Bid tab 200348

Let Nov 19, 2020 · Division 5 · Custer Sign up free

‹ Nov 2020 results

BRIDGE AND APPROACHES I-40B: OVER WASHITA RIVER , 0.4 MILES EAST OF THE US-183 JUNCTION IN CLINTON . PROJECT LENGTH = 0.396 MILE

Let date
Thursday, November 19, 2020
Contract
200348
J/P numbers
30331(04)
District
Division 5
County
Custer
Highway
Limits
BRIDGE AND APPROACHES I-40B: OVER WASHITA RIVER , 0.4 MILES EAST OF THE US-183 JUNCTION IN CLINTON . PROJECT LENGTH = 0.396 MILE
Project number
NHPP-220N(074)PM

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Frontier Bridge, Inc. Low bidder $7,523,691
2 C3 Construction, Inc. $8,879,477 +18.0%
3 Treas Construction Inc $8,993,472 +19.5%
4 K & R BUILDERS, INC. $9,099,013 +20.9%
5 OBC, INC. $9,377,880 +24.6%
6 SEWELL BROS., INC. $9,473,962 +25.9%
7 MANHATTAN ROAD & BRIDGE COMPANY, LLC $9,592,455 +27.5%

Bid tab: unit prices 106 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Frontier Bridge…#2 C3 Construction…#3 Treas Construct…#4 K & R BUILDERS,…#5 OBC, INC.#6 SEWELL BROS., I…#7 MANHATTAN ROAD …
10201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $137,605.13 $13,430.69 $78,642.00 $20,000.00 $15,975.00 $10,000.00 $78,250.00
20202(A) 0183 UNCLASSIFIED EXCAVATION4,444CY $15.00 $7.05 $7.01 $6.12 $8.40 $7.67 $10.00 $10.00
30202(D) 0184 UNCLASSIFIED BORROW1,000CY $25.00 $8.67 $9.34 $9.69 $14.20 $9.59 $10.00 $7.75
40205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $2,856.00 $4,820.45 $5,100.00 $27,000.00 $5,112.00 $7,000.00 $1,550.00
50221(C) 2801 TEMPORARY SILT FENCE2,766LF $2.50 $1.93 $1.90 $1.92 $2.00 $2.01 $2.60 $2.50
60221(D) 2803 TEMPORARY SEDIMENT FILTER3EA $175.00 $239.70 $236.00 $239.70 $167.00 $250.28 $260.00 $140.00
70230(A) 2806 SOLID SLAB SODDING2,947SY $4.50 $3.05 $3.00 $3.06 $3.50 $3.18 $3.60 $3.10
80233(A) 2817 VEGETATIVE MULCHING1.2AC $500.00 $698.70 $687.92 $698.70 $1,000.00 $729.53 $750.00 $710.00
90241 2832 MOWING17.83AC $120.00 $204.00 $200.85 $204.00 $85.00 $213.00 $220.00 $205.00
100307(K) 4300 STABILIZED SUBGRADE10,893SY $8.00 $8.16 $7.01 $6.12 $6.60 $6.39 $6.50 $7.25
110317 4270 CEMENT TREATED BASE10,543SY $25.00 $15.30 $26.12 $10.20 $23.50 $19.78 $25.75 $20.00
120325 5271 SEPARATOR FABRIC10,512SY $2.00 $1.85 $2.34 $1.98 $3.25 $2.13 $2.50 $2.20
130402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E362TON $40.00 $31.76 $30.32 $28.88 $36.00 $31.95 $35.00 $36.00
140408 5774 PRIME COAT4,561GAL $7.00 $5.10 $7.01 $6.12 $6.30 $3.40 $5.50 $3.30
150414(A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT)1,114SY $25.00 $15.30 $17.61 $26.67 $29.15 $25.56 $28.75 $30.50
160414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )8,766SY $40.00 $21.66 $17.37 $28.56 $31.00 $37.28 $32.00 $16.25
170414(G) 5275 P.C. CONCRETE FOR PAVEMENT2,196CY $200.00 $147.09 $164.99 $167.79 $180.00 $197.03 $187.00 $180.00
180609(A) 0380 CONCRETE CURB (8" BARRIER-INTEGRAL)1,064LF $15.00 $12.81 $9.34 $9.94 $11.00 $12.78 $11.00 $7.50
190610(A) 0602 4" CONCRETE SIDEWALK482SY $80.00 $44.65 $47.19 $66.30 $71.00 $61.77 $71.00 $45.00
200610(B) 0604 6" CONCRETE DRIVEWAY401SY $80.00 $52.58 $54.56 $89.76 $97.00 $74.55 $95.00 $70.00
210610(I) 4610 TACTILE WARNING DEVICE-NEW83SF $30.00 $29.82 $17.00 $28.56 $33.00 $79.88 $30.00 $47.00
220611(A) 2657 MANHOLE (4' DIAMETER)1EA $2,150.00 $2,488.30 $1,706.31 $2,335.80 $2,365.00 $2,450.00 $2,500.00 $2,000.00
230611(G) 5113 INLET CI DES. 2 (B)3EA $6,000.00 $8,636.14 $3,328.95 $4,554.30 $5,170.00 $4,500.00 $4,900.00 $4,600.00
240611(H) 5325 ADD'L DEPTH IN INLET CI DES. 212.08VF $310.00 $373.77 $424.15 $331.50 $341.00 $540.00 $350.00 $300.00
250612(B) 0642 MANHOLES REBUILT1EA $1,130.00 $1,530.00 $896.30 $1,224.00 $1,243.00 $1,550.00 $1,300.00 $3,500.00
260613(A) 0491 18" R.C.PIPE CLASS III98LF $70.00 $63.80 $84.39 $57.12 $70.00 $69.23 $71.00 $86.00
270613(A) 0493 30" R.C.PIPE CLASS III18LF $100.00 $132.16 $151.19 $97.92 $110.00 $106.50 $100.00 $106.00
280613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND1EA $600.00 $1,012.61 $597.27 $1,285.20 $2,750.00 $612.38 $1,400.00 $1,050.00
290619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $8,160.00 $14,014.63 $10,200.00 $12,500.00 $19,170.00 $15,000.00 $5,700.00
300619(B) 4727 REMOVAL OF CONCRETE PAVEMENT7,017SY $7.50 $6.12 $7.01 $5.61 $8.00 $7.00 $10.00 $4.75
310619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,854SY $5.00 $4.08 $7.01 $5.10 $11.00 $8.00 $12.00 $3.50
320619(B) 4763 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY2,278SY $15.00 $6.12 $4.85 $7.14 $19.50 $12.00 $15.00 $4.75
330619(B) 4766 REMOVAL OF CONCRETE DRIVEWAY351SY $10.00 $6.12 $4.85 $10.20 $6.00 $11.00 $10.00 $4.50
340501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON460CY $30.00 $12.24 $12.55 $30.60 $10.00 $30.00 $15.00 $40.00
350501(G) 6309 CLSM BACKFILL486CY $200.00 $129.22 $147.56 $238.58 $155.00 $190.00 $200.00 $170.00
360502 1000 TEMPORARY EARTH RETAINAGE1LSUM $50,000.00 $24,883.00 $58,557.79 $125,525.00 $55,000.00 $40,000.00 $60,000.00 $75,000.00
370503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)6,378.68LF $230.00 $199.29 $225.67 $200.27 $218.00 $210.00 $210.00 $225.00
380504 6179 BRIDGE TRAFFIC RAIL1,602LF $450.00 $282.54 $340.72 $375.51 $375.00 $350.00 $345.00 $335.00
390504(A) 1304 APPROACH SLAB493SY $300.00 $217.39 $212.84 $213.11 $212.50 $290.00 $210.00 $235.00
400504(B) 1305 SAW-CUT GROOVING5,747SY $5.00 $3.47 $3.97 $4.78 $3.74 $3.62 $3.75 $3.50
410504(C) 6250 SEALED EXPANSION JOINT299.68LF $350.00 $220.96 $236.81 $295.67 $295.00 $275.00 $275.00 $475.00
420504(E) 1381 CONCRETE PARAPET120LF $150.00 $80.63 $69.61 $82.90 $150.00 $150.00 $150.00 $130.00
430506(A) 1322 STRUCTURAL STEEL6,860LB $4.00 $1.74 $4.27 $2.23 $2.50 $3.25 $2.50 $3.50
440507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY64EA $2,000.00 $1,320.92 $1,493.55 $1,531.30 $1,450.00 $2,000.00 $1,300.00 $2,500.00
450507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY64EA $2,000.00 $1,320.92 $1,493.55 $1,531.30 $1,450.00 $2,000.00 $1,300.00 $2,500.00
460509(A) 1326 CLASS AA CONCRETE2,026.1CY $600.00 $409.62 $519.28 $583.53 $575.00 $540.00 $600.00 $540.00
470509(B) 1328 CLASS A CONCRETE820CY $650.00 $414.72 $406.35 $582.90 $615.00 $700.00 $600.00 $730.00
480509(D) 1331 CLASS C CONCRETE20CY $500.00 $330.21 $135.19 $459.00 $595.00 $1,500.00 $500.00 $545.00
490511 6306 MECHANICAL SPLICES346EA $50.00 $69.20 $72.36 $81.94 $110.00 $80.00 $65.00 $112.00
500511(A) 1332 REINFORCING STEEL6,470LB $1.00 $0.9300 $6.40 $1.54 $1.07 $1.00 $1.00 $1.20
510511(B) 6010 EPOXY COATED REINFORCING STEEL547,270LB $1.10 $1.05 $0.9100 $1.03 $1.13 $1.15 $1.25 $1.15
520514(A) 6010 PILES, FURNISHED (HP 10X42)224LF $40.00 $27.43 $27.81 $31.49 $28.00 $40.00 $30.00 $30.00
530514(A) 6011 PILES, FURNISHED (HP 12X53)1,590LF $45.00 $32.51 $3.85 $38.63 $32.90 $45.00 $35.00 $40.00
540514(B) 6292 PILES, DRIVEN (HP 10X42)224LF $20.00 $10.20 $15.79 $12.24 $12.00 $30.00 $15.00 $12.00
550514(B) 6294 PILES, DRIVEN (HP 12X53)1,590LF $20.00 $14.28 $15.89 $12.24 $14.10 $30.00 $15.00 $12.00
560514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
570515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)4,131SY $5.00 $4.08 $4.02 $4.08 $4.20 $4.26 $4.40 $4.15
580516(A) 6096 DRILLED SHAFTS 60" DIAMETER1,084LF $900.00 $630.16 $829.94 $867.50 $727.00 $800.00 $800.00 $950.00
590516(A) 6098 DRILLED SHAFTS 72" DIAMETER384LF $1,300.00 $783.27 $1,046.97 $1,049.51 $925.00 $1,050.00 $1,100.00 $1,200.00
600516(C) 6200 CROSSHOLE SONIC LOGGING6EA $4,000.00 $1,632.00 $1,506.39 $2,550.00 $2,400.00 $1,597.50 $1,650.00 $1,950.00
610523(A) 6550 SEALER CRACK PREPARATION1,031LF $5.00 $4.08 $4.02 $4.08 $4.20 $4.26 $4.40 $4.15
620523(B) 6560 SEALER RESIN10.4GAL $150.00 $204.00 $200.85 $204.00 $200.00 $213.00 $220.00 $205.00
630542 4605 (PL)INSTALLATION OF BRIDGE ITEMS88EA $600.00 $667.51 $713.29 $663.28 $800.00 $500.00 $570.00 $325.00
640601(B) 1353 TYPE I-A PLAIN RIPRAP2,500TON $55.00 $40.03 $40.03 $48.56 $46.70 $48.00 $48.00 $50.00
650601(C) 1355 TYPE I-A FILTER BLANKET425TON $45.00 $28.04 $30.65 $37.38 $35.00 $38.00 $38.00 $37.00
660613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND150LF $35.00 $13.47 $9.25 $30.60 $25.00 $25.00 $35.00 $30.00
670613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $35.00 $21.02 $12.70 $30.60 $30.00 $25.00 $35.00 $30.00
680619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $350,000.00 $120,000.00 $321,556.29 $312,034.32 $225,000.00 $273,000.00 $300,000.00 $250,000.00
690802(A) 8310 2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED1,790LF $7.00 $41.82 $47.88 $30.60 $45.00 $31.95 $33.00 $42.00
700802(B) 8340 2" PVC SCH.40 PLASTIC CONDUIT BORED395LF $45.00 $28.56 $32.70 $35.70 $30.00 $37.28 $38.00 $29.00
710802(B) 8342 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED745LF $10.00 $10.20 $11.68 $15.30 $11.00 $15.98 $16.00 $10.50
720802(B) 8570 (PL)LIQUID TIGHT FLEXIBLE CONDUIT83LF $35.00 $40.80 $46.72 $25.50 $42.00 $26.63 $27.00 $41.50
730802(E) 8370 JUNCTION BOX(6" X 6" X 4")14EA $770.00 $729.30 $835.04 $1,224.00 $786.00 $1,278.00 $1,300.00 $742.00
740803(A) 8065 PULL BOX(SIZE I)2EA $450.00 $902.70 $1,033.58 $1,020.00 $950.00 $1,065.00 $1,100.00 $920.00
750804(A) 2915 STRUCTURAL CONCRETE13CY $750.00 $897.60 $1,027.74 $969.00 $950.00 $1,011.75 $1,000.00 $915.00
760804(B) 2916 REINFORCING STEEL2,272LB $2.00 $2.02 $2.31 $2.04 $2.10 $2.13 $2.20 $2.00
770809 8090 ENHANCEMENT LIGHTING (COMPLETE)26EA $750.00 $4,513.50 $5,167.89 $5,100.00 $4,800.00 $5,325.00 $5,250.00 $4,600.00
780809(A) 8090 ROADWAY LUMINAIRE26EA $2,000.00 $2,907.00 $3,328.47 $2,958.00 $3,100.00 $3,088.50 $3,200.00 $2,960.00
790810(A) 3118 SERVICE POLE1EA $3,000.00 $6,691.20 $7,661.33 $10,200.00 $7,000.00 $10,650.00 $11,000.00 $6,800.00
800811 8038 1/C NO.4 ELECTRICAL CONDUCTOR5,656LF $2.00 $3.06 $3.50 $5.10 $3.30 $5.33 $5.50 $3.10
810811 8046 1/C NO.12 ELECTRICAL CONDUCTOR2,340LF $2.25 $2.04 $2.34 $1.53 $2.20 $1.60 $2.00 $2.10
820104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)30DAY $300.00 $300.00 $300.00 $300.00 $300.00 $300.00 $300.00 $300.00
830857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)8,400LF $0.1500 $0.2600 $0.2300 $0.2500 $0.2200 $0.2700 $0.2200 $0.2600
840857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-13,846EA $0.7500 $0.3600 $0.5800 $0.3500 $0.5400 $0.3700 $0.5200 $0.3600
850857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)13,934LF $0.2500 $0.1000 $0.4700 $0.1000 $0.4200 $0.1100 $0.4200 $0.1100
860871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.900SD $8.25 $2.04 $5.84 $2.04 $5.20 $2.13 $5.25 $2.05
870877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,750LF $24.00 $13.26 $59.56 $24.48 $28.50 $27.00 $55.00 $60.00
880880(A) 8800 ARROW DISPLAY(TYPE A)600SD $2.75 $12.24 $5.84 $12.24 $5.40 $12.78 $5.50 $12.50
890880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF11,850SD $0.3500 $0.1000 $0.1200 $0.1000 $0.1100 $0.1100 $0.1200 $0.1000
900880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF5,400SD $0.7500 $1.02 $1.17 $1.02 $1.05 $1.07 $1.10 $1.05
910880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,200SD $1.25 $2.04 $3.50 $2.04 $3.15 $2.13 $3.10 $2.10
920880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)16,650SD $1.00 $0.1000 $0.1200 $0.1000 $0.1000 $0.1100 $0.1200 $0.1000
930880(C) 8848 WING BARRICADES1,200SD $1.50 $2.04 $0.5800 $2.04 $0.5300 $2.13 $0.5500 $2.10
940880(E) 8860 WARNING LIGHTS(TYPE A)19,050SD $0.5000 $0.0200 $1.75 $0.0200 $1.50 $0.0200 $1.55 $0.0500
950880(F) 8878 DRUMS28,200SD $0.2500 $0.3900 $0.1200 $0.3800 $0.1000 $0.4000 $0.1200 $0.4000
951880(K) 8908 SURVEILLANCE TRAFFIC CONTROL300SD $500.00 $408.00 $350.37 $102.00 $315.00 $426.00 $390.00 $415.00
960882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN628SD $15.00 $15.30 $14.01 $15.30 $13.20 $15.98 $13.00 $15.60
970805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS11EA $80.00 $20.40 $200.85 $20.40 $200.00 $21.30 $210.00 $21.00
980850(A) 8110 SHEET ALUMINUM SIGNS121.14SF $20.00 $15.30 $20.09 $15.30 $22.00 $15.97 $22.00 $15.60
990851(C) 8324 2" SQUARE TUBE POST152LF $10.00 $5.10 $10.04 $5.10 $11.00 $5.33 $11.00 $5.20
1,000855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)13,800LF $0.5000 $0.5900 $0.6900 $0.5900 $0.7500 $0.6200 $0.7000 $0.6000
1,010855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)160LF $7.00 $3.06 $5.02 $3.06 $5.50 $3.20 $5.50 $3.10
1,020855(B) 8824 TRAFFIC STRIPE(PLASTIC)(SYMBOLS)4EA $1,240.00 $1,020.00 $753.20 $1,020.00 $825.00 $1,065.00 $800.00 $1,040.00
1,030642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $40,000.00 $20,700.00 $36,204.46 $25,500.00 $25,000.00 $19,170.00 $20,000.00 $53,000.00
1,040220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,000.00 $4,208.58 $2,335.77 $3,060.00 $10,000.00 $6,000.00 $4,000.00 $2,150.00
1,050641 1399 MOBILIZATION1LSUM $430,000.00 $339,107.23 $534,068.25 $395,302.01 $365,000.00 $432,000.00 $440,000.00 $446,000.00