| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,130 | CY |
$13.50 |
$14.00 |
$15.00 |
$20.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,000 | CY |
$26.82 |
$0.2500 |
$1.00 |
$25.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$9,000.00 |
$22,000.00 |
$23,440.36 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 5 | EA |
$200.00 |
$150.00 |
$400.00 |
$575.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 228 | LF |
$8.00 |
$10.00 |
$20.00 |
$29.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 10,087 | SY |
$1.45 |
$6.00 |
$7.00 |
$5.25 |
| 7 | 241 2832 |
MOWING | 8 | AC |
$60.00 |
$360.00 |
$100.00 |
$355.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,590 | CY |
$46.54 |
$44.00 |
$40.00 |
$55.00 |
| 9 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 11,654 | SY |
$3.31 |
$5.00 |
$4.00 |
$4.75 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,000 | TON |
$25.10 |
$21.00 |
$10.00 |
$30.00 |
| 11 | 407(B) 0250 |
TACK COAT | 3,309 | GAL |
$3.20 |
$8.00 |
$2.00 |
$2.15 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,125 | TON |
$78.62 |
$78.00 |
$80.00 |
$70.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,228 | TON |
$80.00 |
$84.00 |
$90.00 |
$95.00 |
| 14 | 509(A) 0319 |
CLASS AA CONCRETE | 1 | CY |
$618.57 |
$800.00 |
$2,500.00 |
$1,000.00 |
| 15 | 511(A) 0332 |
REINFORCING STEEL | 23 | LB |
$1.10 |
$14.00 |
$10.00 |
$1.25 |
| 16 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,875.00 |
$2,300.00 |
$5,000.00 |
$2,500.00 |
| 17 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 200 | LF |
$42.50 |
$72.00 |
$85.00 |
$55.00 |
| 18 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 150 | LF |
$75.04 |
$79.00 |
$100.00 |
$71.00 |
| 19 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 150 | LF |
$72.00 |
$112.00 |
$110.00 |
$79.00 |
| 20 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 320 | LF |
$103.49 |
$116.00 |
$130.00 |
$93.00 |
| 21 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 150 | LF |
$110.00 |
$120.00 |
$150.00 |
$105.00 |
| 22 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 26 | LF |
$36.58 |
$45.00 |
$80.00 |
$50.00 |
| 23 | 613(N) 7520 |
TYPE A6 SLOPED CONCRETE END SECTION | 4 | EA |
$1,600.00 |
$3,100.00 |
$2,000.00 |
$3,000.00 |
| 24 | 613(N) 7521 |
TYPE B6 SLOPED CONCRETE END SECTION | 8 | EA |
$1,950.00 |
$3,300.00 |
$2,500.00 |
$3,000.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$13,500.00 |
$17,000.00 |
$25,000.00 |
$17,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,289 | SY |
$3.25 |
$6.00 |
$5.00 |
$7.00 |
| 27 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 680 | LF |
$7.00 |
$12.00 |
$18.00 |
$12.00 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 6,893 | LF |
$1.74 |
$3.00 |
$3.00 |
$1.50 |
| 29 | 509(A) 0319 |
CLASS AA CONCRETE | 40 | CY |
$618.57 |
$360.00 |
$310.00 |
$390.00 |
| 30 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,587 | LF |
$9.25 |
$15.00 |
$15.00 |
$7.30 |
| 31 | 628(C) 5110 |
END ANCHORS | 16 | EA |
$1,582.77 |
$2,400.00 |
$2,500.00 |
$3,218.00 |
| 32 | 628(E) 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$2,500.00 |
$4,210.00 |
$2,500.00 |
$3,393.00 |
| 33 | 628(F) 5185 |
(PL)HIGH TENSION CABLE BARRIER - RE-TENSIONING | 14 | EA |
$115.00 |
$300.00 |
$250.00 |
$127.00 |
| 34 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 169 | SF |
$18.07 |
$15.00 |
$15.00 |
$26.00 |
| 35 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 238 | LF |
$9.58 |
$10.00 |
$11.00 |
$9.50 |
| 36 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 14 | EA |
$23.06 |
$30.00 |
$25.00 |
$22.00 |
| 37 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 12,336 | LF |
$0.8100 |
$1.20 |
$1.30 |
$0.8000 |
| 38 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 36 | EA |
$128.98 |
$120.00 |
$130.00 |
$238.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,846.93 |
$3,000.00 |
$15,000.00 |
$7,750.00 |
| 40 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,133 | CY |
$15.70 |
$14.00 |
$15.00 |
$31.00 |
| 41 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,939 | CY |
$10.40 |
$0.2500 |
$1.00 |
$32.00 |
| 42 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$13,435.80 |
$25,000.00 |
$77,000.00 |
$38,000.00 |
| 43 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 39 | EA |
$165.20 |
$150.00 |
$400.00 |
$575.00 |
| 44 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,086 | LF |
$11.20 |
$10.00 |
$20.00 |
$29.00 |
| 45 | 229 4318 |
DITCH LINER PROTECTION | 6,330 | LF |
$1.90 |
$9.00 |
$8.00 |
$7.65 |
| 46 | 230(A) 2806 |
SOLID SLAB SODDING | 36,468 | SY |
$1.60 |
$6.00 |
$7.00 |
$5.25 |
| 47 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,954 | CY |
$42.30 |
$44.00 |
$40.00 |
$68.00 |
| 48 | 325 5271 |
SEPARATOR FABRIC | 24,837 | SY |
$1.10 |
$1.20 |
$1.00 |
$2.00 |
| 49 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,367 | TON |
$22.50 |
$21.00 |
$10.00 |
$30.00 |
| 50 | 407(B) 0250 |
TACK COAT | 2,903 | GAL |
$2.30 |
$7.00 |
$2.00 |
$2.50 |
| 51 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,467 | TON |
$64.20 |
$78.00 |
$80.00 |
$79.00 |
| 52 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,121 | TON |
$63.20 |
$84.00 |
$90.00 |
$102.00 |
| 53 | 509(D) 0325 |
CLASS C CONCRETE | 338 | CY |
$280.80 |
$340.00 |
$500.00 |
$635.00 |
| 54 | 611(G) 5327 |
INLET GPI TYPE 1 (DES. 1) | 12 | EA |
$3,800.00 |
$2,400.00 |
$4,500.00 |
$3,300.00 |
| 55 | 611(G) 5331 |
INLET GPI TYPE 1 (DES. 5) | 15 | EA |
$3,045.50 |
$2,700.00 |
$4,800.00 |
$3,500.00 |
| 56 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 2 | EA |
$4,824.60 |
$3,200.00 |
$5,000.00 |
$3,800.00 |
| 57 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 10 | EA |
$3,231.40 |
$2,300.00 |
$5,000.00 |
$2,900.00 |
| 58 | 611(H) 5374 |
ADD'L DEPTH IN INLET GPI TYPE 1 | 5.15 | VF |
$280.00 |
$250.00 |
$500.00 |
$218.00 |
| 59 | 611(H) 5375 |
ADD'L DEPTH IN INLET GPI TYPE 2 | 0.59 | VF |
$660.00 |
$300.00 |
$500.00 |
$231.00 |
| 60 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,258 | LF |
$44.90 |
$79.00 |
$100.00 |
$86.00 |
| 61 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 5,693 | LF |
$40.60 |
$50.00 |
$80.00 |
$52.00 |
| 62 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,043.60 |
$3,200.00 |
$2,500.00 |
$3,000.00 |
| 63 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,292 | SY |
$5.50 |
$6.00 |
$5.00 |
$7.00 |
| 64 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 11 | EA |
$475.70 |
$119.00 |
$500.00 |
$615.00 |
| 65 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 4,322 | LF |
$5.80 |
$5.00 |
$4.00 |
$12.00 |
| 66 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 619 | LF |
$15.10 |
$18.00 |
$4.00 |
$18.00 |
| 67 | 619(C) 0924 |
SAWING PAVEMENT | 12,433 | LF |
$2.90 |
$3.00 |
$3.00 |
$1.60 |
| 68 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 17,425 | LF |
$0.6000 |
$0.8000 |
$0.7500 |
$1.20 |
| 69 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 200 | LF |
$0.1000 |
$0.6000 |
$5.00 |
$8.50 |
| 70 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 240 | SD |
$5.40 |
$60.00 |
$40.00 |
$26.00 |
| 71 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 240 | SD |
$3.60 |
$12.00 |
$15.00 |
$11.00 |
| 72 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,060 | SD |
$0.4000 |
$0.6000 |
$0.3000 |
$0.1100 |
| 73 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,500 | SD |
$0.4000 |
$1.20 |
$1.10 |
$1.20 |
| 74 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,020 | SD |
$1.00 |
$2.40 |
$1.10 |
$1.20 |
| 75 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$1.70 |
$1.80 |
$10.00 |
$0.5500 |
| 76 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$0.5000 |
$3.60 |
$11.00 |
$1.10 |
| 77 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,740 | SD |
$0.1000 |
$0.3000 |
$1.00 |
$0.1500 |
| 78 | 880(F) 8878 |
DRUMS | 29,700 | SD |
$0.1000 |
$0.4000 |
$0.3000 |
$0.0500 |
| 79 | 880(G) 8890 |
CHANNELIZER CONES | 41,040 | SD |
$0.1000 |
$0.4000 |
$0.3000 |
$0.6000 |
| 80 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 318 | SD |
$7.90 |
$18.00 |
$25.00 |
$16.00 |
| 81 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 52 | EA |
$56.40 |
$30.00 |
$50.00 |
$42.00 |
| 82 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$235.70 |
$300.00 |
$3,500.00 |
$238.00 |
| 83 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 175.25 | SF |
$23.50 |
$14.00 |
$15.00 |
$31.00 |
| 84 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 14.5 | LF |
$16.70 |
$54.00 |
$35.00 |
$26.00 |
| 85 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 410 | LF |
$9.80 |
$10.00 |
$15.00 |
$9.50 |
| 86 | 853 9027 |
DELINEATORS(TYPE 1, CODE 2) | 12 | EA |
$23.20 |
$30.00 |
$25.00 |
$22.00 |
| 87 | 853 9036 |
DELINEATORS(TYPE 2, CODE 2) | 36 | EA |
$23.20 |
$30.00 |
$30.00 |
$24.00 |
| 88 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 15,296 | LF |
$0.6000 |
$1.20 |
$1.30 |
$0.5500 |
| 89 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 101 | EA |
$190.80 |
$120.00 |
$125.00 |
$238.00 |
| 90 | 509(A) 0319 |
CLASS AA CONCRETE | 142 | CY |
$525.60 |
$360.00 |
$310.00 |
$400.00 |
| 91 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 15,051 | LF |
$9.50 |
$15.00 |
$15.00 |
$7.45 |
| 92 | 628(C) 5110 |
END ANCHORS | 48 | EA |
$5,274.40 |
$2,400.00 |
$2,500.00 |
$2,915.00 |
| 93 | 628(E) 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$4,104.50 |
$4,200.00 |
$2,500.00 |
$3,400.00 |
| 94 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,407.90 |
$20,000.00 |
$95,590.40 |
$35,000.00 |
| 95 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,118.50 |
$3,000.00 |
$27,000.00 |
$8,000.00 |
| 96 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$230,000.00 |
$285,000.00 |
$255,000.00 |