Bid tab 180304

Let Oct 17, 2019 · Division 3 · Seminole Sign up free

‹ Oct 2019 results

BRIDGE AND APPROACHES US -270: OVER WEWOKA CREEK AND RAILROAD , 3.5 MILES AND 3.7 MILES NORTHWEST OF THE US -59 JUNCTION NEAR WEWOKA. PROJECT LENGTH = 0.586 MILE

Let date
Thursday, October 17, 2019
Contract
180304
J/P numbers
21006(07)
District
Division 3
County
Seminole
Highway
Limits
BRIDGE AND APPROACHES US -270: OVER WEWOKA CREEK AND RAILROAD , 3.5 MILES AND 3.7 MILES NORTHWEST OF THE US -59 JUNCTION NEAR WEWOKA. PROJECT LENGTH = 0.586 MILE
Project number
STP-167B(122)PM

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$12,689,408
1 OVERLAND CORPORATION Low bidder $11,794,404 -7.1%
2 Treas Construction Inc $12,562,223 -1.0% +6.5%
3 SHERWOOD CONSTRUCTION CO., INC. $12,933,692 +1.9% +9.7%
4 MANHATTAN ROAD & BRIDGE COMPANY, LLC $14,068,400 +10.9% +19.3%
5 HASKELL LEMON CONSTRUCTION CO. $14,091,157 +11.0% +19.5%
6 Frontier Bridge, Inc. $15,078,716 +18.8% +27.8%

Bid tab: unit prices 128 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 OVERLAND CORPOR…#2 Treas Construct…#3 SHERWOOD CONSTR…#4 MANHATTAN ROAD …#5 HASKELL LEMON C…#6 Frontier Bridge…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $40,000.00 $300,000.00 $37,485.00 $81,227.91 $230,000.00 $163,920.00 $39,270.00
2202(A) 0183 UNCLASSIFIED EXCAVATION65,864CY $8.00 $2.00 $6.41 $4.93 $8.50 $6.35 $6.71
3202(D) 0184 UNCLASSIFIED BORROW83,082CY $12.00 $12.00 $6.16 $7.38 $9.50 $6.10 $6.46
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $85,000.00 $90,000.00 $37,275.00 $69,665.81 $20,000.00 $36,910.00 $39,050.00
5221(C) 2801 TEMPORARY SILT FENCE4,800LF $2.00 $2.00 $2.04 $2.46 $2.50 $2.00 $2.13
6221(K) 0600 TEMPORARY FIBER LOG419LF $5.00 $9.00 $9.34 $9.52 $30.00 $9.25 $9.78
7230(A) 2806 SOLID SLAB SODDING61,107SY $1.50 $1.90 $1.99 $2.32 $2.00 $1.95 $2.08
8233(A) 2817 VEGETATIVE MULCHING13AC $300.00 $200.00 $430.50 $503.43 $425.00 $426.50 $451.00
9241 2832 MOWING26AC $75.00 $100.00 $157.50 $184.18 $155.00 $156.00 $165.00
10303(A) 2100 AGGREGATE BASE TYPE A6,861CY $55.00 $65.00 $59.79 $61.69 $54.00 $59.20 $81.40
11307(K) 4300 STABILIZED SUBGRADE36,398SY $6.00 $6.25 $5.12 $5.19 $6.00 $5.05 $6.55
12325 5271 SEPARATOR FABRIC22,662SY $1.50 $2.75 $4.80 $3.91 $3.75 $4.75 $2.75
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E2,388TON $35.00 $32.00 $30.73 $30.50 $28.00 $30.40 $32.20
14407(B) 0250 TACK COAT4,793GAL $3.00 $1.00 $3.52 $7.30 $3.75 $3.65 $3.69
15408 5774 PRIME COAT18,776GAL $4.00 $3.00 $4.67 $6.61 $4.45 $6.95 $4.90
16411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)1,971TON $80.00 $81.00 $88.57 $95.10 $88.00 $88.30 $92.79
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)9,213TON $75.00 $60.00 $79.85 $83.38 $79.00 $72.90 $83.66
18411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)1,315TON $90.00 $87.00 $101.22 $107.49 $98.00 $92.70 $106.04
19411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)3,108TON $85.00 $80.00 $82.90 $85.73 $82.00 $81.40 $86.85
20412 5267 COLD MILLING PAVEMENT5,204SY $6.00 $1.80 $6.41 $2.96 $6.25 $3.90 $6.71
21501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED81CY $20.00 $37.00 $12.60 $76.69 $75.00 $37.60 $55.00
22501(G) 6315 CLSM BACKFILL50CY $300.00 $155.00 $173.25 $227.28 $225.00 $257.00 $255.12
23509(A) 0319 CLASS AA CONCRETE228CY $550.00 $550.00 $362.25 $743.86 $600.00 $576.00 $930.24
24509(D) 0325 CLASS C CONCRETE20CY $400.00 $400.00 $561.75 $501.75 $260.00 $530.00 $505.81
25511(A) 0332 REINFORCING STEEL31,495LB $1.00 $1.30 $1.21 $1.54 $1.40 $2.35 $1.59
26601(A) 0297 TYPE I PLAIN RIPRAP140TON $50.00 $50.00 $51.45 $82.75 $65.00 $60.50 $62.28
27611(G) 6002 INLET (SMD-TYPE 2)1EA $2,500.00 $3,000.00 $2,808.75 $2,741.55 $3,500.00 $2,781.00 $2,942.50
28613(A) 0491 18" R.C.PIPE CLASS III292LF $60.00 $42.00 $61.72 $85.65 $75.00 $61.00 $64.58
29613(B) 0689 18" CORR. GALV. STEEL PIPE124LF $45.00 $29.50 $33.81 $77.59 $55.00 $33.50 $35.42
30613(B) 0690 24" CORR. GALV. STEEL PIPE38LF $45.00 $33.75 $38.99 $92.68 $80.00 $38.60 $40.85
31613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND7EA $600.00 $130.00 $425.25 $821.62 $475.00 $421.00 $445.50
32613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND2EA $775.00 $180.00 $492.45 $914.70 $500.00 $487.50 $515.90
33614(A) 7049 PREFABRICATED WICK DRAIN1,079,600LF $0.4000 $0.4000 $0.4200 $0.5300 $0.7000 $0.5000 $1.16
34619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $25,000.00 $30,000.00 $6,930.00 $34,562.30 $28,640.00 $70,260.00 $7,260.00
35619(B) 4728 REMOVAL OF ASPHALT PAVEMENT25,512SY $4.00 $1.80 $4.83 $4.93 $5.00 $7.85 $5.28
36623 0100 (PL)GUARDRAIL CURBING8EA $1,000.00 $2,900.00 $1,260.00 $620.63 $750.00 $1,023.00 $1,017.05
37623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,600LF $20.00 $15.00 $18.90 $21.51 $15.00 $15.40 $19.80
38623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,500.00 $2,500.00 $2,625.00 $3,554.02 $2,450.00 $2,495.00 $3,272.50
39623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")8EA $2,000.00 $1,825.00 $1,837.50 $2,251.87 $1,850.00 $1,871.00 $2,073.50
40624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)2,912LF $6.00 $4.75 $7.77 $5.26 $7.50 $4.55 $8.14
41624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,833LF $6.00 $5.00 $8.35 $6.45 $8.25 $5.60 $8.75
42624(E) 4288 FENCE-STYLE CLF (4'HIGH, CLASS A)167LF $22.00 $25.00 $25.20 $71.32 $25.00 $27.80 $26.40
43501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON244CY $25.00 $15.00 $31.50 $16.58 $90.00 $25.00 $27.50
44501(G) 6309 CLSM BACKFILL424CY $180.00 $170.00 $241.87 $222.75 $150.00 $189.50 $238.62
45503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,673LF $235.00 $225.00 $232.70 $223.00 $250.00 $228.00 $238.32
46504(A) 1304 APPROACH SLAB688.2SY $190.00 $170.00 $202.75 $175.71 $162.00 $271.00 $290.79
47504(B) 1305 SAW-CUT GROOVING1,995SY $5.00 $3.80 $5.38 $4.54 $4.00 $3.95 $4.18
48504(C) 6250 SEALED EXPANSION JOINT74.5LF $250.00 $220.00 $307.22 $252.20 $320.00 $306.50 $371.48
49504(E) 6190 42" F-SHAPED PARAPET659.8LF $105.00 $100.00 $87.44 $75.07 $65.00 $137.50 $111.05
50506(A) 1322 STRUCTURAL STEEL2,760LB $3.00 $1.25 $2.36 $4.64 $2.50 $3.60 $3.54
51507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY14EA $1,800.00 $1,500.00 $1,638.99 $2,077.40 $2,000.00 $2,677.00 $2,022.29
52507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY28EA $1,800.00 $1,500.00 $1,638.99 $2,077.40 $2,000.00 $2,053.00 $2,022.29
53509(A) 1326 CLASS AA CONCRETE478CY $650.00 $700.00 $661.71 $729.62 $600.00 $810.50 $945.17
54509(B) 1328 CLASS A CONCRETE370.1CY $650.00 $650.00 $687.96 $764.31 $900.00 $810.50 $841.92
55509(D) 1331 CLASS C CONCRETE39.5CY $350.00 $350.00 $561.75 $467.72 $450.00 $525.00 $605.76
56510(C) 6138 SLOPE WALL (5")1,468SY $120.00 $110.00 $79.16 $101.06 $90.00 $158.00 $112.12
57511(A) 1332 REINFORCING STEEL2,440LB $1.00 $1.00 $1.54 $0.9800 $1.50 $3.20 $1.10
58511(B) 6010 EPOXY COATED REINFORCING STEEL206,130LB $1.10 $1.00 $1.25 $1.11 $1.40 $1.40 $1.32
59514(A) 6010 PILES, FURNISHED (HP 10X42)440LF $30.00 $33.00 $26.78 $25.51 $40.00 $34.50 $32.46
60514(A) 6011 PILES, FURNISHED (HP 12X53)2,784LF $40.00 $35.00 $32.14 $31.68 $45.00 $37.40 $38.08
61514(B) 6292 PILES, DRIVEN (HP 10X42)440LF $20.00 $17.00 $12.60 $17.09 $8.00 $40.00 $27.50
62514(B) 6294 PILES, DRIVEN (HP 12X53)2,784LF $20.00 $8.00 $12.60 $17.09 $9.00 $21.30 $27.50
63514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
64515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,389.2SY $4.00 $4.00 $5.25 $4.78 $4.15 $4.15 $4.40
65516(A) 6096 DRILLED SHAFTS 60" DIAMETER740LF $800.00 $850.00 $1,133.90 $855.00 $1,275.00 $922.00 $1,165.85
66516(C) 6200 CROSSHOLE SONIC LOGGING8EA $3,500.00 $2,200.00 $2,730.00 $1,911.41 $2,000.00 $3,181.00 $3,960.00
67523(A) 6550 SEALER CRACK PREPARATION316.3LF $5.00 $4.00 $4.20 $4.78 $4.10 $4.15 $4.40
68523(B) 6560 SEALER RESIN3.6GAL $175.00 $150.00 $157.50 $179.20 $155.00 $156.00 $165.00
69613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND154LF $30.00 $30.00 $31.50 $24.41 $20.00 $80.70 $29.89
70613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $25.00 $30.00 $31.50 $11.35 $20.00 $32.20 $30.56
71619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $70,000.00 $80,000.00 $57,750.00 $45,231.60 $91,000.00 $287,410.00 $137,500.00
72624(E) 4294 FENCE-STYLE CLF (8'HIGH, CLASS A)140LF $20.00 $88.00 $162.75 $107.16 $160.00 $38.20 $170.50
73501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON301CY $25.00 $15.00 $31.50 $16.58 $90.00 $40.50 $33.00
74501(G) 6309 CLSM BACKFILL655.3CY $180.00 $170.00 $241.87 $222.75 $150.00 $178.00 $227.62
75503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)3,210.67LF $325.00 $250.00 $260.04 $247.44 $270.00 $247.50 $265.26
76504(A) 1304 APPROACH SLAB889.2SY $190.00 $170.00 $203.20 $175.71 $162.00 $260.50 $307.75
77504(B) 1305 SAW-CUT GROOVING4,357.5SY $5.00 $3.80 $5.38 $4.54 $4.00 $3.95 $4.18
78504(C) 6250 SEALED EXPANSION JOINT79.4LF $250.00 $220.00 $307.22 $252.20 $320.00 $299.50 $398.98
79504(E) 6190 42" F-SHAPED PARAPET1,153.2LF $105.00 $100.00 $88.35 $75.07 $65.00 $151.00 $111.98
80506(A) 1322 STRUCTURAL STEEL5,040LB $3.00 $1.25 $2.36 $4.64 $2.50 $2.55 $3.54
81507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY42EA $1,800.00 $1,400.00 $2,145.96 $2,077.40 $2,800.00 $2,504.00 $2,571.66
82507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY14EA $1,800.00 $1,400.00 $2,145.96 $2,077.40 $800.00 $1,794.00 $2,571.66
83509(A) 1326 CLASS AA CONCRETE1,026.2CY $650.00 $600.00 $652.26 $729.62 $550.00 $596.00 $851.91
84509(B) 1328 CLASS A CONCRETE538.9CY $650.00 $650.00 $652.26 $764.31 $900.00 $736.50 $869.42
85509(D) 1331 CLASS C CONCRETE28.5CY $350.00 $350.00 $561.75 $467.72 $450.00 $547.00 $634.43
86511(A) 1332 REINFORCING STEEL3,240LB $1.00 $1.00 $1.54 $0.9800 $1.50 $2.55 $1.00
87511(B) 6010 EPOXY COATED REINFORCING STEEL369,870LB $1.10 $1.00 $1.25 $1.11 $1.40 $1.30 $1.17
88514(A) 6010 PILES, FURNISHED (HP 10X42)734LF $30.00 $32.00 $26.78 $25.51 $40.00 $37.30 $36.31
89514(A) 6011 PILES, FURNISHED (HP 12X53)2,951LF $40.00 $35.00 $32.14 $31.68 $45.00 $37.10 $42.06
90514(B) 6292 PILES, DRIVEN (HP 10X42)734LF $20.00 $17.00 $12.60 $17.09 $8.00 $24.00 $27.50
91514(B) 6294 PILES, DRIVEN (HP 12X53)2,951LF $20.00 $12.00 $12.60 $17.09 $9.00 $34.20 $28.60
92514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
93515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)2,635.4SY $4.00 $4.00 $4.20 $4.78 $4.15 $4.15 $4.40
94516(A) 6096 DRILLED SHAFTS 60" DIAMETER1,044LF $800.00 $850.00 $1,135.40 $1,193.75 $1,275.00 $908.50 $1,056.74
95516(C) 6200 CROSSHOLE SONIC LOGGING12EA $3,500.00 $2,200.00 $2,730.00 $1,911.41 $2,000.00 $3,181.00 $3,960.00
96523(A) 6550 SEALER CRACK PREPARATION1,084.8LF $5.00 $4.00 $4.20 $4.78 $4.10 $4.15 $4.40
97523(B) 6560 SEALER RESIN12.2GAL $175.00 $150.00 $157.50 $179.20 $155.00 $156.00 $165.00
98601(B) 1353 TYPE I-A PLAIN RIPRAP3,900TON $50.00 $45.00 $51.47 $47.90 $50.00 $51.30 $52.38
99601(C) 1355 TYPE I-A FILTER BLANKET1,130TON $40.00 $45.00 $40.54 $40.22 $50.00 $37.60 $41.11
100613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND164LF $30.00 $30.00 $31.50 $24.41 $20.00 $75.90 $29.75
101613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $25.00 $30.00 $31.50 $11.35 $20.00 $32.20 $30.56
102619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $90,000.00 $100,000.00 $91,140.00 $59,521.51 $130,000.00 $356,880.00 $165,000.00
103850(A) 8110 SHEET ALUMINUM SIGNS184SF $25.00 $20.00 $21.00 $23.90 $21.00 $20.80 $22.00
104851(C) 8324 2" SQUARE TUBE POST208LF $15.00 $10.00 $10.50 $11.95 $10.50 $10.40 $11.00
105853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)36EA $10.00 $20.00 $15.75 $17.92 $21.00 $20.80 $16.50
106855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)37,277LF $0.6000 $0.5000 $0.5300 $0.6000 $0.5100 $0.5200 $0.5500
107855(A) 8818 TRAFFIC STRIPE(PLASTIC)(12" WIDE)3,965LF $2.00 $2.87 $3.01 $3.43 $2.95 $3.00 $3.16
108855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)24LF $6.00 $15.00 $15.75 $17.92 $16.50 $15.60 $16.50
109855(B) 8818 TRAFFIC STRIPE(PLASTIC)(ARROWS)3EA $125.00 $150.00 $157.50 $179.20 $152.00 $156.00 $165.00
110855(B) 8821 TRAFFIC STRIPE(PLASTIC)(WORDS)2EA $250.00 $150.00 $157.50 $179.20 $152.00 $156.00 $165.00
111857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)24,800LF $0.2500 $0.1000 $0.1100 $0.1200 $0.1100 $0.1000 $0.1100
112857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-21,500EA $0.7500 $0.5000 $0.5300 $0.6000 $0.5100 $0.5200 $0.5500
113857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)29,600LF $0.2500 $0.1000 $0.1100 $0.1200 $0.1100 $0.1000 $0.1100
114871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.530SD $10.00 $2.50 $2.62 $2.99 $2.60 $2.60 $2.75
115877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,763LF $25.00 $15.51 $22.05 $15.01 $38.00 $39.50 $38.50
116880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF7,735SD $0.3500 $0.2500 $0.2600 $0.3000 $0.2700 $0.2600 $0.2800
117880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF11,115SD $0.7500 $0.2500 $0.2600 $0.3000 $0.2700 $0.2600 $0.2800
118880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF595SD $1.50 $10.00 $10.50 $11.95 $10.40 $10.40 $11.00
119880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)7,475SD $1.00 $0.2500 $0.2600 $0.3000 $0.2700 $0.2600 $0.2800
120880(C) 8848 WING BARRICADES2,380SD $1.00 $1.00 $1.05 $1.19 $1.02 $1.05 $1.10
121880(E) 8860 WARNING LIGHTS(TYPE A)18,390SD $0.5000 $0.1000 $0.1100 $0.1200 $0.1100 $0.1000 $0.1100
122880(F) 8878 DRUMS35,040SD $0.2500 $0.1200 $0.1200 $0.1400 $0.1400 $0.1200 $0.1300
123880(G) 8890 CHANNELIZER CONES16,260SD $0.3500 $0.1600 $0.1700 $0.1900 $0.1800 $0.1700 $0.1800
124882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN120SD $20.00 $5.00 $5.25 $5.97 $5.20 $5.20 $5.50
125642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $105,000.00 $40,000.00 $43,575.00 $81,891.82 $42,100.00 $45,230.00 $52,030.00
126220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,500.00 $5,000.00 $13,650.00 $2,986.57 $1,789.33 $12,595.00 $9,350.00
127640(A) 1426 FIELD OFFICE1EA $15,000.00 $20,000.00 $12,600.00 $29,268.41 $40,200.00 $5,248.00 $22,000.00
128641 1552 MOBILIZATION1LSUM $549,000.00 $525,000.00 $542,987.94 $593,277.05 $627,700.00 $665,694.93