| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 35,326 | CY |
$8.50 |
$7.02 |
$7.50 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 46,450 | CY |
$9.00 |
$9.05 |
$8.50 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,775 | LF |
$1.50 |
$2.68 |
$2.75 |
| 4 | 221(K) 0600 |
TEMPORARY FIBER LOG | 2,740 | LF |
$3.50 |
$7.98 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 33,112 | SY |
$1.50 |
$2.98 |
$3.00 |
| 6 | 232(B) 2814 |
SEEDING METHOD B | 6.84 | AC |
$350.00 |
$1,988.00 |
$2,000.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.84 | AC |
$275.00 |
$1,988.00 |
$2,000.00 |
| 8 | 241 2832 |
MOWING | 26.13 | AC |
$70.00 |
$165.00 |
$170.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,731 | CY |
$50.00 |
$54.14 |
$56.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 3,694 | SY |
$1.50 |
$1.26 |
$1.30 |
| 11 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 14,672 | SY |
$3.50 |
$2.77 |
$2.50 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,789 | TON |
$30.00 |
$27.46 |
$27.25 |
| 13 | 407(B) 0250 |
TACK COAT | 1,940 | GAL |
$3.00 |
$4.00 |
$1.01 |
| 14 | 408 5774 |
PRIME COAT | 10,461 | GAL |
$4.00 |
$4.00 |
$1.01 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,723 | TON |
$70.00 |
$89.00 |
$69.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,627 | TON |
$80.00 |
$105.00 |
$83.00 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 186 | LF |
$35.00 |
$40.31 |
$41.00 |
| 18 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 146 | LF |
$16.00 |
$18.00 |
$21.00 |
| 19 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 49 | LF |
$16.00 |
$18.00 |
$26.00 |
| 20 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$700.00 |
$950.00 |
$140.00 |
| 21 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,000.00 |
$325.00 |
$860.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,747 | SY |
$4.00 |
$4.05 |
$3.85 |
| 23 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,141 | LF |
$3.75 |
$3.00 |
$3.25 |
| 24 | 619(C) 0924 |
SAWING PAVEMENT | 1,361 | LF |
$3.00 |
$5.10 |
$3.25 |
| 25 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$18.00 |
$25.00 |
$27.00 |
| 26 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,300.00 |
$3,500.00 |
$3,500.00 |
| 27 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,800.00 |
$2,300.00 |
$2,300.00 |
| 28 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 385 | LF |
$5.25 |
$4.80 |
$5.00 |
| 29 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 24,276 | CY |
$8.50 |
$7.02 |
$7.50 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 9,187 | CY |
$9.00 |
$9.05 |
$8.50 |
| 31 | 221(C) 2801 |
TEMPORARY SILT FENCE | 425 | LF |
$1.50 |
$3.00 |
$2.75 |
| 32 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 7 | CY |
$125.00 |
$150.00 |
$130.00 |
| 33 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,908 | LF |
$3.50 |
$4.25 |
$8.00 |
| 34 | 230(A) 2806 |
SOLID SLAB SODDING | 18,365 | SY |
$1.50 |
$3.25 |
$3.00 |
| 35 | 232(B) 2814 |
SEEDING METHOD B | 3.79 | AC |
$350.00 |
$1,200.00 |
$2,000.00 |
| 36 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.79 | AC |
$275.00 |
$600.00 |
$2,500.00 |
| 37 | 241 2832 |
MOWING | 24.14 | AC |
$70.00 |
$100.00 |
$170.00 |
| 38 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,453 | CY |
$50.00 |
$54.14 |
$56.00 |
| 39 | 325 5271 |
SEPARATOR FABRIC | 3,539 | SY |
$1.50 |
$1.26 |
$1.30 |
| 40 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 10,436 | SY |
$3.50 |
$2.77 |
$2.50 |
| 41 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,605 | TON |
$30.00 |
$27.46 |
$27.25 |
| 42 | 407(B) 0250 |
TACK COAT | 1,404 | GAL |
$3.00 |
$4.00 |
$1.01 |
| 43 | 408 5774 |
PRIME COAT | 7,955 | GAL |
$4.00 |
$4.00 |
$1.01 |
| 44 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,719 | TON |
$70.00 |
$89.00 |
$69.00 |
| 45 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,216 | TON |
$80.00 |
$105.00 |
$83.00 |
| 46 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 384 | LF |
$70.00 |
$69.59 |
$65.00 |
| 47 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 384 | LF |
$35.00 |
$40.31 |
$35.00 |
| 48 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 114 | LF |
$16.00 |
$18.00 |
$18.00 |
| 49 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 38 | LF |
$16.00 |
$18.00 |
$18.00 |
| 50 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 18 | EA |
$700.00 |
$950.00 |
$780.00 |
| 51 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,000.00 |
$350.00 |
$860.00 |
| 52 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,858 | SY |
$4.00 |
$3.75 |
$0.8500 |
| 53 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 732 | LF |
$3.75 |
$3.00 |
$0.2500 |
| 54 | 619(C) 0924 |
SAWING PAVEMENT | 1,438 | LF |
$3.00 |
$5.10 |
$3.25 |
| 55 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 187.5 | LF |
$18.00 |
$25.00 |
$27.00 |
| 56 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,300.00 |
$3,500.00 |
$3,500.00 |
| 57 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,800.00 |
$2,300.00 |
$2,300.00 |
| 58 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 971 | LF |
$5.00 |
$4.20 |
$4.25 |
| 59 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$55,750.00 |
|
| 60 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$87,000.00 |
$50,525.00 |
$100,000.00 |
| 61 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$345,000.00 |
$408,500.00 |
$200,000.00 |
| 62 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$76,000.00 |
$25,000.00 |
$200,000.00 |
| 63 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 400 | CY |
$30.00 |
$8.00 |
$21.00 |
| 64 | 501(G) 6309 |
CLSM BACKFILL | 376 | CY |
$180.00 |
$165.00 |
$180.00 |
| 65 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 11,446.67 | LF |
$270.00 |
$261.45 |
$280.00 |
| 66 | 504(A) 1304 |
APPROACH SLAB | 307.8 | SY |
$200.00 |
$185.00 |
$214.00 |
| 67 | 504(B) 1305 |
SAW-CUT GROOVING | 11,527 | SY |
$5.00 |
$2.40 |
$2.40 |
| 68 | 504(C) 6250 |
SEALED EXPANSION JOINT | 424.5 | LF |
$250.00 |
$250.00 |
$230.00 |
| 69 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 4,712 | LF |
$80.00 |
$80.00 |
$85.00 |
| 70 | 506(A) 1322 |
STRUCTURAL STEEL | 23,460 | LB |
$3.00 |
$1.50 |
$2.00 |
| 71 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 85 | EA |
$1,500.00 |
$1,500.00 |
$1,500.00 |
| 72 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 85 | EA |
$1,500.00 |
$1,500.00 |
$1,500.00 |
| 73 | 509(A) 1326 |
CLASS AA CONCRETE | 3,220.6 | CY |
$650.00 |
$600.00 |
$525.00 |
| 74 | 509(B) 1328 |
CLASS A CONCRETE | 1,352.3 | CY |
$550.00 |
$800.00 |
$750.00 |
| 75 | 509(D) 1331 |
CLASS C CONCRETE | 15 | CY |
$450.00 |
$600.00 |
$550.00 |
| 76 | 511 6306 |
MECHANICAL SPLICES | 272 | EA |
$50.00 |
$155.00 |
$150.00 |
| 77 | 511(A) 1332 |
REINFORCING STEEL | 9,110 | LB |
$1.10 |
$0.8000 |
$1.00 |
| 78 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 887,620 | LB |
$1.20 |
$1.00 |
$1.00 |
| 79 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 250 | SY |
$300.00 |
$200.00 |
$500.00 |
| 80 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 250 | SY |
$550.00 |
$400.00 |
$600.00 |
| 81 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 10,823 | SY |
$4.00 |
$3.50 |
$3.50 |
| 82 | 516(A) 6090 |
DRILLED SHAFTS 24" DIAMETER | 182 | LF |
$400.00 |
$200.00 |
$600.00 |
| 83 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,716 | LF |
$1,400.00 |
$1,500.00 |
$1,150.00 |
| 84 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 7 | EA |
$3,000.00 |
$2,035.00 |
$2,000.00 |
| 85 | 523(A) 6550 |
SEALER CRACK PREPARATION | 308 | LF |
$5.00 |
$4.00 |
$4.00 |
| 86 | 523(B) 6560 |
SEALER RESIN | 3.1 | GAL |
$200.00 |
$150.00 |
$150.00 |
| 87 | 540 4510 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | LSUM |
$5,000.00 |
$14,000.00 |
$1,000.00 |
| 88 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,470 | TON |
$50.00 |
$40.00 |
$45.00 |
| 89 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 222 | TON |
$40.00 |
$35.00 |
$35.00 |
| 90 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 92 | LF |
$30.00 |
$24.00 |
$35.00 |
| 91 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 42 | LF |
$30.00 |
$24.00 |
$40.00 |
| 92 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$200,000.00 |
$300,000.00 |
$350,000.00 |
| 93 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,388 | LF |
$0.1500 |
$0.2500 |
$0.2500 |
| 94 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,196 | LF |
$0.7500 |
$1.00 |
$1.00 |
| 95 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$9.00 |
$5.00 |
$5.00 |
| 96 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 987.5 | LF |
$24.00 |
$25.00 |
$34.50 |
| 97 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,320 | SD |
$0.3500 |
$0.2500 |
$0.2500 |
| 98 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,860 | SD |
$0.7500 |
$2.00 |
$2.00 |
| 99 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,460 | SD |
$1.25 |
$2.00 |
$2.00 |
| 100 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,960 | SD |
$1.00 |
$0.2500 |
$0.2500 |
| 101 | 880(C) 8848 |
WING BARRICADES | 960 | SD |
$1.50 |
$2.00 |
$2.00 |
| 102 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,980 | SD |
$0.5000 |
$0.2500 |
$0.2500 |
| 103 | 880(F) 8878 |
DRUMS | 5,760 | SD |
$0.2500 |
$0.5000 |
$0.5000 |
| 104 | 880(M) 8325 |
(PL)SPEED MONITORING DEVICE | 480 | SD |
$15.00 |
$2.50 |
$20.00 |
| 105 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$15.00 |
$7.50 |
$7.75 |
| 106 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,553 | LF |
$0.1500 |
$0.2500 |
$0.2500 |
| 107 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,251 | LF |
$0.7500 |
$1.00 |
$1.00 |
| 108 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$9.00 |
$5.00 |
$5.00 |
| 109 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 700 | LF |
$24.00 |
$25.00 |
$34.00 |
| 110 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,260 | SD |
$0.3500 |
$0.2500 |
$0.2500 |
| 111 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,400 | SD |
$0.7500 |
$2.00 |
$2.00 |
| 112 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,460 | SD |
$1.25 |
$2.00 |
$2.00 |
| 113 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,640 | SD |
$1.00 |
$0.2500 |
$0.2500 |
| 114 | 880(C) 8848 |
WING BARRICADES | 960 | SD |
$1.50 |
$2.00 |
$2.00 |
| 115 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,380 | SD |
$0.5000 |
$0.2500 |
$0.2500 |
| 116 | 880(F) 8878 |
DRUMS | 5,940 | SD |
$0.2500 |
$0.5000 |
$0.5000 |
| 117 | 880(M) 8325 |
(PL)SPEED MONITORING DEVICE | 480 | SD |
$15.00 |
$2.50 |
$20.00 |
| 118 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$15.00 |
$7.50 |
$7.75 |
| 119 | 804(A) 2915 |
STRUCTURAL CONCRETE | 2 | CY |
$700.00 |
$400.00 |
$400.00 |
| 120 | 804(B) 2916 |
REINFORCING STEEL | 212 | LB |
$2.00 |
$2.00 |
$2.00 |
| 121 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$250.00 |
$250.00 |
$250.00 |
| 122 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 35 | SF |
$20.00 |
$20.00 |
$20.00 |
| 123 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 27 | LF |
$50.00 |
$45.00 |
$46.00 |
| 124 | 851(C) 8324 |
2" SQUARE TUBE POST | 51 | LF |
$9.50 |
$10.00 |
$10.00 |
| 125 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 7 | EA |
$15.00 |
$15.00 |
$15.00 |
| 126 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 12,808 | LF |
$0.7500 |
$0.6800 |
$0.6800 |
| 127 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,800 | LF |
$0.2500 |
$0.2500 |
$0.2500 |
| 128 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 72 | EA |
$5.00 |
$10.00 |
$10.00 |
| 129 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$300.00 |
$1,250.00 |
$1,250.00 |
| 130 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 60 | SF |
$20.00 |
$20.00 |
$20.00 |
| 131 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 94 | LF |
$20.00 |
$30.00 |
$30.00 |
| 132 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 7 | EA |
$15.00 |
$15.00 |
$15.00 |
| 133 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 10,992 | LF |
$0.7500 |
$0.6800 |
$0.7000 |
| 134 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,800 | LF |
$0.2500 |
$0.2500 |
$0.2500 |
| 135 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 62 | EA |
$5.00 |
$10.00 |
$10.00 |
| 136 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,000.00 |
$250.00 |
$250.00 |
| 137 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$15,000.00 |
$1,500.00 |
$1,500.00 |
| 138 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$140,000.00 |
$60,000.00 |
$150,000.00 |
| 139 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$25,000.00 |
| 140 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$10,000.00 |
$50,000.00 |
| 141 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$642,000.00 |
$665,000.00 |
$700,000.00 |