| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$137,605.13 |
$13,430.69 |
$78,642.00 |
$20,000.00 |
$15,975.00 |
$10,000.00 |
$78,250.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,444 | CY |
$15.00 |
$7.05 |
$7.01 |
$6.12 |
$8.40 |
$7.67 |
$10.00 |
$10.00 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$25.00 |
$8.67 |
$9.34 |
$9.69 |
$14.20 |
$9.59 |
$10.00 |
$7.75 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$2,856.00 |
$4,820.45 |
$5,100.00 |
$27,000.00 |
$5,112.00 |
$7,000.00 |
$1,550.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,766 | LF |
$2.50 |
$1.93 |
$1.90 |
$1.92 |
$2.00 |
$2.01 |
$2.60 |
$2.50 |
| 60 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 3 | EA |
$175.00 |
$239.70 |
$236.00 |
$239.70 |
$167.00 |
$250.28 |
$260.00 |
$140.00 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 2,947 | SY |
$4.50 |
$3.05 |
$3.00 |
$3.06 |
$3.50 |
$3.18 |
$3.60 |
$3.10 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.2 | AC |
$500.00 |
$698.70 |
$687.92 |
$698.70 |
$1,000.00 |
$729.53 |
$750.00 |
$710.00 |
| 90 | 241 2832 |
MOWING | 17.83 | AC |
$120.00 |
$204.00 |
$200.85 |
$204.00 |
$85.00 |
$213.00 |
$220.00 |
$205.00 |
| 100 | 307(K) 4300 |
STABILIZED SUBGRADE | 10,893 | SY |
$8.00 |
$8.16 |
$7.01 |
$6.12 |
$6.60 |
$6.39 |
$6.50 |
$7.25 |
| 110 | 317 4270 |
CEMENT TREATED BASE | 10,543 | SY |
$25.00 |
$15.30 |
$26.12 |
$10.20 |
$23.50 |
$19.78 |
$25.75 |
$20.00 |
| 120 | 325 5271 |
SEPARATOR FABRIC | 10,512 | SY |
$2.00 |
$1.85 |
$2.34 |
$1.98 |
$3.25 |
$2.13 |
$2.50 |
$2.20 |
| 130 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 362 | TON |
$40.00 |
$31.76 |
$30.32 |
$28.88 |
$36.00 |
$31.95 |
$35.00 |
$36.00 |
| 140 | 408 5774 |
PRIME COAT | 4,561 | GAL |
$7.00 |
$5.10 |
$7.01 |
$6.12 |
$6.30 |
$3.40 |
$5.50 |
$3.30 |
| 150 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,114 | SY |
$25.00 |
$15.30 |
$17.61 |
$26.67 |
$29.15 |
$25.56 |
$28.75 |
$30.50 |
| 160 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 8,766 | SY |
$40.00 |
$21.66 |
$17.37 |
$28.56 |
$31.00 |
$37.28 |
$32.00 |
$16.25 |
| 170 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 2,196 | CY |
$200.00 |
$147.09 |
$164.99 |
$167.79 |
$180.00 |
$197.03 |
$187.00 |
$180.00 |
| 180 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 1,064 | LF |
$15.00 |
$12.81 |
$9.34 |
$9.94 |
$11.00 |
$12.78 |
$11.00 |
$7.50 |
| 190 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 482 | SY |
$80.00 |
$44.65 |
$47.19 |
$66.30 |
$71.00 |
$61.77 |
$71.00 |
$45.00 |
| 200 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 401 | SY |
$80.00 |
$52.58 |
$54.56 |
$89.76 |
$97.00 |
$74.55 |
$95.00 |
$70.00 |
| 210 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 83 | SF |
$30.00 |
$29.82 |
$17.00 |
$28.56 |
$33.00 |
$79.88 |
$30.00 |
$47.00 |
| 220 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,150.00 |
$2,488.30 |
$1,706.31 |
$2,335.80 |
$2,365.00 |
$2,450.00 |
$2,500.00 |
$2,000.00 |
| 230 | 611(G) 5113 |
INLET CI DES. 2 (B) | 3 | EA |
$6,000.00 |
$8,636.14 |
$3,328.95 |
$4,554.30 |
$5,170.00 |
$4,500.00 |
$4,900.00 |
$4,600.00 |
| 240 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 12.08 | VF |
$310.00 |
$373.77 |
$424.15 |
$331.50 |
$341.00 |
$540.00 |
$350.00 |
$300.00 |
| 250 | 612(B) 0642 |
MANHOLES REBUILT | 1 | EA |
$1,130.00 |
$1,530.00 |
$896.30 |
$1,224.00 |
$1,243.00 |
$1,550.00 |
$1,300.00 |
$3,500.00 |
| 260 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 98 | LF |
$70.00 |
$63.80 |
$84.39 |
$57.12 |
$70.00 |
$69.23 |
$71.00 |
$86.00 |
| 270 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 18 | LF |
$100.00 |
$132.16 |
$151.19 |
$97.92 |
$110.00 |
$106.50 |
$100.00 |
$106.00 |
| 280 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$600.00 |
$1,012.61 |
$597.27 |
$1,285.20 |
$2,750.00 |
$612.38 |
$1,400.00 |
$1,050.00 |
| 290 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$8,160.00 |
$14,014.63 |
$10,200.00 |
$12,500.00 |
$19,170.00 |
$15,000.00 |
$5,700.00 |
| 300 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 7,017 | SY |
$7.50 |
$6.12 |
$7.01 |
$5.61 |
$8.00 |
$7.00 |
$10.00 |
$4.75 |
| 310 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,854 | SY |
$5.00 |
$4.08 |
$7.01 |
$5.10 |
$11.00 |
$8.00 |
$12.00 |
$3.50 |
| 320 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 2,278 | SY |
$15.00 |
$6.12 |
$4.85 |
$7.14 |
$19.50 |
$12.00 |
$15.00 |
$4.75 |
| 330 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 351 | SY |
$10.00 |
$6.12 |
$4.85 |
$10.20 |
$6.00 |
$11.00 |
$10.00 |
$4.50 |
| 340 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 460 | CY |
$30.00 |
$12.24 |
$12.55 |
$30.60 |
$10.00 |
$30.00 |
$15.00 |
$40.00 |
| 350 | 501(G) 6309 |
CLSM BACKFILL | 486 | CY |
$200.00 |
$129.22 |
$147.56 |
$238.58 |
$155.00 |
$190.00 |
$200.00 |
$170.00 |
| 360 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$50,000.00 |
$24,883.00 |
$58,557.79 |
$125,525.00 |
$55,000.00 |
$40,000.00 |
$60,000.00 |
$75,000.00 |
| 370 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 6,378.68 | LF |
$230.00 |
$199.29 |
$225.67 |
$200.27 |
$218.00 |
$210.00 |
$210.00 |
$225.00 |
| 380 | 504 6179 |
BRIDGE TRAFFIC RAIL | 1,602 | LF |
$450.00 |
$282.54 |
$340.72 |
$375.51 |
$375.00 |
$350.00 |
$345.00 |
$335.00 |
| 390 | 504(A) 1304 |
APPROACH SLAB | 493 | SY |
$300.00 |
$217.39 |
$212.84 |
$213.11 |
$212.50 |
$290.00 |
$210.00 |
$235.00 |
| 400 | 504(B) 1305 |
SAW-CUT GROOVING | 5,747 | SY |
$5.00 |
$3.47 |
$3.97 |
$4.78 |
$3.74 |
$3.62 |
$3.75 |
$3.50 |
| 410 | 504(C) 6250 |
SEALED EXPANSION JOINT | 299.68 | LF |
$350.00 |
$220.96 |
$236.81 |
$295.67 |
$295.00 |
$275.00 |
$275.00 |
$475.00 |
| 420 | 504(E) 1381 |
CONCRETE PARAPET | 120 | LF |
$150.00 |
$80.63 |
$69.61 |
$82.90 |
$150.00 |
$150.00 |
$150.00 |
$130.00 |
| 430 | 506(A) 1322 |
STRUCTURAL STEEL | 6,860 | LB |
$4.00 |
$1.74 |
$4.27 |
$2.23 |
$2.50 |
$3.25 |
$2.50 |
$3.50 |
| 440 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 64 | EA |
$2,000.00 |
$1,320.92 |
$1,493.55 |
$1,531.30 |
$1,450.00 |
$2,000.00 |
$1,300.00 |
$2,500.00 |
| 450 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 64 | EA |
$2,000.00 |
$1,320.92 |
$1,493.55 |
$1,531.30 |
$1,450.00 |
$2,000.00 |
$1,300.00 |
$2,500.00 |
| 460 | 509(A) 1326 |
CLASS AA CONCRETE | 2,026.1 | CY |
$600.00 |
$409.62 |
$519.28 |
$583.53 |
$575.00 |
$540.00 |
$600.00 |
$540.00 |
| 470 | 509(B) 1328 |
CLASS A CONCRETE | 820 | CY |
$650.00 |
$414.72 |
$406.35 |
$582.90 |
$615.00 |
$700.00 |
$600.00 |
$730.00 |
| 480 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$500.00 |
$330.21 |
$135.19 |
$459.00 |
$595.00 |
$1,500.00 |
$500.00 |
$545.00 |
| 490 | 511 6306 |
MECHANICAL SPLICES | 346 | EA |
$50.00 |
$69.20 |
$72.36 |
$81.94 |
$110.00 |
$80.00 |
$65.00 |
$112.00 |
| 500 | 511(A) 1332 |
REINFORCING STEEL | 6,470 | LB |
$1.00 |
$0.9300 |
$6.40 |
$1.54 |
$1.07 |
$1.00 |
$1.00 |
$1.20 |
| 510 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 547,270 | LB |
$1.10 |
$1.05 |
$0.9100 |
$1.03 |
$1.13 |
$1.15 |
$1.25 |
$1.15 |
| 520 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 224 | LF |
$40.00 |
$27.43 |
$27.81 |
$31.49 |
$28.00 |
$40.00 |
$30.00 |
$30.00 |
| 530 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,590 | LF |
$45.00 |
$32.51 |
$3.85 |
$38.63 |
$32.90 |
$45.00 |
$35.00 |
$40.00 |
| 540 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 224 | LF |
$20.00 |
$10.20 |
$15.79 |
$12.24 |
$12.00 |
$30.00 |
$15.00 |
$12.00 |
| 550 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,590 | LF |
$20.00 |
$14.28 |
$15.89 |
$12.24 |
$14.10 |
$30.00 |
$15.00 |
$12.00 |
| 560 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 570 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 4,131 | SY |
$5.00 |
$4.08 |
$4.02 |
$4.08 |
$4.20 |
$4.26 |
$4.40 |
$4.15 |
| 580 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 1,084 | LF |
$900.00 |
$630.16 |
$829.94 |
$867.50 |
$727.00 |
$800.00 |
$800.00 |
$950.00 |
| 590 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 384 | LF |
$1,300.00 |
$783.27 |
$1,046.97 |
$1,049.51 |
$925.00 |
$1,050.00 |
$1,100.00 |
$1,200.00 |
| 600 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 6 | EA |
$4,000.00 |
$1,632.00 |
$1,506.39 |
$2,550.00 |
$2,400.00 |
$1,597.50 |
$1,650.00 |
$1,950.00 |
| 610 | 523(A) 6550 |
SEALER CRACK PREPARATION | 1,031 | LF |
$5.00 |
$4.08 |
$4.02 |
$4.08 |
$4.20 |
$4.26 |
$4.40 |
$4.15 |
| 620 | 523(B) 6560 |
SEALER RESIN | 10.4 | GAL |
$150.00 |
$204.00 |
$200.85 |
$204.00 |
$200.00 |
$213.00 |
$220.00 |
$205.00 |
| 630 | 542 4605 |
(PL)INSTALLATION OF BRIDGE ITEMS | 88 | EA |
$600.00 |
$667.51 |
$713.29 |
$663.28 |
$800.00 |
$500.00 |
$570.00 |
$325.00 |
| 640 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,500 | TON |
$55.00 |
$40.03 |
$40.03 |
$48.56 |
$46.70 |
$48.00 |
$48.00 |
$50.00 |
| 650 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 425 | TON |
$45.00 |
$28.04 |
$30.65 |
$37.38 |
$35.00 |
$38.00 |
$38.00 |
$37.00 |
| 660 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 150 | LF |
$35.00 |
$13.47 |
$9.25 |
$30.60 |
$25.00 |
$25.00 |
$35.00 |
$30.00 |
| 670 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$35.00 |
$21.02 |
$12.70 |
$30.60 |
$30.00 |
$25.00 |
$35.00 |
$30.00 |
| 680 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$350,000.00 |
$120,000.00 |
$321,556.29 |
$312,034.32 |
$225,000.00 |
$273,000.00 |
$300,000.00 |
$250,000.00 |
| 690 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 1,790 | LF |
$7.00 |
$41.82 |
$47.88 |
$30.60 |
$45.00 |
$31.95 |
$33.00 |
$42.00 |
| 700 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 395 | LF |
$45.00 |
$28.56 |
$32.70 |
$35.70 |
$30.00 |
$37.28 |
$38.00 |
$29.00 |
| 710 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 745 | LF |
$10.00 |
$10.20 |
$11.68 |
$15.30 |
$11.00 |
$15.98 |
$16.00 |
$10.50 |
| 720 | 802(B) 8570 |
(PL)LIQUID TIGHT FLEXIBLE CONDUIT | 83 | LF |
$35.00 |
$40.80 |
$46.72 |
$25.50 |
$42.00 |
$26.63 |
$27.00 |
$41.50 |
| 730 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 14 | EA |
$770.00 |
$729.30 |
$835.04 |
$1,224.00 |
$786.00 |
$1,278.00 |
$1,300.00 |
$742.00 |
| 740 | 803(A) 8065 |
PULL BOX(SIZE I) | 2 | EA |
$450.00 |
$902.70 |
$1,033.58 |
$1,020.00 |
$950.00 |
$1,065.00 |
$1,100.00 |
$920.00 |
| 750 | 804(A) 2915 |
STRUCTURAL CONCRETE | 13 | CY |
$750.00 |
$897.60 |
$1,027.74 |
$969.00 |
$950.00 |
$1,011.75 |
$1,000.00 |
$915.00 |
| 760 | 804(B) 2916 |
REINFORCING STEEL | 2,272 | LB |
$2.00 |
$2.02 |
$2.31 |
$2.04 |
$2.10 |
$2.13 |
$2.20 |
$2.00 |
| 770 | 809 8090 |
ENHANCEMENT LIGHTING (COMPLETE) | 26 | EA |
$750.00 |
$4,513.50 |
$5,167.89 |
$5,100.00 |
$4,800.00 |
$5,325.00 |
$5,250.00 |
$4,600.00 |
| 780 | 809(A) 8090 |
ROADWAY LUMINAIRE | 26 | EA |
$2,000.00 |
$2,907.00 |
$3,328.47 |
$2,958.00 |
$3,100.00 |
$3,088.50 |
$3,200.00 |
$2,960.00 |
| 790 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$3,000.00 |
$6,691.20 |
$7,661.33 |
$10,200.00 |
$7,000.00 |
$10,650.00 |
$11,000.00 |
$6,800.00 |
| 800 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 5,656 | LF |
$2.00 |
$3.06 |
$3.50 |
$5.10 |
$3.30 |
$5.33 |
$5.50 |
$3.10 |
| 810 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 2,340 | LF |
$2.25 |
$2.04 |
$2.34 |
$1.53 |
$2.20 |
$1.60 |
$2.00 |
$2.10 |
| 820 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 30 | DAY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 830 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 8,400 | LF |
$0.1500 |
$0.2600 |
$0.2300 |
$0.2500 |
$0.2200 |
$0.2700 |
$0.2200 |
$0.2600 |
| 840 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 3,846 | EA |
$0.7500 |
$0.3600 |
$0.5800 |
$0.3500 |
$0.5400 |
$0.3700 |
$0.5200 |
$0.3600 |
| 850 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 13,934 | LF |
$0.2500 |
$0.1000 |
$0.4700 |
$0.1000 |
$0.4200 |
$0.1100 |
$0.4200 |
$0.1100 |
| 860 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 900 | SD |
$8.25 |
$2.04 |
$5.84 |
$2.04 |
$5.20 |
$2.13 |
$5.25 |
$2.05 |
| 870 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,750 | LF |
$24.00 |
$13.26 |
$59.56 |
$24.48 |
$28.50 |
$27.00 |
$55.00 |
$60.00 |
| 880 | 880(A) 8800 |
ARROW DISPLAY(TYPE A) | 600 | SD |
$2.75 |
$12.24 |
$5.84 |
$12.24 |
$5.40 |
$12.78 |
$5.50 |
$12.50 |
| 890 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 11,850 | SD |
$0.3500 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1000 |
| 900 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,400 | SD |
$0.7500 |
$1.02 |
$1.17 |
$1.02 |
$1.05 |
$1.07 |
$1.10 |
$1.05 |
| 910 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,200 | SD |
$1.25 |
$2.04 |
$3.50 |
$2.04 |
$3.15 |
$2.13 |
$3.10 |
$2.10 |
| 920 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 16,650 | SD |
$1.00 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1000 |
| 930 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$1.50 |
$2.04 |
$0.5800 |
$2.04 |
$0.5300 |
$2.13 |
$0.5500 |
$2.10 |
| 940 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 19,050 | SD |
$0.5000 |
$0.0200 |
$1.75 |
$0.0200 |
$1.50 |
$0.0200 |
$1.55 |
$0.0500 |
| 950 | 880(F) 8878 |
DRUMS | 28,200 | SD |
$0.2500 |
$0.3900 |
$0.1200 |
$0.3800 |
$0.1000 |
$0.4000 |
$0.1200 |
$0.4000 |
| 951 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 300 | SD |
$500.00 |
$408.00 |
$350.37 |
$102.00 |
$315.00 |
$426.00 |
$390.00 |
$415.00 |
| 960 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 628 | SD |
$15.00 |
$15.30 |
$14.01 |
$15.30 |
$13.20 |
$15.98 |
$13.00 |
$15.60 |
| 970 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 11 | EA |
$80.00 |
$20.40 |
$200.85 |
$20.40 |
$200.00 |
$21.30 |
$210.00 |
$21.00 |
| 980 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 121.14 | SF |
$20.00 |
$15.30 |
$20.09 |
$15.30 |
$22.00 |
$15.97 |
$22.00 |
$15.60 |
| 990 | 851(C) 8324 |
2" SQUARE TUBE POST | 152 | LF |
$10.00 |
$5.10 |
$10.04 |
$5.10 |
$11.00 |
$5.33 |
$11.00 |
$5.20 |
| 1,000 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 13,800 | LF |
$0.5000 |
$0.5900 |
$0.6900 |
$0.5900 |
$0.7500 |
$0.6200 |
$0.7000 |
$0.6000 |
| 1,010 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 160 | LF |
$7.00 |
$3.06 |
$5.02 |
$3.06 |
$5.50 |
$3.20 |
$5.50 |
$3.10 |
| 1,020 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 4 | EA |
$1,240.00 |
$1,020.00 |
$753.20 |
$1,020.00 |
$825.00 |
$1,065.00 |
$800.00 |
$1,040.00 |
| 1,030 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$20,700.00 |
$36,204.46 |
$25,500.00 |
$25,000.00 |
$19,170.00 |
$20,000.00 |
$53,000.00 |
| 1,040 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$4,208.58 |
$2,335.77 |
$3,060.00 |
$10,000.00 |
$6,000.00 |
$4,000.00 |
$2,150.00 |
| 1,050 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$430,000.00 |
$339,107.23 |
$534,068.25 |
$395,302.01 |
$365,000.00 |
$432,000.00 |
$440,000.00 |
$446,000.00 |