| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$27,203.34 |
$21,000.00 |
$27,000.00 |
$16,000.00 |
$32,402.89 |
$5,026.00 |
$20,500.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 24,867 | CY |
$6.00 |
$8.48 |
$8.00 |
$4.10 |
$8.86 |
$8.50 |
$8.50 |
$7.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 54,678 | CY |
$7.50 |
$8.75 |
$8.00 |
$10.00 |
$11.23 |
$14.00 |
$12.00 |
$18.75 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$35,717.01 |
$164,623.00 |
$125,000.00 |
$105,000.00 |
$96,363.66 |
$143,506.00 |
$66,194.05 |
$135,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 31,000 | LF |
$1.80 |
$1.65 |
$2.50 |
$1.28 |
$1.37 |
$0.9500 |
$0.9500 |
$2.00 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 13 | EA |
$191.44 |
$159.75 |
$140.00 |
$211.00 |
$226.41 |
$187.00 |
$185.00 |
$350.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,755 | LF |
$7.00 |
$8.52 |
$8.00 |
$8.12 |
$8.71 |
$5.70 |
$5.65 |
$10.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 1,414 | LF |
$2.00 |
$2.13 |
$1.00 |
$1.02 |
$1.09 |
$0.9000 |
$0.9000 |
$1.15 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 127,257 | SY |
$1.30 |
$1.55 |
$2.00 |
$1.97 |
$2.11 |
$1.20 |
$1.22 |
$2.10 |
| 10 | 241 2832 |
MOWING | 114 | AC |
$69.53 |
$159.75 |
$110.00 |
$65.00 |
$69.75 |
$46.00 |
$45.00 |
$125.00 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 92,697 | SY |
$4.50 |
$3.01 |
$4.50 |
$5.80 |
$5.02 |
$6.50 |
$6.50 |
$6.00 |
| 12 | 317 4270 |
CEMENT TREATED BASE | 88,210 | SY |
$11.22 |
$8.65 |
$14.00 |
$15.25 |
$13.56 |
$15.00 |
$15.50 |
$16.50 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 88,210 | SY |
$1.33 |
$0.0500 |
$1.00 |
$1.30 |
$2.91 |
$1.50 |
$0.0100 |
$1.10 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 6,807 | TON |
$32.02 |
$23.08 |
$31.00 |
$33.00 |
$42.78 |
$37.00 |
$46.00 |
$35.00 |
| 15 | 408 5774 |
PRIME COAT | 38,242 | GAL |
$3.72 |
$0.2500 |
$7.00 |
$3.50 |
$3.22 |
$3.50 |
$1.50 |
$2.80 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 15,699 | SY |
$2.60 |
$6.00 |
$3.00 |
$4.88 |
$4.27 |
$4.30 |
$7.00 |
$5.40 |
| 17 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 29,201 | SY |
$12.00 |
$8.00 |
$12.50 |
$9.50 |
$8.81 |
$15.00 |
$13.50 |
$19.00 |
| 18 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 71,606 | SY |
$17.00 |
$9.40 |
$12.50 |
$13.50 |
$12.31 |
$18.00 |
$18.00 |
$20.00 |
| 19 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 640 | SY |
$150.00 |
$30.00 |
$115.00 |
$60.00 |
$86.50 |
$89.00 |
$195.00 |
$125.00 |
| 20 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 25,244 | CY |
$125.00 |
$114.00 |
$117.00 |
$110.00 |
$112.09 |
$95.00 |
$115.00 |
$118.50 |
| 21 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 48,078 | SY |
$4.50 |
$3.17 |
$3.50 |
$5.60 |
$4.99 |
$3.00 |
$2.98 |
$4.00 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 339 | CY |
$18.02 |
$26.63 |
$22.00 |
$5.00 |
$23.23 |
$36.00 |
$25.00 |
$28.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 545 | CY |
$435.00 |
$335.48 |
$550.00 |
$774.40 |
$730.87 |
$366.00 |
$355.00 |
$655.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 197 | CY |
$315.00 |
$223.65 |
$240.00 |
$350.00 |
$240.51 |
$243.00 |
$210.00 |
$325.00 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 86,622 | LB |
$1.00 |
$0.9100 |
$0.9000 |
$0.8500 |
$0.4100 |
$1.10 |
$0.8500 |
$1.15 |
| 26 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 2,260 | SY |
$52.50 |
$61.77 |
$53.00 |
$65.00 |
$52.20 |
$88.00 |
$60.00 |
$65.00 |
| 27 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 14 | EA |
$1,300.00 |
$3,083.18 |
$2,700.00 |
$4,600.00 |
$3,019.56 |
$2,036.00 |
$3,374.59 |
$2,000.00 |
| 28 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 641 | LF |
$59.22 |
$83.62 |
$57.00 |
$48.00 |
$49.28 |
$101.00 |
$45.05 |
$54.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 79 | LF |
$65.00 |
$64.49 |
$65.00 |
$63.00 |
$61.33 |
$115.00 |
$53.47 |
$73.00 |
| 30 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 314 | LF |
$93.58 |
$174.50 |
$130.00 |
$100.00 |
$124.98 |
$149.00 |
$84.85 |
$120.00 |
| 31 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 512 | LF |
$31.41 |
$31.00 |
$49.00 |
$43.00 |
$45.46 |
$101.00 |
$38.45 |
$40.00 |
| 32 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,657 | LF |
$23.50 |
$8.00 |
$20.00 |
$12.00 |
$18.36 |
$10.00 |
$20.55 |
$20.00 |
| 33 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 995 | LF |
$9.50 |
$8.00 |
$9.50 |
$15.00 |
$14.93 |
$6.50 |
$20.55 |
$23.00 |
| 34 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$626.20 |
$756.15 |
$390.00 |
$1,100.00 |
$634.19 |
$715.00 |
$553.04 |
$950.00 |
| 35 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$1,050.00 |
$1,597.50 |
$2,000.00 |
$1,850.00 |
$1,287.62 |
$519.00 |
$1,500.00 |
$1,200.00 |
| 36 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$2,130.00 |
$2,400.00 |
$2,400.00 |
$1,502.23 |
$639.00 |
$2,000.00 |
$1,350.00 |
| 37 | 613(M) 7194 |
TYPE DD4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$3,195.00 |
$4,000.00 |
$3,500.00 |
$4,077.47 |
$1,273.00 |
$3,000.00 |
$4,000.00 |
| 38 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$14,197.93 |
$14,325.00 |
$11,000.00 |
$4,300.00 |
$12,748.17 |
$20,105.00 |
$6,486.65 |
$11,000.00 |
| 39 | 619(B) 0291 |
REMOVAL OF HEADWALL | 8 | EA |
$973.84 |
$1,278.00 |
$170.00 |
$750.00 |
$891.84 |
$794.00 |
$1,200.00 |
$950.00 |
| 40 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 249 | LF |
$10.48 |
$3.67 |
$6.00 |
$3.00 |
$2.68 |
$13.00 |
$1.68 |
$7.00 |
| 41 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 4,000 | SY |
$6.68 |
$4.50 |
$4.00 |
$2.60 |
$8.61 |
$4.60 |
$9.00 |
$9.00 |
| 42 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 54,373 | SY |
$2.88 |
$6.00 |
$3.00 |
$3.50 |
$9.36 |
$6.80 |
$11.50 |
$6.50 |
| 43 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 10 | EA |
$630.99 |
$159.75 |
$1,200.00 |
$635.00 |
$668.85 |
$743.00 |
$682.59 |
$950.00 |
| 44 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 3 | EA |
$5,000.00 |
$505.88 |
$3,800.00 |
$4,600.00 |
$5,878.32 |
$1,523.00 |
$6,500.00 |
$2,800.00 |
| 45 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 692 | LF |
$2.64 |
$3.77 |
$3.00 |
$13.00 |
$5.44 |
$5.10 |
$5.00 |
$5.00 |
| 46 | 619(B) 4791 |
REMOVAL OF CURB | 123 | LF |
$7.72 |
$6.27 |
$4.00 |
$3.00 |
$2.36 |
$13.00 |
$1.68 |
$7.00 |
| 47 | 619(B) 5150 |
REMOVAL OF BRICK CHATTER MEDIAN | 1,056 | SY |
$7.50 |
$6.27 |
$6.00 |
$6.00 |
$7.80 |
$13.00 |
$4.87 |
$10.00 |
| 48 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 637 | LF |
$6.79 |
$5.03 |
$5.00 |
$4.50 |
$6.87 |
$13.00 |
$3.18 |
$7.00 |
| 49 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 1,082 | LF |
$12.96 |
$5.33 |
$9.00 |
$7.00 |
$9.09 |
$39.00 |
$6.16 |
$15.00 |
| 50 | 619(B) 6068 |
REMOVAL OF EXISTING RETAINING WALL | 638 | LF |
$275.00 |
$10.65 |
$9.00 |
$5.00 |
$24.00 |
$28.00 |
$15.91 |
$15.00 |
| 51 | 619(C) 0924 |
SAWING PAVEMENT | 3,066 | LF |
$3.77 |
$3.00 |
$2.00 |
$3.50 |
$4.19 |
$8.90 |
$5.00 |
$3.50 |
| 52 | 413(D) 4869 |
RUMBLE STRIP METHOD PCC-CYC | 45,053 | LF |
$1.25 |
$0.1200 |
$0.4500 |
$0.1100 |
$0.1200 |
$0.3000 |
$0.3100 |
$0.2200 |
| 53 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 10 | EA |
$140.17 |
$213.00 |
$230.00 |
$95.00 |
$101.94 |
$204.00 |
$200.00 |
$110.00 |
| 54 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 469 | SF |
$20.44 |
$15.98 |
$17.00 |
$29.00 |
$31.12 |
$15.00 |
$15.00 |
$34.00 |
| 55 | 851(C) 8324 |
2" SQUARE TUBE POST | 945 | LF |
$6.97 |
$3.20 |
$3.40 |
$3.50 |
$3.76 |
$3.10 |
$3.00 |
$4.20 |
| 56 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 96,512 | LF |
$0.4800 |
$0.7500 |
$0.8000 |
$0.6700 |
$0.7200 |
$0.7000 |
$0.7000 |
$0.7700 |
| 57 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 713 | LF |
$1.86 |
$5.33 |
$5.70 |
$1.00 |
$1.07 |
$5.10 |
$5.00 |
$1.15 |
| 58 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 108 | EA |
$180.95 |
$159.75 |
$170.00 |
$150.00 |
$160.95 |
$153.00 |
$150.00 |
$175.00 |
| 59 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 265 | DAY |
$650.00 |
$650.00 |
$650.00 |
$650.00 |
$650.00 |
$650.00 |
$650.00 |
$650.00 |
| 60 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 151,509 | LF |
$0.5400 |
$0.9100 |
$0.9700 |
$1.00 |
$1.07 |
$0.8500 |
$0.8500 |
$1.05 |
| 61 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 40,771 | LF |
$0.1400 |
$0.2700 |
$0.2900 |
$0.1700 |
$0.1800 |
$0.2500 |
$0.2500 |
$0.2000 |
| 62 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,910 | SD |
$0.4900 |
$0.5300 |
$0.5700 |
$0.2000 |
$0.2100 |
$0.5000 |
$0.5000 |
$0.2500 |
| 63 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,750 | SD |
$0.3900 |
$2.13 |
$2.30 |
$0.2000 |
$0.2100 |
$2.00 |
$2.00 |
$0.5000 |
| 64 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,935 | SD |
$1.04 |
$3.20 |
$3.40 |
$0.2000 |
$0.2100 |
$3.10 |
$3.00 |
$0.7500 |
| 65 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 14,465 | SD |
$0.6900 |
$0.5300 |
$0.5700 |
$0.1000 |
$0.1100 |
$0.5000 |
$0.5000 |
$0.1200 |
| 66 | 880(C) 8848 |
WING BARRICADES | 500 | SD |
$0.7200 |
$3.20 |
$3.40 |
$2.00 |
$2.15 |
$3.10 |
$3.00 |
$3.00 |
| 67 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 15,725 | SD |
$0.1000 |
$0.2700 |
$0.3200 |
$0.2000 |
$0.2100 |
$0.2500 |
$0.2500 |
$0.2300 |
| 68 | 880(F) 8878 |
DRUMS | 4,530 | SD |
$0.2700 |
$1.47 |
$0.6500 |
$0.5000 |
$0.5400 |
$0.5500 |
$0.5500 |
$0.5500 |
| 69 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 265 | SD |
$334.84 |
$346.13 |
$370.00 |
$340.00 |
$713.56 |
$332.00 |
$325.00 |
$340.00 |
| 70 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 265 | SD |
$18.96 |
$58.58 |
$63.00 |
$18.00 |
$19.31 |
$56.00 |
$55.00 |
$20.00 |
| 71 | 802(B) 8332 |
1" PVC SCH.40 PLASTIC CONDUIT BORED | 160 | LF |
$5.00 |
$6.39 |
$6.90 |
$6.00 |
$12.45 |
$6.10 |
$6.00 |
$7.00 |
| 72 | 802(B) 8338 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 820 | LF |
$4.81 |
$6.39 |
$6.90 |
$6.00 |
$5.37 |
$6.10 |
$6.00 |
$7.00 |
| 73 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 80 | LF |
$22.00 |
$8.52 |
$23.00 |
$25.00 |
$21.46 |
$31.00 |
$20.00 |
$29.00 |
| 74 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 185 | LF |
$8.85 |
$9.59 |
$9.20 |
$8.00 |
$5.63 |
$8.10 |
$8.00 |
$9.00 |
| 75 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 370 | LF |
$23.24 |
$26.63 |
$29.00 |
$25.00 |
$28.97 |
$25.00 |
$25.00 |
$29.00 |
| 76 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 120 | LF |
$10.34 |
$12.78 |
$14.00 |
$12.00 |
$10.73 |
$12.00 |
$12.00 |
$14.00 |
| 77 | 803(A) 8065 |
PULL BOX(SIZE I) | 4 | EA |
$392.62 |
$426.00 |
$460.00 |
$400.00 |
$670.64 |
$407.00 |
$400.00 |
$450.00 |
| 78 | 803(A) 8066 |
PULL BOX(SIZE II) | 2 | EA |
$478.18 |
$479.25 |
$520.00 |
$450.00 |
$751.12 |
$458.00 |
$450.00 |
$500.00 |
| 79 | 803(A) 8067 |
PULL BOX(SIZE III) | 4 | EA |
$200.00 |
$319.50 |
$340.00 |
$300.00 |
$670.64 |
$305.00 |
$300.00 |
$350.00 |
| 80 | 804(A) 2915 |
STRUCTURAL CONCRETE | 23 | CY |
$566.08 |
$692.25 |
$750.00 |
$650.00 |
$729.65 |
$661.00 |
$650.00 |
$725.00 |
| 81 | 804(B) 2916 |
REINFORCING STEEL | 3,388.4 | LB |
$1.58 |
$1.33 |
$1.40 |
$1.25 |
$1.88 |
$1.30 |
$1.25 |
$1.50 |
| 82 | 805(A) 8704 |
REMOVAL OF PULL BOX | 3 | EA |
$135.00 |
$106.50 |
$110.00 |
$100.00 |
$128.76 |
$102.00 |
$100.00 |
$115.00 |
| 83 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$6,346.87 |
$3,195.00 |
$3,400.00 |
$3,000.00 |
$4,399.38 |
$3,052.00 |
$3,000.00 |
$3,400.00 |
| 84 | 805(D) 8742 |
(PL)REMOVE & RESET TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$1,500.00 |
$1,065.00 |
$1,100.00 |
$1,000.00 |
$5,204.14 |
$1,017.00 |
$1,000.00 |
$1,200.00 |
| 85 | 806(A) 8312 |
32'MH POLE 40'TS & 10'LMA(G.STL.) | 2 | EA |
$13,797.00 |
$13,430.72 |
$14,000.00 |
$12,611.00 |
$16,744.46 |
$12,829.00 |
$12,611.00 |
$15,000.00 |
| 86 | 806(A) 8313 |
32'MH POLE 45'TS & 10'LMA(G.STL.) | 2 | EA |
$15,437.35 |
$12,623.45 |
$14,000.00 |
$11,853.00 |
$16,749.83 |
$12,058.00 |
$11,853.00 |
$14,000.00 |
| 87 | 809(A) 8090 |
ROADWAY LUMINAIRE | 4 | EA |
$1,429.45 |
$426.00 |
$460.00 |
$400.00 |
$681.37 |
$407.00 |
$400.00 |
$450.00 |
| 88 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 2,070 | LF |
$0.8300 |
$1.07 |
$1.20 |
$1.00 |
$0.8600 |
$1.00 |
$1.00 |
$1.13 |
| 89 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$27,260.77 |
$10,288.97 |
$11,000.00 |
$9,661.00 |
$3,326.36 |
$9,828.00 |
$9,661.00 |
$11,000.00 |
| 90 | 828(A) 8142 |
VEHICLE LOOP DETECTOR | 10 | EA |
$178.44 |
$266.25 |
$290.00 |
$250.00 |
$137.35 |
$254.00 |
$250.00 |
$280.00 |
| 91 | 828(B) 8136 |
LOOP DETECTOR WIRE | 4,048 | LF |
$4.72 |
$6.39 |
$6.90 |
$6.00 |
$4.83 |
$6.10 |
$6.00 |
$6.75 |
| 92 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 2 | EA |
$606.88 |
$639.00 |
$690.00 |
$600.00 |
$718.93 |
$610.00 |
$600.00 |
$675.00 |
| 93 | 831 8280 |
1WAY 4SEC. ADJ. SIG. HD.S-13 | 1 | EA |
$794.69 |
$798.75 |
$860.00 |
$750.00 |
$954.99 |
$763.00 |
$750.00 |
$850.00 |
| 94 | 833 3030 |
BACKPLATE | 3 | EA |
$105.88 |
$133.13 |
$140.00 |
$125.00 |
$182.41 |
$127.00 |
$125.00 |
$140.00 |
| 95 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,545 | LF |
$2.04 |
$2.66 |
$2.90 |
$2.50 |
$1.72 |
$2.50 |
$2.50 |
$3.00 |
| 96 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 105 | LF |
$2.05 |
$3.20 |
$3.40 |
$3.00 |
$2.04 |
$3.10 |
$3.00 |
$3.35 |
| 97 | 834(A) 8213 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 950 | LF |
$4.54 |
$4.26 |
$4.60 |
$4.00 |
$4.61 |
$4.10 |
$4.00 |
$4.50 |
| 98 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 4,020 | LF |
$5.00 |
$1.07 |
$1.20 |
$1.00 |
$1.07 |
$1.00 |
$1.00 |
$1.13 |
| 99 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 7.5 | SF |
$42.88 |
$53.25 |
$57.00 |
$50.00 |
$42.92 |
$51.00 |
$50.00 |
$55.00 |
| 100 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$20,000.00 |
$60,000.00 |
$68,000.00 |
$101,400.29 |
$86,574.00 |
$52,800.00 |
$85,000.00 |
| 101 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,800.00 |
$1,700.00 |
$2,500.00 |
$32,000.00 |
$5,554.92 |
$5,059.00 |
$5,500.00 |
$7,500.00 |
| 102 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$9,000.00 |
$18,000.00 |
$3,000.00 |
$12,000.00 |
$18,533.64 |
$10,052.00 |
$18,000.00 |
$20,000.00 |
| 103 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$455,000.00 |
$294,000.00 |
$490,000.00 |
$475,000.00 |
$350,000.00 |
$443,000.00 |
$510,680.00 |
$540,000.00 |