
$254.86 |
$200.00 |
$205.00 |
$221.47 |
| 3,510 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 711 | TON |
$55.00 |
$41.17 |
$70.00 |
$40.00 |
$44.29 |
| 3,520 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 127 | TON |
$45.00 |
$29.75 |
$35.00 |
$27.00 |
$33.22 |
| 3,530 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 321 | LF |
$25.00 |
$23.38 |
$15.00 |
$20.00 |
$22.15 |
| 3,540 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$25.00 |
$24.31 |
$15.00 |
$20.00 |
$22.15 |
| 3,550 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$115,000.00 |
$231,285.34 |
$440,000.00 |
$40,000.00 |
$655,300.00 |
| 3,560 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 1,106 | CY |
$25.00 |
$19.18 |
$25.00 |
$11.00 |
$19.93 |
| 3,570 | 501(F) 6352 |
GRANULAR BACKFILL | 162 | CY |
$60.00 |
$38.52 |
$45.00 |
$60.00 |
$68.65 |
| 3,580 | 501(G) 6309 |
CLSM BACKFILL | 1,580 | CY |
$160.00 |
$141.58 |
$90.00 |
$110.00 |
$121.80 |
| 3,590 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 2,457 | LF |
$250.00 |
$238.73 |
$300.00 |
$300.00 |
$298.97 |
| 3,600 | 504(A) 1304 |
APPROACH SLAB | 579.2 | SY |
$250.00 |
$203.28 |
$225.00 |
$210.00 |
$221.46 |
| 3,610 | 504(B) 1305 |
SAW-CUT GROOVING | 2,747.1 | SY |
$5.00 |
$5.35 |
$5.00 |
$4.25 |
$4.65 |
| 3,620 | 504(C) 6250 |
SEALED EXPANSION JOINT | 75 | LF |
$275.00 |
$302.86 |
$350.00 |
$300.00 |
$304.51 |
| 3,630 | 504(E) 6190 |
42" F-SHAPED PARAPET | 691.4 | LF |
$100.00 |
$77.22 |
$80.00 |
$80.00 |
$88.58 |
| 3,640 | 506(A) 1322 |
STRUCTURAL STEEL | 2,550 | LB |
$6.00 |
$8.14 |
$6.00 |
$2.35 |
$2.77 |
| 3,650 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$2,500.00 |
$2,214.60 |
| 3,660 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 36 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$2,500.00 |
$2,214.60 |
| 3,670 | 509 5000 |
ELASTOMERIC COATING | 1,790 | SF |
$15.00 |
$18.48 |
$17.00 |
$15.50 |
$21.04 |
| 3,680 | 509(A) 1326 |
CLASS AA CONCRETE | 585.2 | CY |
$725.00 |
$785.42 |
$800.00 |
$625.00 |
$664.38 |
| 3,690 | 509(B) 1328 |
CLASS A CONCRETE | 851.6 | CY |
$700.00 |
$663.22 |
$600.00 |
$650.00 |
$664.38 |
| 3,700 | 509(D) 1331 |
CLASS C CONCRETE | 9.9 | CY |
$800.00 |
$1,453.83 |
$600.00 |
$650.00 |
$669.92 |
| 3,710 | 510(A) 6334 |
RETAINING WALL | 297.4 | SY |
$2,000.00 |
$1,295.44 |
$1,700.00 |
$1,200.00 |
$1,695.40 |
| 3,720 | 510(C) 6138 |
SLOPE WALL (5") | 866.7 | SY |
$120.00 |
$116.97 |
$100.00 |
$125.00 |
$143.95 |
| 3,730 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 50,606 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 3,740 | 511 6306 |
MECHANICAL SPLICES | 1,502 | EA |
$40.00 |
$55.42 |
$40.00 |
$43.00 |
$49.83 |
| 3,750 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 298,670 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.25 |
$1.33 |
| 3,760 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,585 | LF |
$40.00 |
$28.28 |
$35.00 |
$32.00 |
$37.65 |
| 3,770 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 457 | LF |
$50.00 |
$35.15 |
$45.00 |
$42.54 |
$46.51 |
| 3,780 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,585 | LF |
$20.00 |
$26.37 |
$10.00 |
$12.00 |
$13.29 |
| 3,790 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 457 | LF |
$20.00 |
$26.37 |
$10.00 |
$19.00 |
$17.72 |
| 3,800 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$650,000.00 |
$856,773.54 |
$45,000.00 |
$800,000.00 |
$387,555.67 |
| 3,810 | 514(K) 6260 |
(PL)PILOT HOLES | 297 | LF |
$150.00 |
$122.83 |
$100.00 |
$86.00 |
$110.73 |
| 3,820 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 3,830 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 342 | SY |
$5.00 |
$5.73 |
$5.00 |
$4.60 |
$4.98 |
| 3,840 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 496 | LF |
$750.00 |
$622.54 |
$700.00 |
$750.00 |
$636.70 |
| 3,850 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 228 | LF |
$1,000.00 |
$1,069.16 |
$1,000.00 |
$1,500.00 |
$1,660.95 |
| 3,860 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 6 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 3,870 | 523(A) 6550 |
SEALER CRACK PREPARATION | 350.2 | LF |
$5.00 |
$5.10 |
$4.00 |
$4.10 |
$4.43 |
| 3,880 | 523(B) 6560 |
SEALER RESIN | 2.9 | GAL |
$160.00 |
$254.86 |
$200.00 |
$205.00 |
$221.46 |
| 3,890 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 688 | TON |
$55.00 |
$41.17 |
$70.00 |
$40.00 |
$44.29 |
| 3,900 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 122 | TON |
$45.00 |
$29.75 |
$35.00 |
$30.00 |
$33.22 |
| 3,910 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 553 | LF |
$25.00 |
$23.38 |
$15.00 |
$20.00 |
$22.15 |
| 3,920 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 152 | LF |
$25.00 |
$24.31 |
$15.00 |
$22.00 |
$22.15 |
| 3,930 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$115,000.00 |
$231,285.34 |
$440,000.00 |
$690,000.00 |
$710,700.00 |
| 3,940 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 4,032 | CY |
$25.00 |
$19.18 |
$25.00 |
$11.00 |
$16.61 |
| 3,950 | 501(F) 6352 |
GRANULAR BACKFILL | 346 | CY |
$60.00 |
$38.52 |
$45.00 |
$60.00 |
$68.65 |
| 3,960 | 501(G) 6309 |
CLSM BACKFILL | 3,999 | CY |
$160.00 |
$141.58 |
$90.00 |
$110.00 |
$121.80 |
| 3,970 | 504(A) 1304 |
APPROACH SLAB | 654.3 | SY |
$225.00 |
$203.28 |
$225.00 |
$205.00 |
$221.46 |
| 3,980 | 504(B) 1305 |
SAW-CUT GROOVING | 2,208.7 | SY |
$5.00 |
$5.35 |
$5.00 |
$4.25 |
$4.65 |
| 3,990 | 504(C) 6250 |
SEALED EXPANSION JOINT | 134 | LF |
$275.00 |
$302.86 |
$350.00 |
$300.00 |
$304.51 |
| 4,000 | 504(E) 1381 |
CONCRETE PARAPET | 301.3 | LF |
$140.00 |
$97.82 |
$90.00 |
$110.00 |
$127.34 |
| 4,010 | 504(E) 6190 |
42" F-SHAPED PARAPET | 301.3 | LF |
$100.00 |
$77.22 |
$80.00 |
$85.00 |
$88.58 |
| 4,020 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 541,890 | LB |
$3.00 |
$1.64 |
$2.00 |
$2.15 |
$2.21 |
| 4,030 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 7 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$3,500.00 |
$2,546.79 |
| 4,040 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 14 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$3,500.00 |
$2,546.79 |
| 4,050 | 509 5000 |
ELASTOMERIC COATING | 1,165 | SF |
$15.00 |
$18.48 |
$17.00 |
$15.00 |
$21.04 |
| 4,060 | 509(A) 1326 |
CLASS AA CONCRETE | 380.5 | CY |
$685.00 |
$785.42 |
$800.00 |
$590.00 |
$664.38 |
| 4,070 | 509(B) 1328 |
CLASS A CONCRETE | 1,112 | CY |
$600.00 |
$663.22 |
$600.00 |
$550.00 |
$442.92 |
| 4,080 | 509(D) 1331 |
CLASS C CONCRETE | 8.7 | CY |
$800.00 |
$1,453.83 |
$600.00 |
$650.00 |
$669.92 |
| 4,090 | 510(A) 6334 |
RETAINING WALL | 242.3 | SY |
$1,700.00 |
$1,295.44 |
$1,700.00 |
$1,600.00 |
$1,694.25 |
| 4,100 | 510(C) 6138 |
SLOPE WALL (5") | 120 | SY |
$120.00 |
$116.97 |
$100.00 |
$225.00 |
$254.68 |
| 4,110 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 9,349 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 4,120 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 279,880 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.20 |
$1.27 |
| 4,130 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 329 | SY |
$5.00 |
$5.73 |
$5.00 |
$4.55 |
$4.98 |
| 4,131 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 160 | LF |
$700.00 |
$508.28 |
$600.00 |
$415.00 |
$553.65 |
| 4,140 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 972 | LF |
$750.00 |
$622.54 |
$700.00 |
$595.00 |
$586.87 |
| 4,150 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 104 | LF |
$1,000.00 |
$1,069.16 |
$1,000.00 |
$1,100.00 |
$1,107.30 |
| 4,160 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 5 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 4,170 | 523(A) 6550 |
SEALER CRACK PREPARATION | 138 | LF |
$5.00 |
$5.10 |
$4.00 |
$4.15 |
$4.43 |
| 4,180 | 523(B) 6560 |
SEALER RESIN | 1.2 | GAL |
$160.00 |
$254.86 |
$200.00 |
$205.00 |
$221.46 |
| 4,190 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 155 | LF |
$25.00 |
$23.38 |
$8.00 |
$21.00 |
$22.15 |
| 4,200 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$200,000.00 |
$103,679.64 |
$513,000.00 |
$175,000.00 |
$688,500.00 |
| 4,210 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 4,804 | CY |
$25.00 |
$19.18 |
$25.00 |
$12.00 |
$16.61 |
| 4,220 | 501(F) 6352 |
GRANULAR BACKFILL | 400 | CY |
$60.00 |
$38.52 |
$45.00 |
$65.00 |
$68.65 |
| 4,230 | 501(G) 6309 |
CLSM BACKFILL | 4,747 | CY |
$160.00 |
$141.58 |
$90.00 |
$115.00 |
$121.80 |
| 4,240 | 504(A) 1304 |
APPROACH SLAB | 768.7 | SY |
$250.00 |
$203.28 |
$225.00 |
$220.00 |
$221.46 |
| 4,250 | 504(B) 1305 |
SAW-CUT GROOVING | 2,610.9 | SY |
$6.00 |
$5.35 |
$5.00 |
$4.25 |
$4.65 |
| 4,260 | 504(C) 6250 |
SEALED EXPANSION JOINT | 164 | LF |
$325.00 |
$302.86 |
$350.00 |
$300.00 |
$304.51 |
| 4,270 | 504(E) 1381 |
CONCRETE PARAPET | 301.3 | LF |
$140.00 |
$97.82 |
$90.00 |
$120.00 |
$127.34 |
| 4,280 | 504(E) 6190 |
42" F-SHAPED PARAPET | 301.3 | LF |
$100.00 |
$77.22 |
$80.00 |
$85.00 |
$88.58 |
| 4,290 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 702,760 | LB |
$3.00 |
$1.64 |
$2.00 |
$2.50 |
$2.21 |
| 4,300 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$4,500.00 |
$2,546.79 |
| 4,310 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$2,200.00 |
$2,486.83 |
$3,500.00 |
$4,500.00 |
$2,546.79 |
| 4,320 | 509 5000 |
ELASTOMERIC COATING | 1,517 | SF |
$15.00 |
$18.48 |
$17.00 |
$15.00 |
$21.04 |
| 4,330 | 509(A) 1326 |
CLASS AA CONCRETE | 448.3 | CY |
$725.00 |
$785.42 |
$800.00 |
$650.00 |
$664.38 |
| 4,340 | 509(B) 1328 |
CLASS A CONCRETE | 1,297.4 | CY |
$700.00 |
$663.22 |
$600.00 |
$660.00 |
$664.38 |
| 4,350 | 509(D) 1331 |
CLASS C CONCRETE | 7.7 | CY |
$800.00 |
$1,453.83 |
$600.00 |
$700.00 |
$788.25 |
| 4,360 | 510(A) 6334 |
RETAINING WALL | 238.7 | SY |
$1,700.00 |
$1,295.44 |
$1,700.00 |
$1,750.00 |
$1,696.83 |
| 4,370 | 510(C) 6138 |
SLOPE WALL (5") | 139.8 | SY |
$120.00 |
$116.97 |
$100.00 |
$240.00 |
$254.68 |
| 4,380 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 10,349 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.50 |
$2.60 |
| 4,390 | 511 6306 |
MECHANICAL SPLICES | 481 | EA |
$35.00 |
$55.42 |
$40.00 |
$44.00 |
$49.83 |
| 4,400 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 326,940 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.35 |
$1.33 |
| 4,410 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$1,300,000.00 |
|
$45,000.00 |
$950,000.00 |
|
| 4,420 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 331 | SY |
$5.00 |
$5.73 |
$5.00 |
$4.60 |
$4.98 |
| 4,421 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 328 | LF |
$700.00 |
$508.28 |
$600.00 |
$500.00 |
$459.53 |
| 4,430 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 922 | LF |
$750.00 |
$622.54 |
$700.00 |
$800.00 |
$636.70 |
| 4,440 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 135 | LF |
$1,000.00 |
$1,069.16 |
$1,000.00 |
$1,200.00 |
$1,660.95 |
| 4,450 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 7 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,115.95 |
$1,328.76 |
| 4,460 | 523(A) 6550 |
SEALER CRACK PREPARATION | 593.7 | LF |
$5.00 |
$5.10 |
$4.00 |
$4.15 |
$4.43 |
| 4,470 | 523(B) 6560 |
SEALER RESIN | 2.5 | GAL |
$160.00 |
$254.86 |
$200.00 |
$205.00 |
$221.46 |
| 4,480 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 182 | LF |
$25.00 |
$23.38 |
$8.00 |
$22.00 |
$22.15 |
| 4,490 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$200,000.00 |
$103,679.64 |
$513,000.00 |
$690,000.00 |
$821,460.00 |
| 4,500 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 5,266 | CY |
$115.00 |
$19.18 |
$25.00 |
$11.25 |
$16.61 |
| 4,510 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 68 | CY |
$70.00 |
$29.66 |
$35.00 |
$35.00 |
$44.29 |
| 4,520 | 509 5000 |
ELASTOMERIC COATING | 4,459 | SF |
$20.00 |
$18.48 |
$17.00 |
$18.50 |
$21.04 |
| 4,530 | 509(B) 1328 |
CLASS A CONCRETE | 3,212.2 | CY |
$830.00 |
$756.05 |
$600.00 |
$550.00 |
$553.65 |
| 4,540 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 51,475 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 4,550 | 511(A) 1332 |
REINFORCING STEEL | 221,590 | LB |
$1.05 |
$1.01 |
$1.00 |
$1.00 |
$1.22 |
| 4,560 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 552,080 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.15 |
$1.27 |
| 4,570 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 91 | SY |
$5.00 |
$7.65 |
$5.00 |
$6.20 |
$6.64 |
| 4,580 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 342 | LF |
$1,450.00 |
$2,028.95 |
$1,500.00 |
$1,650.00 |
$2,103.87 |
| 4,590 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 124 | LF |
$2,100.00 |
$2,556.64 |
$1,700.00 |
$1,750.00 |
$2,768.25 |
| 4,600 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 172 | LF |
$2,600.00 |
$3,033.70 |
$2,000.00 |
$1,900.00 |
$2,878.99 |
| 4,610 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 15 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 4,620 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 1,519 | CY |
$175.00 |
$19.18 |
$25.00 |
$11.50 |
$19.93 |
| 4,630 | 509 5000 |
ELASTOMERIC COATING | 1,541 | SF |
$20.00 |
$18.48 |
$17.00 |
$18.50 |
$21.04 |
| 4,640 | 509(B) 1328 |
CLASS A CONCRETE | 942.2 | CY |
$825.00 |
$756.05 |
$600.00 |
$550.00 |
$553.65 |
| 4,650 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 12,482 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 4,660 | 511(A) 1332 |
REINFORCING STEEL | 115,660 | LB |
$1.05 |
$1.01 |
$1.00 |
$1.00 |
$1.22 |
| 4,670 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 148,360 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.15 |
$1.27 |
| 4,680 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 23 | SY |
$5.00 |
$7.65 |
$5.00 |
$6.20 |
$6.64 |
| 4,690 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 190 | LF |
$2,600.00 |
$3,213.94 |
$2,000.00 |
$2,300.00 |
$2,878.99 |
| 4,700 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 7 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 4,710 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 919 | CY |
$80.00 |
$19.18 |
$25.00 |
$11.50 |
$19.93 |
| 4,720 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 84 | CY |
$70.00 |
$29.66 |
$35.00 |
$30.00 |
$44.29 |
| 4,730 | 509 5000 |
ELASTOMERIC COATING | 605 | SF |
$15.00 |
$18.48 |
$17.00 |
$15.00 |
$21.04 |
| 4,740 | 509(B) 1328 |
CLASS A CONCRETE | 322.1 | CY |
$725.00 |
$756.05 |
$600.00 |
$600.00 |
$581.33 |
| 4,750 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 4,820 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 4,760 | 511(A) 1332 |
REINFORCING STEEL | 34,320 | LB |
$1.05 |
$1.01 |
$1.00 |
$1.05 |
$1.09 |
| 4,770 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 52,010 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.20 |
$1.27 |
| 4,780 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 33 | LF |
$2,100.00 |
$3,550.14 |
$2,800.00 |
$2,500.00 |
$2,768.25 |
| 4,790 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 4,800 | 509 5000 |
ELASTOMERIC COATING | 468 | SF |
$17.50 |
$18.48 |
$17.00 |
$17.50 |
$21.04 |
| 4,810 | 509(B) 1328 |
CLASS A CONCRETE | 202.9 | CY |
$840.00 |
$756.05 |
$600.00 |
$870.00 |
$830.48 |
| 4,820 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 4,206 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 4,830 | 511(A) 1332 |
REINFORCING STEEL | 3,900 | LB |
$1.05 |
$1.01 |
$1.00 |
$1.10 |
$1.22 |
| 4,840 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 38,320 | LB |
$1.20 |
$1.21 |
$1.10 |
$1.20 |
$1.27 |
| 4,850 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 92 | LF |
$1,450.00 |
$2,160.83 |
$1,600.00 |
$1,500.00 |
$2,103.87 |
| 4,860 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 4,870 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 4,025 | CY |
$150.00 |
$19.18 |
$25.00 |
$11.50 |
$16.61 |
| 4,880 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 77 | CY |
$70.00 |
$29.66 |
$35.00 |
$35.00 |
$44.29 |
| 4,890 | 506(A) 1322 |
STRUCTURAL STEEL | 5,080 | LB |
$4.00 |
$8.14 |
$5.00 |
$9.00 |
$9.41 |
| 4,900 | 509 5000 |
ELASTOMERIC COATING | 1,437 | SF |
$15.00 |
$18.48 |
$17.00 |
$15.00 |
$21.04 |
| 4,910 | 509(B) 1328 |
CLASS A CONCRETE | 849.5 | CY |
$825.00 |
$756.05 |
$600.00 |
$520.00 |
$498.29 |
| 4,920 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 9,729 | SF |
$2.00 |
$2.99 |
$3.00 |
$2.40 |
$2.60 |
| 4,930 | 511 6306 |
MECHANICAL SPLICES | 276 | EA |
$40.00 |
$55.42 |
$100.00 |
$120.00 |
$116.27 |
| 4,940 | 511(A) 1332 |
REINFORCING STEEL | 102,200 | LB |
$1.05 |
$1.01 |
$1.00 |
$1.00 |
$1.22 |
| 4,950 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 116,580 | LB |
$1.20 |
$1.21 |
$1.10 |
$2.15 |
$1.27 |
| 4,960 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 23 | SY |
$5.00 |
$7.65 |
$5.00 |
$6.20 |
$6.64 |
| 4,970 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 265 | LF |
$2,600.00 |
$3,286.36 |
$2,200.00 |
$2,300.00 |
$2,878.98 |
| 4,980 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 10 | EA |
$2,600.00 |
$1,783.98 |
$5,000.00 |
$1,100.00 |
$1,328.76 |
| 4,990 | 509(D) 0325 |
CLASS C CONCRETE | 41.02 | CY |
$600.00 |
$573.43 |
$600.00 |
$475.00 |
$332.19 |
| 5,000 | 511(A) 0332 |
REINFORCING STEEL | 1,686 | LB |
$1.00 |
$1.18 |
$2.00 |
$1.10 |
$1.11 |
| 5,010 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 576 | LF |
$1,250.00 |
$637.14 |
$550.00 |
$675.00 |
$1,051.94 |
| 5,020 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,225 | LF |
$15.00 |
$19.11 |
$30.00 |
$19.50 |
$34.03 |
| 5,030 | 628(C) 5110 |
END ANCHORS | 1 | EA |
$7,500.00 |
$11,213.60 |
$5,500.00 |
$1,800.00 |
$3,127.50 |
| 5,040 | 804(A) 2915 |
STRUCTURAL CONCRETE | 22.8 | CY |
$650.00 |
$445.99 |
$385.00 |
$360.00 |
$553.65 |
| 5,050 | 804(B) 2916 |
REINFORCING STEEL | 3,180 | LB |
$1.00 |
$2.55 |
$2.20 |
$2.10 |
$2.21 |
| 5,060 | 805(A) 8716 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE | 5 | EA |
$5,000.00 |
$12,742.72 |
$11,000.00 |
$10,400.00 |
$11,073.02 |
| 5,070 | 805(A) 8720 |
(PL)REMOVAL OF GROUND MOUNTED SIGNS | 1 | LSUM |
$22,500.00 |
$9,557.04 |
$10,000.00 |
$7,750.00 |
$5,536.51 |
| 5,080 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 120 | EA |
$35.00 |
$63.71 |
$55.00 |
$51.00 |
$110.73 |
| 5,090 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 1,090.85 | SF |
$18.00 |
$25.48 |
$22.00 |
$21.00 |
$22.15 |
| 5,100 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 591.5 | SF |
$25.00 |
$44.60 |
$40.00 |
$36.00 |
$27.68 |
| 5,110 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 2,143.25 | SF |
$30.00 |
$44.60 |
$40.00 |
$36.00 |
$27.68 |
| 5,120 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 520.4 | LF |
$25.00 |
$57.34 |
$50.00 |
$46.00 |
$44.29 |
| 5,130 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 1,348.1 | LF |
$10.00 |
$12.74 |
$11.00 |
$10.50 |
$15.50 |
| 5,140 | 852(D) 0300 |
OVHD.SN.STR., MONOTUBE TYPE B 70' | 2 | EA |
$110,000.00 |
$140,169.99 |
$125,000.00 |
$111,000.00 |
$123,525.35 |
| 5,150 | 852(D) 0320 |
OVHD.SN.STR., MONOTUBE TYPE B 90' | 1 | EA |
$125,000.00 |
$152,912.73 |
$135,000.00 |
$121,000.00 |
$132,876.23 |
| 5,160 | 852(D) 0335 |
OVHD.SN.STR., MONOTUBE TYPE B 105' | 1 | EA |
$150,000.00 |
$165,655.45 |
$145,000.00 |
$131,000.00 |
$139,520.04 |
| 5,170 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 4 | EA |
$65,000.00 |
$108,313.18 |
$95,000.00 |
$86,000.00 |
$59,019.19 |
| 5,180 | 856(A) 8410 |
TRAF. STR(MULT.)(AW)(INLAID)(6" WIDE) | 69,801 | LF |
$2.50 |
$3.19 |
$2.60 |
$2.55 |
$1.99 |
| 5,190 | 856(A) 8420 |
TRAF. STR(MULT.)(AW)(INLAID)(8" WIDE) | 9,916 | LF |
$3.25 |
$4.46 |
$3.60 |
$3.60 |
$3.32 |
| 5,200 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 4,206 | LF |
$2.25 |
$6.37 |
$6.00 |
$5.20 |
$3.32 |
| 5,210 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 30 | LF |
$10.00 |
$12.74 |
$15.00 |
$10.04 |
$22.15 |
| 5,220 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 28 | EA |
$250.00 |
$382.28 |
$400.00 |
$310.00 |
$276.83 |
| 5,230 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 114 | EA |
$350.00 |
$490.59 |
$600.00 |
$390.00 |
$315.58 |
| 5,240 | 880(G) 8900 |
TUBE CHANNELIZERS | 20 | EA |
$125.00 |
$127.42 |
$100.00 |
$105.00 |
$221.46 |
| 5,250 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 57,575 | LF |
$0.3000 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.2800 |
| 5,260 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 760,545.5 | LF |
$0.4500 |
$0.1300 |
$0.1000 |
$0.1100 |
$0.8900 |
| 5,270 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 5,616 | EA |
$0.6000 |
$0.6400 |
$0.5500 |
$0.5500 |
$1.11 |
| 5,280 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 97,311 | LF |
$0.3000 |
$0.1900 |
$0.2000 |
$0.1600 |
$0.2800 |
| 5,290 | 871(A) 8330 |
(PL) IMPACT ATTENUATOR | 1 | EA |
$25,000.00 |
$31,219.68 |
$30,000.00 |
$30,000.00 |
$27,682.55 |
| 5,300 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 6,200 | SD |
$6.00 |
$6.37 |
$5.50 |
$5.20 |
$5.54 |
| 5,310 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 33,950 | LF |
$20.00 |
$16.39 |
$11.00 |
$33.00 |
$39.87 |
| 5,320 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 155,687.5 | LF |
$3.00 |
$4.37 |
$6.00 |
$2.00 |
$8.74 |
| 5,330 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 146,475 | SD |
$0.1000 |
$0.1300 |
$0.1000 |
$0.1200 |
$0.2200 |
| 5,340 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 68,155 | SD |
$0.3000 |
$0.3200 |
$0.3000 |
$0.2600 |
$0.1100 |
| 5,350 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 34,815 | SD |
$0.5000 |
$2.55 |
$2.25 |
$2.05 |
$4.43 |
| 5,360 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 51,850 | SD |
$1.00 |
$3.19 |
$2.75 |
$2.60 |
$5.54 |
| 5,370 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 17,410 | SD |
$0.7500 |
$1.91 |
$2.00 |
$1.55 |
$2.21 |
| 5,380 | 880(C) 8848 |
WING BARRICADES | 15,670 | SD |
$0.5000 |
$0.0600 |
$0.1000 |
$0.0600 |
$0.2800 |
| 5,390 | 880(D) 8854 |
VERTICAL PANELS | 36,425 | SD |
$0.1500 |
$0.1900 |
$0.2000 |
$0.1600 |
$0.2800 |
| 5,400 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 121,595 | SD |
$0.2000 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.1100 |
| 5,410 | 880(F) 8878 |
DRUMS | 228,090 | SD |
$0.3000 |
$0.3200 |
$0.2800 |
$0.2600 |
$0.2800 |
| 5,420 | 880(G) 8890 |
CHANNELIZER CONES | 52,700 | SD |
$0.2500 |
$0.5700 |
$0.5000 |
$0.5000 |
$1.11 |
| 5,430 | 880(I) 8902 |
FLAGGER | 80 | SD |
$130.00 |
$238.29 |
$200.00 |
$550.00 |
$617.71 |
| 5,440 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 775 | SD |
$250.00 |
$248.02 |
$150.00 |
$190.00 |
$359.87 |
| 5,450 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 1,500 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 5,460 | 880(O) 0500 |
SERVICE PATROL | 775 | SD |
$900.00 |
$1,027.51 |
$1,285.00 |
$625.00 |
$1,051.94 |
| 5,470 | 882 8360 |
(SP)SMART WORK ZONE SYSTEM | 775 | SD |
$20.00 |
$70.08 |
$55.00 |
$115.00 |
$143.95 |
| 5,480 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 21,700 | SD |
$12.00 |
$19.11 |
$15.00 |
$15.50 |
$11.07 |
| 5,490 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 23,250 | SD |
$6.00 |
$10.19 |
$8.00 |
$8.25 |
$5.54 |
| 5,500 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 6,200 | SD |
$20.00 |
$17.84 |
$14.00 |
$14.50 |
$5.54 |
| 5,510 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 775 | SD |
$35.00 |
$70.08 |
$55.00 |
$115.00 |
$143.95 |
| 5,520 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 4,060 | SD |
$12.50 |
$19.11 |
$16.50 |
$15.50 |
$11.07 |
| 5,530 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 387 | LF |
$1,000.00 |
$1,019.42 |
$880.00 |
$815.00 |
$885.84 |
| 5,540 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 294 | SY |
$100.00 |
$82.83 |
$65.00 |
$69.00 |
$71.97 |
| 5,550 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 4,500 | LF |
$40.00 |
$23.57 |
$19.00 |
$19.00 |
$20.49 |
| 5,560 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 4,800 | LF |
$40.00 |
$31.86 |
$25.00 |
$26.00 |
$27.68 |
| 5,570 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 8,000 | LF |
$10.00 |
$9.56 |
$8.00 |
$7.75 |
$8.30 |
| 5,580 | 803(A) 8060 |
PULL BOX | 18 | EA |
$750.00 |
$2,159.89 |
$1,700.00 |
$1,750.00 |
$1,876.88 |
| 5,590 | 803(A) 8066 |
PULL BOX(SIZE II) | 45 | EA |
$1,000.00 |
$1,121.36 |
$900.00 |
$900.00 |
$974.43 |
| 5,600 | 804(A) 2915 |
STRUCTURAL CONCRETE | 75.88 | CY |
$900.00 |
$1,153.21 |
$910.00 |
$940.00 |
$1,002.11 |
| 5,610 | 804(B) 2916 |
REINFORCING STEEL | 13,042 | LB |
$2.00 |
$2.55 |
$2.00 |
$2.10 |
$2.21 |
| 5,620 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 35 | EA |
$1,000.00 |
$382.28 |
$400.00 |
$310.00 |
$332.19 |
| 5,630 | 806(C) 8922 |
40' MTG & 8' HLMA(G.STL.) | 17 | EA |
$4,500.00 |
$4,013.95 |
$3,500.00 |
$3,275.00 |
$3,488.00 |
| 5,640 | 806(C) 8929 |
40' MTG.HT.POLE & TWIN H.L.MST.ARM(G.STL.) | 18 | EA |
$5,500.00 |
$5,785.19 |
$5,000.00 |
$4,700.00 |
$5,027.15 |
| 5,641 | 807 8091 |
BREAKAWAY BASE (DES. A) | 12 | EA |
$1,100.00 |
$700.85 |
$600.00 |
$570.00 |
$609.02 |
| 5,650 | 809(A) 8090 |
ROADWAY LUMINAIRE | 53 | EA |
$1,500.00 |
$1,624.70 |
$1,400.00 |
$1,325.00 |
$1,411.81 |
| 5,660 | 809(B) 8098 |
UNDERPASS LUMINIARE | 10 | EA |
$1,250.00 |
$1,401.70 |
$1,200.00 |
$1,150.00 |
$1,218.03 |
| 5,670 | 809(E) 8103 |
HIGH MAST LUMINAIRE | 71 | EA |
$2,500.00 |
$2,803.40 |
$2,400.00 |
$2,275.00 |
$2,436.06 |
| 5,680 | 810(A) 3118 |
SERVICE POLE | 3 | EA |
$25,000.00 |
$35,679.63 |
$30,000.00 |
$29,000.00 |
$31,004.45 |
| 5,690 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 84,000 | LF |
$2.25 |
$1.59 |
$1.25 |
$1.30 |
$1.38 |
| 5,700 | 811 8042 |
1/C NO.8 ELECTRICAL CONDUCTOR | 34,500 | LF |
$2.00 |
$1.85 |
$1.50 |
$1.50 |
$1.61 |
| 5,710 | 812 8072 |
150' HIGH MAST POLE(G.STL.) | 14 | EA |
$55,000.00 |
$39,502.45 |
$35,000.00 |
$31,500.00 |
$34,326.36 |
| 5,720 | 812 8100 |
HIGH MAST POLE ASSEMBLY | 1 | LSUM |
$10,000.00 |
$20,388.36 |
$20,000.00 |
$16,250.00 |
$17,716.83 |
| 5,730 | 813 8074 |
HIGH MAST LOWERING DEVICE TYPE I | 14 | EA |
$15,000.00 |
$18,476.96 |
$15,000.00 |
$15,000.00 |
$16,055.88 |
| 5,740 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$429,000.00 |
$248,865.45 |
$725,000.00 |
$250,000.00 |
$716,313.61 |
| 5,750 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$4,000.00 |
$337,000.00 |
$1,900.00 |
$56,710.20 |
| 5,760 | 640(A) 1426 |
FIELD OFFICE | 2 | EA |
$10,000.00 |
$10,000.00 |
$20,000.00 |
$50,000.00 |
$60,812.29 |
| 5,770 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$3,600,000.00 |
|
|
|
|
| 5,780 | 852(D) 0400 |
POWDER COAT TYPE B1 | 4 | EA |
$9,000.00 |
$9,557.04 |
$8,000.00 |
$7,550.00 |
$12,180.32 |
| 5,790 | 852(D) 0405 |
POWDER COAT TYPE B2 | 3 | EA |
$12,000.00 |
$9,557.04 |
$8,000.00 |
$7,550.00 |
$13,841.27 |
| 5,800 | 852(E) 0600 |
POWDER COAT TYPE C | 1 | EA |
$6,000.00 |
$19,114.09 |
$15,000.00 |
$15,500.00 |
$6,643.81 |
| 5,810 | 806(C) 8269 |
POWDER COAT LIGHTING POLE | 35 | EA |
$600.00 |
$955.71 |
$825.00 |
$775.00 |
$830.48 |