| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$43,000.00 |
$377,771.70 |
$100,000.00 |
$76,120.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 83,331 | CY |
$12.00 |
$22.00 |
$8.40 |
$10.00 |
$10.20 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 50,470 | LF |
$1.25 |
$2.05 |
$0.9700 |
$1.50 |
$2.10 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 56,290 | SY |
$1.50 |
$1.10 |
$2.04 |
$1.80 |
$1.85 |
| 5 | 232(B) 2814 |
SEEDING METHOD B | 12 | AC |
$200.00 |
$1,195.00 |
$1,398.82 |
$1,230.00 |
$1,255.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 12 | AC |
$350.00 |
$995.00 |
$1,164.71 |
$1,025.00 |
$1,045.00 |
| 7 | 241 2832 |
MOWING | 45.3 | AC |
$65.00 |
$80.00 |
$92.47 |
$82.00 |
$83.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 61,213 | CY |
$30.80 |
$25.00 |
$35.35 |
$40.00 |
$39.30 |
| 9 | 307(K) 4300 |
STABILIZED SUBGRADE | 600 | SY |
$1.20 |
$15.00 |
$18.73 |
$36.00 |
$31.50 |
| 10 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 298,298 | SY |
$1.25 |
$4.50 |
$3.89 |
$4.70 |
$4.45 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50,910 | TON |
$17.00 |
$17.75 |
$19.66 |
$18.25 |
$19.70 |
| 12 | 405 5200 |
PERMEABLE FRICTION COURSE | 14,465 | TON |
$102.00 |
$78.50 |
$70.00 |
$83.40 |
$90.30 |
| 13 | 407(B) 0250 |
TACK COAT | 89,168 | GAL |
$2.00 |
$2.05 |
$1.00 |
$2.75 |
$3.65 |
| 14 | 408 5774 |
PRIME COAT | 74,848 | GAL |
$1.40 |
$1.56 |
$0.9000 |
$2.60 |
$6.75 |
| 15 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 48,868 | TON |
$70.00 |
$56.00 |
$60.75 |
$68.20 |
$68.50 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 108,121 | TON |
$52.00 |
$51.00 |
$52.00 |
$62.05 |
$62.70 |
| 17 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 15,397 | TON |
$80.00 |
$68.00 |
$59.95 |
$68.85 |
$73.20 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 188 | TON |
$57.00 |
$100.00 |
$127.18 |
$155.50 |
$157.00 |
| 19 | 411(F) 6100 |
STONE MATRIX ASPHALT | 27,043 | TON |
$100.00 |
$83.00 |
$77.00 |
$84.60 |
$91.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 28,721 | SY |
$1.50 |
$3.25 |
$1.00 |
$2.10 |
$3.50 |
| 21 | 501(G) 6309 |
CLSM BACKFILL | 413 | CY |
$130.00 |
$155.00 |
$216.55 |
$160.00 |
$186.00 |
| 22 | 504(E) 6190 |
42" F-SHAPED PARAPET | 230 | LF |
$120.00 |
$125.00 |
$134.61 |
$140.00 |
$183.50 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 111 | CY |
$525.00 |
$550.00 |
$380.43 |
$150.00 |
$551.00 |
| 24 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 5,921 | LB |
$1.33 |
$1.25 |
$1.17 |
$1.50 |
$2.10 |
| 25 | 611(G) 5697 |
INLET - LONGITUDINAL BARRIER - TYPE I, DES.1 | 13 | EA |
$6,500.00 |
$6,500.00 |
$2,926.41 |
$7.00 |
$3,412.00 |
| 26 | 612(C) 0645 |
INLET ADJUST TO GRADE | 13 | EA |
$1,500.00 |
$2,300.00 |
$1,170.56 |
$2,370.00 |
$2,336.00 |
| 27 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,837 | LF |
$7.00 |
$12.00 |
$5.85 |
$8.50 |
$21.00 |
| 28 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 613 | LF |
$7.00 |
$12.00 |
$5.85 |
$8.50 |
$21.00 |
| 29 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 5 | EA |
$500.00 |
$650.00 |
$351.17 |
$670.00 |
$624.50 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$148,000.00 |
$228,071.49 |
$75,000.00 |
$78,745.00 |
| 31 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 137,668 | SY |
$5.00 |
$1.00 |
$4.37 |
$6.70 |
$5.75 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 82,738 | SY |
$3.00 |
$5.00 |
$1.96 |
$5.15 |
$4.80 |
| 33 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 68,770 | SY |
$5.00 |
$2.00 |
$6.35 |
$10.45 |
$5.75 |
| 34 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 18,226.17 | LF |
$4.50 |
$4.00 |
$3.22 |
$2.85 |
$4.35 |
| 35 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 839 | LF |
$25.00 |
$75.00 |
$39.48 |
$7.36 |
$26.30 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 2,021 | LF |
$4.00 |
$5.00 |
$4.68 |
$6.15 |
$10.50 |
| 37 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 18,792 | LF |
$17.50 |
$16.00 |
$18.20 |
$16.50 |
$19.10 |
| 38 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 11 | EA |
$2,540.00 |
$2,200.00 |
$3,806.00 |
$2,265.00 |
$2,389.00 |
| 39 | 623(I) 8690 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$1,400.00 |
$800.00 |
$1,698.00 |
$825.00 |
$815.00 |
| 40 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 11 | EA |
$1,855.00 |
$1,600.00 |
$3,748.00 |
$1,650.00 |
$1,512.00 |
| 41 | 624(A) 4281 |
FENCE-STYLE WWF | 52,609 | LF |
$6.30 |
$6.25 |
$6.00 |
$6.50 |
$6.50 |
| 42 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 26,307 | LF |
$30.00 |
$42.95 |
$64.95 |
$63.25 |
$52.50 |
| 43 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 82,575 | LF |
$0.1500 |
$0.3000 |
$0.0600 |
$0.1000 |
$0.1000 |
| 44 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 58,700 | LF |
$0.6500 |
$0.6500 |
$0.9900 |
$0.7500 |
$0.7300 |
| 45 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 56,650 | LF |
$0.2000 |
$0.1500 |
$0.0200 |
$0.1500 |
$0.1600 |
| 46 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,920 | SD |
$8.50 |
$5.00 |
$5.85 |
$5.15 |
$5.25 |
| 47 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 906 | SD |
$23.00 |
$5.00 |
$11.71 |
$5.15 |
$5.25 |
| 48 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 29,350 | LF |
$19.00 |
$24.00 |
$17.26 |
$38.10 |
$33.30 |
| 49 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 44,025 | LF |
$3.00 |
$4.00 |
$5.00 |
$10.30 |
$8.00 |
| 50 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 33,580 | SD |
$0.1500 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.1000 |
| 51 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 730 | SD |
$2.60 |
$25.00 |
$11.71 |
$25.75 |
$26.30 |
| 52 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 27,740 | SD |
$0.3500 |
$1.00 |
$0.2900 |
$1.00 |
$1.05 |
| 53 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 16,644 | SD |
$0.6500 |
$0.1000 |
$1.17 |
$0.1000 |
$0.1000 |
| 54 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 19,272 | SD |
$1.35 |
$2.00 |
$1.17 |
$2.10 |
$2.10 |
| 55 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 9,125 | SD |
$1.00 |
$1.00 |
$1.17 |
$1.00 |
$1.05 |
| 56 | 880(C) 8848 |
WING BARRICADES | 1,460 | SD |
$1.00 |
$1.00 |
$5.85 |
$1.00 |
$1.05 |
| 57 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 27,375 | SD |
$0.3000 |
$0.0200 |
$0.1800 |
$0.0200 |
$0.0200 |
| 58 | 880(F) 8878 |
DRUMS | 43,800 | SD |
$0.3500 |
$0.2500 |
$0.2900 |
$0.2500 |
$0.2600 |
| 59 | 880(G) 8890 |
CHANNELIZER CONES | 235,827 | SD |
$0.3000 |
$0.0200 |
$0.2900 |
$0.0200 |
$0.0200 |
| 60 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 150 | HOUR |
$70.00 |
$65.00 |
$76.09 |
$72.00 |
$173.00 |
| 61 | 882 8382 |
(SP) LITE SMART WORKZONE SYSTEM-PCMS | 2,920 | SD |
$15.00 |
$10.00 |
$5.85 |
$10.30 |
$10.50 |
| 62 | 882 8384 |
(SP) LITE SMART WORKZONE SYSTEM-PTS | 2,920 | SD |
$10.50 |
$5.00 |
$5.85 |
$5.15 |
$5.25 |
| 63 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 771 | SD |
$12.50 |
$10.00 |
$5.85 |
$10.30 |
$10.50 |
| 64 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 103,600 | LF |
$0.2000 |
$0.0700 |
$0.2500 |
$0.0700 |
$0.0700 |
| 65 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 21,975 | LF |
$5.00 |
$4.50 |
$3.00 |
$4.65 |
$5.25 |
| 66 | 804(A) 2915 |
STRUCTURAL CONCRETE | 6.16 | CY |
$400.00 |
$400.00 |
$175.58 |
$411.50 |
$420.00 |
| 67 | 804(B) 2916 |
REINFORCING STEEL | 1,036 | LB |
$1.60 |
$1.50 |
$0.5900 |
$1.50 |
$1.55 |
| 68 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 3 | EA |
$400.00 |
$1,500.00 |
$585.28 |
$1,550.00 |
$1,575.00 |
| 69 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 183.15 | SF |
$21.00 |
$14.00 |
$23.41 |
$14.50 |
$14.70 |
| 70 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 231.8 | SF |
$31.00 |
$23.00 |
$25.75 |
$23.65 |
$24.20 |
| 71 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 232 | LF |
$30.50 |
$20.00 |
$17.56 |
$20.60 |
$21.00 |
| 72 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 160 | LF |
$13.00 |
$18.00 |
$17.56 |
$18.50 |
$18.90 |
| 73 | 851(C) 8324 |
2" SQUARE TUBE POST | 185.5 | LF |
$9.00 |
$8.00 |
$5.85 |
$8.25 |
$8.40 |
| 74 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 131,100 | LF |
$0.6000 |
$0.4000 |
$0.5300 |
$0.4100 |
$0.4200 |
| 75 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$12,000.00 |
$1,000.00 |
$2,926.31 |
$1,030.00 |
$1,050.00 |
| 76 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$470,580.00 |
$101,000.00 |
$185,000.00 |
$150,000.00 |
$172,930.00 |
| 77 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$5,000.00 |
$4,000.00 |
$20,600.00 |
$10,500.00 |
| 78 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$19,000.00 |
$17,558.45 |
$7,500.00 |
$7,875.00 |
| 79 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$1,024,983.19 |
|
|
$470,000.00 |
|