| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,700.00 |
$15,500.00 |
$12,623.65 |
$11,713.50 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,853 | CY |
$10.00 |
$8.60 |
$7.61 |
$16.49 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 32,191 | CY |
$8.00 |
$9.20 |
$11.72 |
$12.07 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$9,000.00 |
$15,000.00 |
$21,039.42 |
$35,083.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 9,064 | LF |
$3.00 |
$1.79 |
$1.94 |
$1.83 |
| 60 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 3 | EA |
$160.00 |
$395.00 |
$428.40 |
$404.91 |
| 70 | 221(F) 0100 |
TEMPORARY SILT DIKE | 28 | LF |
$12.00 |
$18.50 |
$20.06 |
$18.96 |
| 80 | 230(A) 2806 |
SOLID SLAB SODDING | 23,608 | SY |
$3.00 |
$2.45 |
$2.66 |
$2.51 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 2 | AC |
$235.00 |
$1,250.00 |
$1,355.68 |
$1,281.36 |
| 100 | 241 2832 |
MOWING | 5 | AC |
$110.00 |
$395.00 |
$428.39 |
$404.91 |
| 110 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,789 | CY |
$57.00 |
$62.00 |
$47.34 |
$95.32 |
| 120 | 307(K) 4300 |
STABILIZED SUBGRADE | 34,233 | SY |
$7.00 |
$5.50 |
$6.35 |
$8.38 |
| 130 | 317 4270 |
CEMENT TREATED BASE | 29,486 | SY |
$15.00 |
$18.00 |
$14.20 |
$25.11 |
| 140 | 325 5271 |
SEPARATOR FABRIC | 35,189 | SY |
$2.00 |
$6.10 |
$5.63 |
$4.98 |
| 150 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 29,486 | SY |
$2.00 |
$1.60 |
$2.16 |
$2.24 |
| 160 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,817 | TON |
$45.00 |
$35.00 |
$36.82 |
$52.27 |
| 170 | 408 5774 |
PRIME COAT | 7,722 | GAL |
$10.00 |
$4.75 |
$5.11 |
$4.92 |
| 180 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 3,531 | TON |
$95.00 |
$114.00 |
$122.64 |
$118.03 |
| 190 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,784 | TON |
$85.00 |
$118.00 |
$126.94 |
$122.17 |
| 200 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,501 | TON |
$115.00 |
$138.00 |
$148.45 |
$142.88 |
| 210 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 303 | TON |
$120.00 |
$143.00 |
$153.83 |
$148.05 |
| 220 | 412 5267 |
COLD MILLING PAVEMENT | 2,830 | SY |
$10.00 |
$14.00 |
$11.69 |
$8.70 |
| 230 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 7,902 | LF |
$0.5000 |
$0.1000 |
$0.1200 |
$0.1200 |
| 240 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 34,175 | LF |
$0.5000 |
$0.5200 |
$0.6500 |
$0.6300 |
| 250 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 9,442 | SY |
$20.00 |
$16.00 |
$13.15 |
$13.74 |
| 260 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 20,044 | SY |
$25.00 |
$20.00 |
$19.57 |
$19.87 |
| 270 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 9,010 | CY |
$150.00 |
$136.00 |
$127.44 |
$177.83 |
| 280 | 509(D) 0325 |
CLASS C CONCRETE | 96 | CY |
$450.00 |
$341.00 |
$340.00 |
$645.89 |
| 290 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,760.00 |
$3,200.00 |
$3,100.00 |
$5,124.30 |
| 300 | 612(C) 0645 |
INLET ADJUST TO GRADE | 1 | EA |
$1,740.00 |
$1,830.00 |
$1,300.00 |
$1,250.11 |
| 310 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 75 | LF |
$150.00 |
$106.00 |
$107.00 |
$133.16 |
| 320 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$946.00 |
$1,810.00 |
$2,200.00 |
$3,361.28 |
| 330 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$14,100.00 |
$12,058.74 |
$4,167.04 |
| 340 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 4,372 | SY |
$8.00 |
$5.50 |
$8.42 |
$4.63 |
| 350 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 28,690 | SY |
$6.00 |
$5.50 |
$7.29 |
$4.94 |
| 360 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,815 | LF |
$3.50 |
$6.68 |
$3.73 |
$3.59 |
| 370 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,688 | LF |
$20.00 |
$17.16 |
$23.96 |
$23.06 |
| 380 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,500.00 |
$2,950.00 |
$1,863.75 |
$2,613.98 |
| 390 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,000.00 |
$2,850.00 |
$2,715.75 |
$1,793.90 |
| 400 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,297 | LF |
$6.25 |
$5.90 |
$7.20 |
$6.05 |
| 410 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$25.00 |
$9.50 |
$40.00 |
$13.51 |
| 420 | 501(G) 6309 |
CLSM BACKFILL | 290 | CY |
$175.00 |
$181.00 |
$160.00 |
$278.30 |
| 430 | 504(A) 1304 |
APPROACH SLAB | 412.4 | SY |
$225.00 |
$194.00 |
$205.00 |
$273.10 |
| 440 | 504(B) 1305 |
SAW-CUT GROOVING | 1,414.4 | SY |
$6.00 |
$4.00 |
$4.26 |
$4.69 |
| 450 | 504(C) 6250 |
SEALED EXPANSION JOINT | 49.5 | LF |
$350.00 |
$338.00 |
$285.00 |
$317.32 |
| 460 | 504(E) 6190 |
42" F-SHAPED PARAPET | 669 | LF |
$100.00 |
$141.00 |
$90.00 |
$124.85 |
| 470 | 506(A) 1322 |
STRUCTURAL STEEL | 257,090 | LB |
$1.90 |
$1.72 |
$2.07 |
$1.78 |
| 480 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,300.00 |
$2,680.00 |
$2,500.00 |
$2,236.81 |
| 490 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,300.00 |
$2,680.00 |
$2,500.00 |
$2,236.81 |
| 500 | 509 6152 |
SPECIAL CONCRETE FINISH | 43 | SY |
$120.00 |
$140.00 |
$133.13 |
$130.06 |
| 510 | 509(A) 1326 |
CLASS AA CONCRETE | 258.6 | CY |
$800.00 |
$1,010.00 |
$580.00 |
$775.60 |
| 520 | 509(B) 1328 |
CLASS A CONCRETE | 245.3 | CY |
$650.00 |
$579.00 |
$750.00 |
$785.49 |
| 530 | 509(D) 1331 |
CLASS C CONCRETE | 15 | CY |
$300.00 |
$1,220.00 |
$1,500.00 |
$762.08 |
| 540 | 510(C) 6138 |
SLOPE WALL (5") | 2,770 | SY |
$120.00 |
$74.00 |
$95.00 |
$137.33 |
| 550 | 511(A) 1332 |
REINFORCING STEEL | 1,180 | LB |
$1.50 |
$1.30 |
$1.30 |
$1.34 |
| 560 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 116,090 | LB |
$1.15 |
$1.40 |
$1.20 |
$1.37 |
| 570 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$500.00 |
$423.00 |
$929.03 |
$770.98 |
| 580 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 20 | SY |
$600.00 |
$511.00 |
$1,053.15 |
$873.99 |
| 590 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 278 | LF |
$35.00 |
$34.00 |
$40.00 |
$33.50 |
| 600 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 925 | LF |
$40.00 |
$43.00 |
$50.00 |
$40.78 |
| 610 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 278 | LF |
$25.00 |
$21.00 |
$24.00 |
$14.36 |
| 620 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 925 | LF |
$25.00 |
$22.00 |
$24.00 |
$17.48 |
| 630 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 640 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,007 | SY |
$4.00 |
$4.00 |
$4.26 |
$4.74 |
| 650 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 208 | LF |
$900.00 |
$1,170.00 |
$950.00 |
$1,204.76 |
| 660 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,500.00 |
$1,860.00 |
$1,650.75 |
$3,121.13 |
| 670 | 523(A) 6550 |
SEALER CRACK PREPARATION | 48.8 | LF |
$6.00 |
$5.00 |
$5.33 |
$5.78 |
| 680 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$200.00 |
$213.00 |
$230.96 |
| 690 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 410 | LF |
$25.00 |
$24.00 |
$35.00 |
$28.09 |
| 700 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 145 | LF |
$25.00 |
$14.00 |
$35.00 |
$30.17 |
| 710 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$39,500.00 |
$80,000.00 |
$72,826.44 |
| 720 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 255 | CY |
$25.00 |
$9.50 |
$40.00 |
$13.51 |
| 730 | 501(G) 6309 |
CLSM BACKFILL | 295 | CY |
$175.00 |
$181.00 |
$160.00 |
$278.30 |
| 740 | 504(A) 1304 |
APPROACH SLAB | 412.4 | SY |
$225.00 |
$194.00 |
$205.00 |
$273.10 |
| 750 | 504(B) 1305 |
SAW-CUT GROOVING | 1,414.4 | SY |
$6.00 |
$4.00 |
$4.26 |
$4.69 |
| 760 | 504(C) 6250 |
SEALED EXPANSION JOINT | 49.5 | LF |
$350.00 |
$338.00 |
$285.00 |
$317.32 |
| 770 | 504(E) 6190 |
42" F-SHAPED PARAPET | 669 | LF |
$100.00 |
$141.00 |
$90.00 |
$124.85 |
| 780 | 506(A) 1322 |
STRUCTURAL STEEL | 257,090 | LB |
$1.90 |
$1.72 |
$2.07 |
$1.78 |
| 790 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,300.00 |
$2,680.00 |
$2,500.00 |
$2,236.81 |
| 800 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,300.00 |
$2,680.00 |
$2,500.00 |
$2,236.81 |
| 810 | 509 6152 |
SPECIAL CONCRETE FINISH | 43 | SY |
$120.00 |
$140.00 |
$133.13 |
$130.06 |
| 820 | 509(A) 1326 |
CLASS AA CONCRETE | 258.6 | CY |
$800.00 |
$1,010.00 |
$580.00 |
$775.60 |
| 830 | 509(B) 1328 |
CLASS A CONCRETE | 246.8 | CY |
$650.00 |
$579.00 |
$750.00 |
$785.49 |
| 840 | 509(D) 1331 |
CLASS C CONCRETE | 15 | CY |
$300.00 |
$1,220.00 |
$1,500.00 |
$762.08 |
| 850 | 511(A) 1332 |
REINFORCING STEEL | 1,180 | LB |
$1.50 |
$1.30 |
$1.30 |
$1.34 |
| 860 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 116,140 | LB |
$1.15 |
$1.40 |
$1.20 |
$1.37 |
| 870 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 284 | LF |
$35.00 |
$34.00 |
$40.00 |
$33.50 |
| 880 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 946 | LF |
$40.00 |
$43.00 |
$50.00 |
$40.78 |
| 890 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 284 | LF |
$25.00 |
$21.00 |
$24.00 |
$14.36 |
| 900 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 946 | LF |
$25.00 |
$22.00 |
$24.00 |
$17.48 |
| 910 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 920 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,010 | SY |
$4.00 |
$4.00 |
$4.26 |
$4.74 |
| 930 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 220 | LF |
$900.00 |
$1,170.00 |
$950.00 |
$1,204.76 |
| 940 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,500.00 |
$1,860.00 |
$1,650.75 |
$3,121.13 |
| 950 | 523(A) 6550 |
SEALER CRACK PREPARATION | 48.8 | LF |
$6.00 |
$5.00 |
$5.33 |
$5.78 |
| 960 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$200.00 |
$213.00 |
$230.96 |
| 970 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 102 | LF |
$25.00 |
$24.00 |
$35.00 |
$28.09 |
| 980 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 55 | LF |
$25.00 |
$14.00 |
$35.00 |
$30.17 |
| 990 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$39,500.00 |
$80,000.00 |
$72,826.44 |
| 1,000 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 365 | DAY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 1,010 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,414 | LF |
$0.2500 |
$1.50 |
$1.60 |
$1.55 |
| 1,020 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 7,500 | EA |
$0.5000 |
$0.7500 |
$0.8000 |
$0.7800 |
| 1,030 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.3100 |
$1.00 |
$1.07 |
$1.04 |
| 1,040 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 1,000 | SD |
$3.00 |
$10.00 |
$10.65 |
$10.35 |
| 1,050 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 8,576 | LF |
$20.00 |
$18.10 |
$30.65 |
$18.14 |
| 1,060 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 11,325 | LF |
$3.50 |
$1.92 |
$2.63 |
$3.35 |
| 1,070 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 90,450 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0200 |
| 1,080 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 670 | SD |
$2.25 |
$10.00 |
$10.65 |
$10.35 |
| 1,090 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,760 | SD |
$0.2500 |
$0.3500 |
$0.3700 |
$0.3600 |
| 1,100 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 18,045 | SD |
$0.5000 |
$0.5000 |
$0.5300 |
$0.5200 |
| 1,110 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 14,945 | SD |
$0.6500 |
$1.50 |
$1.60 |
$1.55 |
| 1,120 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 9,540 | SD |
$0.4000 |
$1.00 |
$1.07 |
$1.04 |
| 1,130 | 880(C) 8848 |
WING BARRICADES | 1,400 | SD |
$0.5000 |
$2.00 |
$2.13 |
$2.07 |
| 1,140 | 880(D) 8854 |
VERTICAL PANELS | 29,375 | SD |
$0.0500 |
$0.2500 |
$0.2700 |
$0.2600 |
| 1,150 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 23,610 | SD |
$0.2500 |
$0.1000 |
$0.1100 |
$0.1000 |
| 1,160 | 880(F) 8878 |
DRUMS | 32,940 | SD |
$0.2000 |
$0.3500 |
$0.3700 |
$0.3600 |
| 1,170 | 880(G) 8884 |
TUBE CHANNELIZERS | 9,220 | SD |
$0.1000 |
$0.3500 |
$0.3700 |
$0.3600 |
| 1,180 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 500 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 1,190 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,400 | SD |
$8.00 |
$10.00 |
$10.65 |
$10.35 |
| 1,200 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 735 | TON |
$115.00 |
$143.00 |
$153.83 |
$148.05 |
| 1,210 | 509(A) 0319 |
CLASS AA CONCRETE | 40 | CY |
$700.00 |
$145.00 |
$162.01 |
$393.74 |
| 1,220 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 3,201 | LF |
$7.00 |
$9.74 |
$10.88 |
$15.86 |
| 1,230 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 6,084 | LF |
$20.00 |
$10.00 |
$11.17 |
$12.35 |
| 1,240 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 6,084 | LF |
$15.00 |
$19.92 |
$22.26 |
$12.35 |
| 1,250 | 628(C) 5110 |
END ANCHORS | 4 | EA |
$3,585.00 |
$9,500.00 |
$10,614.24 |
$3,763.02 |
| 1,260 | 628(F) 5185 |
(PL)HIGH TENSION CABLE BARRIER - RE-TENSIONING | 3 | EA |
$300.00 |
$250.00 |
$279.32 |
$1,666.81 |
| 1,270 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 4 | EA |
$500.00 |
$500.00 |
$532.50 |
$517.67 |
| 1,280 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 12,693 | LF |
$0.7000 |
$0.6500 |
$0.6900 |
$0.6700 |
| 1,290 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 460 | LF |
$2.35 |
$2.00 |
$2.13 |
$2.07 |
| 1,300 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 200 | LF |
$3.65 |
$3.00 |
$3.20 |
$3.11 |
| 1,310 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 19,650 | LF |
$0.7500 |
$0.6500 |
$0.6900 |
$0.6700 |
| 1,320 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 830 | LF |
$1.50 |
$2.00 |
$2.13 |
$2.07 |
| 1,330 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 497 | LF |
$2.85 |
$3.00 |
$3.20 |
$3.11 |
| 1,340 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 12 | LF |
$18.20 |
$6.00 |
$6.39 |
$6.21 |
| 1,350 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$50,000.00 |
$29,759.39 |
$82,007.09 |
| 1,360 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,875.00 |
$4,000.00 |
$7,500.00 |
$10,050.06 |
| 1,370 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$20,000.00 |
$20,000.00 |
$28,140.16 |
| 1,380 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$445,000.00 |
$418,715.00 |
$494,000.00 |
$474,616.21 |