| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$10,300.00 |
$29,500.00 |
$4,728.24 |
$27,560.00 |
$15,915.00 |
$10,000.00 |
$30,000.00 |
$12,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,560 | CY |
$9.00 |
$5.27 |
$7.15 |
$8.27 |
$3.71 |
$7.20 |
$8.50 |
$9.50 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,895 | CY |
$11.00 |
$5.64 |
$8.85 |
$7.90 |
$7.42 |
$8.90 |
$12.00 |
$11.50 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$14,935.00 |
$11,000.00 |
$12,753.81 |
$26,500.00 |
$17,370.00 |
$10,500.00 |
$21,000.00 |
$12,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 100 | LF |
$3.07 |
$6.18 |
$5.35 |
$5.60 |
$5.29 |
$6.50 |
$5.00 |
$10.00 |
$8.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 144 | LF |
$10.22 |
$10.04 |
$22.00 |
$14.93 |
$20.09 |
$10.50 |
$15.00 |
$12.00 |
$16.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 40 | CY |
$101.07 |
$46.35 |
$37.50 |
$18.66 |
$100.67 |
$378.00 |
$159.00 |
$250.00 |
$150.00 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 244 | LF |
$6.30 |
$5.25 |
$23.00 |
$18.66 |
$20.09 |
$5.50 |
$10.00 |
$20.00 |
$15.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 12,800 | SY |
$3.00 |
$2.42 |
$5.30 |
$4.35 |
$5.25 |
$2.55 |
$6.00 |
$5.00 |
$3.75 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 1 | AC |
$2,859.37 |
$1,493.50 |
$3,200.00 |
$4,354.96 |
$3,127.00 |
$1,566.00 |
$10,000.00 |
$3,500.00 |
$3,500.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$1,004.83 |
$1,030.00 |
$3,200.00 |
$4,354.96 |
$3,127.00 |
$1,080.00 |
$1,500.00 |
$2,000.00 |
$3,500.00 |
| 12 | 241 2832 |
MOWING | 6 | AC |
$143.43 |
$309.00 |
$600.00 |
$746.57 |
$524.70 |
$324.00 |
$1,000.00 |
$500.00 |
$150.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 920 | CY |
$65.00 |
$66.95 |
$52.00 |
$47.33 |
$44.52 |
$51.80 |
$50.00 |
$74.00 |
$52.00 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 8,625 | SY |
$8.00 |
$6.70 |
$12.00 |
$6.84 |
$7.42 |
$12.20 |
$7.50 |
$9.50 |
$8.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 4,680 | SY |
$1.73 |
$4.12 |
$4.50 |
$5.23 |
$4.94 |
$4.55 |
$4.50 |
$6.00 |
$4.20 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 556 | TON |
$35.00 |
$48.41 |
$34.25 |
$29.96 |
$44.52 |
$34.60 |
$40.00 |
$40.00 |
$34.00 |
| 17 | 407(B) 0250 |
TACK COAT | 1,208 | GAL |
$3.49 |
$3.35 |
$2.25 |
$2.61 |
$2.23 |
$3.80 |
$3.00 |
$3.00 |
$2.10 |
| 18 | 408 5774 |
PRIME COAT | 2,550 | GAL |
$4.26 |
$5.15 |
$3.36 |
$3.91 |
$3.33 |
$7.90 |
$4.00 |
$3.76 |
$3.14 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 300 | TON |
$115.00 |
$119.74 |
$113.35 |
$131.78 |
$112.27 |
$122.00 |
$115.00 |
$112.00 |
$114.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,924 | TON |
$87.00 |
$92.39 |
$97.75 |
$113.53 |
$96.71 |
$94.10 |
$105.00 |
$102.00 |
$98.50 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 580 | TON |
$115.00 |
$123.39 |
$114.00 |
$132.58 |
$112.94 |
$99.70 |
$115.00 |
$115.00 |
$115.00 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 757 | TON |
$125.00 |
$110.57 |
$111.70 |
$129.88 |
$110.64 |
$102.50 |
$115.00 |
$110.00 |
$112.65 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 3,355 | SY |
$7.00 |
$6.95 |
$6.00 |
$6.97 |
$7.00 |
$5.35 |
$7.50 |
$6.70 |
$6.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 89.6 | CY |
$350.00 |
$309.00 |
$350.00 |
$504.72 |
$350.67 |
$405.00 |
$600.00 |
$300.00 |
$385.00 |
| 25 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 104 | LF |
$75.00 |
$59.95 |
$51.35 |
$57.27 |
$39.75 |
$51.80 |
$52.00 |
$58.00 |
$52.00 |
| 26 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 64 | LF |
$90.00 |
$78.28 |
$78.00 |
$83.95 |
$56.29 |
$78.80 |
$78.00 |
$85.00 |
$78.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 56 | LF |
$29.75 |
$43.26 |
$33.20 |
$61.85 |
$30.74 |
$33.50 |
$35.00 |
$41.00 |
$33.00 |
| 28 | 613(B) 4819 |
96" CORR. GALV. STEEL PIPE | 308 | LF |
$175.00 |
$191.58 |
$242.90 |
$171.54 |
$205.64 |
$245.00 |
$230.00 |
$350.00 |
$300.00 |
| 29 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,208.56 |
$1,519.25 |
$1,500.00 |
$1,226.55 |
$1,387.66 |
$1,296.00 |
$1,600.00 |
$2,000.00 |
$1,875.00 |
| 30 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,324.55 |
$1,684.05 |
$1,900.00 |
$1,325.00 |
$1,476.22 |
$1,512.00 |
$2,100.00 |
$2,800.00 |
$2,125.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$7,416.00 |
$12,400.00 |
$12,442.74 |
$15,900.00 |
$11,485.00 |
$5,000.00 |
$17,000.00 |
$4,800.00 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 6,180 | SY |
$3.94 |
$3.09 |
$4.40 |
$3.73 |
$4.24 |
$10.40 |
$5.00 |
$2.69 |
$4.10 |
| 33 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 774 | LF |
$3.65 |
$3.09 |
$7.00 |
$3.73 |
$3.18 |
$3.25 |
$4.00 |
$4.31 |
$3.00 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 850 | LF |
$18.95 |
$18.54 |
$19.25 |
$22.40 |
$19.08 |
$19.40 |
$20.00 |
$22.00 |
$18.00 |
| 35 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,611.32 |
$2,317.50 |
$2,410.00 |
$2,799.62 |
$2,385.00 |
$2,429.00 |
$2,500.00 |
$2,500.00 |
$2,250.00 |
| 36 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,041.13 |
$1,648.00 |
$1,715.00 |
$1,990.84 |
$1,696.00 |
$1,727.00 |
$2,000.00 |
$2,000.00 |
$1,600.00 |
| 37 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,224 | LF |
$5.94 |
$4.89 |
$5.10 |
$5.91 |
$7.37 |
$6.30 |
$6.00 |
$10.28 |
$5.85 |
| 38 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$17.04 |
$36.05 |
$12.00 |
$17.42 |
$27.50 |
$35.80 |
$25.00 |
$18.00 |
$25.00 |
| 39 | 501(G) 6309 |
CLSM BACKFILL | 304 | CY |
$200.00 |
$238.48 |
$177.06 |
$151.25 |
$194.26 |
$165.00 |
$170.00 |
$140.00 |
$250.00 |
| 40 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 499 | LF |
$250.00 |
$300.09 |
$305.45 |
$351.49 |
$307.19 |
$308.00 |
$260.00 |
$360.00 |
$400.00 |
| 41 | 504(A) 1304 |
APPROACH SLAB | 271.8 | SY |
$206.47 |
$199.23 |
$238.87 |
$185.44 |
$266.20 |
$270.00 |
$245.00 |
$210.00 |
$325.00 |
| 42 | 504(B) 1305 |
SAW-CUT GROOVING | 815.6 | SY |
$5.65 |
$5.77 |
$4.95 |
$5.72 |
$5.06 |
$4.95 |
$12.00 |
$5.50 |
$4.60 |
| 43 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 367 | LF |
$95.00 |
$87.90 |
$80.00 |
$107.20 |
$99.51 |
$122.50 |
$100.00 |
$90.00 |
$110.00 |
| 44 | 506(A) 1322 |
STRUCTURAL STEEL | 600 | LB |
$2.87 |
$2.09 |
$4.02 |
$4.36 |
$2.75 |
$6.95 |
$4.00 |
$3.00 |
$4.00 |
| 45 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$682.55 |
$823.31 |
$669.00 |
$639.53 |
$675.37 |
$823.50 |
$1,500.00 |
$800.00 |
$1,350.00 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 208.8 | CY |
$603.79 |
$585.27 |
$625.00 |
$521.17 |
$790.67 |
$585.50 |
$650.00 |
$831.00 |
$875.00 |
| 47 | 509(B) 1328 |
CLASS A CONCRETE | 69.2 | CY |
$660.45 |
$585.27 |
$650.00 |
$653.32 |
$815.51 |
$676.50 |
$500.00 |
$850.00 |
$875.00 |
| 48 | 509(D) 1331 |
CLASS C CONCRETE | 8 | CY |
$642.63 |
$579.68 |
$400.00 |
$471.90 |
$612.92 |
$1,206.00 |
$500.00 |
$300.00 |
$700.00 |
| 49 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 50,570 | LB |
$1.13 |
$1.27 |
$1.20 |
$1.12 |
$1.14 |
$1.45 |
$1.80 |
$1.25 |
$1.25 |
| 50 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 984 | LF |
$35.00 |
$26.94 |
$24.30 |
$30.86 |
$35.21 |
$35.90 |
$40.00 |
$41.00 |
$50.00 |
| 51 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 984 | LF |
$15.00 |
$15.45 |
$15.00 |
$17.42 |
$16.50 |
$17.10 |
$25.00 |
$15.00 |
$15.00 |
| 52 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 53 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 641 | SY |
$4.69 |
$5.15 |
$4.30 |
$4.98 |
$4.40 |
$4.30 |
$6.00 |
$5.00 |
$4.00 |
| 54 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,790 | TON |
$45.00 |
$44.30 |
$43.70 |
$47.77 |
$48.37 |
$51.50 |
$70.00 |
$45.00 |
$56.00 |
| 55 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 310 | TON |
$40.00 |
$32.81 |
$41.00 |
$34.77 |
$38.81 |
$38.20 |
$45.00 |
$34.00 |
$48.00 |
| 56 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$29.66 |
$29.65 |
$60.00 |
$10.05 |
$22.09 |
$60.10 |
$25.00 |
$20.00 |
$40.00 |
| 57 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$27.07 |
$29.65 |
$45.00 |
$12.89 |
$23.49 |
$29.80 |
$35.00 |
$20.00 |
$40.00 |
| 58 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$5,051.64 |
$54,500.00 |
$29,364.87 |
$75,625.00 |
$66,535.00 |
$15,000.00 |
$35,000.00 |
$56,000.00 |
| 59 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,625 | LF |
$0.2200 |
$0.1500 |
$0.1800 |
$0.1900 |
$0.1700 |
$0.1600 |
$0.1500 |
$0.1800 |
$0.1700 |
| 60 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 720 | EA |
$1.28 |
$0.5600 |
$0.6000 |
$0.6800 |
$0.6100 |
$0.5900 |
$0.5500 |
$0.6600 |
$0.6000 |
| 61 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,820 | LF |
$0.6600 |
$0.2500 |
$0.2800 |
$0.3100 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.3000 |
$0.3500 |
| 62 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,000 | SD |
$0.2500 |
$0.5100 |
$0.5500 |
$0.6200 |
$0.5500 |
$0.5400 |
$0.5000 |
$0.9000 |
$0.5500 |
| 63 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,600 | SD |
$0.3900 |
$0.7700 |
$0.8000 |
$0.9300 |
$0.8300 |
$0.8100 |
$0.7500 |
$0.9000 |
$0.8000 |
| 64 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,000 | SD |
$1.17 |
$1.03 |
$1.07 |
$1.24 |
$1.10 |
$1.10 |
$1.00 |
$1.20 |
$1.10 |
| 65 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$0.7700 |
$0.5200 |
$0.5500 |
$0.6200 |
$0.5500 |
$0.5400 |
$0.5000 |
$0.6000 |
$0.5500 |
| 66 | 880(C) 8848 |
WING BARRICADES | 580 | SD |
$1.02 |
$0.2500 |
$0.2800 |
$0.3100 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.3000 |
$0.2800 |
| 67 | 880(D) 8854 |
VERTICAL PANELS | 1,300 | SD |
$0.3500 |
$0.2500 |
$0.2800 |
$0.3100 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.3000 |
$0.2800 |
| 68 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,600 | SD |
$0.2400 |
$0.2500 |
$0.2800 |
$0.3100 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.3000 |
$0.2800 |
| 69 | 880(F) 8878 |
DRUMS | 4,320 | SD |
$0.2000 |
$0.2500 |
$0.2800 |
$0.3100 |
$0.2800 |
$0.2700 |
$0.2500 |
$0.4000 |
$0.2800 |
| 70 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$11.70 |
$10.30 |
$11.00 |
$12.44 |
$11.00 |
$10.80 |
$10.00 |
$11.90 |
$11.00 |
| 71 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$668.16 |
$51.50 |
$60.00 |
$62.21 |
$55.00 |
$54.00 |
$50.00 |
$60.00 |
$55.00 |
| 72 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 35.5 | SF |
$21.65 |
$20.60 |
$22.00 |
$24.89 |
$22.00 |
$21.60 |
$20.00 |
$23.00 |
$22.00 |
| 73 | 851(C) 8324 |
2" SQUARE TUBE POST | 58 | LF |
$9.86 |
$8.24 |
$9.00 |
$9.95 |
$8.80 |
$8.65 |
$8.00 |
$10.00 |
$8.75 |
| 74 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$16.25 |
$15.45 |
$18.00 |
$18.66 |
$16.50 |
$16.20 |
$15.00 |
$17.94 |
$16.00 |
| 75 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 7,000 | LF |
$0.6300 |
$0.8800 |
$0.9100 |
$1.06 |
$0.9400 |
$0.9200 |
$0.8500 |
$1.02 |
$0.9000 |
| 76 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$33,000.00 |
$14,111.00 |
$11,985.00 |
$12,442.74 |
$13,200.00 |
$20,615.00 |
$12,000.00 |
$12,000.00 |
$11,000.00 |
| 77 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,014.87 |
$2,575.00 |
$4,000.00 |
$1,866.41 |
$5,500.00 |
$4,049.00 |
$5,000.00 |
$2,800.00 |
$13,500.00 |
| 78 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$12,042.56 |
$2,575.00 |
$7,000.00 |
$746.56 |
$8,250.00 |
$2,699.00 |
$25,000.00 |
$5,500.00 |
$2,500.00 |
| 79 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$105,690.46 |
$100,000.00 |
$162,968.82 |
$129,728.99 |
$118,347.60 |
$175,000.00 |
$125,000.00 |
$145,000.00 |